Kozyheat Callaway 40 Le manuel du propriétaire

Taper
Le manuel du propriétaire
EN
FR
PG
5
HUSSONG MANUFACTURING CO., INC.
NATURAL GAS CONVERSION KIT
#NCK-CW40-SPB
For use with the Callaway-40 #CLW-40
Direct Vent Gas Fireplace
This replace is certied under U.S. and Canadian standards ANSI Z21.88-2017/CSA 2.33-2017, CSA 2.17-2017
WARNING
This conversion kit shall be installed by
a qualied service agency in accordance
with the manufacturers instructions and
all applicable codes and requirements
of the authority having jurisdiction. If
the information in these instructions is
not followed exactly, a re, explosion
or productions of carbon monoxide
may result, causing property damage,
personal injury, or loss of life. The
qualied service agency is responsible
for proper installation of this kit. The
installation is not proper and complete
until operation of the converted
appliance is checked as specied in the
manufacturers instructions supplied
with the kit. Refer to appliance owners
manual or product data plate for proper
inlet and manifold pressure adjustments
and orice sizing.
IMPORTANT
THE CONVERSION SHALL BE CARRIED OUT BY A
MANUFACTURER’S AUTHORIZED REPRESENTATIVE,
IN ACCORDANCE WITH THE REQUIREMENTS
OF THE MANUFACTURER, PROVINCIAL OR
TERRITORIAL AUTHORITIES HAVING JURISDICTION
AND IN ACCORDANCE WITH THE REQUIREMENTS
OF THE CAN/CGA-B149.1 OR CAN/CGA-B149.2
INSTALLATION CODES.
CETTE CONVERSION DE GAZ DOIT ÊTRE EFFECTUÉE
PAR UN REPRÉSENTANT AUTORISÉ DU FABRICANT,
CONFORMÉMENT AUX EXIGENCES DU FABRICANT ET
DES AUTORITÉS PROVINCIALES OU TERRITORIALES
AYANT JURIDICTION, ET AUX EXIGENCES DES
CODES D’INSTALLATION CAN/CGA-B149.1 OU CAN/
CGA-B149.2.
READ ALL STEPS BEFORE STARTING INSTALLATION.
LEAVE THESE INSTRUCTIONS WITH THE APPLIANCE.
This gas conversion kit installation instructions must be used in
conjunction with the installation and operation manual provided with
the appliance. Please read the appliance owner’s manual completely
before performing any procedures in these instructions. All warnings,
precautions, and instructions outlined in the manual provided with the
appliance will continue to apply to these instructions.
AVERTISSEMENT
Ce kit de conversion doit être installé
par une agence d’entretien qualiée,
selon les instructions du fabricant et
tous codes et règlements applicables
de l’autorité ayant juridiction. Le non-
respect de ces instructions peut créer un
incendie, une explosion ou la production
de monoxyde de carbone, et causer des
dommages matériels, des blessures
ou même la mort. Lagence d’entretien
qualiée est responsable de la qualité
d’installation de ce kit. L’installation
ne sera conforme et complète qu’après
avoir vérié le fonctionnement du
foyer converti, tel que spécié dans les
instructions du propriétaire fournies
avec ce kit. Voir le manuel d’utilisation
ou la plaque signalétique de l’appareil,
pour les réglages de pressions d’entrée
et du manifold et les dimensions d’orice
(injecteur) de brûleur/veilleuse.
Hussong Manufacturing Co., Inc.
P.O. Box 577, 204 Industrial Park Drive
Lakeeld, MN 56150-0577, USA
CLW-40 • Rev. 1, 9/19
Report Number: 19-472
EN
#NCK-CW40-SP R.1 2019 Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
3
Conversion Kit Components
(1) Gas Conversion Label
(1) 50% Turndown Stepper Motor
(1) Gas Label
(1) Pilot Injector NG: #.023NG
(1) Burner Orices NG: #38
High Altitude Conversions
For high altitude installations in the United States, refer to the
American Gas Association guidelines for the gas designed
appliances derating method. For elevations above 2,000 ft (610
m), input ratings are to be reduced by 4% for each 1,000 ft (305 m)
above sea level.
When the appliance is installed at elevations above 4,500 ft (1,372
m), the certied high altitude rating shall be reduced at the rate of
4% for each additional 1,000 ft (305 m). Refer also to CSA-B149.1
Natural Gas and Propane Installation Code, local authorities, or
codes which have jurisdiction in your area regarding the derate
guidelines.
