General
The low prole vent termination kit allows both the intake
for combustion air and the exhaust vent to pass through a
standard sidewall. Follow these instructions as well as the
furnace installation instructions for installation of the intake/
vent pipe(s) and all furnace installation procedures. These
instructions are intended as an aid to qualied service
personnel for proper installation, adjustment and operation
of this unit. Refer to the furnace installation instructions for
intake/vent pipe sizing information.
This kit contains the following parts:
(1) Vent Cap
(1) Vent Plate
(1) Mounting Hardware
Key Installation Requirements
1. Examine all components for possible shipping damage
prior to installation.
2. Proper joint construction is essential for a safe installation.
Follow these instructions exactly as written. Check for
proper joint construction when joining pipe to ttings.
3. This venting system must be free to expand and contract.
Check for unrestricted vent movement through walls,
ceilings, and roof penetrations.
4. This venting system must be supported in accordance
with these instructions.
Warnings
o Do not operate the furnace without the side wall cap in
place as recirculation of combustion products may occur.
o If the venting system is not installed properly, recirculation
of ue gasses may occur, causing the intake pipe to
freeze shut during cold weather operation.
o Water may collect inside the combustion air pipe and ow
to the burner enclosure. Means shall be provided for
2
draining the condensate. Failure to follow this warning
could result in product damage or improper operation,
personal injury or death.
o Dierent manufacturers have dierent joint systems and
adhesives. Do not mix pipe, ttings, or joining methods
from dierent manufacturers.
o Plastic venting systems shall not pass through rated re
separations.
o Keep assembly free of insulation during installation
o Do not use eld supplied couplings to extend pipes.
o Recirculation of ue gasses may occur, causing the
intake pipe to freeze shut during cold weather operation if
the venting system is not installed per these guidelines.
If the venting system is not installed properly, ue gas may
recirculate, possibly causing the intake pipe to freeze shut
during cold weather.
o The safe operation of the vent system is based on the use
of parts supplied in this kit or approved per the guidelines
that follow in the instructions. The performance of the
system may be aected if the combination of these
prescribed parts is not used in actual building
construction.
1) Acceptable Gas Appliances, Components, Sealants and
Installation Methods
a) The DiversiTech horizontal vent termination kit is
intended for use with Category IV high eciency
(condensing gas) furnaces or water heaters with
exhaust temperatures up to and including 65°C
(149°F), ULC S636 Class II. Failure to follow this warning
could result in re, personal injury or death.
b) Pipe and ttings are required to complete installation
(user supplied). The combustion air and vent pipe
ttings must conform to ANSI and ASTM standards
D1785, F891, D2665, D2241, D2661, or F628. Pipe
cement and primer must conform to ASTM standards
D2564 or D2235.
3
c) In Canada, construct all combustion air and vent
pipes for this unit of CSA or ULC certied Schedule 40
PVC, PVC-DWV, or ABS-DWV pipe and pipe cement.
d) Failure to use pipe, ttings or solvents as outlined
above can result in unsafe conditions.
i. For assembly of PVC piping, DiversiTech Pro-Weld
PVC Cement (clear) is recommended.
ii. Where primer is required (see Section 4: Solvent
Cementing), DiversiTech Pro-Prime PVC Primer
(purple) is recommended.
e) PVC solvent cements and all primers must not be
used more than 3 years beyond the date of
manufacture printed on the container.
f) Where restopping is required, Fireseal 814 (red) or
equivalent is recommended.
h) Acceptance of the vent system is dependent upon
full compliance with these installation instructions,
CSA B149 and local building and re codes.
2) Installation and Terminations
General Installation Notes:
a) Prior to installation the authority having jurisdiction
(such as gas inspection authority, municipal building
department, re department, re prevention
bureau, etc.) should be consulted to determine the
need to obtain a permit.
b) Follow the appliance manufacturer’s installation
instructions, local installation codes from the
authority having jurisdiction.
c) The venting system shall terminate in accordance
with the requirements of CAN/CSA-B149.1–2, Natural
Gas and Propane Installation Code, or CAN/
CSA-B149.2, Propane Storage and Handling Code,
as applicable.
d) Follow the appliance manufacturer’s installation
instructions for details on vent-to-appliance
connections.
