HeatStar 9050360 Le manuel du propriétaire

Taper
Le manuel du propriétaire

Ce manuel convient également à

Installation and Maintenance Instructions
Saf-T Vent® Model EZ Seal/EZ 316
and Model GC/GC 316
Single Wall
Gas Vent Connector
Chimney Liner &
Special Gas Vent (USA) / Type BH Vent Class I/II (Canada)
For Venting Residential, Commercial & Industrial Appliances
Category I, II, III & IV Appliances
Model EZ Seal/EZ 316 - 6”-16” Diameter Vent for use on Positive, Neutral
and Negative Pressures up to 9” W.C.
Model GC/GC 316 - 18”-32” Diameter Vent for use on Positive, Neutral and
Negative Pressures up to 15 W.C.
Important: Do NOT install this product until you have read and fully understand these installation
instructions. Failure to comply with these instructions may result in injury or damage to property. An
improper installation will void any stated warranty.
Follow these instructions exactly as written.
Examine all components for possible shipping damage prior to installation.
Proper joint assembly is essential for a safe installation. Check integrity of joints upon
completion of assembly.
This venting system must be supported in accordance with these instructions.
Check for restricted vent movement through the walls, ceilings and roof penetrations.
This venting system must be free to expand and contract.
Do not mix Saf-T vent pipe with pipe from different manufacturers.
5030 Corporate Exchange Blv
Grand Rapids, MI 49512
Call 800 772-0739
Fax 800 972-1421
www.heatfab.com
Tested and Listed to
UL1738 & ULC S636
By Underwriters Laboratories, Inc.
PI-GCINS 4/17
APPLICATION INFORMATION
Saf-T Vent Model EZ Seal/EZ 316 and Model GC/GC 316 Gas Vent Systems may be used to vent safety certified
Category I, II, III, IV and Certain Direct Vent gas appliances with a flue gas temperature of not more than 550° F
(288° C). When used as a masonry chimney liner, Saf-T Vent EZ Seal/EZ 316 (up to 10” diameter) can be used
to vent condensing oil appliances and category I, II, III, IV gas fired appliances. The Saf-T Vent EZ Seal/EZ 316
system is for use with appliances which produce positive vent pressures of 9 inches of water column or less and
Model GC/GC316 is for use with appliances which produce positive vent pressures of 15 inches of water column
or less. Saf-T Vent Model EZ Seal, EZ 316, GC and GC 316 components are compatible and may be combined
for installations. Because these types of appliances may produce vent gases under positive pressure and/or at or
near their dew point, special installation considerations may be required.
Install in accordance with these instructions and those of the appliance manufacturer. Consult the appliance
manufacturer’s instructions for the maximum horizontal length of the vent connector as well as any restriction on
total vent height, proper sizing of the vent, common venting considerations and procedures for connecting the
vent to the appliance.
The installation must conform to applicable National, Regional, State and local codes. Contact the Authority
Having Jurisdiction prior to beginning any work to obtain any required permits.
Pre-Installation Considerations:
Proper planning prior to installation is essential for maintaining proper clearances and for avoiding possible
contact with concealed plumbing or electrical wiring inside walls, floors and ceilings. A continuous straight-line
upward pitch of at least 1/4 inch (2 degrees) rise per foot on horizontal runs must be maintained in order to
properly rid the system of the corrosive condensate. Be sure to plan a sufficient number of supports for the entire
system to maintain the required straight-line pitch and to hold the system in place.
Reference Combustion & Ventilation Air on the last page for proper air supply guidelines
Personal Safety
Wear eye protection and heavy gloves throughout the installation. In addition, wear an approved dust and vapor
respirator whenever in contact with building insulation. Proper and safe scaffolding and/or ladders should be
used. Check overhead for antennas, power lines or other obstacles before erecting ladders or scaffolding and
while working with conduit on any roof structure.