CAUTION: The gas supply shall be shut o prior to disconnecting
the electrical power, before proceeding with the conversion.
A. Prepare the Fireplace
Step 1: Remove the safety barrier, gas valve access cover, and glass
frame assembly.
Step 2: Remove perimeter media and burner media.
Step 3: Remove pilot shield, media tray and burner, media tray
support brackets, and burner tube.
Refer to the installation manual for more information.
B. Replace Burner Orice
Step 1: Remove the existing orice cap.
Step 2: Replace with the orice cap included with this kit. Tighten
cap securely. The sizes are stamped on the orices.
Table 1, Burner Orice Size at Elevations 0-4,500 ft (1,372 m)
Fuel Orice Size
Natural Gas #38 (DMS)
BURNER
ORIFICE
Figure 1, Burner Orice
C. Convert Pilot Assembly
Step 1: Using a ⁄” wrench, loosen the pilot nut by turning
counterclockwise.
Step 2: Remove the pilot hood by pulling it up from the top.
Remove existing pilot orice.
Step 3: Install new pilot orice included with the kit (number
stamped on pilot orices).
Step 4: Reattach pilot nut and tighten using ⁄” wrench. Fitting
should be snug. DO NOT OVER-TIGHTEN!
D. Convert Gas Control Valve
Follow the stepper motor pressure regulator instruction sheet
included with this conversion kit to convert the gas valve.
E. Complete the Conversion
Step 1: Adjust the venturis. Loosen the screw, then adjust the cap to
the correct setting. Re-tighten the screw. Ensure the venutri
on each inlet tube has the same opening measurement.
See Table 2.
Step 2: Reinstall all components previously removed. Refer to the
installation manual for more information.
Step 3: Turn the manual valve counterclockwise to the ON position.
Step 4: Reconnect electrical power.
Figure 2, Converted Pilot and Pilot Injectors
EN
4
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces #NCK-CW40-SP R.1 2019
Step 5: Check for leaks at all connections with soapy water.
Table 2, Factory Set Venturi Openings
Fuel Opening
Natural Gas 1/8” (3 mm) OPEN
F. Test Inlet Pressure
IMPORTANT: For a proper pressure reading, apply the gas supply
pressure tests with all other gas appliances on or at full capacity
in the household.
Step 1: Loosen the inlet (IN) pressure tap screw (counterclockwise)
on the gas valve.
Step 2: Attach a manometer to the inlet pressure tap with a ¼ in
(6mm) ID hose.
Step 3: Light the pilot and burner. Verify manometer reading is
between the recommended minimum and maximum
pressure settings. See Table 3.
Step 4: Turn o pilot and burner.
Step 5: Disconnect hose and tighten the inlet pressure tap screw
(clockwise). The screw should be snug; do not over tighten.
Step 6: Relight the pilot and burner.
Step 7: Reattach the manometer to the inlet pressure tap to verify
tap is completely sealed. Manometer should read no
pressure.
Table 3, Inlet Gas Supply Pressures
Fuel Minimum Maximum
NG 5” WC (1.25 kPa) 10.5” (2.62 kPa)
G. Test Manifold Pressures
Step 1: Loosen the manifold (OUT) pressure tap screw
(counterclockwise) on the gas valve.
Step 2: Attach a manometer to the outlet pressure tap with a ¼ in
(6mm) ID hose.
Step 3: Light the pilot and burner. Verify manometer reading is
between the recommended low and high pressure settings.
See Table 4.
Step 4: Turn o pilot and burner.
Step 5: Disconnect hose and tighten the outlet pressure tap screw
(clockwise). The screw should be snug; do not over tighten.
Step 6: Relight the pilot and burner.
Burner Venturi
Figure 3, Burner Venturi Location
Step 7: Reattach the manometer to the outlet pressure tap to
verify tap is completely sealed. Manometer should read no
pressure.
Table 4, Manifold Gas Supply Pressures
Fuel Low High
NG 1.1” WC (.27 kPa) 3.8” WC (.95 kPa)
H. Verify Operation
Step 1: Light the pilot. Visually check the pilot ame to verify ame
envelopes the top of the ame sensor and extends far
enough onto the burner for proper ignition.
Step 2: To adjust the pilot ame, turn the pilot adjustment
screw on the gas valve clockwise to decrease ame, and
counterclockwise to increase ame.
Step 3: Turn the appliance o.
