Tetra GEPSJB60 Power Supply Junction Box LED Signage Guide d'installation

Taper
Guide d'installation
Installation Guide
SIGN108
Junction Box Features
Installation
Remove screw and lock washer and snap the top
cover off of the junction box.
Select a wire entry knock out location and carefully
remove metal plug. Install wire box fitting and supply
wire and secure in place.
GEPSJB60 supports: GEPS12-60, GEPS12D-60U, GEPS24-80, GEPS24D-80U,
GEPS12-60U-NA, GEPS12SE-60U-NA, GEPS12-60U-GL, GEPS24-100U-NA,
GEPS24-100U-GL, GEPS24-100U-GLX
Can be used on primary side of the power supplies listed above; or any other
power supply that similarly fits, with a class 2 output where otherwise acceptable
in the application.
Suitable for dry or damp locations
1 2
Power Supply Junction Box
GEPSJB60
BEFORE YOU BEGIN
Read these instructions completely and carefully.
WARNING / AVERTISSEMENT
RISK OF ELECTRIC SHOCK:
Disconnect power at fuse box or circuit breaker before servicing
or installing product.
Properly ground Tetra® power supply.
RISK OF FIRE:
Use only approved wire for input/output connection. Minimum
size 18 AWG (0.82 mm2).
Use only approved wire for input connection. Maximum size 14
AWG; minimum 75C rated.
Branch circuit limit of 15A.
Follow all local codes.
RISQUES DE DÉCHARGES ÉLECTRIQUES
Coupez l’alimentation électrique à la boîte de fusibles ou au disjoncteur
avant l’entretien ou l’installation du produit.
Assurez-vous de correctement mettre à terre l’alimentation électrique Tetra®.
RISQUES D’INCENDIE
N’utilisez que des fils approuvés pour les entrées/sorties de connexion. Taille
minimum 18 AWG (0.82 mm2).
N’utilisez que des fils approuvés pour les entrées/sorties de connexion. La
taille maximale 14 AWG; minimum 75C nominale.
Respectez tous les codes locaux.
Tetra® Power Supply GEPSJB60 Installation Guide
LED.com
© 2023 Current Lighting Solutions, LLC. All rights reserved. Information and specifications subject to change
without notice. All values are design or typical values when measured under laboratory conditions.
Page 2 of 2
(Rev 06/19/23)
SIGN108
Trim flush
with power
supply edge
Neatly fold wires within the
Junction Box and reattach cover
with mounting screw and washer.
Tighten securely.
Complete installation. Continue
with LED light engine connections.
For all other power supplies: Slide junction box onto
AC input end of power supply and align mounting
holes. Ensure power supply mounting tab is under the
junction box.
For GEPS24-100U-GLX only: On the AC input end
of power supply, trim or grind sides of mounting tab
flush with power supply. Then slide junction box onto
AC input end of power supply and align mounting
holes. Ensure power supply mounting tab is inside the
junction box.
Connect AC line ground wire to Junction Box ground
screw.
Mount and secure Junction Box and Tetra Power
Supply using #6 or #8 screws and star-type lock
washers in both holes.
Connect Tetra Power Supply to AC
line per instructions enclosed with
the power supply.
Conforms to the following standards:
Power supply
mounting tab is
inside junction box
AC input end of
GEPS24-100U-GLX
power supply
Power supply mounting
tab is under junction box
6
4
3A 3A
7 8
5
  • Page 1 1
  • Page 2 2

Tetra GEPSJB60 Power Supply Junction Box LED Signage Guide d'installation

Taper
Guide d'installation