Tools Required for Installation
Common building tools including but not limited to a Tape Measure, Pliers, Screw Drivers, Saws and/or Snips,
Drills, Drop Cloth(s); Ladder/Scaffold; Safety and Personal Protective Clothing.
Definitions:
AL 29-4C – A super ferritic stainless steel alloy designed by Allegheny Ludlum for extreme resistance to chloride
ion pitting, crevice corrosion and stress corrosion cracking. Equivalent material made by other manufacturers
may be identified by the UNS designator S44735.
316L An austenitic chromium-nickel stainless steel containing molybdenum. Type 316L is an extra-low carbon
version of Type 316 that minimizes harmful carbide precipitation due to welding. Type 316L is used in
applications where immunity to carbide precipitation due to welding assures optimum corrosion resistance.
316L may be identified by the UNS designator S31603.
Category I Appliance - An appliance which operates with a non-positive vent static pressure and with a vent gas
temperature that avoids excessive condensate production in the appliance.
Category II Appliance - An appliance which operates with a non-positive vent static pressure and with a vent gas
temperature that may cause excessive condensate production in the appliance.
Category III Appliance - An appliance that operates with a positive vent static pressure and with a vent gas
temperature that avoids excessive condensate production in the appliance.
Category IV Appliance - An appliance that operates with a positive vent static pressure and with a vent gas
temperature that may cause excessive condensate production in the appliance.
Combustible Material - Any material made of or surfaced with wood, compressed paper, plant fibers, or other
materials that are capable of being ignited or burned. Such material shall be considered combustible even
though it is flame proofed, fire-retardant treated, or plastered. (Source: NFPA54/ ANSI Z223.1-2006.).
PI-GCINS 4/17
Clearance to Combustibles and Framing Requirements
Table 1 shows the required MINIMUM AIRSPACE CLEARANCE TO COMBUSTIBLES. EZ Seal/EZ 316 - 6”-16”
and model GC/GC 316 are primarily intended for installation in fire resistive, non-combustible surroundings or
installed unenclosed. This airspace clearance is required for safe operation of the vent. Failure to follow these
clearances could overheat the building materials and could cause fire.
Max Appliance
Operating
Temperature
6-12" 230°F* 0"* 0"*
14-32" 194°F* 0"* 0"*
6-10"
300°F 1" 1"
6-12" 550°F 2" 2"
14" 550°F 3" 3"
16" 550°F 4" 4"
18" 550°F 4" 4"
20-22" 550°F 5" 5"
24-26" 550°F 6" 6"
28-32" 550°F 7" 7"
0": Enough to allow pipe passage
Pipe Size
Minimum Airspace Clearance to Combustibles
Minimum Framing Dimension
(Through a Wall or Roof)
Vert & Horiz
Unenclosed
(ID + 7") X (ID + 7")
N/A (Gas Vent Connector Only)
(ID + 5") X (ID + 5")
(ID + 5") X (ID + 5")
(ID + 5") X (ID + 5")
(ID + 7") X (ID + 7")
(ID + 7") X (ID + 7")
(ID + 7") X (ID + 7")
0": Enough to allow pipe passage
* Permitted to be fully enclosed with combustibles at 0” clearance per ULC-S636
Vertical (Floor, Ceiling and Roof) Penetrations
All vertical penetrations where the vent passes through a combustible floor, ceiling or roof, require a Fire Stop (p/n
5x18CI) or Roof Jack be installed. See Table 1 for proper framing dimension and refer to the Fire Stop or Roof
Jack Section for proper installation. Non-combustible Floor, Ceiling & Roof Penetrations do not require a Fire
Stop or Roof Jack.
Horizontal (Wall) Penetrations
Horizontal systems passing through a combustible wall require the use of a Wall Penetration, for relative
temperatures with clearances. See Table 1 for proper framing dimensions and refer to Wall Penetration section
for installation instructions. Non-combustible wall penetrations do not require a Wall Penetration.
TYPICAL INSTALLATIONS
Rain Cap or other Termination
Flashing & Storm Collar
See Table 1.
