Kelvinator KG7S(D,M) Guide d'installation

Taper
Guide d'installation

Ce manuel convient également à

*SL (92.1% AFUE) &
*SM (95.0% AFUE)
Downflow Furnace
92.1% Through 95.0% AFUESingle Stage Condensing Gas Furnaces
*SD & *SD-E (95.0% AFUE)
Upflow / Horizontal Furnace
*SC (92.1%AFUE)
Upflow / Horizontal Furnace
INSTALLATION INSTRUCTIONS
WARNING
FIRE OR EXPLOSION HAZARD


supplier.


WHAT TO DO IF YOU SMELL GAS





DO NOT DESTROY. PLEASE READ CAREFULLY & KEEP IN A SAFE PLACE FOR FUTURE REFERENCE.
2
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION ..........................3
REQUIREMENTS & CODES ..........................................4
Combustion Air Quality ................................................5
Heating Load ................................................................5
Installation in a Garage ................................................6
Clearances to Combustible Materials ..........................6
Operation of Furnace During Construction ..................6
COMBUSTION AIR & VENTING REQUIREMENTS .......7
Direct Vent Furnaces ....................................................8
Conventional Vent Systems - Confined Spaces ..........8
Air From Inside .........................................................8
Outdoor Air from a Crawl Space or Vented Attic .......8
Outdoor Air Using Vertical Ducts ..............................8
Outdoor Air Using Horizontal Ducts ..........................9
Air Directly Through An Exterior Wall ........................9
Alternate Method of Providing Air from Outside .......10
Conventional Vent Systems - Unconfined Spaces ......10
Category IV Venting .....................................................10
Vent Pipe Material .....................................................11
Vent Pipe Length & Diameter ...................................11
Vent Pipe Installation ................................................11
Outdoor Terminations - Horizontal Venting ...............12
Outdoor Terminations - Vertical Venting ....................13
Vent Freezing Protection ...........................................13
Existing Installations .................................................13
Condensate Disposal ...................................................13
CIRCULATING AIR REQUIREMENTS ...........................14
Plenums & Air Ducts ....................................................14
Return Air Connections ................................................14
Upflow & Horizontal Furnaces ..................................14
Downflow Furnaces ..................................................15
Supply Air Connections ................................................15
Acoustical Treatments ..................................................15
FURNACE INSTALLATION ............................................15
General Requirements .................................................15
Upflow Furnaces ..........................................................15
Horizontal Furnaces .....................................................15
Special Instructions for SC038-23A Furnaces ..........16
Downflow Furnaces ......................................................16
Installation on a Concrete Slab .................................17
Inducer & Venting Options ...........................................17
Inducer Assembly Rotation .......................................18
Pressure Switch Tubing ............................................18
Alternate Pressure Switch Location ..........................18
Accessories ..................................................................19
Finish Flange ............................................................19
Rubber Grommets ....................................................19
PVC Components .....................................................20
Typical Orientation ................................................20
Alternate Orientation ............................................20
Optional PVC Pipe Installation ..................................20
Condensate Drain Lines ...........................................20
Bottom Panel Removal.................................................21
Alternate Bottom Panel Removal .................................21
GAS SUPPLY & PIPING .................................................22
Leak Check ..................................................................22
High Altitude Application (Natural Gas Only) ...............22
Converting from Natural Gas to LP / Propane .............23
ELECTRICAL WIRING ....................................................26
Line Voltage Wiring ......................................................26
Grounding .....................................................................26
Thermostat / Low Voltage Connections .......................26
Heat Anticipator ............................................................26
Twinning .......................................................................27
START-UP & ADJUSTMENTS ........................................28
Pre-Start Check List .....................................................28
Start-up Procedures .....................................................28
Verifying & Adjusting Input Rate ..................................29
Verifying & Adjusting Temperature Rise ......................29
Verifying Burner Operation ...........................................29
Verifying Operation of the Supply Air Limit Switch ......29
Configuring The Blower ................................................30
Selecting the (Gas) Heating Speed ..........................30
Determining Nominal System Capacity ....................30
Selecting the Cooling/Heat Pump Speed .................30
System Operation ........................................................30
(Gas) Heating Mode .................................................30
Cooling or Heat Pump Mode ....................................30
Manual Fan ...............................................................30
Fault Conditions ...........................................................30
OPERATING SEQUENCE ..............................................30
Heating Cycle ...............................................................30
Cooling Cycle ...............................................................31
Fan Mode .....................................................................31
MAINTENANCE ..............................................................31
3
IMPORTANT SAFETY INFORMATION
INSTALLER: Please read all instructions before servicing
this equipment. Pay attention to all safety warnings and
any other special notes highlighted in the manual. Safety
markings are used frequently throughout this manual to
designate a degree or level of seriousness and should not
be ignored. WARNING - Indicates a potentially hazardous
situation that if not avoided, could result in personal injury
or death.
CAUTION - Indicates a potentially hazardous
situation that if not avoided, may result in minor or moderate
injury or property damage.
WARNING:


     


    
     

WARNING:
    


WARNING:
    


      
     


WARNING:


      




• Tominimizeequipmentfailureorpersonalinjury,itis
essential that only qualified individuals install, service,
or maintain this equipment. If you do not posses
mechanical skills or tools, call your local dealer for
assistance.
FIGURES & TABLES ......................................................32
Figure 31. *SL & *SM Cabinet Dimensions ...............32
Figure 32. *SC, *SD & *SD-E Cabinet Dimensions ..33
Airflow Data ..................................................................34
Table 6. *SC Upflow / Horizontal Furnaces ...............34
Table 7. *SL Downflow Furnaces ..............................35
Table 8. *SD & *SD-E Upflow / Horizontal
Furnaces (ECM Motor) ...............................36
Table 9. *SD & *SD-E Upflow / Horizontal
Furnaces .....................................................38
Table 10. *SM Downflow Furnaces ...........................39
Electrical Information....................................................40
Figure 33. Wiring Diagram ........................................40
Figure 34. Wiring Diagram (Fixed Speed) .................41
Gas Information ............................................................42
Table 11. Gas Flow Rates .........................................42
Table 12. Gas Pipe Capacities ..................................42
Table 13. High Altitude Deration – Propane Gas ......43
Table 14. Natural Gas Heating Values ......................43
Table 15. High Altitude Deration – Natural Gas with
HIGH Heating Value ..................................44
Table 16. High Altitude Deration – Natural Gas with
LOW Heating Value ...................................44
Venting Information ......................................................45
Table 17. Vent Termination Clearances .....................45
*SC & *SL Series
Figure 35. Horizontal & Vertical Venting ....................46
Figure 36. Venting Options for Upflow Installations
(*SC Series) .............................................47
Figure 37. Venting Options for 1 Pipe Horizontal
Installations (*SC Series) .........................48
Figure 38. Venting Options for 2-Pipe Horizontal
Installations (*SC Series) .........................49
Figure 39. Venting Options for Downflow
Installations (*SL Series) ..........................50
*SD, *SD-E & *SM Series
Figure 40. Horizontal & Vertical Venting ....................51
Figure 41. Venting Options for Upflow Installations
(*SD & *SD-E Series) ...............................52
Figure 42. Venting Options for Horizontal Installations
(*SD & *SD-E Series) ..............................53
Figure 43. Venting Options for Downflow Installations
(*SM Series) .............................................54
TROUBLESHOOTING ....................................................55
Table 18. Control Board Fault Conditions .................55
Table 19. Motor Control Board Fault Conditions .......55
FURNACE COMPONENTS ............................................55
Figure 44. *SC & *SD & *SD-E Component
Locations ..................................................56
Figure 45. *SL & *SM Component Locations ............57
INSTALLATION / PERFORMANCE CHECK LIST .........62
4
• Followall precautions in the literature, on tags, and
on labels provided with the equipment. Read and
thoroughly understand the instructions provided with
the equipment prior to performing the installation and
operational checkout of the equipment.
• Usecautionwhenhandlingthisapplianceorremoving
components. Personal injury can occur from sharp
metal edges present in all sheet metal constructed
equipment.
• Donotstoreanyofthefollowingon,orincontactwith,
the unit: Rags, brooms, vacuum cleaners, or other
cleaning tools, spray or aerosol cans, soap powders,
bleaches, waxes, cleaning compounds, plastics or
plastic containers, paper bags or other paper products,
gasoline, kerosene, cigarette lighter fluid, dry cleaning
fluids, paint thinners, or other volatile fluids.
• The installer should become familiar with the
units wiring diagram before making any electrical
connections to the unit. See Figure 33 (page 40),
Figure 34 (page 41), or the unit wiring label.
        


