Your waste container features (4) adjustable mounting
brackets (AMB).
Begin by loosening (4) nuts with (10mm) nut driver
and slide brackets out to desired location.
(NOTE: Be sure you are mounting AMB to thick
portion of door.)
Use provided screws to attach your door to wood
frame.
1
2
Slide door either left or right for proper door
alignment. Re-tighten AMB once set.
Adjust (4) micro-screws for door tilt adjustment.
3
4
10mm Nut
Micro Screw Tilt
Adjustment
2
Door Mounting
(AMB)
Instrucciones de Instalación
Instructions d’Installation
NOTA: El contenedor de basura de Rev-A-Shelf, está ya listo con oricios pre
taladrados para aceptar el sistema deslizante tándem BLUM.
NOTE: Votre poubelle Rev-A-Shelf est déjà pré-forée pour recevoir le système de
coulisses BLUM tandem. Aucune préparation du tiroir n’est nécessaire.
Para la instalación del deslizante, siga los pasos del 1 al 6 de la plantilla BLUM.
Suivez les étapes 1-6 du modèle BLUM pour l’installation de la coulisse.
Dispositivo de cierre
Dispositif de verrouillage
Agujero pre perforados
Pré Percé trou
Agujero pre perforados
Pré Percé trou
15 MIN
1
I-4WCD-0511
Bottom View
LEER PRIMERO
LIRE D’ABORD
HERRAMIENTAS REQUERIDAS:
OUTILS REQUIS:
TIEMPO ESTIMADO DE ENSAMBLADO:
TEMPS D’ASSEMBLAGE ESTIMÉ: