ABB EVLunic V1 Guide d'installation

Taper
Guide d'installation

Ce manuel convient également à

Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018
Installation manual Rev. 1.00
EVLunic
Pedestal – floor-mounted column
Standsäule –
Installationsanleitung
Deutsch
(5)
Floor-mounted column –
Installation manual
English
(11)
Colonne
Notice d'installation
Français
(17)
Instrucciones de instalación
del poste
Español
(23)
Colonnina portante –
Istruzioni per l'installazione
Italiano
(29)
Standzuil – Installatiehandlei-
ding
Nederlands
(35)
Coluna vertical –
Instruções de instalação
Português
(41)
Specifications are subject to change due to ongoing technical development. Errors and omis-
sions excepted. All rights reserved.
All intellectual property, including trademarks and copyrights, is the property of the
respective owner. Any unauthorized use of such intellectual property is expressly forbidden.
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |2
V1
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |3
V2
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |4
V3
DE
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |5
Standsäule
Installationsanleitung
Sicherheitshinweise
!
WARNUNG!
Nichtbeachtung der Sicherheitshinweise kann zu Lebensgefahr, Verletzungen und
Schäden am Gerät führen! Der Hersteller lehnt jede Haftung für daraus resultie-
rende Ansprüche ab!
Elektrische Gefahr!
Die Montage, erste Inbetriebnahme und Wartung der Ladestation darf nur von
einer einschlägig ausgebildeten, qualifizierten und befugten Elektrofachkraft
durchgeführt werden, der dabei für die Beachtung der bestehenden Normen
und Installationsvorschriften verantwortlich ist.
Halten Sie die angeführten Vorgaben für die Standortauswahl und die baulichen
Voraussetzungen ein!
Abweichungen zu den Standortvorgaben können zu Tod, schweren Körperver-
letzungen oder Sachschäden führen, wenn die entsprechenden Vorsichtsmaß-
nahmen nicht getroffen werden!
Gebrauch dieses Handbuches
Dieses Installationshandbuch wendet sich ausschließlich an qualifiziertes Personal
1
.
Diese Anleitung ist eine Ergänzung zum „Installationshandbuch“ der zugehörigen Ladesta-
tion. Alle im Handbuch enthaltenen Hinweise und Anweisungen zu Standortauswahl, Mon-
tage und zum Anschluss der Ladestation müssen beachtet werden!
Bestimmungsgemäßer Gebrauch
Alternativ zur Montage der Wallbox auf einer Wand, steht eine Standsäule zur freistehenden
Montage im Innen- oder Außenbereich zur Verfügung.
Je nach Ausführung und Anzahl der Ladestationen muss eine unterschiedliche Anzahl von
Anschlusskabel und Leerrohre im Betonfundament berücksichtigt werden.
Wird die Ladestation mit einer steckbaren Versorgungsleitung installiert (z.B. für Demonstra-
tionszwecke), ist für die Versorgungsleitung eine ausreichende Zugentlastung sowie ein Kan-
tenschutz vorzusehen.
Für die Montage der Standsäule sind die jeweiligen nationalen Vorschriften zu beachten.
Gewicht (ohne Ladestation): 15,0 kg (V1/V2)
19,2 kg (V3)
1
Personen die aufgrund fachlicher Ausbildung, Kenntnis und Erfahrung sowie Kenntnis der einschlägigen Nor-
men, die übertragenen Arbeiten beurteilen und mögliche Gefahren erkennen können.
DE
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |6
Übersicht
Standsäule
V1
Die Standsäule V1 ist für die Montage von einer
Wallbox auf der Standsäule geeignet.
Standsäule
V2
Die Standsäule V2 ist für die Montage von zwei
Wallboxen auf der Standsäule geeignet.
Standsäule V3
Die Standsäule V3 ist für die Montage von zwei
Wallboxen auf der Standsäule geeignet.
DE
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |7
!
Elektrische Gefahr!
