Midmark Elevance® Continental-Style Delivery System Guide d'installation

Taper
Guide d'installation

Ce manuel convient également à

English - 1
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
Style G
Electrical Supply Requirements
Have an electrician install a 1/2 in. (13 mm) conduit box with quad or equal
receptacle. Top of box must be no higher than 4-1/2 in. (114 mm) above
finished surface of floor.
Water Supply Requirements (optional)
Use 1/2 in. (13 mm) pipe (supplied by contractor) protruding 2 in. (51 mm)
above finished surface of floor. Manual shut-off valve is to be installed by a
plumber.
Water pressure must be 30-50 PSI (206-344 kPa) maximum, at the shut-off
valve. Flush water plumbing clean before making final connections to dental
equipment.
Recommended water supply hardness level <60 ppm of calcium carbonate.
Elevance
®
Delivery: LR Mounted Installation
(Includes Elevance
®
Continental-Style Delivery)
Language of origin: English
Equipment Alert
Do not remove wraps or packaging from the delivery flex arm assembly until it is mounted onto the LR arm.
Air Supply Requirements
Use 1/2 in. (13 mm) pipe (supplied by contractor) protruding 2 in. (51 mm) from
finished surface of floor. Manual shut-off valve is to be installed by a plumber.
Air pressure must be 70-100 PSI (482 -689 kPa) maximum, at the shut-off valve.
Flush air plumbing clean before making final connections to dental equipment.
Air supply to be filtered, dry and oil-free per NFPA 99 requirements or equivalent
local codes.
Drain Requirements (optional)
Not less than 1-1/2 in. (38 mm) I.D. pipe from downpipe to trap, decreasing to
3/4 in. (19 mm) pipe from trap to connection box. Terminate with
3/4 in. (19 mm) NPT pipe protruding 1 in. (26 mm) above finished surface of
floor. Install adapter for 5/8 in. (16 mm) drain tubing. Place trap in line and vent
to conform with local codes. [All hardware supplied by contractor].
Vacuum Requirements (optional)
Plumbing to J-Box box should be specified by central vacuum supplier and
terminated in J-Box with 3/4 in. (19 mm) O.D. tube protruding 1 in. (26 mm)
above finished surface of floor.
003-1841-99 Rev. RA2 (11/18/18)
Equipment Alert
When installing 115~ (VAC) receptacle in the J-Box, position it so that all
the other components needed in the box will also fit.
Grounding reliability can only be achieved if this equipment is connected to an
equivalent receptacle marked Hospital Grade (NEMA 5-15R, HOSPITAL GRADE).
Attention!
The electrical and plumbing supply connectors must be installed by an electrician and plumber in compliance with local building codes. All required hardware is to be supplied by
contractor. Supply connections must be located to fit inside the J-box and be properly distanced, within reach of the chair umbilical [4 or 8 foot (1.2 or 2.4 m)].
midmark.com
English - 2
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
17.82"
(45.3 cm)
11.88"
(30.2 cm)
4.75"
(12.07 cm)
6.5"
(16.5 cm)
Water Supply
Air Supply
Step 1: Verify Proper Position and Types of Supply Connections Required for the J-Box.
A) Verify that you have the proper supply connections required for the components being installed.
B) Verify that the connections fit inside the J-box and are located within reach of the umbilical provided (4 or 8 foot [1.2 or 2.4 m]).
C) Reference the J-Box Installation Guide for more details.
Step 2: Verify proper installation of Elevance chair.
A) Reference Elevance Chair Installation Guide packaged with chair.
midmark.com
English - 3
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Step 5: Remove seat shrouds and seat frame.
A) Remove three screws / washers and RH seat shroud.
B) Repeat for LH seat shroud (not shown).
C) Remove two shoulder bolts / washers and lift seat frame.
Seat Frame
Seat Shroud (RH)
Equipment Alert
Tap a lift arm or lower pivot cover three times to raise
the chair to the pre-programmed “home” position; a
convenient height for installation or patient access.
The chair beeps until it reaches the home position.
Upper Lift Arm Cover
Lower Lift Arm Cover
Lower Pivot Cover
Step 3: Position chair.