REQUIREMENTS & CODES
WARNING:

     
      
    
     

• This furnace must be installed in accordance with
these instructions, all applicable local building codes
and the current revision of the National Fuel Gas
Code (NFPA54/ANSI Z223.1) or the Natural Gas and
Propane Installation Code, CAN/CGA B149.1.
• Use onlywithtype ofgas approvedforthis furnace.
Refer to the furnace rating plate.
• Installthisfurnaceonlyinalocationandpositionas
specified on page 6.
• Provideadequatecombustionandventilationairtothe
furnace space as specified on page 7, page 8,
page 9
& page 10.
• Provide adequate clearances around the vent air
intake terminal as shown in Figure 7 (page 12), Figure
8 (page 12)
, Figure 9 (page 12), & Figure 10 (page
12)
.
• Combustion products must be discharged outdoors.
Connect this furnace to an approved vent system only,
as specified on page 10, page 11, page 12, & page
13
.
• Never test for gas leaks withan open ame. Use a
commercially available soap solution to check all
connections. See page 22.
• Thisfurnaceisdesignedtooperatewithamaximum
external pressure rise of 0.5 inches of water column.
Consult Table 6 (page 34), Table 7 (page 35), Table
8 (page 36)
, Table 9 (page 38), & Table 10 (page
39)
and the rating plate for the proper circulating air
flow and temperature rise. It is important that the duct
system be designed to provide the correct flow rates
and external pressure rise. An improperly designed
duct system can result in nuisance shutdowns, and
comfort or noise issues.
• Whensupplyductscarryaircirculatedbythefurnace
to areas outside the space containing the furnace, the
return air shall also be handled by duct(s) sealed to
the furnace casing and terminating in the conditioned
space. See page 14 .
• A gas-red furnace for installation in a residential
garage must be installed as specified on page 6.
• This furnace may be used for temporary heating of
buildings or structures under construction. See the
guidelines listed on page 6.
• Thisfurnaceisnotapprovedforinstallationinmobile
homes. Installing this furnace in a mobile home could
cause fire, property damage, and/or personal injury.
• The Commonwealth of Massachusetts requires
compliance with regulation 248 CMR 4.00 and 5.00
for installation of through – the – wall vented gas
appliances as follows:
1. For direct-vent appliances, mechanical-vent heating
appliances or domestic hot water equipment, where the
bottom of the vent terminal and the air intake is installed
below four feet above grade the following requirements
must be satisfied:
a.) A carbon monoxide (CO) detector and alarm shall
be placed on each floor level where there are
bedrooms. The detector shall comply with NFPA
720 (2005 Edition) and be mounted in the living
area outside the bedroom(s).
b.) A (CO) detector shall be located in the room that
houses the appliance or equipment and shall:
•Bepoweredbythesameelectricalcircuitasthe
appliance or equipment. Only one service switch
shall power the appliance and the (CO) detector;
•Havebatteryback-uppower;
•MeetANSI/UL2034Standardsandcomplywith
NFPA 720 (2005 Edition); and Approved and listed
by a Nationally Recognized Testing Laboratory as
recognized under 527 CMR.
c.) A Product-approved vent terminal must be used,
and if applicable, a product-approved air intake must
be used. Installation shall be in strict compliance
with the manufacturer’s instructions. A copy of
the installation instructions shall remain with the
appliance or equipment at the completion of the
installation.
d.) A metal or plastic identification plate shall be
mounted at the exterior of the building, four feet
directly above the location of vent terminal. The
plate shall be of sufficient size, easily read from
a distance of eight feet away, and read “Gas Vent
Directly Below”.
2. For direct-vent appliances, mechanical-vent heating
appliances or domestic hot water equipment where the
bottom of the vent terminal and the air intake is installed
above four feet above grade the following requirements
must be satisfied:
5
a.) A (CO) detector and alarm shall be placed on each
floor level where there are bedrooms. The detector
shall comply with NFPA 720 (2005 Edition) and be
mounted in the living area outside the bedroom(s).
b.) The (CO) detector shall:
•Belocatedintheroomthathousestheappliance
or equipment;
•Behard-wiredorbatterypoweredorboth.
•ShallcomplywithNFPA720(2005Edition).
c.) A product-approved vent terminal must be used,
and if applicable, a product-approved air intake must
be used. Installation shall be in strict compliance
with the manufacturer’s instructions. A copy of
the installation instructions shall remain with the
appliance or equipment at the completion of the
installation.
The information listed below is for reference purposes only
and does not necessarily have jurisdiction over local or
state codes. Always consult with local authorities before
installing any gas appliance.

• US:NationalFuelGasCode(NFGC),AirforCombustionand
Ventilation
• CANADA: Natural Gas and Propane Installation Codes
(NSCNGPIC), Venting Systems and Air Supply for Appliances

• USandCANADA:AirConditioningContractorsAssociation
(ACCA) Manual D, Sheet Metal and Air Conditioning
Contractors National Association (SMACNA), or American
Society of Heating, Refrigeration, and Air Conditioning
Engineers (ASHRAE) Fundamentals Handbook
Electrical Connections
• US:NationalElectricalCode(NEC)ANSI/NFPA70
• CANADA:CanadianElectricalCodeCSAC22.1
Gas Piping & Gas Pipe Pressure Testing
• US:NFGCandNationalPlumbingCodes
• CANADA:NSCNGPIC
General Installation
• US: Current edition of theNFGC and the NFPA 90B. For
copies, contact the National Fire Protection Association Inc.,
Batterymarch Park, Quincy, MA 02269; or American Gas
Association, 400 N. Capitol, N.W., Washington DC 20001 or
www.NFPA.org
• CANADA:NSCNGPIC.Foracopy,contactStandardSales,
CSA International, 178 Rexdale Boulevard, Etobicoke
(Toronto), Ontario, M9W 1R3 Canada

• US:(NFGC)NFPA54–1999/ANSIZ223.1andtheInstallation
Standards, Warm Air Heating and Air Conditioning Systems
ANSI/NFPA 90B.
• CANADA:CAN/CGA-B149.1and.2–M00NationalStandard
of Canada. (NSCNGPIC)

CAUTION:
       

To maximize heat exchanger life, the combustion air
must be free of chemicals that can form corrosive acidic
compounds in the combustion gases. The recommended
source of combustion air is to use outdoor air. However,
the use of indoor air in most applications is acceptable
except as listed:
• Ifthefurnaceisinstalledasasinglepipeinstallation
in a confined space, it is required that the necessary
combustion air come from the outdoors by way of attic,
crawl space, air duct, or direct opening. For Installations
in confined spaces, see page 8 for combustion air
requirements.
• Installationsintheselocationsmayrequireoutdoorair
for combustion, due to chemical exposures:
Commercial buildings
Buildings with indoor pools
Furnaces installed in laundry rooms
Furnaces installed in hobby or craft rooms
Furnaces installed near chemical storage areas
• Exposuretothefollowingsubstancesinthecombustion
air supply may require outdoor air for combustion:
Permanent wave solutions
Chlorinated waxes and cleaners
Chlorine based swimming pool chemicals
Water softening chemicals
De-icing salts or chemicals
Carbon Tetrachloride
Halogen type refrigerants
Cleaning solvents (perchloroethylene)
Printing inks, paint removers, varnishes, etc.
Hydrochloric Acid
Cements and glues
Antistatic fabric softeners
Masonry acid washing materials
Heating Load
This furnace should be sized to provide the design heating
load requirement. Heating load estimates can be made
using approved methods available from Air Conditioning
Contractors of America (Manual J); American Society of
Heating, Refrigerating, and Air Conditioning Engineers;
or other approved engineering methods. 
   