Die Standsäule V2/V3 muss immer
mit zwei Wallboxen bestückt wer-
den! Kabelöffnungen in der
Standsäule dürfen nicht offen blei-
ben.
Anforderungen an den Standort
Allgemeines:
Alle Standortanforderungen für die Wallbox aus dem zugehörigen „Installations-
handbuch“ müssen beachtet werden!
Bei der Montage der Standsäule auf Parkplätzen oder in Tiefgaragen ist bauseits ein ge-
eigneter Anfahrschutz vorzusehen.
Betonfundament:
Die Berechnung, Auslegung und Herstellung des Betonfundaments liegt im Verantwor-
tungsbereich des Standortherstellers.
Für die Aufstellung ist waagrechter, ebener und tragfähiger Untergrund erforderlich.
Um eine sichere und dauerhafte Verankerung zu gewährleisten, empfehlen wir die Aus-
führung eines Betonfundaments:
65cm (L) x 50cm (B), Tiefe = mind. Frostgrenze jedoch > 40cm, frostsicher gegründet.
Beton: C30/37 LP für XC4, XD1, XF4 bzw. C25/30 LP für XC4, XD1, XF2
Betonstahl: BSt 500 S; BSt 500 M
Der Untergrund muss das Ablaufen von eventuell in den Sockel gelangendem Wasser
ermöglichen.
Alle Kabel müssen genau in der Mitte des Betonfundamentes aus dem Boden geführt
werden und für die weitere Montage eine Überlänge von ca. 1,5 m aufweisen.
Bei der Herstellung des Betonfundaments sind die Kabel mit geeigneten Mitteln gegen
Beschädigungen zu schützen (z.B. mit einem Schutzschlauch). Der Schutzschlauch
muss eine Überlänge von ca. 25 cm über dem Betonfundament aufweisen.
Eine Aufstellung der Standsäule auf Asphalt ist nicht zulässig!
DE
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |8
Verankerung am Boden
Zum Verankern müssen die beigelegten Dübel verwendet werden (6 Stück Kompaktdübel
Hilti HKD-ER M8x30).
Technische Daten
M8
Ankergrund Normbeton ab Festigkeitsklasse
C20/25-C50/60
Empfohlene Last Zug N (ungerissener Beton) 4
Pro Dübel Querzug V (ungerissener Beton) 3,9 kN
Erforderlicher Randabstand 10,5
cm
Drehmoment Tinst 8 Nm
Bohrlochdurchmesser do 10 mm
Bohrlochtiefe h1 33 mm
Spezifikation Kompaktdübel Hilti HKD-ER M8x30. Quelle: Fa. Hilti
Bohrungen durchführen
Zeichnen Sie die 6 Bohrungen mit Hilfe der Bodenplatte der Standsäule auf dem
Betonfundament an.
Stellen Sie sicher, dass sich die Anschlusskabel genau unter der Öffnung der
Bodenplatte der Standsäule befinden.
Bohren Sie die 6 Befestigungslöcher:
Durchmesser: 10 mm
Bohrlochtiefe: 33 mm
Schlagen Sie die beigepackten Dübel mit dem Hilti HSD-G Hand-Setzwerkzeug (nicht
im Lieferumfang) so weit ein, dass sie mit dem Boden eben abschließen.
Hilti HSD-G Hand-Setzwerkzeug. Quelle: Fa. Hilti
Beachten Sie auch die folgende Anleitung:
Anleitung zum Setzen der Dübel. Quelle: Fa. Hilti
DE
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |9
Hinweis
Die Abbildungen gelten für alle Varianten.
Standsäule von unten
Kabel einfädeln
Fädeln Sie die Anschlusskabel von unten
durch die Standsäule nach oben zur
Kabelöffnung.
Verankerung
Verankerung
Positionieren Sie die Standsäule über
dem Kabelauslass.
