Simplicity 071057-02 Guide d'installation

Taper
Guide d'installation

Ce manuel convient également à

Dual 200 Amp - Split 400 Amp
Automatic Transfer Switch
with Service Disconnect and
Symphony™ II Power Management System
Installation and Operators Manual
Questions?
Help is just a moment away!
Call: Transfer Switch Helpline
800-743-4115
Monday - Friday 8:00 AM - 5:00 PM Central Standard Time
Copyright © Briggs & Stratton Corporation, Milwaukee, WI, USA.
All rights reserved.
80011076 Revision A
2 BRIGGSandSTRATTON.COM
Thank you for your purchase of this Briggs & Stratton Power Products® automatic transfer switch. This product is designed for use with
specific home standby generators and may not function with generators or remote modules produced by other manufacturers. Seek a
qualified electrical professional to determine applicability of this equipment to equipment manufactured by others. When operated and
maintained according to the instructions in this manual, your system will provide many years of dependable service.
This manual contains safety information to make you aware of the hazards and risks associated with this system and how to avoid them.
We have made every effort to provide for a safe, streamlined and cost-effective installation. As each installation is unique, it is impossible
to know of and advise of all conceivable procedures and methods by which installation might be achieved. We do not know all possible
hazards and/or the results of each possible method or procedure. It is important that you read and understand these instructions thoroughly
before attempting to install or operate this equipment. Save these original instructions for future reference.
This transfer switch and optional remote modules require professional installation before use. Refer to the Installation section of this manual
and the installation instructions packaged with the remote modules for instructions on installation procedures. Only licensed electrical
contractors should install transfer switches and remote modules. Installations must strictly comply with all applicable federal, state and local
codes, standards and regulations. Your installer should follow the instructions completely.
Where to Find Us
You never have to look far to find Briggs & Stratton support and service for your system. Consult your Yellow Pages. There are many
authorized service dealers who provide quality service. You can also contact Technical Service by phone at 800-743-4115 between 8:00 AM
and 5:00 PM CT, or click on Find a Dealer at BRIGGSandSTRATTON.COM, which provides a list of authorized dealers.
For Future Reference
Please fill out the information below and keep with your receipt to assist in unit identification for future purchase issues.
Transfer Switch Remote Module Remote Module Remote Module Remote Module
Model Number
Revision
Serial Number
Date Purchased
PRIORITY /
Appliance
Name*
N/A Priority 1 Priority 2 Priority 3 Priority 4
Remote Module Remote Module Remote Module Remote Module Remote Module Remote Module
Priority 5 Priority 6 Priority 7 Priority 8 Lock Out Lock Out
*Appliance name and priority number should be listed in the spaces provided. Example: Electric Stove / 2
3
Table of Contents
Important Safety Instructions .............................4
Installation..........................................5
Owner Responsibilities ...............................................5
Owner Orientation ...................................................5
Installing Dealer/Contractor Responsibilities...............................5
Equipment Description ...............................................5
Delivery Inspection ..................................................6
Mounting Guidelines .................................................6
Power Wiring Interconnections ........................................11
Supervisory Control Terminals ........................................13
Interconnection Diagram.............................................13
System Setup .....................................................16
Remote Module Setup...............................................17
Testing the Automatic Transfer Switch ..................................17
Te sting the Symphony™ II Power ManagementSystem.....................18
Controls ...........................................19
Operation..........................................19
Enclosure Door ....................................................19
Symphony™ II Power Monitor (Optional) ................................20
Status LED’s ......................................................20
Remote Module LED Status Indicators ..................................21
Troubleshooting .....................................23
Transfer Switch Wiring Diagram .......................................24
Transfer Switch Schematic Diagram ....................................25
Product Specfications .................................26
4 BRIGGSandSTRATTON.COM
Save These Instructions
Important Safety Instructions
SAVE THESE INSTRUCTIONS - This manual contains
important instructions that should be followed during
installation and maintenance of the equipment.
Safety Symbols and Meanings
The safety alert symbol indicates a potential personal injury
hazard. A signal word (DANGER, WARNING, or CAUTION) is used
with the alert symbol to designate a degree or level of hazard
seriousness. A safety symbol may be used to represent the type of
hazard. The signal word NOTICE is used to address practices not
related to personal injury.
DANGER indicates a hazard which, if not avoided, will result in
death or serious injury.
WARNING indicates a hazard which, if not avoided, could result
in death or serious injury.
CAUTION indicates a hazard which, if not avoided, could result
in minor or moderate injury.
NOTICE addresses practices not related to personal injury.