The ductwork should be appropriately sized to the capacity
of the furnace to ensure its proper airflow rating. For
installations above 2,000 ft., the furnace should have a
sea level input rating large enough that it will meet the
heating load after deration for altitude.
6
Installation in a Garage
WARNING:

        



This gas-fired furnace may be installed in a residential
garage with the provision that the burners and igniter
are located no less than 18 inches (457mm) above the
floor. The furnace must be located or protected to prevent
physical damage by vehicles.

This furnace is Design Certified in the U.S. and Canada
by CSA International for the minimum clearances to
combustible materials. NOTE: The furnace is listed for
installation on combustible or non-combustible flooring.
However, wood is the only combustible flooring allowed
for installation. Downflow models must use the appropriate
subase kit when installing over a wood floor. To obtain
model number and specific clearance information, refer
to the furnace rating plate, located inside of the furnace
cabinet.
Access for positioning and servicing the unit must be
considered when locating unit. The need to provide
clearance for access to panels or doors may require
clearance distances over and above the requirements.


See Figure 1 for minimum clearance requirements.

CAUTION:



        


Operating gas furnaces in construction environments can
cause a variety of problems with the furnace. Proper use
of commercial portable space heating equipment during
construction is recommended. This gas furnace may be
used during construction if it is not in violation of any
applicable codes and the following criteria are met:
• The installation mustmeetall applicablecodes.The
furnace must be permanently installed according to
the instructions supplied with the furnace including
electrical supply, gas supply, duct work and venting. The
furnace must be controlled by a thermostat properly
installed according to the instructions supplied with the
furnace and thermostat. The installation must include
a properly installed filter in the return air system with
no by-pass air. The filter must be inspected frequently
and replaced when necessary.
• Combustion air must be supplied from outside the
structure and located such that dust and gases
from construction activity are not introduced into the
combustion system.
• Provisions must be made to insure that condensate
does not freeze in the furnace or condensate drain
lines during operation and during idle times; for
example, overnight if turned off.
• Before occupying the structure: The lter must be
replaced or cleaned, the duct work must be inspected
and cleaned of any construction debris, and the
furnace must be cleaned and/or repaired if found to
be dirty, damaged, or malfunctioning in any way by
a qualified HVAC technician. The furnace shall be
inspected and approved by applicable local authority
even if this requires redundant inspections.
• Serialnumbersforfurnacesusedduringconstruction
must be submitted in writing (fax and email also
acceptable). This information will be used to track the
long-term affects of the use during construction on
furnaces. Proof of this submittal shall be available for
the final inspection of the furnace prior to occupancy.
• This furnace is designed to operate with return air
temperatures in ranges normally found in occupied
residences, including setbacks. Minimum continuous
return temperature must not be below 60° F (15° C).
Occasionally a temporary return temperature of 55° F
(12° C) is acceptable. However, operation with a return
temperature below 55° F (12° C) is not allowed.
CLEARANCES TO COMBUSTIBLE MATERIALS
Left Side..................0 Inches Top ..........................0 Inches
Right Side ...............0 Inches Front ......................
4 Inches
Vent .........................0 Inches Back ........................0 Inches
†Allow 24 in. minimum clearance for servicing. Recommended clearance
is 36 in.
Figure 1. 

TOP
FRONT
UPFLOW
APPLICATIONS
HORIZONTAL
APPLICATIONS
VENT
TOP
FRONT
DOWNFLOW
APPLICATIONS
SIDE
TOP
BOTTOM
VENT
VENT
FRONT
BACK
BACK
SIDE
LEFT SIDE
LEFT SIDE
RIGHT SIDE
RIGHT SIDE
7
COMBUSTION AIR & VENTING
REQUIREMENTS
WARNING:
CARBON MONOXIDE POISONING HAZARD
      

     

      

     
while all other appliances connected to the

      






      




in which the appliance(s) connected to the



      



      

6. Follow the lighting instructions. Place the
    


      
      




corrected in accordance with the National Fuel


Codes.
      
     


     

IMPORTANT INFORMATION:
 


        
     
       

      

 

with the National Fuel Gas Code (NFGC) and all

      




   


   


page 5.
WARNING:
     
      
    

 


WARNING:
       
       


      
   


This condensing furnace is certified for installation either as
a Direct Vent (2-pipe) or Conventional (1-pipe) appliance.
Direct Vent appliances draw combustion air from the
outdoors and vent combustion products back outside.
Installation with air taken from around the furnace is often
referred to as Conventional installation - i.e. only the vent
(exhaust) pipe is provided.
Another important consideration when selecting one or
two pipe installation is the quality of the Indoor air which
can sometimes be contaminated with various household
8
chemicals . These chemicals can cause severe corrosion
in the furnace combustion system. A 2-pipe installation
has the additional advantage that it isolates the system
from the effects of negative pressure in the house.
CAUTION:
     





      



Air openings on top of the furnace and openings in closet
doors or walls must never be restricted. If the furnace is
operated without adequate air for combustion, the flame
roll-out switch will open, turning off the gas supply to the
burners.
IMPORTANT NOTE


 



Direct Vent Furnaces
Direct Vent (2-pipe) furnaces draw combustion air directly
from the outdoors and then vent the combustion products
back outside, isolating the entire system from the indoor
space. It is important to make sure that the whole system
is sealed and clearances to combustibles are maintained
regardless of the installation being in a confined or
unconfined space.
    