Verankern Sie die Standsäule mit den
6 Sechskantschrauben am Fundament.
Erdungspunkt
Erdung
Schließen Sie (falls erforderlich) die
Erdung am Erdungspunkt der Standsäule
an.
DE
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |10
Kantenschutz entfernen
Kantenschutz entfernen
Entfernen Sie den Kantenschutz an der
Kabelöffnung der Standule erst
unmittelbar vor der Montage der
Ladestation (siehe Abbildung).
Beispiel Standsäule V2
L
adestationen montieren
Montieren Sie die Ladestationen mit den
beiliegenden Schrauben auf der
Standsäule.
Anschluss und Inbetriebnahme
Führen Sie den elektrischen Anschluss
und die Inbetriebnahme entsprechend der
Anleitung im „Installationshandbuch“
durch.
Halterung für Ladekabel
Halterung für Ladekabel montieren (Option)
Montieren Sie die Halterung für das
Ladekabel unterhalb der Ladestation mit
zwei Schrauben [A] an der Standsäule.
EN
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |11
Floor
-
mounted column
-
Installation
manual
Safety instructions
!
WARNING!
Not observing the safety instructions can result in risk of death, injuries and dam-
age to the device! The producer assumes no liability for claims resulting from this!
Electrical hazard!
The installation, commissioning and maintenance of the charging station may
only be performed by correctly trained, qualified and authorized electricians
who are fully responsible for the compliance with existing standards and in-
stallation regulations.
Observe the instructions given for selecting the location and the constructional re-
quirements!
If the specifications for the location are not observed, this can result in death,
serious physical injury or equipment damage if the corresponding precaution-
ary measures are not met!
Use of this manual
This installation manual is intended for qualified personnel only
2
.
This guide is a supplement to the "Wallbox Installation Manual." The information and instruc-
tions in the manual about selecting the location, installation and connection of the charging
station must be adhered to.
Intended use
A floor-mounted column for free-standing installation in inside or outside areas is available as
an alternative to mounting the charging station on a wall.
Depending on the design and number of charging stations the relevant number of empty
pipes and connection cables should be taken into consideration in the concrete foundation.
If the charging station is installed with a plug-in power supply line (e.g., for demonstration
purposes), you should ensure that there is sufficient tension relief and edge protection for the
power supply line.
The respective national regulations must be observed with regard to the installation of the
floor-mounted columns.
Weight (without charging station): 15,0 kg (V1/V2)
19,2 kg (V3)
2
Persons who, due to their special training, expertise and experience as well as knowledge of current standards,
are able to assess the work performed and the possible hazards.
EN
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |12
Overview
V1 floor
-
mounted column
The V1 floor-mounted column is designed for
the installation of one charging station on the
column.
V2 floor
-
mounted column
The V2 floor-mounted column is designed for
the installation of two charging stations on the
column.
V3 floor
-
mounted column
The V3 floor-mounted column is designed for
the installation of two charging stations on the
column.
EN
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |13
!
WARNING!
Electrical hazard!
The V2/V3 floor-mounted column
must always be fitted with two
charging stations! There can be no
open cable openings in the column.
Location requirements
General:
All of the location requirements for the charging station in the " Installation man-
ual" must be adhered to!
When mounting the floor-mounted columns in parking spaces or parking garages, appro-
priate anti-collision protection must be provided by the customer.
Concrete foundation:
The calculation, design and manufacture of the concrete founcation lies in the scope of
responsibility of the producer of the site.
A horizontal, level and sound foundation is required for installation.
To ensure safe and permanent anchoring, we recommend creating a concrete founda-
tion:
65cm (L) x 50cm (W), depth = min. frost limit but > 40cm, frost-free.
Concrete: C30/37 LP for XC4, XD1, XF4 or C25/30 LP for XC4, XD1, XF2
reinforced concrete: BSt 500 S; BSt 500 M
The base must permit the running off of any water that has entered the base.
All cables must be laid precisely in the centre of the concrete foundation from the base
and must have an excess length of approx. 1.5 m for the remaining installation activities.