The manufacturer cannot possibly anticipate every possible
circumstance that might involve a hazard. The warnings in this
manual, and the tags and decals affixed to the unit are, therefore,
not all-inclusive. If you use a procedure, work method or operating
technique that the manufacturer does not specifically recommend,
you must satisfy yourself that it is safe for you and others. You
must also make sure that the procedure, work method or operating
technique that you choose does not render the equipment unsafe.
NOTICE Only qualified electricians should attempt installation
of this equipment, which must strictly comply with applicable
codes, standards and regulations.
WARNING Certain components in this product and related
accessories contain chemicals known to the State of California
to cause cancer, birth defects, or other reproductive harm. Wash
hands after handling.
NOTICE Improper treatment of equipment could damage it and
shorten its life.
Use equipment only for intended uses.
If you have questions about intended use, ask dealer or contact
Briggs & Stratton Power Products.
Do not expose equipment to excessive moisture, dust, dirt, or
corrosive vapors.
Remain alert at all times while working on this equipment. Never
work on the equipment when you are physically or
mentally fatigued.
If connected devices overheat, turn them off and turn off their
circuit breaker/fuse.
Electrical Shock Read Manual
WARNING Shock Hazard. Installing low and high voltage
wire in same conduit could result in death, serious injury
and/or property damage.
Do not run low and high voltage wire in the same conduit unless
the insulation rating on ALL wiring is rated for 600V. See NEC
for more information.
WARNING Failure to properly ground equipment could cause
electrocution resulting in death or seriousinjury.
Do not touch bare wires.
Do not use equipment with worn, frayed, bare or otherwise
damaged wiring.
Do not handle electrical cords while standing in water, while
barefoot, or while hands or feet are wet.
If you must work around a unit while it is operating, stand on an
insulated dry surface to reduce shock hazard.
Do not allow unqualified persons or children to operate or
service equipment.
In case of an accident caused by electrical shock, immediately
shut down all sources of electrical power and contact local
authorities. Avoid direct contact with the victim.
WARNING Shock hazard. Equipment contains high voltage
that could result in death, serious injury and/or
property damage.
DO NOT operate this equipment imprudently or neglect its
maintenance.
5
Installation
We sincerely appreciate your patronage and have made significant
effort to provide for a safe, streamlined and cost-effective
installation. Because each installation is unique, it is impossible
to know of and advise the trade of all conceivable procedures and
methods by which installation might be achieved. Neither could we
know of possible hazards and/or the results of each method
or procedure.
For these reasons, only current licensed electrical professionals
should attempt system installations. Installations must strictly
comply with all applicable codes, industry standards and
regulations.
Your equipment is supplied with this Installation Manual and a
separate Operator’s Manual. These are important documents and
should be retained by the owner after the installation has
been completed.
Every effort has been made to make sure that the information
in this manual is both accurate and current. However, the
manufacturer reserves the right to change, alter or otherwise
improve the system at any time without prior notice.
Owner Responsibilities
To help you make informed choices and communicate effectively
with your installation contractor(s), read and understand Owner
Orientation before contracting or starting your
equipment installation.
To arrange for proper installation, contact the store at which you
purchased your equipment, your dealer, or your utility
power provider.
The equipment warranty is VOID unless the system is installed by
licensed electrical professionals.
Owner Orientation
The illustrations provided are for typical circumstances and are
meant to familiarize you with the installation options available with
your system.
Local codes, appearance, and distances are the factors that must
be considered when planning an installation. As the distance from
the existing electrical service increases, compensation in wiring
materials must be allowed for. This is necessary to comply with
local codes and overcome electrical voltage drops.
These factors will have a direct effect on the overall price of your
equipment installation.
Your installer must check local codes AND obtain permits before
installing the system.
• Read and follow the instructions given in this manual.
• Follow a regular schedule in caring for and using your
equipment, as specified in this manual.
Installing Dealer/Contractor Responsibilities
• Read and observe the Important Safety Instructions.
• Read and follow the instructions given in this manual.
• The installer may need to provide appropriate rated contactors
based on loads to be controlled.
• Discuss with owner their load priority preferences to decide
on remote module priority settings.
• Check federal, state and local codes and authority having
jurisdiction, for questions on installation.
• Ensure generator is not overloaded with selected loads.
If you need more information about the transfer switch, call
800-743-4115, between 8:00 AM and 5:00 PM CT.
Equipment Description
The transfer switch is designed to transfer selected loads found
in normal residential installations to standby power in the event
of a primary power outage. The load is connected either to utility
power (normal) or standby power (generator). The transfer switch
monitors utility and generator voltages and will automatically
connect loads to the appropriate source of power.