4
e) It is required that means shall be provided for
draining the condensate. The venting system must
be sloped upwards not less than 20mm per 1,000mm
from the appliance to the vent terminal in order to
prevent the collection of condensate. Refer to the
appliance manufacturer’s installation instructions for
further details regarding condensate drain ttings.
f) Insulation must not interfere with any necessary
clearances.
g) Provide support as close as reasonably possible to
any ttings to alleviate excessive stress at joints and
within the piping system as a whole. Supports,
hangers and anchors should be suitable for use with
plastic pipe.
h) Horizontal runs of PVC pipe must be supported at
intervals of no more than 5 feet unless otherwise
specied by local regulatory codes, the local
authority having jurisdiction, or the appliance
manufacturer.
i) Vertical runs of PVC pipe should be adequately
supported at the rst penetration in order to bear the
weight of the vertical run. The pipe should be
securely fastened to the support structure.
Additional supports should be utilized on the vertical
run, but they must allow for movement due to
expansion and contraction.
j) Utilize ½” or ¾” steel strapping (or equivalent)
fastened to the support structure to support PVC
pipe runs. Framing nails or screws may be used to
fasten the strapping to the support structure.
HORIZONTAL SIDEWALL MOUNTING
NOTE:
For proper function, never install vent on side of structure
exposed to prevailing winter winds.
Consult your furnace installation instructions for allowable
exhaust and intake air pipe placement and length.
5
Do not install more than one furnace per vent without
consulting furnace manufacturer.
For proper function and to allow for eld disassembly for
inspection and cleaning, seal all gaps and all pipe
penetrations in wall with silicone sealant.
Do not install vent kits above one another. This will help to
prevent the condensate from freezing.
Refer to gures 1 and 2 for Typical Horizontal Vent
placement during installation.
Avoid locations where vapors are objectionable, or may
damage the structure, plants or air conditioning
condensing unit.
Refer to gures 3 and 4 for conguration of the PVC piping
installed with the Horizontal Vent.
1. Use furnace installation instructions to determine pipe
diameter.
2. Determine correct HVENT kit size for the pipe diameter
selected.
3. Install air intake piping and vent into vent plate openings.
a. This installation method can be used for non-direct
vent termination as well.
b. Vent should extend no further than 2 ¼” beyond vent
plate.
c. Air intake should extend no further than 1” beyond
vent plate.
4. Mark air intake, vent and four mounting holes using vent
plate as a guide. Make note of the minimum clearances.
5. Cut 2 holes for air intake and vent.
6. Drill four 3/16” holes and insert plastic anchors into the
wall.
7. Secure vent plate with four supplied screws (#8 x 2” long,
pan head stainless steel).
8. Attach vent cap to vent plate and secure with four
supplied screws (#8 x 2” long, pan head stainless steel).
9. Check for any gaps in the wall and seal using silicone or
other suitable sealant.
6
Figure 1: Typical Vertical Installation
Figure 2: Typical Horizontal Installation
8”
min.
8”
min.
7
Figure 3: Typical Installation for 2 in.
Maintain 12” (18” for Canada) minimum clearance above highest
anticipated snow level or grade (whichever is greater).
Reducing Coupling, Field Supplied
12” min.
to Overhang
Install pipe in this direction to
ensure correct cut lengths
Vent
Air Intake
3” Piping Between 12” and 30” of 2” pipe
1.5” to 2” Reducing Blushing
12” of 1.5” Pipe
18” of 2” Pipe
30” of 2” Pipe
90,000 BTUH -
120,000 BTUH
45,000 BTUH -
75,000 BTUH
Vent
Air Intake
12”-30”/2” pipe
18”/2” pipe
12”/1.5” pipe
Figure 4: Typical Installation for 3 in.
Maintain 12” (18” for Canada) minimum clearance above highest
anticipated snow level or grade (whichever is greater).
12” min.
to Overhang
Install pipe in this direction to
ensure correct cut lengths
8
Note: Vent should protrude a maximum of 2-1/4” beyond outer wall.
Intake should protrude a maximum of 1” beyond outer wall.
Refer to furnace or condensing tankless water heater installation instructions for details
on pipe length and size requirements, as well as maximum pipe run lengths.
Refer to furnace or condensing tankless water heater installation instructions for details
on pipe length and size requirements, as well as maximum pipe run lengths.
Reducing Coupling/Coupling, Field Supplied if Needed
Vent
Air Intake
3” Piping
2”, 2-1/2”
or 3” Piping
Note: Vent should protrude a maximum of 2-1/4” beyond outer wall.