For Min. Clearance
Fig 1. (Vertical Termination)
See Table 1.
For Min. Clearance
See Table 1.
For Min. Clearance
See Table 1. (Min.
Framing Dimension for
Wall Penetration)
Fig 2. (Horizontal Termination)
Horizontal
Termination
See Table 1.
For Min. Clearance
Condensate Drain
Vertical
Support
Horizontal
Support
Vertical
Support
Appliance
See Table 1.
For Min.
Framing
Dimension
Joist Shield or
Roof Jack
In addition to the configurations shown in Figs. 1 & 2, this system may be installed in any combination of vertical
and horizontal, unenclosed configurations as long as the minimum clearances are maintained per clearance
Table 1 and the total length and number of fittings does not exceed the appliance manufacturers
recommendations. This system may also be installed within an existing masonry chimney.
PI-GCINS 4/17
Notes:
1. Unenclosed systems require at least one side open (combustible material on maximum of 3 sides).
2. Reduced clearances may be attained by using noncombustible enclosures.
3. Systems fully enclosed by combustible material are NOT permitted.
4. Do not place insulation in any required clearance spaces surrounding the vent system unless these
instructions suggest otherwise and the insulation is specified or supplied.
5. Noncombustible enclosures require 0” air space.
VENT ROUTING LIMITATIONS - MAXIMUM EQUIVALENT LENGTHS
In order to insure the vent system is not overly restrictive to flow, refer to the maximum length of vent specified by
the appliance manufacturer. In order to account for turns in the system (which cause additional resistance to
flow) most manufacturers recommend using an “Equivalent Length” method of determining the limitations. Via
such method, elbows and tees are assigned an “equivalent length” (in feet). If the sum of straight length segments
and additional “equivalent lengths” (due to turns) exceeds the limit specified by the manufacturer, the routing is
not permitted. See appliance manufacturer’s instructions for additional information.
If the appliance manufacturer’s instructions do not list equivalent lengths for standard fittings, use Table 2 to
determine the Equivalent Length of the vent fittings.
GENERAL INSTALLATION REQUIREMENTS
1. In instances where the appliance manufacturer’s instructions conflict
with requirements in this document, the appliance manufacturer’s
instructions take precedence.
2. Failure to conform to any of these requirements may violate local, state
or national codes as well as create conditions which may cause
catastrophic property damage and/or personal injury.
3. The horizontal vent connector must slope upward toward the
termination at least 1/4 inch per foot and be installed so that all
condensate runs back toward the appliance or inline drain and is not
retained in any part of the venting system.
4. If called for by the appliance manufacturer’s instructions, a drain fitting must be located as close as possible
to the appliance flue outlet. Additional drains are required for each 30’ of vent. If a drain fitting is not
supplied with the appliance, install a Saf-T Vent in-line drain or a tee with a drain tee cover. Properly
dispose of collected condensate.
5. Multiple Category III or IV appliances may not be interconnected to any part of the venting system unless
the appliance manufacturer has specifically approved the engineering of the vent system. A Category III or
IV appliance may not be interconnected to any part of a vent system used with a natural draft or draft hood
appliance, except when a listed mechanical draft system is installed.
6. For venting systems that extend through any zone above that on which the connected appliance is located
(except for one and two family dwellings), codes require that the vent system be enclosed with an enclosure
having a fire resistance rating equal to or greater than that of the floor or roof assemblies through which it
passes. In one and two family residential construction the system must be enclosed whenever passing
through occupied spaces. The enclosure should be fabricated to allow periodic inspection of the vent.
7. Whenever gas-burning equipment is installed in the same space where halogenated substances may exist
(refrigerants, solvents, bleaches, salts, etc.), clean outside air must be utilized for combustion.
8. When passing 5’ or more of vent through an unheated area (such as attics, crawl spaces, building exteriors
or above roof lines), it is recommended that the system be converted to double wall CI Plus/CI 316 to
prevent condensation and freezing.