Spaces
A confined space is an area with volume less than 50
cubic feet per 1,000 Btuh of the combined input rates of
all appliances drawing combustion air from that space.
Furnace closets, small equipment rooms and garages are
confined spaces. Furnaces installed in a confined space
which supply heated air to areas outside the space must
draw return air from outside the space and must have the
return air ducts tightly sealed to the furnace. Ducts must
have cross - sectional area at least as large as the free area
of their respective openings to the furnace space. Attics
or crawl spaces must connect freely with the outdoors if
they are the source of air for combustion and ventilation.
The required sizing of these openings is determined by
whether inside or outside air is used to support combustion,
the method by which the air is brought to the space, and
by the total input rate of all appliances in the space. In
all cases, the minimum dimension of any combustion air
opening is 3 inches.
Air From Inside
If combustion air is taken from the heated space, the two
openings must each have a free area of at least one square
inch per 1,000 Btuh of total input of all appliances in the
confined space, but not less than 100 square inches of
free area. See Example and Figure 2.
EXAMPLE
If the combined input rate of all appliances is less than
or equal to 100,000 Btuh, each opening must have
a free area of at least 100 in
2
. If the combined input
rate of all appliances is 120,000 Btuh, each opening
must have a free area of at least 120 in
2
.
TOTAL INPUT
RATING (BTUH)
MINIMUM FREE AREA
(EACH OPENING)
ROUND DUCT
DIAMETER
40,000 100 sq. In 12 inches
60,000 100 sq. In 12 inches
80,000 100 sq. In 12 inches
100,000 100 sq. In 12 inches
120,000 120 sq. In 13 inches
140,000 140 sq. In 14 inches
160,000 160 sq. In 15 inches
Figure 2. 
Vent or
Chimney
Furnace
Water
Heater
12” Max.
12” Max.
See
Notes
See
Notes
NOTES:
Each opening must be
at least 100 sq. in. or
1 sq. in. per 1,000 Btuh
of total input rating,
whichever is greater.
Openings must start at
no more than 12 inches
from the top and bottom
of the enclosure.
Outdoor Air from a Crawl Space or Vented
Attic
When the openings can freely exchange air with the
outdoors, each opening shall have a minimum free area
of 1 square inch per 4,000 Btuh of total appliance input.
The openings shall exchange directly, or by ducts, with
the outdoor spaces (crawl or attic) that freely exchange
with the outdoors. See Figure 3 (page 9).
Outdoor Air Using Vertical Ducts
If combustion air is taken from outdoors through vertical
ducts, the openings and ducts must have a minimum free
area of one square inch per 4,000 Btuh of total appliance
input. See Figure 4 (page 9).
9
Outdoor Air Using Horizontal Ducts
If combustion air is taken from outdoors through horizontal
ducts, the openings and ducts must have a minimum free
area of one square inch per 2,000 Btuh of total appliance
input. Ducts must have cross - sectional area at least as
large as the free area of their respective openings to the
furnace space. See Figure 5.
Air Directly Through An Exterior Wall
If combustion air is provided directly through an exterior
wall, the two openings must each have free area of at
least one square inch per 4,000 Btuh of total appliance
input. See Figure 6,
Figure 4. 
Through Vertical Ducts
TOTAL INPUT
RATING (BTUH)
MINIMUM FREE AREA
(EACH OPENING)
ROUND DUCT
DIAMETER
40,000 10 sq. In 4 inches
60,000 15 sq. In 5 inches
80,000 20 sq. In 5 inches
100,000 25 sq. In 6 inches
120,000 30 sq. In 6 inches
140,000 35 sq. In 7 inches
160,000 40 sq. In 8 inches
Air Duct must be
at least 1 sq. in.
per 4,000 Btuh of
total input rating.
Ducts must
extend above
attic insulation.
Air Duct must be
at least 1 sq. in.
per 4,000 Btuh of
total input rating.
Ventilation Louvers
at each end of attic
Attic
Insulation
12" Max
Furnace
Water
Heater
Vent or
Chimney
Water
Heater
Vent or
Chimney
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Furnace
Ventilation Louvers For
Unheated Crawl Space
-
-
-
-
-
-
-
-
-
Inlet Air
Ventilation Louvers
(each end of attic)
NOTE: Air openings shall
each have a free area of
not less than one square
inch per 4,000 Btuh of the
total input rating of all
equipment in the enclosure
.
-
-
-
-
-
-
-
-
-
Alternate
Air Inlet
Outlet
Air
Figure 3. 
Space or Vented Attic
Figure 5. 
Through Horizontal Ducts
TOTAL INPUT
RATING (BTUH)
MINIMUM FREE AREA
(EACH OPENING)
ROUND DUCT
DIAMETER
40,000 20 sq. In 5 inches
60,000 30 sq. In 6 inches
80,000 40 sq. In 7 inches
100,000 50 sq. In 8 inches
120,000 60 sq. In 9 inches
140,000 70 sq. In 10 inches
160,000 80 sq. In 10 inches
Furnace
Water
Heater
Air Ducts must be
at least 1 sq. in.
per 2,000 Btuh of
total input rating.
Vent or
Chimney
Air Duct
Air Duct
TOTAL INPUT
RATING (BTUH)
MINIMUM FREE AREA
(EACH OPENING)
ROUND DUCT
DIAMETER
40,000 10 sq. In 4 inches
60,000 15 sq. In 5 inches
80,000 20 sq. In 5 inches
100,000 25 sq. In 6 inches
120,000 30 sq. In 6 inches
140,000 35 sq. In 7 inches
160,000 40 sq. In 8 inches
Figure 6. 

NOTE: Each opening to outside
must be at least 1 sq. in. per
4,000 Btuh of total input rating.
12" Max.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Furnace
Water
Heater
Vent or
Chimney
12"
Max
See
Note
See
Note
10
Alternate Method of Providing Air from
Outside
If acceptable under local Codes, it is permitted to provide
outside air using one opening (See NFGC). Generally,
confined spaces must have two openings in the space for
combustion air. One opening must be within 12 inches of
the ceiling, and the other must be within 12 inches of the
floor. However, an alternative method recently adopted by
the NFGC uses one opening within 12 inches of the top
of the space. This method may be used if it is acceptable
to the local codes.
THE FOLLOWING CONDITIONS MUST BE MET:
1. The opening must start within 12” of the top of the
structure and connect with the out of doors through
vertical or horizontal ducts or be ducted to a crawl or
attic space that connects with the out of doors.
2. The opening must have a minimum free area of 1 sq.
in. per 3,000 Btu per hour of the total input rating of all
equipment located in the enclosure.
3. The free area must not be less than the sum of all the
areas of the vent connectors in the enclosure.
    
Spaces
An unconfined space is an area including all rooms not
separated by doors with a volume greater than 50 cubic
feet per 1,000 Btuh of the combined input rates of all
appliances which draw combustion air from that space.
In general, a furnace installed in an unconfined space will
not require outside air for combustion. However, in homes
built for energy efficiency (low air change rates), it may
be necessary to provide outside air to ensure adequate
combustion and venting, even though the furnace is located
in an unconfined space. See Example below.
EXAMPLE
A space with a water heater rated at 45,000 Btuh
input and a furnace rated at 75,000 Btuh requires a
volume of 6,000 cubic feet [50 x (45 + 75) = 6,000] to
be considered unconfined. If the space has an 8 foot
ceiling, the floor area of the space must be 750 sq. ft.
(6,000 / 8 = 750).

WARNING:
     
      
      




This furnace is classified as a “Category IV” appliance,
which requires special venting materials and installation
procedures. This section specifies installation requirements
for Conventional (1-pipe) and Direct Vent (2-pipe) piping.
For 1- pipe installations, install vent piping as described in
this section and provide air for combustion and ventilation
according to page 7, page 8, page 9 & page 10.
The length of vent and combustion air piping for either
type of installation are llisted in Table 1.
FURNACE
MODELS
(BTU)
FURNACE
INSTALLATION
SINGLE VENT PIPE LENGTH (FT.)
WITH 1 LONG RADIUS ELBOW†
DUAL VENT PIPE LENGTH (FT.)
WITH 1 LONG RADIUS ELBOW ON EACH PIPE†
OUTLET
2” DIAMETER
OUTLET
3” DIAMETER
INLET / OUTLET
2” DIAMETER
INLET / OUTLET
3” DIAMETER
38,000 Upflow 50 70 50 70
54,000
Upflow 70 90 70 90
Downflow 70 90 70 90
72,000
Upflow 50 90 50 90
Downflow 50 90 50 90
90,000
Upflow 60 90 60 90
Downflow 60 90 60 90
108,000 Upflow N/A 90 N/A 90
118,000 Downflow N/A 90 N/A 90
120,000
Upflow N/A 90 N/A 90
Downflow N/A 90 N/A 90
NOTES:
1. Subtract 2.5 ft. for each additional 2 inch long radius elbow, 5 ft. for each additional 2 inch short radius elbow, 3.5 ft. for each additional 3 inch long radius elbow,
and 7 ft. for each additional 3 inch short radius elbow. Subtract 5 ft for each 2” tee and 8 ft for each 3” tee.
2. Two 45 degree elbows are equivalent to one 90 degree elbow.
3. This table applies for elevations from sea level to 2,000 ft. For higher elevations, decrease pipe lengths by 8% per 1,000 ft of altitude.
4. A long radius elbow’s centerline radius is equal to or greater than 1.5 times the vent diameter.
Vent Pipe Lengths
11
Category IV appliances operate with positive vent pressure
and therefore require vent systems which are thoroughly
sealed. They also produce liquid condensate, which is
slightly acidic and can cause severe corrosion of ordinary
venting materials. Furnace operation can be adversely
affected by restrictive vent and combustion air piping.
The inducer assembly on this furnace can be rotated to
vent the flue products out of the top, left or right side. This
increases the flexibility of which direction the vent pipe
can exit the furnace.
Vent Pipe Material
Vent and combustion air pipe and fittings must be one
of the following materials in the list and must conform to
the indicated ANSI/ASTM standards.
MATERIALS STANDARDS
Schedule 40PVC ......................................................D1785
PVC-DWV .................................................................D2665
SDR-21 & SDR-26 ....................................................D2241
ABS-DWV ................................................................. D2661
Schedule 40 ABS .....................................................F628
Foam / Cellular Core PVC ........................................F891
*PolyPro
®
by DuraVent ..............................................ULC-S636
*When using PolyPro
®
, all venting and fittings must be from the same
manufacturer with no interchanging of other materials. Refer to specific
instructions supplied with the PolyPro vent kits
When joining PVC to PVC, use cement that conforms to
ASTM standard D2564. PVC primer must meet standard
ASTM F656. When joining ABS to ABS, use cement that
conforms to ASTM standard D2235. When joining PVC
to ABS, use cement as specified in procedure from ASTM
standard D3138
In Canada, all plastic vent pipes and fittings including
any cement, cleaners, or primers must be certified as a
system to ULC S636. However this requirement does not
apply to the finish flanges or piping internal to the furnace.
Vent Pipe Length & Diameter
In order for the furnace to operate properly, the combustion
air and vent piping must not be excessively restrictive.
• The ventingsystem shouldbedesignedtohavethe
minimum number of elbows or turns.
• Transitiontothenalventdiametershouldbedoneas
close to the furnace outlet as practical.
• Always use the same size or a larger pipe for
combustion air that is used for the exhaust vent.
Table 1 (page 10) indicates the maximum allowable pipe
length for a furnace of known input rate, when installed
with piping of selected diameter and number of elbows. To
use the table, the furnace input rate, the centerline length
and the number of elbows on each pipe must be known.
When estimating the length of vent runs, consideration
must be made to the effect of elbows and other fittings.
This is conveniently handled using the idea of “equivalent
length”. This means the fittings are assigned a linear
length that accounts for the pressure drop they will cause.
For example: a 2” diameter, long radius elbow is worth
the equivalent of 2.5 feet of linear run. A 90 degree tee
is worth 7 ft.
The equivalent lenghts of tees and various elbows are
listed in Table 1. Measure the linear length of your vent run
and then add in the equivalent length of each fitting. The
total length, including the equivalent fitting lengths, must
be less than the maximum length specified in the table.
Vent Pipe Installation
CAUTION:
       