Intake should protrude a maximum of 1” beyond outer wall.
3) Expansion and Contraction
a) PVC will expand and contract with temperature
changes. When running piping to the DiversiTech
concentric vent termination, this physical property of
PVC must be taken into account. General expansion
vs. temperature change based on the length of run
can be found in tables 1 and 2 of this section.
i. Ensure adequate clearance between piping and
other structures. It is recommended that pipe and
ttings are installed at least 1 inch from the
supporting structure. In some instances additional
clearance may be required. Please refer to the
linear expansion tables (Figures 1 & 2) to help
determine if extra clearance is necessary.
ii. Ensure that clamps, hangers and other supports are
intended for use on plastic pipe and allow
necessary pipe movement without damaging the
PVC piping.
Temp. PVC Linear Expansion (ΔL) in inches
Change
Length of Run ()
(°F) 10 20 30 40 50
10 0.04 0.07 0.11 0.14 0.18
20 0.07 0.14 0.22 0.29 0.36
30 0.11 0.22 0.32 0.43 0.54
40 0.14 0.29 0.43 0.58 0.72
50 0.18 0.36 0.54 0.72 0.90
60 0.22 0.43 0.65 0.86 1.08
70 0.25 0.50 0.76 1.01 1.26
80 0.29 0.58 0.86 1.15 1.44
90 0.32 0.65 0.97 1.30 1.62
100 0.36 0.72 1.08 1.44 1.80
Table. 1: Linear Expansion of PVC in inches
9
10
Temp. PVC Linear Expansion (ΔL) in mm
Change
Length of Run (m)
(°C) 3 6 9 12 15
5 0.81 1.62 2.43 3.24 4.05
10 1.62 3.24 4.86 6.48 8.10
15 2.43 4.86 7.29 9.72 12.15
20 3.24 6.48 9.72 12.96 16.20
25 4.05 8.10 12.15 16.20 20.25
30 4.86 9.72 14.58 19.44 24.30
35 5.67 11.34 17.01 22.68 28.35
40 6.48 12.96 19.44 25.92 32.40
45 7.29 14.58 21.87 29.16 36.45
50 8.10 16.20 24.30 32.40 40.50
Table 2. Linear Expansion of PVC in mm
4) Solvent Cementing
Notes:
Check with local jurisdictions for requirements
regarding the use of primer. The use of primer is
required at temperatures below 0°C.
Do not use primer to thin cement.
a) Cut pipe square and remove any dirt burrs.
b) Check dry t of pipe and tting. Pipe should enter
tting at least 1/3 of the way without forcing. If pipe
bottoms, it should be a snug t.
c) Wipe surfaces to be joined with a clean cloth to
remove dirt and moisture.
d) If using primer, apply primer with applicator to inside
of tting and to outside end of pipe end. Apply with
scrubbing motion in order to dissolve the surfaces. If
primer is applied with cloth, wear gloves impervious to
the primer. If not using primer, skip to the next step.
e) Check the cement applicator size. Applicator
supplied with DiversiTech Pro-Weld may be used on
pipe diameters up to 2”. On larger pipe, use a brush
width of ½ the pipe diameter.
f) Apply a heavy coat of cement to outside end of the
pipe and a light coat to the inside of the tting and
then another coat to the outside of the pipe.
g) Immediately insert pipe into tting with a slight twisting
motion until it bottoms in the socket.
h) Hold joint together momentarily until it has set in order
to prevent the tapered socket from pushing the pipe
out of the tting.
i) Wipe all excess cement from joint.
j) Use care when handling freshly made joints, and be
sure not to disturb joints during the cure period. Joints
may be pressure tested aer the cure times in
following section and in Table 3. Note that longer
cure times are required when installing under cold
ambient temperatures.
5) Set/Cure Times
a) Handling Time is the time required before handling
the joint.
b) Cure Time is the required time to allow before
pressurizing the system
i. Cure Times are valid if the Relative Humidity is 60%
or less.
c) In case of damp or humid weather allow 50%
additional cure time.
Temperature Handling/Set Time Joint Cure Time
60°-100° F 5 min 30 min
40°-60° F 10 min 45 min
0°-40° F 15 min 1 hr
Note: Set/Cure Times valid for 1 ½” – 3” Pipe Sizes
Table 3. Set and Joint Cure Times
**All data is estimated based on laboratory tests. Due to the many
variables in the eld, these gures should be used as a general guide
only.
11
6) Maintenance
a) The DiversiTech Horizontal Vent termination kit and
related vent piping should be checked once a year
by a qualied technician.
b) To aid in visibility of certication and warning labels,
and enable proper inspection/maintenance,
DiversiTech Horizontal Vent kits and related piping
should not be painted.
***These installation guidelines were issued on June 2014.
Manufacturer Information:
DiversiTech Corporation
2175 East Park Drive NE
Conyers, GA 30013
12
Général
Le kit de terminaison de ventilation à prol bas permet à
la fois la prise d’air comburant et la sortie d’air de passer à
travers une paroi latérale standard. Suivez ces instructions
ainsi que les instructions d’installation de la chaudière pour
l’installation de la/des conduite(s) d’entrée/ventilation et
toutes les procédures d’installation de la chaudière. Ces
instructions servent d’aide à un technicien qualié pour l’in-
stallation, le réglage et le fonctionnement correctes de cet
appareil. Référez-vous aux instructions d’installation de la
chaudière pour les informations sur le dimensionnement de
la conduite d’entrée/d’évacuation.
Ce kit contient les éléments suivants:
(1) Chapeau d’évent
(1) Plaque d’évent
(1) Matériel de montage
Exigences-clé d’installation
1. Examinez tous les composants pour d’éventuels
dommages d’expédition avant l’installation.
2. Une bonne construction des joints est essentielle pour une
installation sécurisée. Suivez ces instructions exactement
comme écrites. Veillez à une excellente xation des joints
lors de l’assemblage du tuyau aux raccords.
3. Ce système de ventilation doit être libre pour se dilater
et se contracter. Vériez le mouvement d’air incontrôlé à
travers les murs, les plafonds et les pénétrations de toit.
4. Ce système de ventilation doit être soutenu
conformément à ces instructions.
Avertissements
Ne pas utiliser la chaudière sans le bouchon de la paroi
latérale en place car les produits de combustion risquent
de recirculer.
Si le système de ventilation n’est pas installée
13
correctement, les gaz de combustion peuvent être remis
en circulation, provoquant la gelée complète du tuyau
d’entrée pendant la saison froide.
De l’eau peut s’accumuler à l’intérieur du tuyau d’air
comburant et couler vers l’enceinte de la chaudière. Des
moyens doivent être prévus pour l’évacuation du
condensat. Le non-respect de cet avertissement peut
entraîner des dommages matériels, le dysfonctionnement,
des blessures corporelles ou la mort.
Diérents fabricants ont des systèmes diérents de joints et
d’adhésifs. Ne mélangez pas les tuyaux, les raccords, ou
les méthodes d’assemblage de diérents fabricants.
Les systèmes de ventilation en plastique ne peuvent pas
passer par des séparations coupe-feu certiées.
Garder l’ensemble libre d’isolant lors de l’installation.
Ne pas utiliser des pièces de jonction fournies sur place
pour rallonger les tuyaux.
Les gaz de combustion peuvent être remis en
circulation, entraînant la gelée complète du tuyau
d’entrée par temps froid si le système de ventilation n’est
pas installé en respectant ces consignes. Si le système de
ventilation n’est pas installée correctement, les gaz de
combustion peuvent être remis en circulation, provoquant
la gelée complète du tuyau d’entrée pendant la saison
froide.
La sécurité de fonctionnement du système de ventilation
est basée sur l’utilisation des pièces fournies dans ce kit ou
approuvé par les consignes qui suivent dans les
instructions. La performance du système peut être
aectée si la combinaison de ces pièces prescrites n’est
pas utilisée dans la construction actuelle.
1) Appareils à gaz, composants, produits d’étanchéité et
méthodes d’installation acceptables
a) Le kit de terminaison de ventilation horizontale
DiversiTech est destinée à être utilisée avec les
chaudières à haut rendement Catégorie IV (à
14
condensation gaz) ou avec les chaue-eau ayant des
températures de gaz d’échappement jusqu’à et y co
pris 65°C (149°F), ULC S636 Classe II. Le non-respect de
cet avertissement peut entraîner un incendie, des
blessures ou la mort.
b) Les tuyaux et les raccords sont nécessaires pour
terminer l’installation (fournis par l’utilisateur). Les
raccords des tuyaux de ventilation et d’air comburant
doivent être conformes aux normes ANSI et ASTM
D1785, F891, D2665, D2241, D2661, ou F628. La colle de
tuyau et l’apprêt doivent être conformes aux normes
de l’ASTM D2564 ou D2235.