The Symphony™ II Power Management System is highly flexible
and utilizes individual high and low voltage modules that can be
mounted anywhere between the buildings’s main distribution
panel and the managed appliance. Designed to communicate via
the buildings’s existing power wiring, the power demand and
priority sequence of up to 8 appliance loads are relayed back to
the standby generator, effectively preventing generator overload
while expanding power range and performance. The system is
flexible and additional relays can be added as an owner’s power
management needs change over time.
Only a licensed electrician should complete a standby installation.
Service conduit and conductors can be wired directly from the
watt-hour meter to the transfer switch. A separate service entrance
disconnect and associated wiring is not required when installed per
applicable federal, state and local codes, standards andregulations.
Major components of the transfer switch are three, 2-pole
circuit breakers (one for generator disconnect and two for utility
disconnect), two, 2 pole double throw transfer switches, transfer
switch control circuit board, Symphony II power management
system control circuit board, fused utility terminals and
interconnecting wiring. All of these components are housed in a
NEMA3R enclosure that is suitable for both indoor and outdoor
installations.
The transfer switch is solenoid-operated from utility or generator
inputs and contain suitable mechanical and electrical interlock
switches to eliminate the possibility of connecting the utility service
to the generator output. It has ratings capable of switching full
utility power into the residence. In addition, a manual override lever
is provided for the transfer function.
6 BRIGGSandSTRATTON.COM
The transfer switch control board has active circuits sensing utility
and generator voltages. It creates a signal for generator start-up,
switch transfer and retransfer when utility is restored. The transfer
switch control board provides status LED’s to indicate the power
source available.
The Symphony™ II power management system control board
contains a test button, a status LED and eight priority load LED’s. It
creates and sends signals to optional remote modules, instructing
them when to add (turn power on) or remove (turn power off) the
managedload.
The Symphony II system power line carrier technology has been
rigorously tested and has proven to be very robust. However,
certain types of devices and appliances in the building generate
‘noise’ on the power line. Such devices may include non-residential
fluorescent ballasts, dimmers, speed controls (lighting and fans),
bathroom equipment, kitchen equipment, power tools, phone
chargers, and power supplies. These types of devices have the
greatest impact on power line communication when located close
to a remote module.
AM broadcast radio, X10, power line carrier (PLC), uninterrupted
power supply (UPS), transient voltage surge suppression (TVSS)
systems, and power filter technology may also cause the Symphony
II system to not operate as intended. They may cause interference
with the Symphony II system during standby power operation.
If it is determined that power line noise is causing a communication
issue with the Symphony II system, the following changes may
remedy the issue.
• Have commercial (non consumer use) fluorescent ballasts
replaced with residential use ballasts.
• Have a EMI/RFI filter installed in series and near the
problematic device.
• Have the remote module rewired to the opposite power line
(Line 1 or Line 2) from that of the problematic device.
• Refer to Troubleshooting section.
The optional 50 Amp remote module is designed for control by the
Symphony II system to add or remove appliance loads connected
to it based on a user-defined priority setting. This remote module
manages 120VAC or 240VAC, single or double pole loads up to
50 amperes. The remote module’s relay state is normally open. Its
components are housed in a NEMA4 enclosure suitable for indoor
and outdoorinstallations.
The optional low voltage remote module is designed for control by
the Symphony II system to add or remove an air conditioner, heat
pump, or low voltage contactor controlled loads based on a user-
defined priority setting. The remote module is housed in a NEMA4
enclosure suitable for indoor and outdoor installations.
Delivery Inspection
After opening the carton, carefully inspect the transfer
switch components for any damage that may have occurred
duringshipment.
If loss or damage is noted at time of delivery, have the person(s)
making delivery note all damage on the freight bill and affix their
signature under the consignor’s memo of loss or damage. If loss
or damage is noted after delivery, contact the carrier for claim
procedures. Missing or damaged parts are not warranted.
Shipment contents:
• Automatic transfer switch
• Installation and operator’s manuals
• Current transformers (2)
Optional components:
• 50 Amp module
• Low voltage module (single or dual models)
• Symphony™ II power monitor
To be supplied by installer:
• Connecting wire and conduit
• Various specialty tools/equipment
Mounting Guidelines
The transfer switch system circuitry is enclosed in a NEMA Type3R
enclosure suitable for indoor/outdoor use. Guidelines for mounting
the enclosure include:
• Install enclosure on a firm, sturdy supporting structure.
• The transfer switch enclosure must be installed with
minimum NEMA3R hardware for conduit connections.
• To prevent switch contact distortion, level and plumb the
enclosure. This can be done by placing washers between the
enclosure and the mounting surface.
• NEVER install the switch or remote modules where any
corrosive substance might drip onto the enclosure.
• Protect the switch at all times against excessive moisture,
dust, dirt, lint, construction grit and corrosivevapors.