Step 4: Ax the gas type sticker on or near the gas valve.
Step 5: Reinstall the glass frame assembly and safety barrier.
Step 6: Light the pilot and burner. Visually check the main burner
ame appearance for proper ignition and operation of the
replace. Refer to the installation manual for complete
adjustment procedures.
Step 7: Complete and ax the Gas Conversion’ labels as close to
the rating plate as possible.
Step 8: Verify the input rating of the converted appliance. See Table
5.
Table 5, Input Ratings
Fuel Minimum Input Input
NG 16,500 Btu/h (4.9 kW) 31,500 Btu/h (9.2 kW)
Figure 4, Burner Ports Location
LAZY, YELLOW FLAMES
IDEAL
Figure 5, Ideal Burner Flame and Pilot Flame Appearance
FR
#NCK-CW40-SP R.1 2019 Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
5
Composants du kit de conversion
(1) Étiquette de conversion de gaz
(1) Modulateur / Régulateur de pression de gaz (moteur pas-à-
pas)
(1) Étiquette du type de gaz
(1) Injecteur de la veilleuse NG : nº .023NG
(1) Orice du brûleur NG : nº 38
Installations à hautes altitudes
Aux États-Unis: Pour les installations à haute altitude, voir les
directives de l’American Gas Association. La puissance de chaue
nominale au niveau de la mer d’un appareil à gaz installé à une
altitude dépassant 2000 pieds (610 m) doit être réduite de 4%
pour chaque 1000 pieds (305 m) au-dessus du niveau de la mer.
Voir aussi le National Fuel Gas Code, ANSI Z223.1/ NFPA 54, vos
agents locaux, ou les codes ayant juridiction dans votre région,
pour les directives de recalibrage.
Au Canada: Si l’appareil est installé à une altitude dépassant
4500 pieds (1372 m), la puissance de chaue nominale certiée
à haute altitude doit être réduite de 4% pour chaque 1000 pieds
(305 m) additionnels. Voir aussi la norme CSA-B149.1 du Code
d’installation du gaz et du propane, les codes locaux, ou les
codes ayant juridiction dans votre région, pour les directives de
recalibrage.
ATTENTION: Lalimentation de gaz doit être fermée avant de
couper l’alimentation électrique, et avant de commencer la
conversion de gaz.
A. Préparation du foyer
Étape 1: Retirez l’écran pare-étincelles, le couvercle d’accès à valve
de contrôle de gaz et vitre (avec cadre).
Étape 2: Retirez des lits de braise décoratifs.
Étape 3: Retirez thermique de veilleuse, le plateau à braises et le
brûleur, le boîtier de brûleur et tube de brûleur.
B. Remplacer l’orice du brûleur
Étape 1: Retirez l’orice du brûleur existant.
Étape 2: Remplacez-le par le nouvel orice de brûleur fourni avec
le kit (numéro marqué sur l’orice du brûleur), en veillant
à bien serrer l’orice du brûleur.
Tableau 1, Dimension d’orice du brûleur,
Élévation 0-4500 pi (1372m)
Combustible Dimension d’orice
Gaz naturel #38 (DMS)
C. Convertir l’ensemble de veilleuse
Étape 1: Avec une clé 7/16 po, desserrez l’écrou de veilleuse en
tournant en sens anti-horaire.
Étape 2: Retirez l’orice de veilleuse existant.
Étape 3: Installez le nouvel orice de veilleuse fourni avec le kit
(numéro marqué sur l’orice de veilleuse).
Étape 4: Remettez l’écrou de veilleuse et serrez-le avec la clé 7/16.
Serrez-le juste assez; NE SERREZ PAS TROP !
D. Convertir la valve de contrôle de gaz
Suivez le feuillet d’instructions du modulateur/régulateur de
pression (moteur pas-à-pas), fourni avec le kit de conversion, pour
convertir la valve de contrôle de gaz.
E. Finaliser la Conversion
Étape 1: Desserrez les vis de réglage du venturi et faites les
réglages requis, puis resserrez les vis de réglage.
Étape 2: Réinstaller tous les composants retirés précédemment.
Étape 3: Tournez le robinet en sens antihoraire à la position ON.
Étape 4: Mettez l’appareil sous tension.
Étape 5: À l’eau savonneuse, vériez l’étanchéité de tous raccords
de gaz, préfabriqués ou installés sur place (aucune fuite).