c) Au Canada, il faut construire tous les tuyaux d’air
comburant et de ventilation pour cet appareil avec
du PVC Schedule 40, du PVC-DWV, ou il faut utiliser
des tuyaux et des colles ABS-DWV.
d) La non-utilisation des tuyaux, des raccords ou des
solvants indiqués ci-dessus peut entraîner des
conditions dangereuses.
i. Pour le montage de tuyauterie PVC, la colle
DiversiTech Pro-Weld PVC (clair) est recommandée.
ii. Si l’endroit demande de l’apprêt (voir Section 4:
Collage au solvant), l’apprêt DiversiTech Pro-Prime
PVC (violet) est recommandé.
e) Les colles à solvant PVC et tous les apprêts ne
peuvent plus être utilisés plus de 3 ans après la date
de fabrication indiquée sur l’emballage.
f) Si l’endroit demande un coupe-feu, FIRESEAL 814
(rouge) ou un équivalent est recommandé.
g) L’acceptation du système de ventilation dépend de
la pleine conformité avec ces instructions
d’installation, le CSA B149, les règles de construction
locales et le code national de prévention des
incendies.
15
2) Installation et terminaisons
Remarques générales sur l’installation:
a) Avant l’installation, l’autorité compétente (comme
l’autorité de contrôle de gaz, le service d’urbanisme,
le service des incendies, le service de prévention des
incendies, etc) doit être consultée an de déterminer
la nécessité d’obtenir un permis.
b. Suivez les instructions d’installation du fabricant de
l’appareil et les codes d’installation locaux de
l’autorité compétente.
c. Ce système de ventilation devra se terminer en
conformité avec les exigences du CAN/CSA-B149.1,
le Code d’installation du gaz naturel et du propane,
ou du CAN/CSA-B149.2, le Code sur l’emmagasinage
et la manipulation de propane, le cas échéant.
d. Suivez les instructions d’installation du fabricant de
l’appareil pour avoir plus de détails concernant les
connexions du système de ventilation à l’appareil.
e) Il est nécessaire de prévoir des moyens pour évacuer
le condensat. Le système de ventilation doit être
incliné vers le haut d’au moins 20 mm par 1000 mm à
partir de l’appareil vers la terminaison de ventilation
dans le but d’empêcher la collecte de condensat
Référez-vous aux instructions d’installation du
fabricant de l’appareil pour plus de détails
concernant les raccords de purge de condensats.
f) Les matériaux d’isolation ne peuvent pas interférer
avec les espaces libres nécessaires.
g) Fournissez un support aussi près que possible de tous
les raccords an de réduire la charge excessive sur les
joints et sur l’ensemble de la tuyauterie. Des supports,
des crochets et des ancrages doivent être adaptés à
être utilisés avec des tuyaux en plastique.
h) Les conduits horizontaux de tuyau en PVC doivent
être soutenus à des intervalles de maximum 5 pieds,
sauf indication contraire par les codes réglementaires
locales, l’autorité locale compétente ou le fabricant
de l’appareil.
16
i) Les conduits verticaux de tuyau en PVC doivent être
soutenus de manière adéquate lors de la première
pénétration an de supporter le poids du conduit
vertical. Le tuyau doit être solidement xé à la
structure de support. Des supports supplémentaires
doivent être utilisés sur le conduit vertical, mais ils
doivent permettre du mouvement provenant de la
dilatation et de la contraction.
j) Utilisez du cerclage en acier de ½ “ou ¾” (ou son
équivalent) xé à la structure de support pour
supporter les tuyaux en PVC. Des clous ou des vis de
xation peuvent être utilisés pour xer le cerclage sur
la structure de support.
LE MONTAGE HORIZONTAL MURAL
Remarque:
Pour le bon fonctionnement, n’installez jamais d’évent sur
le côté d’une structure exposée aux vents dominants
d’hiver.
Consultez les instructions d’installation de la chaudière
pour l’emplacement et la longueur admissibles du tuyau
de sortie d’air et du tuyau d’entrée d’air.
N’installez pas plus qu’une chaudière par ventilation sans
avoir consulté le fabricant de la chaudière.