During the production of the concrete foundation, the cables must be protected against
damage using appropriate measures (e.g., a protective tube). The protective tube must
have an excess length of approx. 25 cm above the concrete foundation.
Mounting the column on asphalt is not allowed!
EN
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |14
Anchoring to the base
The enclosed dowels must be used for anchoring (6 x Hilti HKD-ER compact dowels M8x30).
Technical data
M8
Anchorage ground Standard concrete with a strength
class of C20/25-C50/60 or greater
Recommended load Tension N (uncracked concrete) 4
Per dowel Transversal shear V (uncracked con-
crete)
3,9 kN
Required clearance 10,5
cm
Torque Tinst 8 Nm
Drill-hole diameter do 10 mm
Drill-hole depth h1 33 mm
Specifications for compact dowels Hilti HKD-ER M8x30. Source: Hilti
Making drillholes
Mark the 6 holes on the concrete foundation using the baseplate of the floor-mounted
column.
Make sure that the connection cable is located precisely underneath the opening in the
baseplate.
Drill the 6 mounting holes:
Diameter: 10 mm
Drill-hole depth: 33 mm
Hammer the enclosed dowels using the Hilti HSD-G manual setting tool (not included
in the scope of delivery) so that they are flush with the floor.
Hilti HSD-G manual setting tool. Source: Hilti
Please also observe the following instructions:
Instructions on inserting the dowels. Source: Hilti
EN
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |15
Note
The images are valid for all versions.
Floor-mounted column from below
Thread in cable
Thread the connection cables from the
bottom through the column upwards
through the cable opening.
Anchoring
Anchoring
Position the column directly over the
cable outlet.
Anchor the column to the foundation
using the 6 hexagon bolts.
Grounding point
Grounding
If necessary, connect the earthing to the
column's grounding point.
EN
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |16
Remove edge protection
Remove edge protection
Remove the edge protection on the cable
opening of the column immediately before
installing the charging station (see figure).
V2 floor-mounted column example
Mounting the charging stations
Mount the charging stations on the
column using the enclosed screws.
Connecting and commissioning
Perform the electrical connection and
commissioning in accordance with the
instructions in the "Installation manual."
Holder for charging cable
Mount the holder for the charging cable
(option)
Mount the holder for the charging cable
on the floor-mounted column below the
charging station using two screws [A].
FR
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |17
Colonne
Notice d'installation
Consignes de sécurité
!
AVERTISSEMENT
!
Le non-respect des consignes de sécurité peut entraîner la mort, des blessures ou
l’endommagement de l’appareil ! Le fabricant décline toute responsabilité pour les
demandes qui en résulteraient !
Danger électrique !
Le montage, la première mise en service et la maintenance de la station de re-
charge doivent être confiés uniquement à un électricien comtent, qualifié et
autorisé qui porte l’entière responsabilité du respect des normes et des pres-
criptions d’installation existantes.
Tenir compte des informations suivantes dans le choix du site et respecter les con-
ditions structurelles !
Toute différence peut entraîner la mort, des blessures graves ou des dom-
mages matériels si les mesures de sécurité correspondantes ne sont pas
prises !
Utilisation de ce manuel
Ce manuel d’installation s’adresse exclusivement au personnel qualif
3
.
Cette notice complète le "Manuel d'installation". Respecter les consignes et les instructions
du manuel en ce qui concerne le choix du site, le montage et le raccordement de la station
de recharge !
Utilisation conforme
L'alternative au montage mural de la station de recharge est le montage isolé sur colonne à
l'intérieur ou à l'extérieur.
Selon le modèle et le nombre de stations de recharge, le nombre de câbles de raccordement
et de gaines dans la fondation en béton varie.
Si la station de recharge est installée avec un câble d'alimentation enfichable (par ex. à des
fins de démonstration), prévoir une décharge de traction suffisante et une protection de bord
pour le câble d'alimentation.