This furnace has been certified for installation with zero
clearance between vent piping and combustible surfaces.
However, it is good practice to allow space for convenience
in installation and service.
• In the absence of local codes, the location of any
combustion air inlet relative to any vent terminal
must be at least 8 inches. This includes installations
involving more than one furnace.
• Thequalityofoutdoorairmustalsobeconsidered.Be
sure that the combustion air intake is not located near a
source of solvent fumes or other chemicals which can
cause corrosion of the furnace combustion system.
(See
page 5 for a sample list of substances).
• Routepipingasdirectaspossiblebetweenthefurnace
and the outdoors. Horizontal piping from inducer to
the flue pipe must be sloped 1/4” per foot to ensure
condensate flows towards the drain tee or PVC trap.
Longer vent runs require larger pipe diameters. Refer
to the Inducer & Venting Options section on page 17
for additional information.
• IfaDirectVent(2-pipe)systemisused,thecombustion
air intake and the vent exhaust must be located in the
same atmospheric pressure zone. This means both
pipes must exit the building through the same portion
of exterior wall or roof as shown in Figure 35 (page 46)
or Figure 40 (page 51).
• Piping must be mechanically supported so that its
weight does not bear on the furnace. Pipe supports
must be installed a minimum of every five feet along the
vent run to ensure no displacement after installation.
Supports may be at shorter intervals if necessary to
ensure that there are no sagging sections that can trap
condensate. It is recommended to install couplings
along the vent pipe, on either side of the exterior
wall (Figure 35 or Figure 40). These couplings may be
required by local code.
• If breakable connections are required in the
combustion air inlet pipe (if present) and exhaust vent
piping, then straight neoprene couplings for 2” or 3”
piping with hose clamps can be used. These couplings
can be ordered through your local furnace distributor.
To install a coupling:
1. Slide the rubber coupling over the end of the pipe that
is attached to the furnace and secure it with one of the
hose clamps.
2. Slide the other end of the rubber coupling onto the other
pipe from the vent.
12
3. Secure the coupling with the second hose clamp,
ensuring that the connection is tight and leak free.
Outdoor Terminations - Horizontal Venting
• Vent and combustion air intake terminations shall
be installed as shown in Figure 7 & Figure 8 and in
accordance with these instructions:
• Venttermination clearancesmustbeconsistent with
the NFGC, ANSI 2223.1/NFPA 54 and/or the CSA
B149.1, Natural Gas and Propane Installation Code.
Table 16 (page 43) lists the necessary distances
from the vent termination to windows and building air
intakes.
• Vent and combustion air intake terminations must
be located to ensure proper furnace operation and
conformance to applicable codes. A vent terminal
must be located at least 3 feet above any forced air
inlet located within 10 feet. This does not apply to
the combustion air inlet of a direct vent (two pipe)
appliance. In Canada, CSA B149.1 takes precedence
over these instructions. See Table 17 (page 45).
• Allminimumclearancesmustbemaintainedtoprotect
building materials from degradation by flue gases. See
(Figure 8).
• For optimal performance, vent the furnace through
a wall that experiences the least exposure to winter
winds.
• The vent termination shall be located at least 3 ft.
horizontally from any electric meter, gas meter,
regulator and any relief equipment. These distances
apply ONLY to U.S. installations. In Canada, CSA
B149.1 takes precedence over these instructions.
• Do not installtheventterminal such thatexhaust is
directed into window wells, stairwells, under decks
or into alcoves or similar recessed areas, and do not
terminate above any public walkways.
• Ifventinghorizontally,asidewallventkitisavailable
according to the pipe diameter size of the installation.
For 2 inch pipe use side wall vent kit #904617, and
for 3 inch pipe use kit #904347.   

• Concentricventterminationkitsareavailableforuse
with these furnaces. For 2 Inch pipe use kit #904952
and or 3 inch pipe use kit # 904953. 

• Whentheventpipemustexitanexteriorwallcloseto
the grade or expected snow level where it is not possible
Figure 7. 
12” min. to maximum
expected snow level
(both pipes)
90° Elbow
Exhaust vent
option B
Exhaust vent
option A
Mounting kit faceplate
secured to wall with screws
(both pipes)
Combustion
air inlet
Exhaust vent
option C
18” Min.
36” Max.
8” Min.
36” Max.
(all positions)
Note 2
Mechanical draft
vent terminal
Direct vent
terminal
50,000 Btuh
or less
Forced air inlet
Direct vent
terminal - more
than 50,000 Btuh
Mechanical
draft vent
terminal
Mechanical
draft vent
terminal
Less
than
10 ft.
3 ft.
NOTES:
1. All dimensions shown are
minimum requirements.
2. Exterior vent terminations must
be located at least 12” above the
maximum expected snow level.
Note 2
4 ft
4 ft
12 in.
12 in.
9 in.
Note 2
Figure 8. Vent Locations
Figure 9. Alternate Horizontal Vent Installation
Support
NOTE: Vent Configuration to Provide
12" Minimum height above Snow Level.
1/2"
Armaflex
Insulation or
Equivalent
(if required)
12" Above
Maximum
Expected
Snow Level
19" Max.
(See Note)
Outside
Wall
Figure 10. 
Combustion Air
Exhaust Vent
12” Above Maximum
Expected Snow Level
(Both pipes)
Elbows on the combustion air
inlet must be positioned pointing
away from the exhaust vent.
8" Min.
36" Max.
Plumbing Vent Roof Boot
(Both Pipes)
13
• To prevent debris or creatures from entering the
combustion system, a protective screen may be
installed over the combustion air intake opening. The
screens hole size must be large enough to prevent air
restriction.
Existing Installations
When an existing furnace is removed from a vent system
serving other appliances, the existing vent system may
not be sized properly to vent the remaining appliances
(For example: water heater). An improperly sized venting
system can result in the formation of condensate, leakage,
or spillage. The existing vent system should be checked
to make sure it is in compliance with NFGC and must be
brought into compliance before installing the furnace.
NOTE: If replacing an existing furnace, it is possible you
will encounter an existing plastic venting system that is
subject to a Consumer Product Safety Commission recall.
The pipes involved in the recall are High Temperature
Plastic Vent (HTPV). 
these pipes  This
recall does not apply to other plastic vent pipes, such
as white PVC or CPVC. Check for details on the CPSC
website or call their toll-free number (800) 758-3688.
Condensate Disposal
The method for disposing of condensate varies according
to local codes. Consult your local code or authority having
jurisdiction. Neutralizer kit P/N 902377 is available for
use with this furnace. 