Step 4: Remove seat upholstery.
A) Disconnect the chair from power source.
B) Rotate lock knob.
C) Lift seat upholstery to remove tabs from slots.
WARNING
Always disconnect chair from the power source before removing
any covers. Failure to do so may result in personal injury.
midmark.com
English - 4
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
LR Casting
Cap
Bearings
Bolt
WARNING
The Elevance chair must be anchored to floor before
installing the delivery system components.
Cover
Note
Have an assistant help to mount the delivery unit on the LR casting.
Step 6: Level LR casting.
A) Loosen four mounting bolts.
B) Adjust three leveling screws as necessary.
C) Tighten four mounting bolts.
Note: If LR casting is not level, delivery arm may drift.
Mounting Bolts
Leveling
Screws
Step 7: Install LR delivery arm.
A) Position LR delivery arm / bearings / cap as shown.
B) Secure to LR casting with bolt.
C) Install water bottle (turn until tight) and cover.
D) Adjust the drag on the delivery arm by loosening or
tightening the bolt.
midmark.com
English - 5
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Step 9: Route delivery umbilical into chair.
A) Route umbilical into opening and thru LR casting.
B) Route umbilical up thru hole in chair casting.
Note: Optional Sopro camera harness and switch wires need to be
routed thru the chair to the J-box, following the same route as
the chair umbilical.
Sopro Camera
Harness and
Switch Wires
(optional)
Step 8: Level delivery unit and adjust drag.
A) Position flex arm horizontal to the floor.
B) Place a level across unit and alternately turn the
three leveling screws.
C) Adjust drag with the drag adjustment screws.
Drag Adjustment
Screws
Leveling
Screws
Counter-Clockwise
Raises Head
Clockwise
Lowers Head
Equipment Alert
Do not remove wraps or packaging from the delivery flex arm assembly
until it is mounted onto LR arm.
LR Casting
midmark.com
English - 6
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Supply Air to Master ON/OFF Switch
Handpiece Pilot Air for Coolant Water
Handpiece Drive Air
Syringe Air
Instrument Water
Spare Tubing
Spare Tubing
Spare Tubing
Supply Air from Master ON/OFF Switch
Handpiece Coolant Air
Delivery Power
LIN Lines
Ground
Connections
Step 10: Connect delivery umbilical to J-box umbilical.
A) Connect two LIN lines to LIN coupler.
B) Connect USB connectors to USB hub and place inside chair casting.
C) Connect delivery power harnesses.
D) Screw ground wires onto the chair casting using toothed-lock washer.
E) Connect like colored tubing.
F) Optional Sopro camera harnesses must be routed thru the chair to the
J-box following the same path as the chair umbilical.
Note: Umbilicals contain tubing for all possible components. Leave unused tubing capped.
USB Hub
USB
USB Power
USB to Delivery
Optional USB
for Camera
LIN Coupler
with Velcro
Velcro
Caution
Connect ground wire to ensure system ground continuity.
Failure to do so may result in electric shock.
Optional Sopro
Camera Harnesses
midmark.com
English - 7
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
40
6
0
8
0
1
0
0
2
0
0
1
2
3
5
6
7
4
0
40
6
0
80
1
0
0
20
0
1
2
3
5
6
7
4
0
Step 11: Verify umbilical tubing and water supply connections.
A) Remove J-box lid.
B) Verify proper yellow, clear and purple connections from umbilical to valve assemblies.
C) Optional - Install city water supply fittings and connect blue tubing as shown.
Pilot Valve
T-Barb
Pilot Valve
To
Power
Supply
From
Umbilical
From Air
Valve
Assembly
To Water
Valve
Assembly
1
4"
1
8"
1
8"
Optional Cuspidor
Water Supply
Connection
Air Valve
Assembly
Optional City Water
Valve Assembly
Connector Retainer
Tubing
midmark.com
English - 8
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Delivery Power
Illuminated
Handpiece
Power
Adapter
(optional)
LIN Line
Power Supply
To Water Valve
Assembly
Power Supply
Power Cord
USB
Power
USB Power
Adapter
Receptacle
USB
Hub
Chair Power
USB
Step 12: Standard Power Supply Connections.
