R H
•••••••••••••••••••••••••••••••••••••••••
INSTALLATION INSTRUCTIONS
HANGER HOLES
Assembly Instructions
Next you will repeat the setting in of the C1, C2, and C3
parts for the second panel. See #2, above.
4.
3.
Next you will identify the BC center stile. You will notice that
the A2 rail (the part that your already lagged together) has a
small hole drill in the groove of the part. is is for placing the
included wood dowel pin into place. On the ends of the BC you
will notice matching holes. Use a small dab of glue in the holes
of the BC part and the A2 part, insert the dowel into the holes.
is part is also universal and can be used on either end. Next run
a bead of glue along the edge of the already inserted T&G. Put
a drop of glue on the dowel on one end, place that part into the
alignment hole on the bottom rail and then set into place over the
T&G, using a mallet, lightly tap this part into place.
2.
Next you will need to turn the assembled parts onto their sides
where the holes are. Locate one C1 part, sixteen C3 Parts, and
one C2 part. Next, apply a bead of glue running lengthwise
up the BR part until you are about 5” from the top. Quickly,
starting from the bottom place in the C2 parts with the groove
facing the top of the door, then stack in all sixteen C3 parts in
succession, tongue into grooves. en take the nal part (C1) to
cap o the T&G. Using a soft mallet gently tap all parts down
into part A2, and each part to the side into Stile BR.
Place a spot of glue into each
predrilled hole and insert dowell into
the predrilled holes. Tap gently with
your rubber mallett.
A1
A2
BR
C1
C2
C3
A2
C1
C2
C3
BC
A2
A2
BC