This furnace has multiple options for positioning the vent
pipe as described in the, Vent and Inducer Assembly
Options section (page 17). Each of the condensate
drain lines must be J-trapped using field supplied parts.
After the condensate lines are J-trapped, they may be
combined together when routed to the drain.
For Installations where there is limited clearance for the
J-Trap (such as an attic where it may be installed between
ceiling joists), either side of the J-Trap can be shortened
to a minimum of 3 Inches. See Figure 11 (page 16).
to obtain clearances shown in Figure 7, a riser may be
provided as shown in Figure 9 (page 12). Insulation is
required to prevent freezing of this section of pipe. See
Table 3 (page 17) for vent freezing protection.
Outdoor Terminations - Vertical Venting
Termination spacing requirements from the roof and from
each other are shown in
Figure 10. The roof penetration
must be properly flashed and waterproofed with a plumbing
roof boot or equivalent flashing. Vent and combustion air
piping may be installed in an existing chimney which is
not in use provided that:
• Boththeexhaustventandairintakerunthelengthof
the chimney.
• Thetopofthechimneyissealedandweatherproofed.
• The termination clearances shown in
Figure 10 are
maintained.
• Noothergasredorfuel-burningequipmentisvented
through the chimney.
Vent Freezing Protection
CAUTION:

      




icing.
• Table 2 lists the maximum length of flue pipe that can
travel through an unconditioned space or an exterior
space. The total vent length must not exceed the
lengths noted in Table 1 (page 10). For Canadian
installations, please refer to the Canadian Installation
Code (CAN/CGA-B149.1 or 2) and/or local codes.
• Forextremelycoldclimatesorforconditionsofshort
furnace cycles (i.e. set back thermostat conditions)
the last 18 inches of vent pipe can be reduced. It is
acceptable to reduce from 3” to 2-1/2”, 3” to 2”, or 2”
to 1-1/2” if the total vent length is at least 15 feet in
length, and the vent length is within the parameters
specified in Table 1. The restriction should be counted
as 3 equivalent feet. Smaller vent pipes are less
susceptible to freezing, but must not be excessively
restrictive. The length of the 2 inch pipe must not be
longer than 18 inches.
• If furnace is installed horiziontally, make sure the
drainage port on the in-line drain assembly is pointed
downward to ensure proper drainage of condensate.
For *SC series, see Figure 37 (page 48) & Figure 38
(page 49)
. For *SD & *SD-E series, see Figure 42
(page 53)
.
WINTER DESIGN
TEMPERATURE
MAXIMUM FLUE PIPE LENGTH (FEET)
IN UNCONDITIONED & EXTERIOR SPACES
WITHOUT INSULATION WITH INSULATION*
20 45 70
0 20 70
-20 10 60
*NOTE: Insulation thickness greater than 3/8 inch, based on an R value
of 3.5 (ft x F x hr) / (BTU x in.)
Vent Protection
14
CIRCULATING AIR REQUIREMENTS
WARNING:

      
     
     


       



       




       

      





• Plenumsandairductsmustbeinstalledinaccordance
with the Standard for the Installation of Air Conditioning
and Ventilating Systems (NFPA No. 90A) or the
Standard for the Installation of Warm Air Heating and
Air Conditioning Systems (NFPA No. 90B).
• Table 6 (page 34), Table 7 (page 35), Table 8 (page
36)
, Table 9 (page 38), & Table 10 (page 39)
contain the maximum airflow and temperature rise
data for each furnace input rate. If the maximum airflow
is 1,600 CFM or more, it is recommended that two
openings be used for return air on upflow furnaces.
Downflow furnaces can only use one return opening.
• It is recommended that the outlet duct contain a
removable access panel. The opening should be
accessible when the furnace is installed in service and
shall be of a size that smoke or reflected light may be
observed inside the casing to indicate the presence of
leaks in the heat exchanger. The cover for the opening
shall be attached in a way that prevent leaks.
• If outsideair isused asreturn airto thefurnacefor
ventilation or to improve indoor air quality, the system
must be designed so that the return air is not less than
60° F (15° C) during operation. If a combination of
indoor and outdoor air is used, the ducts and damper
system must be designed so that the return air supply
to the furnace is equal to the return air supply under
normal, indoor return air applications.
• When a cooling system is installed which uses the
furnace blower to provide airflow over the indoor coil,
the coil must be installed downstream (on the outlet
side) of the furnace or in parallel with the furnace.
• If a cooling system is installed in parallel with the
furnace, a damper must be installed to prevent chilled
air from entering the furnace and condensing on the
heat exchanger. If a manually operated damper is
installed, it must be designed so that operation of
the furnace is prevented when the damper is in the
cooling position and operation of the cooling system is
prevented when the damper is in the heating position.
• Seal all connections and joints withindustrial grade
sealing tape or liquid sealant. Requirements for sealing
ductwork vary from region to region. Consult with local
codes for requirements specific to your area.
Return Air Connections
• In applications where the supply ducts carry heated
air to areas outside the space where the furnace is
installed, the return air must be delivered to the furnace
by duct(s) secured to the furnace casing, running full
size and without interruption. 

• Position the furnace with the return air ductwork
ensuring even alignment of furnace (or coil casing)
air opening and return air duct. NOTE: The ductwork
must have an opening equal to that of the return air
opening of the furnace (or coil casing). See Figure
31 (page 32)
or Figure 32 (page 33) for return air
opening size.
Upflow & Horizontal Furnaces
• The return air ductwork may be connected to the
left side, right side, or bottom of the furnace. NOTE:
If using the left or right side of the furnace for return
air, the bottom panel (Figure 32) must not be removed
from the bottom of the furnace.
WARNING:







• Side Return Installations: To attach the return air
duct to the left or right side of the furnace, punch out
the 4 knockouts from the side of the furnace (Figure 32).
Using sharp metal cutters, cut an opening between all
4 knockouts to expose the blower assembly. Position
the return air duct over the opening and secure to the
side with sheet metal screws.
•  If using the bottom of
the furnace for return air, the bottom panel (Figure 32)
must be removed from the bottom of the furnace. See
page 21 for removal instructions. Position the furnace
over the return air duct and secure together with sheet
metal screws. Make sure the screws penetrate the
duct and furnace casing.
15
Downflow Furnaces
• Toattachthereturnairducttothefurnace,bendthe
flanges on the furnace upward 90° with wide duct
pliers. See Figure 31 for furnace flange locations.
NOTE: If system installation includes AC coil casing,
bend the flanges on the coil casing upward 90° before
attaching the return air duct.
• Securethereturnairductworktothefurnaceorcoil
casing (if installed) with sheet metal screws. Make
sure the screws penetrate the sheet metal casing and
flanges.

• The supply air must be delivered to the heated space
by duct(s) secured to the furnace or coil box casing,
running full size and without interruption.
• To attach the supply air duct to upflow & horizontal
furnaces, bend the flanges on the furnace upward 90°
with wide duct pliers. See Figure 32 for furnace flange
locations. NOTE: If system installation includes AC coil
casing, bend the flanges on the coil casing upward 90°
before attaching the supply air duct.
• Position the supply air ductwork onto the furnace
ensuring even alignment of furnace air opening and
supply air duct. NOTE: The ductwork must have an
opening equal to that of the supply air opening of the
furnace. See Figure 31 (page 32) and Figure 32 (page
33)
for supply air opening size.

Damping ducts, flexible vibration isolators, or pleated
media-style filters on the return air inlet of the furnace
may be used to reduce the transmission of equipment
noise eminating from the furnace. These treatments can
produce a quieter installation, particularly in the heated
space. However, they can increase the pressure drop in
the duct system. Care must be taken to maintain the proper
maximum pressure rise across the furnace, temperature
rise and flow rate. This may mean increasing the duct size
and/or reducing the blower speed. These treatments must
be constructed and installed in accordance with NFPA and
SMACNA construction standards. Consult with local codes
for special requirements. For best sound performance,
install all the needed gaskets and grommets around
penetrations into the furnace, such as for electrical wiring.
FURNACE INSTALLATION
*SC , *SD & *SD-E series gas furnaces offer a wide range
of installation options, including installation in the upflow or
horizontal positions with either right, left, or upflow return
air. *SL & *SM series gas furnaces may only be installed
as a downflow application.