A) Add T-fitting and connect red tubing to power supply.
B) Install the appropriate receptacle onto the USB power adapter
and connect the USB, USB power and the other end of the
adapter to the USB Hub.
C) Connect delivery power to power supply.
D) Connect chair power to power supply.
E) Connect LIN line to power supply.
F) Install optional components (Steps 13 - 19) as required OR
proceed to Step 20.
Facility Power
Relay
Harness
(optional)
Light
(optional)
Equipment Alert
Chair umbilical includes
connectors for optional
components that may not
be included in your installation.
Equipment Alert
Once the delivery unit is pow-
ered ON, it must STAY ON for 30
minutes to charge the clock circuitry.
153808 Power Supply
153941 Power Supply
USB
Hub
Power Supply
Power Cord
For Illuminated
Handpiece
Power Adapter
(optional)
Facility
Power
Chair Power
LIN
Lines
USB
USB
Power
Power Supply
Relay
Harness
(optional)
Delivery
Power
Light
(optional)
A
A
midmark.com
English - 9
Note
Arm assemblies are packaged separately and must be installed
when setting up a Whip delivery unit.
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Pivot
Tool Pads
Left Arms
Right Arms
Arm Assembly
Handpiece
Connectors
Screw
Continental-Style Units Only
Step 13: Install Arm Assemblies and Tool Pads.
A) Remove screw from arm assembly.
B) Insert arm assembly into the pivot and rotate forward.
C) Install the screw thru pivot hole into arm assembly to secure.
D) Install three left and three right arm assemblies.
E) Install left and right tool pads onto the front of unit.
F) Route tubing thru wheels and align handpiece connectors
with tool pads as shown below.
midmark.com
English - 10
Continental-Style Units Only
Step 14: Install Tray Mount on Arm.
A) Align tray mount assembly onto arm post.
B) Install set screw and tighten to secure tray mount
to arm post.
C) Adjust drag on tray rotation with set screw.
Continental-Style Units Only
Step 15: Level Tray Mount.
A) Place a level on the flat surface of the tray mount.
B) Alternately turn the three leveling screws while
watching level.
Arm Post
Set Screw
Leveling Screws
Continental-Style Units Only
Step 16: Install Pad and/or Tray.
A) For 002-1693-001 Kit: Set tray on tray mount
B) For 002-1693-002 & 003 Kits: Place silicon pad onto tray mount.
(Trays are not included in these kits.)
002-1693-002 &
002-1693-003 Kits
002-1693-001 Kit
Silicon Pad
Tray
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
midmark.com
English - 11
For Units Having Deluxe Rheostat with Chip Air Foot Controls Only:
Make Chip Air Connection in Delivery Head.
A) Cut green 1/8" Coolant Air Supply tubing.
B) Locate brown 1/8” tubing coming into the unit head.
C) Use barbed tee and sleeves to tee the 1/8" brown tubing into the 1/8" green coolant air tubing.
Chip Air
Elevance Standard
Delivery Unit
Elevance Continental-Style
Delivery Unit
Deluxe Rheostat with Chip Air
Unit Foot Control
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
midmark.com
English - 12
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Step 18: Install seat upholstery.
A) Insert seat upholstery tabs into slots.
B) Lay upholstery flat. (Lock knob must align with hole)
C) Rotate lock knob to secure upholstery.
Step 17: Install seat shrouds and seat frame.
A) Position seat frame, then secure with two pivot screws / washers.
B) Position RH seat shroud, then secure with three screws / washers.
C) Repeat for LH seat shroud (not shown).
Seat Frame
Seat Shroud (RH)
Perform Steps 17 thru 20 last, if you have additional components to install.
midmark.com
English - 13
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Installation Checklist
Test Verify the following:
1 LR casting and ex arm are level and secure.
2 Flex arm and delivery unit rotate easily and stay where placed.
3 All covers are in place on all components and chair.
4 All tubing is securely connected or capped if not used.
5
Water and air supply regulator gauges in J-box read appropriate
pressures.