Respecter la réglementation nationale en vigueur pour le montage de la colonne.
Poids (sans station de recharge): 15,0 kg (V1/V2)
19,2 kg (V3)
3
Personnes qui, en raison de leur formation technique, de leurs connaissances, de leur expérience et de leur
connaissance des normes en vigueur, sont capables d'évaluer les travaux qui leur sont confiés et d'identifier les
dangers potentiels.
FR
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |18
Aperçu
Colonne V1
La colonne V1 convient au montage d'une sta-
tion de recharge.
Colonne V2
La colonne V2 convient au montage de deux
stations de recharge.
Colonne V3
La colonne V3 convient au montage de deux
stations de recharge.
FR
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |19
!
AVERTISSEMENT
!
Danger électrique !
La colonne V2/V3 doit toujours être
équipée de deux stations de re-
charge ! Les ouvertures de câble de
la colonne ne doivent pas rester ou-
vertes.
Exigences sur site
Généralités
Respecter toutes les exigences relatives au site pour la station de recharge qui fi-
gurent dans le "Manuel d'installation " !
Si la colonne est installée dans un parking ou dans un garage souterrain, prévoir une
protection contre les collisions adaptée.
Fondation en béton
Le constructeur du site est responsable de l'élaboration, de la conception et de la cons-
truction de la fondation en béton.
L'installation exige un support horizontal, plan et résistant.
Pour garantir un ancrage sûr et durable, construire une fondation en béton ingélive dont
les caractéristiques sont les suivantes :
65 cm (longueur) x 50 cm (largeur), profondeur = au moins limite du gel mais > 40 cm.
Béton : C30/37 LP pour XC4, XD1, XF4 ou C25/30 LP pour XC4, XD1, XF2
Béton armé : BSt 500 S ; BSt 500 M
La fondation doit permettre l'évacuation de l'eau éventuellement présente dans la se-
melle.
Tous les câbles doivent ressortir du sol exactement au milieu de la fondation en béton et
dépasser d'env. 1,5 m pour poursuivre le montage.
Lors de la construction de la fondation en béton, protéger les bles contre les dom-
mages à l'aide d'accessoires adaptés (par ex. une gaine). La gaine doit dépasser de la
fondation en béton d'env. 25 cm.
L'installation de la colonne sur l'asphalte n'est pas autorisée !
FR
Document: Rev. 1.00 / Document No.: 90333 Date 21.08.2018 |20
Ancrage au sol
Pour l'ancrage, utiliser les chevilles fournies (6 chevilles compactes Hilti HKD-ER M8x30).
Caractéristiques techniques
M8
Support d'ancrage Béton normalisé à partir de la classe
de résistance C20/25-C50/60
Charge recommandée Traction N (béton non fissuré) 4
Par cheville Traction transversale V (béton non fis-
suré)
3,9 kN
Distance du bord nécessaire 10,5
cm
Couple de serrage Tinst 8 Nm
Diamètre de perçage do 10 mm
Profondeur de perçage h1 33 mm
Spécifications des chevilles compactes Hilti HKD-ER M8x30. Source : Sté Hilti
Exécution des perçages
Sur la fondation en béton, tracez les 6 perçages à l'aide du socle de la colonne.
Assurez-vous que les câbles de raccordement se trouvent exactement sous l'ouverture
du socle de la colonne.
Percez les six trous de fixation :
Diamètre: 10 mm
Profondeur du perçage: 33 mm
Insérez les chevilles fournies avec l'outil de pose manuel Hilti HSD-G (non fourni)
jusqu'à ce qu'elles touchent le sol.
Outil de pose manuel Hilti HSD-G. Source : Sté Hilti
Respectez également les instructions suivantes :
Instructions pour la pose des chevilles. Source : Sté Hilti
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47

ABB EVLunic V1 Guide d'installation

Taper
Guide d'installation
Ce manuel convient également à