Pour le bon fonctionnement et pour faciliter le
démontage sur place pour l’inspection et le nettoyage,
rebouchez tous les trous et les pénétrations de tuyaux
dans le mur à l’aide de joint silicone.
N’installez pas les kits de ventilation l’un au-dessus de
l’autre, empêchant ainsi la gelée du condensat.
Référez-vous aux gures 1 et 2 pour le placement de la
ventilation horizontale lors de l’installation.
Évitez les endroits où il y a des vapeurs qui peuvent être
désagréables ou endommager la structure, les
installations
ou l’unité de condensation de la climatisation.
Référez-vous aux gures 3 et 4 pour la conguration de la
tuyauterie en PVC installée avec l’évent horizontal.
17
1. Suivez les instructions d’installation de la chaudière pour
déterminer le diamètre du tuyau.
2. Déterminez la taille correcte du kit HVENT pour le diamètre
du tuyau sélectionné.
3. Installez l’évent et la tuyauterie d’entrée d’air dans les
ouvertures de la plaque d’évent.
a. cette méthode d’installation s’applique également à
une terminaison de ventilation non-directe.
b. la sortie d’air ne peut pas s’étendre au-delà de 2 ¼ ‘’ de
la plaque d’évent.
c. l’entrée d’air ne peut pas s’étendre au-delà de 1‘’ de la
plaque d’évent.
4. Marquez l’entrée d’air, la sortie d’air et quatre trous de
montage en utilisant la plaque d’évent comme guide.
Prenez note des distances minimales.
5. Coupez deux orices pour l’entrée d’air et la sortie d’air.
6. Percez quatre orices 3/16’’ et insérez des chevilles en
plastique dans le mur.
7. Fixez la plaque d’évent à l’aide de quatre vis fournies (n° 8
x 2’’ de long, en acier inoxydable à tête cylindrique).
8. Fixez le chapeau d’évent à la plaque d’évent et
sécurisez-les avec quatre vis fournies (n° 8 x 2’’ de long,
en acier inoxydable à tête cylindrique).
9. Contrôlez la présence d’éventuels trous dans le mur et
bouchez-les à l’aide de silicone ou d’un produit
d’étanchéité approprié.
18
Installation verticale typique 8’’ min.
Installation horizontale typique 8’’ min.
19
8”
min.
8”
min.
Figure 3 : Installation typique pour 2
Gardez une distance minimale de 12’’ (18’’ pour le Canada)
au-dessus du niveau maximal de neige prévisible (le plus élevé).
Couplage de réduction, à fournir sur place
12” min. vers la
saillie de toit
Installez le tuyau dans cette
direction pour assurer la bonne
longueur de coupe
Event
Entrée d’air
Tuyauterie
de 3”
Entre 12” et 30” de tuyau de 2”
Bague de réduction 1.5” à 2”
12” de tuyau 1.5”
18” de tuyau 2”
30” de tuyau 2”
90,000 BTUH –
120,000 BTUH
45,000 BTUH -
75,000 BTUH
Event
12” de tuyau
3-“/2”
18” de tuyau 2”
12” de tuyau 1.5”
Figure 4 : Installation typique pour 3
Gardez une distance minimale de 12’’ (18’’ pour le Canada)
au-dessus du niveau maximal de neige prévisible (le plus élevé).
Entrée d’air
20
Note : l’évent devrait dépasser un maximum de 2-1/4’’ au-delà de la
paroi extérieure. L’entrée d’air devrait dépasser un maximum de 1
‘’ au-delà de la paroi extérieure.
Référez-vous aux instructions d’installation de la chaudière ou du chaue-eau instantané pour les
détails des dimensions des tuyaux, ainsi que la longueur maximale des conduites horizontales.
Référez-vous aux instructions d’installation de la chaudière ou du chaue-eau instantané pour les
détails des dimensions des tuyaux, ainsi que la longueur maximale des conduites horizontales.
Les couplages (de réduction) sont à fournir sur place si nécessaire
Note : l’évent devrait dépasser un maximum de 2-1/4’’ au-delà de la paroi extérieure.
L’entrée d’air devrait dépasser un maximum de 1 ‘’ au-delà de la paroi extérieure.
Tuyauterie
de 3”
Tuyauterie de 2”,
2-1/2” ou 3”
12” min. vers la
saillie de toit
Event
Entrée d’air
Installez le tuyau dans cette
direction pour assurer la bonne
longueur de coupe
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19