6
Electrical connectors and couplers are tightly connected, grounded and
protected inside chair casting.
7
All electrical devices are properly connected to the power supply.
Power supply is properly connected to facility power.
8 Delivery unit comes ON when master switch is turned ON.
9 Control screens appear as handpieces are pulled from the delivery unit.
10 Control screens respond as expected when buttons are pressed.
11 Pressing footpedal delivers air/waster to handpieces as expected.
12 Wipe all components with a soft dry cloth to remove dirt and smudges.
Step 19: Connect power and verify operation.
A) Connect the power supply to facility power.
B) Arrange components neatly inside J-Box.
C) Connect power supply and optional power adapters into
facility power.
D) Install J-box lid.
E) Verify operation of the delivery.
Note: Reference Elevance Delivery User Guide for more detailed
operation information.
Power
Supply
Electrical
USB
Hub
Camera
Docking
Station
Drain
Water
Vacuum
Air
Equipment Alert
Once the delivery unit is powered ON, it must
STAY ON for 30 minutes to charge the clock circuitry.
midmark.com
English - 14
This page is intentionally blank
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
midmark.com
Deutsch - 1
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Anforderungen an die elektrische Versorgung
Einen 13-mm (1/2-in.)-Verteilerkasten mit einer Vierfach- oder gleichwertigen
Steckdose von einem Elektriker installieren lassen. Die Oberkante des
Kastens darf nicht höher liegen als 114 mm (4-1/2 in.) über der Oberfläche
des Fußbodens.
Anforderungen an die Wasserversorgung (optional)
13-mm (1/2-in.)-Rohr (lieferantenseitige Bereitstellung) verwenden, Austritt:
51 mm (2 in.) ab Oberkante Fußboden. Installation eines manuellen
Absperrventils durch einen Installateur.
Der Wasserdruck darf am Absperrventil bis (maximal) 206-344 kPa (30 bis
50 PSI) betragen. Wasserleitungen vor dem endgültigen Anschluss an die
Dental-Instrumente durch Spülen säubern.
Empfohlener Wasserhärtegrad <60 ppm Kalziumkarbonat.
Ausgangssprache: Englisch
Gerätewarnung
Die Folie oder die Verpackung erst dann vom Schwenkarm des Dentalsystems entfernen, wenn dieser am LR-Arm montiert ist.
Anforderungen an die Luftversorgung
13-mm (1/2-in.)-Rohr (lieferantenseitige Bereitstellung), Austritt: 51 mm (2 in.) ab
Oberkante Fußboden. Installation eines manuellen Absperrventils durch einen
Installateur.
Der Wasserdruck darf am Absperrventil bis (maximal) 482-689 kPa (70 bis
100 PSI) betragen. Luftleitungen vor dem endgültigen Anschluss an die Dental-
Instrumente durch Spülen säubern.
Gefilterte Luftzufuhr, trocken und ölfrei gemäß Anforderungen nach NFPA 99 oder
entsprechenden örtlichen Vorschriften.
Anforderungen an Ablass (optional)
Rohr mit nicht weniger als 38 mm (1-1/2 in.) Innendurchmesser von Fallrohr
zu Siphon. Verschmälerung auf 19 mm (3/4 in.) zwischen Siphon und
Anschlusskasten. Abschluss mit NPT-Rohr (19 mm [3/4 in.]), das 26 mm (1 in.)
ab Oberkante Fußboden austritt. Installation eines Adapters für Ablassleitung
(16 mm [5/8 in.]). Einen Siphon in die Leitung einpassen und die Leitung
entlüften, gemäß lokalen Vorschriften. (Sämtliche Befestigungsteile werden vom
Lieferanten bereitgestellt.)
Anforderungen an Vakuum (optional)
Anschluss am Verteilerkasten gemäß zentralem Vakuumanbieter.
Abschluss im Verteilerkasten durch einen Schlauch mit einem
Außendurchmesser von 19 mm (3/4 in.), der 26 mm (1 in.) über Oberkante
Fußboden austritt.