• The furnace must be leveled at installation and
attached to a properly installed duct system. See
Figure 1 (page 6) for the required clearances needed
to move the furnace to its installation point (hallways,
doorways, stairs, etc).
• The furnace must be installed so that all electrical
components are protected from water.
• The furnace must be installed upstream from a
refrigeration system. (If applicable)
• Thecabinetplugmustalwaysbeusedtoclosethehole
in the side of the furnace when rotating the inducer.
• The furnace requires special venting materials and
installation procedures. See
page 7, page 8, page
9
, page 10, page 11, page 12, & page 13 for
venting guidelines and specifications.
Upflow Furnaces
WARNING:
      

than wood flooring.
*SC, *SD & *SD-E series gas furnaces are shipped with
the bottom panel installed as shown in
Figure 32 (page
33)
. If the furnace is installed with side return air, the
bottom panel must not be removed. If the furnace is
installed with bottom return air, the bottom panel must
be removed. See Bottom Panel Removal on page 21.
Horizontal Furnaces
WARNING:
      

than wood flooring.
*SC, *SD & *SD-E series gas furnaces can be installed
horizontally (Figure 11) in an attic, basement, crawl space
or alcove. It can also be suspended from a ceiling in a
basement or utility room in either a right to left airflow or
left to right airflow as shown in Figure 12 (page 16).
These furnaces are shipped with the bottom panel installed.
If the furnace is installed horizontally, remove the bottom
panel from the furnace before attaching the duct system.
See Bottom Panel Removal on
page 21.
If installing the furnace with an evaporator coil (in an attic),
it is required that a drip pan be placed under the furnace.
If the installation is on a combustible platform as shown
in
Figure 11, it is recommended that the drip pan extend
16
at least 12 inches past the top and front of the furnace.
NOTE: Although it is not required to use a drip pan for heat
only applications, state and local codes may require it.
If suspending the furnace from the ceiling, assemble a
support frame (Figure 12) using slotted iron channel and
full threaded rod. Fasten the frame together with nuts,
washers, and lockwashers. Secure the support frame to the
rafters with lag bolts. The furnace can also be suspended
using steel straps around each end of the furnace. The
straps should be attached to the furnace with sheet metal
screws and to the rafters with bolts.
It is recommended for further reduction of fire hazard
that cement board or sheet metal be placed between the
furnace and the combustible floor and extend 12 inches
beyond the front of the door and top of the furnace.
Special Instructions for SC038-23A Furnaces
If installing an SC038-23A furnace horizontally (with
airflow going from left to right), the pressure switch will
need to be moved to the side of the furnace that is not
facing the ground. See Figure 13. Moving the switch will
make it easier to replace in the future.
Figure 12. 
Lag
Bolt
Nuts (x2)
Washer
and
Lockwasher
Nuts (x2)
Threaded
Rod
1. Shut off any electrical power to the furnace.
2. Label and disconnect the tubing and wires from the
pressure switch (1).
3. Remove two screws (2) securing the pressure switch
(1) to the side of the furnace.
4. Remove two 1/4” black plugs (3) on the opposite side
of the cabinet that the pressure switch will be relocated
to.
5. Position the pressure switch (1) in its new location and
secure it in place using the same screws (2) removed
in step 2
6. Insert the plugs (3) into the holes on the side that the
pressure switch (1) was removed from.
7. Reconnect the tubing and wiring to the pressure switch
(1) being careful that they will not fall into the burner
box.
CAUTION:


        

8. Check the furnace for proper operation as directed in
Startup and Adjustments section. If the furnace shuts
down during the pre-purge, the switch that measures
pressure in the header needs to be checked for correct
tubing connections.
Downflow Furnaces
WARNING:
      

than wood flooring.
Flue pipe vented
to outside
J-Trap
Height
3” Min.
Coil Plenum
Wood or
non-combustible
platform
Two-pipe installation shown
Combustion Air
Condensate
Drain Lines
Figure 11. 
Figure 13. SC038-23A Pressure Switch
PLUGS (X2)
PRESSURE
SWITCHES
SCREWS (X2)
17
WARNING:


To install an *SL & *SM series gas furnace on combustible
flooring, a special sub-base is required. Downflow sub-
base kits are factory supplied accessories and are listed
according to the cabinet letter of the furnace. For ‘B’, ‘C’,
and ‘D’ size cabinets use Kit #904911. 

A downflow sub-base kit is not necessary if the furnace
is installed on a factory or site-built cased air conditioning
coil. However, the plenum attached to the coil casing
must be installed so that its surfaces are at least 1” from
combustible construction.
Installation on a Concrete Slab
1. Create an opening in the floor according to the
dimensions in Table 3.
2. Position the plenum and the furnace as shown in
Figure 14.
Figure 14. 
Concrete
Floor
Furnace
Sheet
Metal
Plenum

MODEL # DIM. “A” DIM. “B”
054D-24B 16 5/8 19 1/4
072D-24B 16 5/8 19 1/4
072D-35C 20 1/8 19 1/4
090D-35C 20 1/8 19 1/4
118D-45D 23 5/8 19 1/4
120D-45D 23 5/8 19 1/4
NOTE: Dimensions shown in Inches.
“A”
“B”
Opening in concrete floor
Inducer & Venting Options
To increase installation flexibility, the inducer assembly can
be rotated up to 3 different positions. Each variation has
slightly different requirements with regard to condensate
disposal and, in some cases, the need to seal the furnace
cabinet.
IMPORTANT NOTE:


Before using Table 4, the number of pipes (1-pipe or 2-pipe)
connected to the furnace must be known. Find the proper
furnace style (upflow, horizontal, or downflow) and then
the side that the pipes will exit from the furnace. Finally
select the option that properly matches your installation
type. For *SC & *SL series, Figure 35, Figure 36, Figure 37,
Figure 38, or Figure 39. For *SD, *SD-E & *SM series, see
Figure 40, Figure 41, Figure 42, or Figure 43.
NOTE: It is important that Direct Vent (2-pipe) systems
maintain an airtight flow path from the air inlet to the flue
gas outlet. The furnace ships from the factory with two
holes in the cabinet for the air inlet and flue gas outlet.
In certain configurations, it is necessary to remove and
relocate a plastic plug in the furnace cabinet. If changing
the position of the air inlet and flue gas outlet, it is required
that the previous hole be closed off with the plastic plug to
maintain air tightness in the furnace. The hole locations
for all furnace series are shown in
Figure 31 and Figure 32.

VENT
DIRECTION
UPFLOW
HORIZONTAL
RIGHT
HORIZONTAL
LEFT
DOWNFLOW
Right
Option 21
N/A N/A
Option 29
Up N/A
Option 25 Option 26 Option 30
Left
Option 22
N/A N/A
Option 31

VENT
DIRECTION
UPFLOW
HORIZONTAL
RIGHT
HORIZONTAL
LEFT
DOWNFLOW
Right
Option 23
N/A N/A
Option 32
Up N/A
Option 27 Option 28 Option 33
Left
Option 24
N/A N/A
Option 34
Vent & Inducer Blower Options
*SC & *SL SERIES - CONVENTIONAL (1 PIPE)
VENT
DIRECTION
UPFLOW
HORIZONTAL
RIGHT
HORIZONTAL
LEFT
DOWNFLOW
Up
Option 1 Option 7 Option 10 Option 15
Right
Option 2 Option 8
N/A
Option 16
Left
Option 3
N/A
Option 9 Option 17
*SC & *SL SERIES - DIRECT VENT (2-PIPE)
VENT
DIRECTION
UPFLOW
HORIZONTAL
RIGHT
HORIZONTAL
LEFT
DOWNFLOW
Up
Option 4 Option 12 Option 14 Option 18
Right
Option 5 Option 11
N/A
Option 19
Left
Option 6
N/A
Option 13 Option 20
18
Inducer Assembly Rotation
WARNING:
     

 
     