ORIFICE
DU BRÛLEUR
Figure 1, Lorice du brûluer
Figure 2, Conversion de veilleuse et orices de veilleuse
FR
6
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces #NCK-CW40-SP R.1 2019
Tableau 2, Ouverture du venturi (préréglés par le fabricant)
Combustible Ouvert
Gaz naturel 1/8 po (3 mm)
F. Test de pression à l’entrée
IMPORTANT : Eectuez tous les tests de pression avec tous les
appareils à gaz du bâtiment allumés au réglage maximum, pour
des mesures de pression adéquates.
Étape 1: Desserrer la vis du raccord de test de pression d’entrée
(«IN») en sens antihoraire.
Étape 2: Brancher le manomètre au raccord de test de pression en
utilisant un tube ¼ po D.I.
Étape 3: Allumez la veilleuse et le brûleur. Vériez la pression
au manomètre pour vous assurer qu’elle reste entre
les réglages de pression minimum et maximum
recommandés. Tableau 3
Étape 4: Éteignez le brûleur et la veilleuse.
Étape 5: Débranchez le tube avec manomètre et serrez la vis
du raccord de test de pression d’entrée («IN») en sens
horaire. La vis doit être vissée juste assez; ne la vissez pas
trop serrée.
Étape 6: Rallumez la veilleuse et le brûleur. Ensuite, rebranchez le
manomètre au raccord de test de pression d’entrée, pour
vérier que ce raccord est complètement étanche. Le
manomètre ne devrait indiquer aucune pression.
Tableau 3, Pression de gaz à l’entrée
Combustible Minimum Maximum
NG 5 po WC (1,25 kPa) 10,5 po WC (2,62 kPa)
G. Test de pression au manifold
Étape 1: Desserrez la vis du raccord de test de pression du
manifold («OUT») en sens antihoraire.
Étape 2: Branchez le manomètre au raccord de test de pression de
sortie (manifold).
Étape 3: Allumez la veilleuse et le brûleur. Vériez la pression au
manomètre, qui doit rester entre les réglages de pression
minimum et maximum recommandés. Tableau 4
Étape 4: Éteignez la veilleuse et le brûleur.
Étape 5: Débranchez le tube et serrez la vis du raccord de test de
pression du manifold («OUT») en sens horaire. La vis doit
être vissée juste assez; ne la vissez pas trop serrée.
Étape 6: Rallumez la veilleuse et le brûleur.
Étape 7: Branchez le manomètre au raccord de test de pression du
manifold, pour vérier qu’il est étanche. Le manomètre
ne devrait indiquer aucune pression lorsque la veilleuse
et le brûleur sont allumés.
Tableau 4, Pression de gaz au manifold
Combustible Minimum («Low») Maximum («High»)
NG 1,1 po WC (0,27 kPa) 3,8 po WC (0,95 kPa)
H. Vérier le fonctionnement
Étape 1: Allumez la veilleuse pour vérier visuellement les
ammes. Elles doivent envelopper le haut du détecteur
de amme, et se prolonger sur le brûleur assez loin, pour
assurer un allumage adéquat.
Étape 2: Pour ajuster la veilleuse : Tournez la vis de réglage de
veilleuse en sens horaire pour réduire les ammes de
veilleuse, ou en sens anti-horaire les augmenter.
Étape 3: Éteignez le foyer.
Étape 4: Collez l’autocollant du «Type de gaz» sur l’étiquette.
Étape 5: Réinstallez la vitre (avec cadre) et lécran pare-étincelles.
Étape 6: Vériez l’allumage et le bon fonctionnement du
foyer. Pour plus d’information, suivre les instrucitons
d’installation.
Étape 7: Remplir et coller l’étiquette de «Conversion de gaz» le
plus près possible de la plaque d’homologation.
Étape 8: Les puissances de chauage (en BTU/h) de ce foyer à gaz
converti sont indiquées au Tableau 5.
Tableau 5, Puissances de chauage
Combustible Puissance minimum Puissance maximum
NG 16 500 Btu/h (4,9 kW) 31 500 Btu/h (9,3 kW)
FLAMMES JAUNES ET
LENTES
RÉGLAGE IDÉAL
Venturi du brûleur
Figure 3, Venturi du brûleur
Figure 4, Emplacement trous perforés du brûleur
Figure 5, Apparence idéale des ammes du brûleur et de la veilleuse
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6

Kozyheat Callaway 40 Le manuel du propriétaire

Taper
Le manuel du propriétaire

dans d''autres langues