Gerätewarnung
Bei der Installation einer Steckdose mit 115~ (V AC) im Verteilerkasten darauf
achten, dass genügend Platz für die anderen nötigen Komponenten bleibt.
Eine zuverlässige Erdung ist nur dann gewährleistet, wenn das Gerät an eine
Steckdose angeschlossen ist, die für den Einsatz in einer medizinischen
Umgebung (NEMA 5-15R, HOSPITAL GRADE) geeignet ist.
Achtung!
Die Anschlüsse für die Elektrik und die Leitungen müssen von einem Elektriker und einem Installateur gemäß den örtlichen Vorschriften installiert werden. Die erforderlichen Befesti-
gungsteile werden vom Lieferanten bereitgestellt. Der Verteilerkasten muss in Reichweite der Versorgungsleitungen installiert werden (1,2 oder 2,4 m [4 oder 8 foot]).
Dentalsystem Elevance
®
: Montage der LR-Ausführung
(einschließlich Dentalsystem Elevance
®
Continental stil)
midmark.com
Deutsch - 2
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
45,3 cm
(17.82”)
30,2 cm
(11.88”)
12,07 cm
(4.75”)
16,5 cm
(6.5”)
Wasserzufuhr
Luftzufuhr
Schritt 1: Korrekte Position und Typ der für den Verteilerkasten erforderlichen Versorgungsanschlüsse überprüfen.
A) Sicherstellen, dass die für die zu montierenden Komponenten erforderlichen korrekten Versorgungsanschlüsse vorhanden sind.
B) Sicherstellen, dass die Verbindungsstücke im Verteilerkasten in Reichweite der Versorgungsleitungen liegen (1,2 oder 2,4 m [4 oder 8 foot]).
C) Details hierzu finden sich in der Montageanleitung des Verteilerkastens.
Schritt 2: Ordnungsgemäße Installation des Elevance
Patientenstuhls prüfen.
A) Informationen hierzu finden sich in der dem Elevance
Patientenstuhl beiliegenden Montageanleitung.
midmark.com
Deutsch - 3
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Schritt 5: Sitzverkleidungen und Sitzrahmen entfernen.
A) Drei Schrauben/Unterlegscheiben und die rechte Sitzverkleidung
entfernen.
B) Dies für die linke Sitzverkleidung (nicht abgebildet) wiederholen.
C) Zwei Schaftschrauben/Unterlegscheiben entfernen und den
Sitzrahmen anheben.
Sitzrahmen
Sitzverkleidung (rechts)
Gerätewarnung
Dreimal auf eine der Hebearm- oder unteren Dreh-
gelenkabdeckungen klopfen, um den Stuhl in die
vorprogrammierte Ausgangsposition zu bringen. Diese
Position eignet sich für die Installation und für den
Patienteneinstieg.
Der Stuhl gibt Signaltöne aus, bis er die Ausgangsposition erreicht hat.
Obere Hebearmabdeckung
Untere Hebearmabdeckung
Untere
Drehgelenkabdeckung
Schritt 3: Stuhl positionieren.
Schritt 4: Sitzpolster abnehmen.
A) Den Stuhl von der Stromversorgung trennen.
B) Den Verriegelungsknopf drehen.
C) Die Sitzpolsterung anheben, um die Laschen
aus den Schlitzen zu lösen.
ACHTUNG!
Vor dem Entfernen der Abdeckungen stets die Stromzufuhr zum
Stuhl abschalten. Bei Nichtbefolgung kann es zu Verletzungen kommen.
midmark.com
Deutsch - 4
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Schritt 6: LR-Gussteil ausrichten.
A) Die vier Befestigungsschrauben lösen.
B) Die drei Nivellierschrauben nach Bedarf einstellen.
C) Die vier Befestigungsschrauben anziehen.
Hinweis: Wenn das LR-Gussteil nicht ausgerichtet ist, kann sich der
Schwenkarm von selbst bewegen.
Schritt 7: LR-Schwenkarm installieren.
A) Den LR-Schwenkarm/die Lager/die Kappe wie abgebildet positionieren.
B) Das LR-Gussteil mit einer Schraube sichern.