CAUTION:
         

and dangerous operation.
1. Disconnect the electrical harness from the inducer
assembly.
2. Remove the inducer assembly ground wire from the
blower deck.
3. Remove 3 screws securing the inducer assembly to the
header box.
4. Rotate the inducer assembly to its new position.
5. Secure the inducer assembly to the header box by
reinstalling the three screws. If the inducer assembly
is rotated to the left or right side of the furnace, use the
extra screw provided in the parts package.
6. Remove the cabinet plug from side of furnace and
reinstall in hole on opposite side of cabinet.
7. Install in-line drain assembly and tubing.
8. Install all condensate drain lines. For *SC & *SL series,
refer to Figure 35, Figure 36, Figure 37, Figure 38, or Figure
39.
For *SD, *SD-E & *SM series, refer to Figure 40,
Figure 41, Figure 42, or Figure 43.
9. Reconnect the electrical harness to the inducer
assembly.
10. Reconnect the inducer assembly ground wire to the
blower deck or door.
11. Verify operation as detailed on the furnace label.
Pressure Switch Tubing
All upflow / horizontal furnaces have two switches, one
connected to the static tap on the inducer assembly and
the other to the collector box. Figure 15 & Figure 16 display
the proper routing of pressure switch tubing for *SC, *SD
& *SD-E furnaces. Downflow (*SL & *SM) furnaces require
only one switch connected to the inducer’s static tap as
shown in
Figure 17.
Alternate Pressure Switch Location
In some inducer orientations, the inducer pressure switch
may interfere with gas pipe installation. Determine the
side of the cabinet the gas pipe will enter and see if the
inducer pressure switch needs to be moved. If the pressure
switch interferes with the gas pipe, use these instructions
for relocating it to an alternate location:
Figure 15. 

Figure 16. 
Upflow Furnaces


Figure 17. 
Downflow Furnaces


19
Accessories
The components below are included in the extra parts
bag that is supplied with the purchase of your furnace.
Depending on your particular installation, some of these
components are optional and may not be used. Please
refer to the descriptions and accompanying figures when
installing these items. NOTE: Some parts may not be
supplied with each furnace. Refer to the literature in the
extra parts bag for the parts included witht he particular
furnace.
Finish Flange
The finish flange must be installed to vent the combustion
air pipe through the top of the furnace. NOTE: For proper
installation it is important that the pipe and screw holes
in the finish flanges, gasket, and cabinet are aligned.
See Figure 19.
1. Position flange gasket over hole in the furnace cabinet.
2. Position finish flange on top of the flange gasket.
NOTE: Make sure the flange is properly oriented so
that the FRONT lettering is located near the front of
the furnace as shown in Figure 19.
3. Secure flange and gasket to cabinet with three field
supplied sheet metal screws.
Rubber Grommets
The 2 1/4” rubber grommet is used to seal the opening
between the furnace cabinet and the 2” PVC vent pipe.
The rubber grommet should be installed in the 3” hole
prior to running the vent pipe out of cabinet. No sealants
are required. See Figure 20.
The 7/8” rubber grommet is used to seal the opening
between the furnace cabinet and the gas pipe. The rubber
grommet should be installed in the 1 5/8” hole prior to
running the gas pipe into the cabinet. No sealants are
required.
The 3/4” rubber grommet is used if venting out the left
side of the cabinet and the drain tube is routed through
the blower deck. Remove the plastic plug from the hole
and install the grommet before routing the drain tube.
1. Shut off any electrical power to the furnace.
2. Label and disconnect the tubing and wires from the
pressure switch (Figure 18).
3. Remove two screws securing the pressure switch to
the inducer housing.
4. Remove the pressure switch from the mounts on the
inducer housing and relocate it to the other set of mounts
90° from previous location.
5. Secure the pressure switch with two screws.
6. Reconnect the tubes and wires to the pressure switch.
Figure 18. Alternate Pressure Switch Location
PRIMARY
LOCATION
ALTERNATE
LOCATION
Figure 20. 
Ø 3/4” Rubber
Grommet
ø 2 1/4” Rubber Grommet
(see note)
ø 7/8” Rubber
Grommet
Figure 19. Finish Flange
Finish
Flange
Flange
Gasket
Hole for
Flue
Vent Pipe
Hole for Inlet
Air Vent Pipe
FRONT
FRONT lettering must be
located near front
of furnace
20
3. Install the 1/2” x 1/2” hose barb on the 2” PVC reducer.
NOTE: Do not over tighten! Use an adequate amount of
Teflon tape on the threads. Do not use liquid sealants.
4. Verify all connections and joints for tight fit and proper
alignment with other vent pipes.
Alternate Orientation
1. Install the 2” PVC Tee horizontally on the 2” vent pipe that
is extending out the side of the cabinet. Permanently bond
them together using appropriate primer and cement.
Refer to the alternate orientation shown in
Figure 21.
2. Install the 2” PVC Elbow on the end of the 2” PVC Tee.
Permanently bond them together using appropriate
primer and cement.
3. Install the reducer or PVC trap (if supplied) on the bottom
end of the PVC Tee. Permanenly bond them together
using appropriate primer and cement.
4. Install the 1/2” x 1/2” hose barb on the 2” PVC reducer.
NOTE: Do not over tighten! Use an adequate amount of
Teflon tape on the threads. Do not use liquid sealants.
5. Verify all connections and joints for tight fit and proper
alignment with other vent pipes.
Optional PVC Pipe Installation
When running the 2” PVC pipe out through the top of
the *SD or *SD-E upflow furnace, there may be possible
clearance issues when transitioning the PVC pipe from
2” to 3”:
• IfthesizeofthePVCueneedstobeincreasedfrom
2” to 3”, two, 2” x 45° PVC elbows may be used to
achieve the clearances needed between the coil box
and the 2” x 3” coupling. See
Figure 22 (page 21).
• Install the2” x3” couplingin thevertical run only. If
the coupling is installed horizontally, it will allow water
to build up inside the furnace and cause a lock out
condition.
• Toavoidtheclearanceissue,itisrecommendedthat
the furnace be vented through the left side or the right
side of the cabinet.
Condensate Drain Lines








• Themethodfordisposingcondensatevariesaccording
to local codes. Consult your local code or authority
having jurisdiction.
• The condensate drain line must be trapped using
a kit (P/N- 922485) or field supplied parts. After the
drain trap, condensate can continue to the drain by
connecting to a recommended 3/4” ID minimum drain
line, but no smaller than the original tubing ID supplied
by the manufacturer. The drain line should slope
downward away from the furnace to ensure proper
drainage.
PVC Components
IMPORTANT NOTES:
 


 Figure 21 are not



The 2” PVC tee, reducer, PVC Trap and 1/2” X 1/2” hose
barb are used when the inducer is rotated to vent out thru
the left or right side of the furnace cabinet. See Figure 21.
The 1/2” X 3/4” hose barb can be used to route the
condensate drain to the outside of the cabinet. It must
be installed from inside the cabinet with the threaded
end inserted thru the 1 1/16” hole. The condensate drain
should be connected to the barbed end. Attach 1” PVC
drain line to the threaded end. See Figure 31 (page 32)
or Figure 32 (page 33) for hole location.
Typical Orientation
1. Install the PVC Tee vertically on the 2” vent pipe that is
extending out the side of the cabinet. Permanently bond
them together using appropriate primer and cement.
Refer to the typical orientation shown in Figure 21.
2. Install the reducer or PVC trap (if supplied) on the bottom
end of the PVC Tee. Permanently bond them together
using appropriate primer and cement.
Figure 21. 
1/2” x 3/4”
Hose Barb
2” PVC Elbow
(Field Supplied)
2” PVC Te e
1/2” x 3/4”
Hose Barb
2” PVC Pipe from Inline
Drain Assembly
(Not Included)
1/2” Tubing Formed
into a Loop
(Field Supplied)
PVC
Trap
(TYPICAL ORIENTATION)
INSTALLATION OF PVC COMPONENTS
(ALTERNATE ORIENTATION)
2” PVC Te e
2” PVC Pipe from Inline
Drain Assembly
(Not Included)
1/2” Tubing Formed
into a Loop
(Field Supplied)
PVC
Trap
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120

Kelvinator KG7S(D,M) Guide d'installation

Taper
Guide d'installation
Ce manuel convient également à

dans d''autres langues