9. The vent system shall not be routed into, through or within any other actively used vent or chimney.
10. Another appliance may not vent into the flue space outside the Saf-T Vent conduit. However, if there is
sufficient space and all manufacturer’s instructions and codes are followed, a separate chimney liner may
be installed within the chimney to vent another appliance.
HORIZONTAL INSTALLATION REQUIREMENTS
1. If the termination is through a combustible wall, the system must include Wall Penetration and a Saf-T Vent
termination as required by the appliance manufacturer.
Equivalent Length Table
Fitting
Straight Length
Boot Tee
90 Degree Elbow
70 Degree Elbow
45 Degree Elbow
30 Degree Elbow
15 Degree Elbow
Table 2
PI-GCINS 4/17
2. The horizontal termination shall be located not less than 12 inches above grade or anticipated snow line
(remember to consider snow and ice falling from overhead objects), and not less than 7 feet above grade
when located adjacent to a public walkway. It shall also terminate a minimum of 4 feet below, 4 feet
horizontally from, or 1 foot above any door, window, fresh air intake, utility meter or regulator unless the
appliance is Listed differently. The termination must be a minimum of 6 feet from the combustion air intake
of any other appliance. Proper judgment may require greater distances depending on the size of the
equipment installed or site conditions. Consult with the local Authority Having Jurisdiction.
3. The termination should be away from trees,
shrubs, or decorative items as flue gases
could cause damage.
4. The total equivalent horizontal distance of
the vent system from the appliance flue
collar to the outside of the termination shall
not be less than 14 inches.
5. A minimum of one (1) horizontal support is
required for every 6 feet of run.
VERTICAL INSTALLATION REQUIREMENTS
1. The vent system must terminate at least 3
feet above the roof line and at least 2 feet
higher than any portion of the building within
10 feet.
2. When terminated at a height of more than 6 feet above the roof, the vent must be supported by a Saf-T
Vent Guy Section. Refer to the Guy Support section of these installation instructions.
3. The vent system must terminate with one of the Saf-T
Vent Terminations; except when a Termination or
approved mechanical vent device is specified or
provided by the appliance manufacture.
4. The total continuous distance of the vent system from
the appliance flue collar to the termination shall not
exceed that specified in the appliance manufacturer’s
installation instructions. When venting natural draft
appliances the termination must be at least 5 feet
above the topmost draft hood. Otherwise a Listed
mechanical draft inducing device is required.
5. Vertical supports are required after every transition to
vertical. Vertical supports are also required above
every offset elbow. See Table 3 for vertical support
requirements.
JOINT SEALING AND CONNECTION METHOD
Model EZ Seal/EZ 316 (Diameters 6" thru 16") is joined using the Ring & Tab Method. EZ Seal/EZ 316 is also
manufactured with a factory installed seal on the inside of the
female (outlet) end making the use of any additional sealant
unnecessary.
To Connect:
Note: It is required to apply gasket lubricant (p/n 7001SIL-5), sold
separately) to the factory installed silicone gasket when
assembling the pipe. Apply lubricant directly to the gasket on the
inside female pipe end, both edges of gasket.
1. Connect parts using the Ring and Tab Connection
Method. See Fig 5A.
a. To connect, slide the lock ring away from the end
to allow clearance for the tabs extending from the
female end.
b. Engage the two sections making sure the tabs stay to the outside of the vent.
1 Ft. Above Doors & Windows
4 Ft. Horizontally from
Doors and Windows
4 Ft. Below any
window or fresh
air inlet.
7 Ft. Above Public
Walkways and Drives
1 Ft. above ground
or snow line Sidewalk
Fig 3. (Horizontal Installation Requirements)
Fig 4. (Vertical Installation Requirements)
2'
10'
(2 Ft. Above Structures within 10 Ft.)