C) Die Wasserflasche und die Abdeckung (fest eindrehen) installieren.
D) Den Widerstand am Schwenkarm durch Lockern oder Anziehen
der Schraube einstellen.
Befestigungs-
schrauben
Nivellier-
schrauben
LR-Gussteil
Kappe
Lager
Schraube
ACHTUNG!
Der Elevance Patientenstuhl muss vor der Installation der
Komponenten des Dentalsystems im Fußboden verankert
werden.
Abdeckung
Hinweis
Das Dentalsystem mit Hilfe einer weiteren Person auf das LR-Gussteil heben.
midmark.com
Deutsch - 5
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Schritt 9: Versorgungsleitungen des
Dentalsystems zum Stuhl hin verlegen.
A) Versorgungsleitungen durch die Öffnung und das LR-
Gussteil verlegen.
B) Die Versorgungsleitungen nach oben durch die Öffnung
im Stuhl-Gussteil verlegen.
Hinweis: Kabelstrang für optionale Sopro-Kamera und Schalterkabel
müssen entlang den Versorgungsleitungen des Stuhls durch
den Stuhl in den Verteilerkasten laufen.
Kabelstrang
und Schal-
terkabel der
Sopro-Kamera
(optional)
Schritt 8: Dentalsystem ausrichten und Widerstand
einstellen.
A) Schwenkarm horizontal zum Boden positionieren.
B) Eine Wasserwaage auf das System legen und
abwechselnd die drei Nivellierschrauben drehen.
C) Den Widerstand mithilfe der Einstellschrauben
einstellen.
Widerstand-Einstell-
schrauben
Nivellier-
schrau-
ben
Gegen den Uhrzei-
gersinn – Kopfteil
wird angehoben
Im Uhrzeiger-
sinn – Kopfteil
wird abgesenkt
Gerätewarnung
Die Folie oder die Verpackung erst dann vom Schwenkarm des
Dentalsystems entfernen, wenn dieser am LR-Arm montiert ist.
LR-Gussteil
midmark.com
Deutsch - 6
© 2012 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
003-1841-99
Handstück-Druckluft
Luft für Spritze
Wasser für die Instrumente
Zusätzlicher Schlauch
Zusätzlicher Schlauch
Zusätzlicher Schlauch
Luftzufuhr zum Hauptschalter EIN/AUS
Handstück-Luftsteuerung für Kühlwasser
Luftzufuhr vom Hauptschalter EIN/AUS
Handstück-Kühlluft
Strom für Dentalsystem
LIN-Leitungen
Masseanschlüsse
Schritt 10: Versorgungsleitungen des Dentalsystems an die
Versorgungsleitungen im Verteilerkasten anschließen.
A) LIN-Leitungen an die LIN-Kupplung anschließen.
B) USB-Stecker an den USB-Hub anschließen und diesen in das Stuhl-
Gussteil schieben.
C) Den Kabelstrang für die Stromversorgung des Dentalsystems anschließen.
D) Die Massekabel unter Verwendung einer Zahnscheibe am Stuhl-Gussteil
festschrauben.
E) Die gleichfarbigen Schläuche verbinden.
F) Kabelstränge für optionale Sopro-Kamera müssen entlang den Versor-
gungsleitungen des Stuhls durch den Stuhl in den Verteilerkasten laufen.
Hinweis: Versorgungsleitungen enthalten Schläuche für alle Komponenten, die möglich sind.
Die Kappen auf den nicht verwendeten Schläuchen belassen.
USB-Hub
USB
USB-
Stromkabel
USB an Dentalsystem
Optionaler USB-
Anschluss für Kamera
LIN-Kupplung
mit Klettband
Klett-
band
Vorsicht!
Den Schutzleiter anschließen, um einen zuverlässigen Erdschutz des
Systems zu gewährleisten. Andernfalls droht Stromschlaggefahr.
Kabelstränge für
optionale Sopro-Kamera
midmark.com
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70

Midmark Elevance® Continental-Style Delivery System Guide d'installation

Taper
Guide d'installation
Ce manuel convient également à