A typical automatic transfer switch installation is depicted on
the next page. Examples of remote module installations are also
shown. It is best if the transfer switch is mounted near the utility
meter, either inside or outside. The remote module(s) can be
located anywhere between the main distribution panel and its
connected load, either inside or outside. The remote module must
be accessible for service. Discuss layout suggestions/ changes with
the owner before beginning the system installation process.
NOTICE Before drilling conduit entry holes, or any other holes,
cover and protect the switch and electronics to prevent dirt and
metal fragments from entering the mechanical and electrical
components. Failure to do so may result in damage or malfunction
of the switch.
NOTICE Use a vacuum to clean any dirt or metal shavings inside
the transfer switch. Do not use a blower or compressed air to clean
the inside of the transfer switch because debris may become lodged
in the electrical and mechanical components causing damage or
malfunction.
7
Optional
Remote
Module
A/C
Themostat
Service
Disconnect
Hot
Water
Heater
Air
Conditioner
Distribution
Panel #1
Distribution
Panel #2
Transfer
Switch
Appliance
Generator
Appliance
Optional
Remote
Module
Optional
Remote
Module
Optional
Remote
Module
Branch
Circuits
Branch
Circuits
200 Amp
Utility
200 Amp
Utility
400 Amp
Watt / Hourmeter
BUS
NOTICE: The load outputs of the transfer switch can supply one 200 Amp panel each. These outputs MUST NOT be combined, or used
individually to supply a panel larger than 200 Amps.
text text
200A 200A
Dual 200 Amp
Transfer
Switch
Correct
Dual 200 Amp
Transfer
Switch
text
400A
Dual 200 Amp
Transfer
Switch
text
400A
Incorrect
!I
ncorrect!
8 BRIGGSandSTRATTON.COM
To thermostat and heat pump
or air handler, or air conditioner,
or furnace, or HVAC.
Example of 240VAC heat pump load
controlled by a dual low voltage
remote module.
To thermostat and heat pump
or air handler, or air conditioner,
or furnace, or HVAC.
Example of 240VAC air conditioner
load controlled by thermostat.
Thermostat controlled by low voltage
remote module.
{
Example of thermostat controlled by low voltage
remote module. Power can be supplied from a
120VAC and neutral source powered by
the generator.
9
G
N
Distribution Panel
L2
L1 IN
L2
L1 IN
G
N
N
L
Dual Low
Voltage Module
#1
#2
Low Voltage
Control Wiring
To thermostat and heat pump
or air handler, or air conditioner,
or furnace, or HVAC.
Example of two 240VAC air conditioner
loads controlled by thermostat.
Thermostats controlled by dual low
voltage remote module.
L2 IN
L2 OUT
L1 IN
L1 OUT
Neutral IN
Neutral OUT
Example of two 120VAC loads
controlled by 50Amp remote
module.
10 BRIGGSandSTRATTON.COM
L2 IN
L2 OUT
L1 IN
L1 OUT
Neutral IN
Neutral OUT
Distribution Panel
L1
L2
Example of one 240VAC load controlled
by 50Amp remote module using a 3-wire
installation procedure.
L2 IN
L2 OUT
L1 IN
L1 OUT
Neutral IN
Neutral OUT
Example of one 240VAC load controlled
by 50Amp remote module.
11
Power Wiring Interconnections
NOTICE Improper installation could cause damage to the circuit
boards and shorten their life. Installing circuit boards in live
circuits will damage the board and is not covered by warranty.
ALWAYS disconnect ALL sources of power prior to servicing.
Remove all power prior to installing this equipment. Failure to
do so could cause internal damage to the board when making
electrical connections.
Turn generator to OFF position.
Turn off utility power to the standby generator and
transferswitch.
All wiring must be the proper gauge, properly supported and
protected by conduit. All wiring should be done per applicable
federal, state and local codes, standards and regulations. Obey
wire type and torque specifications printed on the terminal blocks,
neutral/ground connectors, and installation instructions. Approved
for copper and aluminum conductors.
Use installer supplied 600VAC or greater wire of a gauge that
complies with the latest version of the National Electric Code to
complete the following connections between utility power, transfer
switch, generator, main distribution panel, and optional remote
modules. Apply the necessary correction factors and
wire size calculations. Refer to the illustration on pages 14 and 15
for component location.
1. Set generator’s circuit breaker to OFF position.
2. Set generator’s system switch to OFF position.
3. Remove 15 Amp fuse from generator control panel.
4. Turn off utility power to the standby generator and
transfer switch.
5. Locate both 200 Amp utility line circuits coming from the
utility meter.
6. Connect one 200 Amp utility service line circuit to one
transfer switch service disconnect circuit breaker. The
terminal is marked “Utility Connection” (Z1). Repeat for
second 200 Amp utility service line circuit (Z2).
NOTICE: DO NOT wire 400 Amp utility line to this Automatic
Transfer Switch.
7. Connect utility service neutral to transfer switch
neutralterminal (H1 or H2).
8. Connect main distribution panel feeder from first distribution
panel conductors (R1) to transfer switch terminals marked
“LOADCONNECTION (V1)”.
9. Connect main distribution panel feeder from second
distribution panel conductors (R2) to transfer switch
terminals marked “LOADCONNECTION (V2)”.
NOTICE The two individual transfer switch terminals marked
“Load Connection” (V1 and V2) must be connected to separate
distribution panels.
NOTICE Connect the neutrals from both main distribution panels
(S1 and S2) to the transfer switch neutral terminal (H1 and H2).
10. Connect two main distribution panel grounds to transfer
switch “GND” terminal.
Assure grounding electrode conductor is connected and
bonded per applicable federal, state and local codes,
standards and regulations.
11. Connect feeder conductors from transfer switch breaker
“GENERATOR CONNECTION” terminals to generator circuit
breaker LINE1 and LINE2 terminals. Each conductor must
pass through hole of current transformer before
making connection.
CT1
CT2
DPSW2
DPSW1
J6
J5
J4
J3
J2
J1
E1
E2
WARNING Shock Hazard. Installing low and high voltage
wire in same conduit could result in death, serious injury
and/or property damage.
Do not run low and high voltage wire in the same conduit unless
the insulation rating on ALL wiring is rated for 600V. See NEC
for more information.
33
240V
11
22
44
11
22
44
120V
120V
0
Neutral
Ground Line 1 Neutral
Ground
Line 2
Generator
Circuit
Breaker
*
*Some generator models will have wires 22 and 33 going to neutral.
To Transfer Switch
12 BRIGGSandSTRATTON.COM
12. Plug current transformer leads into “CT1” and “CT2”
terminals (E1 and E2) on transfer switch control board.
13. Connect conductor from transfer switch neutral terminal (H1
or H2) to generator NEUTRAL terminal. Observe generator
control panel labeling for terminalidentification.
14. Connect conductor from transfer switch “GND” terminal
(U1 and U2) to generator control panel “GROUND” terminal.
Assure generator equipment grounding conductor (G) is
connected per applicable federal, state and local codes,
standards and regulations.
15. Using minimum #14 AWG conductors, connect the transfer
switch “UTILITY 240 VAC” terminals to generator’s “240
VAC” terminals via two-pole connector supplied
with generator (P).
16. Using #18 AWG twisted pair conductors, no greater than
200 ft. in length, 300 volt 75°C-90°C, connect “T/R” and
“GND” terminals (B) on transfer switch control board to the
generator’s control panel “TxRx” and “TxRx GND” terminals
via ten pin connector (A) supplied with generator. Count
down to the proper pin location on the generator control
board since visual alignment with its decal can bemisleading:
NOTICE TxRx and TxRx GND communication wiring must be
connected for the Symphony II System to operate properly.
17. Install optional remote modules using the installation
instructions provided with each module. Set each module to
the agreed-upon priority setting that was confirmed with
the customer.
18. Tighten all wire connections/fasteners to proper torque.
See label inside transfer switch enclosure or values listed in
remote module installation instructions for proper
torque values.
A
B
A
B
OR
13
Supervisory Control Terminals
To avoid undesirable operation, we recommend loads be managed
only with low voltage or 50 Amp remote modules. DO NOT use
the transfer switch control board supervisory control terminals on
transfer switch control board (if present).
Interconnection Diagram
The illustration on the following pages shows a completed transfer
switch installation. Your actual layout may vary.