Fig 5A. (Ring and Tab Joint)
Ring
Tab
Tabs Under Ring
Fold Tabs
Over Ring
PI-GCINS 4/17
c. After the sections are fully engaged, slide the lock ring down over the tabs, making sure all tabs
are contained within the lock ring.
d. Bend the tabs back over the lock ring to complete the joint. Note: Some termination parts have a
hose clamp in place of the lock ring. In such cases, the hose clamp is tightened down over the
tabs. The tabs need not be bent over the clamp.
Model GC/GC 316 (Diameters 18" thru 32") is joined using
the Locking Strap method. Model GC/GC 316 requires
sealant to be applied at each joint during the assembly
process.
To Connect:
1. Remove the Locking Strap from the Vent (See Fig.5B)
2. Wipe/clean the outlet and the inlet ends of the
GC/GC316 pipe with alcohol wipes.
3. At ¾” inside the outlet end, apply a ¼” thick,
continuous, straight-line bead of high temperature
sealant to the inside circumference. Do not use a zig-
zag pattern when applying sealant.
4. Smooth down the bead with a flat instrument or moistened finger (See Fig. 5B).
5. Insert the male (outlet) end into the female (inlet) end, and align the Locking Tabs on the two parts.
6. Wrap the Locking Strap around the joint so that the tabs extruding from the vent align and engage into the
slots in the Locking Strap. NOTE: The Tabs on the male end of elbows and tees are permitted to rotate
so that the vent can be aligned to the desired direction.
7. Install Bolt and Nut through the end tabs of the Locking Strap and tighten strap using a 7/16” nut driver or
socket. CAUTION: DO NOT over tighten the clap as it may cause the vent to collapse (See Fig 5B).
Condensate Drains:
When An Internal Condensate Drain Is NOT Part of the Appliance:
A Saf-T Vent In-Line Drain Section, Tee or Boot Tee with
a separate Tee Cover Drain is strongly recommended.
Install this drain fitting as close to the appliance flue collar
as possible (See Fig. 6A).
Use the Boot Tee to transition from horizontal to vertical
and attach the Drain Tee Cover to the appropriate leg of
the tee (See Fig 6A).
A condensate drain is required for every 30 feet of
horizontal vent and at/near the bottom of a vertical stack.
Use the In-Line Drain Section for a straight horizontal run.
Rotate the fitting so that the drain tube points downward
and is as vertical as possible (See Fig. 6B).
A Condensate Drain Tube Kit is available to drain the
condensate to an appropriate location (i.e. floor drain or
vented sanitary sewer connection). A trap loop must be
formed into the drain hose and must be a diameter that is
at least four times the appliance's rated stack pressure in
inches of water column or 3 inches, whichever is greater.
Secure the loop with a cable tie. Prior to final assembly
the trap loop must be 'primed' by pouring a small quantity
of water into the drain hose.
Follow all local and national codes and regulations for the draining of acidic condensate.
In cold climates do not install a condensate drain on the exterior of the building. Doing so may result in
dangerous icy conditions on surfaces near the drain and may cause damage to the vent system and/ or
the building exterior. We will NOT be held liable for any injury or property damage due to formation of ice.
Fig 6B. (In-Line Drain Sectionand Drain Tube)
Fig 6A. (Boot Tee w/ Drain Cover & Tube)
Boot Tee
Drain Tube
Drain Tube
w/ Trap Loop
Drain Section
Fig 5B. (Locking Strap Joint)
Apply
Sealant
Here
Locking Strap
PI-GCINS 4/17
Adjustable Length
The Adjustable Length Section serves as a variable length between
other components when specific lengths cannot be utilized and
eliminates the need to cut parts to length. For proper installation, refer
to instructions packaged with the Adjustable Length (See Fig. 7).
Customized LengthsCutting Standard Lengths
The Saf-T Vent EZ Seal/EZ 316 system (6”-16”) is designed
so that in most cases standard lengths will not need to be cut.
There may arise, however, an occasional situation where
standard lengths and adjustable length slip connectors are
not adequate. In such cases, a standard length of Saf-T Vent
may be field cut.
