Bradley Corporation S19-120ABF Guide d'installation

Catégorie
Articles sanitaires
Taper
Guide d'installation
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817
bradleycorp.com
Installation
215-1259 Rev. E; ECN 12-05-016C
© 2012 Bradley
Page 1 of 5 5/29/12
S19-120BF
Plastic Showerhead
S19-120ABF
Plastic Showerhead with Stainless
Steel Shroud
Drench Shower - Horizontal Supply
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . . . . 2
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
S19-120BF Components and Parts List . . . . . . . . . . . . 4
S19-120ABF Components and Parts List . . . . . . . . . . . 5
2
S19-120BF, S19-120ABF Installation
5/29/12 Bradley 215-1259 Rev. E; ECN 12-05-016C
WARNING
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products”
on our web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
P.O. Box 309, Menomonee F
alls,
WI 53051
R
TEST THIS
UNIT EACH
WEEK
Test-operate valv
e(s) each week and sign
below.
Report an
y malfunctions immediatel
y.
Ventil(e) wöc
hentlich im
Testbetrieb prüfen,
bestätigt
durch Untersc
hrift. Jeglic
he Störung sofor
t melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST
WÖC
HENTLICH ZU
PRÜFEN.
ESSAI HEBDOMA
DAIRE
Test le fonctionnement des v
alves chaque semaine et
signe en bas. S'il y à quelqu
e chose qui ne v
a pas fait
un rappor
t immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
Installation S19-120BF, S19-120ABF
Bradley 215-1259 Rev. E; ECN 12-05-016C 5/29/2012
Installation
Supplies Required:
• Teflontapeandpipesealant
• Pipingto1"NPTwatersupplyinlet
• Adequatesupplypipesupports
• Minimum4"(102mm)draintoaccommodate
30gallons(115liters)perminutedischargefor
showerwaste
• Sign-mountinghardware
Step 1: Assemble components
1. Assemblecomponentsasshownonpage4.
• Applypipesealant(suppliedbyinstaller)to
allmale-threadedpipejoints.
• Threadthejamnutontothethreadedend
ofthepullrod.Threadthepullrodonto
thecouplingandtightenthejamnut.The
triangular end of the pull rod must be in
line with the hook end(seepage4).
• Bottomedgeofshowerheadshouldbe7'-
0"(2134mm)fromthefloor.
Step 2: Connect water supply
IMPORTANT: Do not rely on Bradley’s
Drench Shower to support supply
piping.
1. Connectwatersupplypipingto1"NPTinlet
onunit(pipingsuppliedbyinstaller).Provide
adequatesupports(suppliedbyinstaller)
forsupplypipeusingpipehangersorother
means.
2. Mountthesafetysigntothewallusingsign-
mountinghardwaresuppliedbyinstaller.
6"
(152mm)
9"
(229mm)
Ø 10-3/4"
(273mm)
7'-0"
(2134mm)
to Floor
24"
(610mm)
S19-120BF
S19-120ABF
4-1/2"
(114mm)
Ø 3.1"
(78.7mm)
45"
(1142mm)
7'-0"
(2134mm)
to Floor
24"
(610mm)
3-5/8"
(92mm)
8"
(203mm)
3-5/8"
(92mm)
8"
(203mm)
9"
(229mm)
45"
(1142mm)
4
S19-120BF, S19-120ABF Installation
5/29/12 Bradley 215-1259 Rev. E; ECN 12-05-016C
Assembly of Components - S19-120BF
ALIGN
HANDLE
PIECES
AS SHOWN
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
6
7
8
2
4
3
5
1.2
1.3
1.4
1.5
1.31
1.1
1
Parts List
1" NPT
Supply Inlet
NOTE: Use
teflon tape
only.
Item Part No. Qty. Description
1 S30-059 1 1"Stay-OpenBallValveAssembly
1.1 142-002DC 1 Lockwasher
1.2 124-048 1 Washer,Friction
1.3 S27-278 1 1"BallValvewithNut
1.31 110-214 1 JamNutOnly
1.4 140-720 1 Stop Bracket
1.5 128-129 1 Handle
2 113-006MT 1 Pipe1"NPTx21"
Item Part No. Qty. Description
3 169-847 1 90°Elbow1"NPT
4 S24-188 1 PlasticShowerheadAssembly
5 151-001 2 CurtainHook
6 S90-365D 1 PullRod,45"
6.1 161-026 1 Nut,1/4"-20
7 204-421 1 EmergencyInspectionTag
8 114-050 1 SafetySign
5
Installation S19-120BF, S19-120ABF
Bradley 215-1259 Rev. E; ECN 12-05-016C 5/29/2012
Assembly of Components - S19-120ABF
Parts List
ALIGN
HANDLE
PIECES
AS SHOWN
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
6
7
8
2
3
5
1.2
1.3
1.4
1.5
1.31
1.1
1
4.11
4.12
4
4.1
4.2
1" NPT
Supply Inlet
NOTE: Use
teflon tape
only.
Item Part No. Qty. Description
1 S30-059 1 1"Stay-OpenBallValveAssembly
1.1 142-002DC 1 Lockwasher
1.2 124-048 1 Washer,Friction
1.3 S27-278 1 1"BallValvewithNut
1.31 110-214 1 JamNutOnly
1.4 140-720 1 Stop Bracket
1.5 128-129 1 Handle
2 113-006MT 1 Pipe1"NPTx21"
3 169-847 1 90°Elbow1"NPT
4 S24-189 1 StainlessSteelShowerhead
Assembly
Item Part No. Qty. Description
4.1 S24-193 1 ShowerheadShellKit
4.11 187-053 1 ShowerheadShell
4.12 154-147 1 Ring
4.2 S24-188 1 PlasticShowerheadAssembly
5 151-001 2 CurtainHook
6 S90-365D 1 PullRod,45"
6.1 161-026 1 Nut,1/4"-20
7 204-421 1 EmergencyInspectionTag
8 114-050 1 SafetySign
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Bradley Corporation S19-120ABF Guide d'installation

Catégorie
Articles sanitaires
Taper
Guide d'installation

dans d''autres langues