Illustration callouts are:
A1 - From Utility to First Service Panel
A2 - From Utility to Second Service Panel
B1 - Current Transformer
B2 - Current Transformer
C - Symphony™ II System Control Board
D - T/R and GND to Generator
E - CT Terminals
F - Transfer Switch Contactors
G - UTILITY 240VAC to Generator
H1 - Transfer Switch Neutral Terminal
H2 - Transfer Switch Neutral Terminal
J - Generator
K - Generator Ground Terminal
L - Generator Neutral Terminal
M - Generator Circuit Breaker
N - Ten pin Connector or Ten pin terminal block
P - Two pin Connector or Two pin terminal block
R1 - Main Distribution Panel 1
R2 - Main Distribution Panel 2
S1 - Distribution Panel Neutral Bus
S2 - Distribution Panel Neutral Bus
T1 - Distribution Panel Ground Bus
T2 - Distribution Panel Ground Bus
U1 - Transfer Switch Ground Terminal
U2 - Transfer Switch Ground Terminal
V1 - Load Connections to Distribution Panel
V2 - Load Connections to Distribution Panel
W1 - Service Entrance Breaker - UTILITY 1
W2 - Service Entrance Breaker - UTILITY 2
Y - Generator Connection
Z1 - Utility Connection
Z2 - Utility Connection
14 BRIGGSandSTRATTON.COM
G
N
{
{
FROM
UTILITY
FROM
UTILITY
FROM
GENERATOR
G
N
{
LINE2
LINE1
N
G
}
FROM
UTILITY
SUPPLY
Z2
W2
F
U2
H1
G
F
E
D
C
Z1
W1
H2
U1
A2
A1 B1 B2
Y
V2
V1
15
G
N
{
{
FROM
UTILITY
FROM
UTILITY
FROM
GENERATOR
G
N
{
LINE2
LINE1
N
G
}
FROM
UTILITY
SUPPLY
R1 R2
P
P
N
N
M
L
K
J
S2
T2
S1
T1
16 BRIGGSandSTRATTON.COM
System Setup
You must perform the following before operating the system:
• If generator is installed in an area regularly subjected to
temperatures below 40°F (4°C), select a 50 second warm up
time by moving jumper JP2 (C) installed on transfer switch
control board from ‘20’ position to ‘50’position.
• Set the DPSW1 (A) and DPSW2 (B) dipswitches on the
transfer switch control board to match the kW rating of the
standby generator, as described in SettingDipswitches.
Setting Dipswitches
Dipswitches are used to adjust control board operation based
on generator capacity. DPSW1 and DPSW2 switches are set to
correspond to total system kW rating. Dipswitch DPSW1 (A) has
units of 1,000 watts; Dipswitch DPSW2 (B) has units of
10,000 watts.
Set dipswitches with utility and generator power removed from
the transfer switch to ensure proper control system operation.
If dipswitches are set when power is present at transfer switch,
a power reset needs to be performed before the new dipswitch
settings will take effect. Power reset is when all power is removed
from the transfer switch and then reintroduced after 30 seconds.
NOTICE Transfer switch fault message will occur on standby
generator control board if dipswitches are not properly established
as noted above.
To properly establish the dipswitches, make sure that only one
dipswitch is set to “ON” position for DPSW1 and one dipswitch for
DPSW2. For example a 20kW generator, set DPSW2 dipswitch
20 to “ON” position and DPSW1 dipswitch 0 to “ON” position.
20,000 plus 0 equal 20,000 watts.
The “On” position for the dipswitches is the switch number ON
THE TRANSFER SWITCH CONTROL BOARD, not on the switch. For
example, for an 18,000 watt generator, set DPSW2 dipswitch 10 to
“On” position. Set DPSW1 dipswitch 8 to “On” position. 10,000 plus
8000 equals 18,000 watts.
Set only one switch to “On” position
on DPSW1 andDPSW2.
Refer to following chart for proper switch selection(s).
NOTICE
Air density is less at high altitudes, resulting in less
available engine power. Specifically, engine power will decrease 3.5%
for each 1,000 feet (300 meters) above sea level and 1% for each 10°
F (5.6°C) above 77°F (25°C). Generators located in these conditions
must have the transfer switch programmed appropriately for this
power decrease.
DPSW
1
DPSW2
JP2
NOTICE Use extreme caution when setting dipswitches or
damage to control board will result.
Use a pencil or small piece of plastic to set the dipswitch.
NEVER use a screwdriver or any type of metal object to set
dipswitches.
kW Rating
of
Generator
DPSW
#1 “ON”
Position
DPSW
#2 “ON”
Position
7kW 7 0
8kW 8 0
9kW 9 0
10kW* 0 10
11kW* 1 10
12kW 2 10
13kW* 3 10
14kW 4 10
15kW 5 10
16kW 6 10
17kW 7 10
18kW 8 10
19kW 9 10
20kW 0 20
30kW 0 30
45kW 5 40
48kW 8 40
50kW 0 50
60kW 0 60
* For generators with a rating that includes 500 Watts, round down to
next lowest rating
(example: 13.5 kW set to 13kW)
A
B
A
B
C
17
Remote Module Setup
Each remote module features a priority selector (A) that permits
control of load-add or load-shed sequence. Priority number is
identified on clear protective barrier. Diagrams of each module are
shown in Status LED’s, later in this manual. Priority 1 is the highest
priority - devices set to this priority will be the first load(s) added or
last load(s) shed in a load management situation. Priority 8 is the
lowest priority.
NOTICE When setting priorities, use the number on the clear
protective barrier. DO NOT use the number printed on the
control board.
NOTICE When using multiple modules, it is required that separate
priorities (1-8) be used. DO NOT set the same priority level in
multiple modules.
Priority 9 and 10 are lockouts. Remote module(s) set to these
priorities will remain unpowered during any utility poweroutage. An
unlimited amount of remote modules can be assigned to priority
9 or 10.
In consultation with the owner, set each remote module’s priority
selector switch to the desired priority position. Assign a different
priority to each remote module for optimum operation.
Testing the Automatic Transfer Switch
Turn both of the utility service disconnect circuit breakers feeding
the transfer switch contactors to the OFF position. The system’s
automatic sequence described below will initiate. To return to utility
power, turn the utility service disconnect circuit breakers to the
ON position.
Utility Fail
The generator senses when utility voltage is below 70percent of
nominal. Engine start sequence is initiated after 6second time
delay.
Engine Warm-Up
There is a time delay to allow for engine warm-up before transfer.
Use jumper on transfer switch control board to select delay of
20seconds or 50 seconds.
Transfer
Transfer from utility to generator supply occurs after voltage is
above set levels and after the initial warm-up period. The transfer
switch control board LED lights will change from green (utility) to
red (generator) and the Symphony II status light will change blink
status from Blink Blink_Pause_Blink Blink to Blink_Pause_Blink.
Minimum engine run time is 5 minutes after transfer.
Load Management
Five minutes after transfer to generator power, the remote modules
will energize connected load(s) if generator power is available,
starting with the highest priority (1) through the lowest priority (8).
There is a 10 second delay between each sequential activation.
The P1 through P8 LED’s on the Symphony II control board will
illuminate to show loads being added.
Loads connected to remote modules set to priorities 9 and 10
remain off for the duration of a utility power outage.
Utility Pickup
Voltage pickup level is 80 percent of nominal voltage.
Retransfer
Retransfer from generator to utility power is approximately 10
seconds after utility voltage supply is above pickup level and
minimum run time is completed. All remote module(s) will remain
OFF for five minutes after the power transfer.
NOTICE Any time the remote module is turned off, even under
utility power, there is a 5 minute delay in power being restored to
the module.
Engine Cool Down
Engine will run for 60 seconds after retransfer.
A
WARNING Shock Hazard. Equipment contains high voltage
that could result in death, serious injury and/or
property damage.
Testing must only be performed by qualified personnel.
DO NOT operate this equipment imprudently or neglect its
maintenance.
18 BRIGGSandSTRATTON.COM
Te sting the Symphony™ II Power ManagementSystem
The Symphony II system can be tested under either utility power
or generator power. Only one priority LED and associated remote
module will be powered (ON) at a time during test mode.
• If TEST is not pressed again within 4 minutes AND testing is
being done under utility power, all managed loads will resume
operation under utility power after a five minute delay.
• If TEST is not pressed again within 4 minutes AND testing is
being done under generator power, managed loads will be
added in the priority order set for eachload.
The test procedure in generator mode is as follows:
1. Turn both of the utility service disconnect circuit breakers
feeding the transfer switch contactors to the OFFposition.
2. After transfer to generator power, verify communication LED
is green on each remote module.
3. Press the TEST button (B) on the Symphony II system control
board. The Symphony II system control board priority 1 LED
(C) and load connected to remote module set to priority 1 will
turn ON.
4. Verify signal was received by remote module set to priority
one. Follow the test guidelines for each module:
4a. 50 Amp Module: Relay contacts will be closed. Relay and
communication LED’s will be green. Appliance/load will
have power.
4b. Low Voltage Module (Single or Dual): Verify continuity
across low voltage control wiring contacts (E).
Communication LED will be green. Appliance/load will
have power.
5. Press the TEST button on the Symphony II system control
board. The priority 1 LED and load connected to remote
module set to priority 1 will turn OFF. The priority 2 LED and
load connected to remote module set to priority 2 will turn
ON. Repeat step 4 for each priority number being managed.
5a. 50 Amp Module: If off, relay LED status is off.
Communication LED status is green.
5b. Low Voltage Module (Single or Dual): If off, low voltage
communication LED status is green. Continuity will not be
measured across low voltage contacts.
6. Each subsequent press of the TEST button cycles to the next
lower priority, through priority 8. After priority 8, press TEST
button one time to exit test mode. The system will reset and
be ready to add loads in 5 minutes.
7. To return to utility power, turn the utility disconnect circuit
breakers to the ON position. All managed loads will be
turned off and turn back on after 5 minutes.
LED
LED
LED
LED
LED
LED
LED
LED
LED
B
D
C
A
Closed
Open
E
WARNING Shock Hazard. Equipment contains high voltage
that could result in death, serious injury and/or
property damage.
Testing must only be performed by qualified personnel.
DO NOT operate this equipment imprudently or neglect its
maintenance.
19
Controls
Other than a Manual Override lever, there are no operator controls
because this is an automatic transfer switch. The manual override
is to be used only by licensed professionals. Information on handle
use can be obtained by calling Technical Service at 800-743-4115.
Operation
To select automatic transfer operation, do the following:
1. In the transfer switch, set both utility disconnect circuit
breakers
to ON position.
2. In the transfer switch, set generator disconnect circuit breaker
to ON position.
3. Install 15 Amp fuse in generator’s control panel.
4. Set generator’s circuit breaker to ON position.
5. Set generator’s system switch to AUTO position.
The system will now be in automatic operation mode.
When the generator is providing power to the transfer switch, the
transfer switch control board is constantly monitoring generator
power and communicating with the Symphony II system
control board.
The Symphony II system will control up to 8 priorities, with priority
9 and 10 as lockouts. When the total generator load meets a preset
value, the Symphony II system control board will start removing
loads, starting with the lowest priority (highest number) load. The
Symphony II system will add or remove managed loads based on
the generator output capacity and priority settings.
The Symphony II system waits 10 seconds between adding or
removing each load to permit the system to stabilize. If too much
load demand is seen, the Symphony II system will remove all
managed loads quickly to prevent the generator from overloading.
Once the load demand has stabilized, the Symphony II system will
determine when power is available and then add the remote module
loads to the generator after a 5 minute delay.
There is a minimum five minute delay between the time utility
power is lost and priority 1 loads may be energized by the
Symphony II system.
Be aware that managed heating element energy loads (such as
electric range burners, oven, or space heaters) that were ON
when utility power was lost, will be ON when the generator begins
supplying power. It is advised that the owner check all such
managed devices to ensure they are turned OFF before generator
power appears.
Managed devices like clothes dryers that require pressing a START
button will not resume operation unless the START button is
pressed after generator power begins.
Enclosure Door
To open the transfer switch door, remove the two exterior thumb
screws (A) and carefully lift off door.
To close and secure the door, push door closed against enclosure.
While in this position, the door can rest on the tab (B) at the
bottom of the enclosure. Reinstall both thumb screws to finger
tight. Enclosure door MUST be closed and secured at all times
except when system is being serviced.
A
B
20 BRIGGSandSTRATTON.COM
Symphony™ II Power Monitor (Optional)
For your convenience, a Symphony II Power Monitor is available,
which provides a visual “on/off” status of each managed appliance/
load. A series of LED lights are ON when an appliance has
generator power and OFF when the appliance is in a removal mode
or does not have power. When on generator power, the consumer
can see which appliances are beingmanaged.
A decal is provided that can be labeled with the managed
appliances/loads and placed next to each priorityLED.
The monitor is plugged into any convenient standard outlet that will
receive generator power within the building and constantly receives
system status via the power line communication technology utilized
by the Symphony II Power Management System during generator
power.
POWER LIGHT (A)
When lit, indicates that monitor
detects outlet power.
When not lit, indicates that no
power is present at outlet.
COMM (communication status)
LIGHT (B)
When lit, indicates that unit
is receiving signals from the
Symphony II controller.
When not lit, indicates that utility
power is present, or possibly
power line noise causing a
communication issue, or a fault
in Symphony II controller.
PRIORITY LIGHTS/LED’s (C)
When green LED is lit, indicates that optional remote module set to
that priority is supplying power to connected load during generator
power.
When not lit, indicates that optional remote module set to that
priority is set to OFF (being managed and Symphony II System is
not allowing power to the unit).
All lights/LED’s are OFF when utility power is present.
Status LED’s
Described below are the system’s LED indicators and the conditions
each LED color represents:
Transfer Switch Control Board
STATUS LED
RED (D) means GENERATOR power is present.
GREEN (E) means UTILITY power is present.
Symphony II System Control Board
STATUS LED (F)
Single Blink-Pause means unit is operating on GENERATORpower.
Double Blink–Pause means unit is operating on UTILITYpower.
PRIORITY LIGHTS/LED’s (C & G)
When green LED is lit, indicates that optional remote module set to
that priority is supplying power to connected load during generator
power.
When not lit, indicates that optional remote module set to that
priority is set to OFF (being managed and Symphony II System is
not allowing power to the unit).
All lights/LED’s are OFF when utility power is present.
CT1
CT2
DPSW2
DPSW1
J6
J5
J4
J3
J2
J1
D E
A
B
C
312113
LED
LED
LED
LED
LED
LED
LED
LED
LED
F G
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84

Simplicity 071057-02 Guide d'installation

Taper
Guide d'installation
Ce manuel convient également à