To custom cut a standard length part:
1. Measure the length of vent needed (Dim A) and add 3
inches to the result (See Fig. 8).
2. Measuring from the female end (end with the tabs)
measure out the distance A + 3" and mark it on the
pipe.
3. Cut the pipe with an abrasive cutoff, plasma, or
compound snips.
To help get a square cut, create a straightedge by
wrapping masking tape around the waste side of the cut
point. If using snips, start the cut at the male end and
follow a spiral path around the pipe until the cutoff mark is
reached.
4. File off any burrs that develop in the cutting process prior
to assembling. If the cutting process distorts the
roundness of the pipe carefully use your thumbs to re-
round the end.
5. Apply high-temperature silicone sealant to the field-cut
joint.
6. Assemble the joint using the procedures above.
7. A hose clamp must be used to retain the tabs.
Vertical and Horizontal Support
For proper installation, Vertical and/or Horizontal supports must be
installed to support the Saf-T Vent. Refer to Table 3 for minimum
spacing distances and the corresponding section for instructions for
installing the support. Note: For all support options, ensure all
minimum clearance to combustibles are maintained. Never drill or screw
through the Saf-T Vent system.
Guy Support Section
The Guy Support is a short section of vent pipe with brackets protruding
from it. These brackets provide a means for attaching a guy line,
threaded rod or similar metal bracing to provide support to the vent
system.
To Install: Connect Guy Section to the vent using standard joint
connection method. Attach guy wires or metal bracing to the brackets
provided on the Guy Section. Anchor guy wires or bracing to the
building infrastructure capable of supporting the load of the vent (See
Fig. 9).
Spacing Between Supports
Diameters
Vertical
Spacing
Horizontal
Spacing
6” to 12”
20’
Every six (6)
feet and after
every transition
from vertical to
horizontal.
14” to 18”
12’
20” to 24”
10’
26” to 32” 6’
Table 3. (Vertical and Horizontal Support
Requirements)
Fig 7. (Adjustable Length)
A + 3"
Cut Here
A
Non-Standard Length
Required
Fig 8. (Cutting Standard Lengths)
Standard Length
Anchor Bracket
Fig 9. (Guy Support Assembly)
Guy Support Section
Guy Wire
(Model EZ Seal Shown)
PI-GCINS 4/17
Fire Stop
Wherever the vent passes through a ceiling or floor a Fire Stop (5x18CI)
must be installed. To Install: Establish the correct framing dimension
(See Table 1) and nail the Fire Stop to the joist (Fig 10a). Route the vent
through the Fire Stop plate.
Caution about insulation in attics Note: The Fire Stop should be
located on the top of the joist to prevent insulation from falling into the
joist. Keep all attic insulation the proper minimum clearance from
pipe by installing an enclosure or similar around the pipe.
Support Clamps
Support Clamps may be suspended from rods or cables and used as a
saddle to rest the vent in or they may be used in pairs to clamp around
the vent and suspended from a single rod, or cable (See Fig. 10b).
EZ Seal/EZ 316 Horizontal Clearance Support Clamp
The Horizontal Clearance Support Clamp (Sizes 3”-10”) provides
horizontal support for the vent and establishes a specified amount of
clearance to combustible materials. To install: Secure the mounting plate to the
wall by installing fasteners through the pilot holes in the mounting plate, and into
the wall. Install a pair of Support Clamps around the vent, and secure the
Support Clamp to the Horizontal support by installing a bolt through the mounting
tabs on the Support Clamps and through the pilot hole in the 2” Horizontal
Support (See Fig. 11).
EZ Seal/EZ 316 Vertical Clearance Support Clamp
The Vertical Clearance Support Clamp (Sizes 5”-10”) provides vertical support
for the vent and establishes a specified amount of clearance to combustible
materials. To install: Secure the mounting plate to the wall by installing
fasteners through the pilot holes in the mounting plate, and into the wall. Route
the vent through the Support Clamp and secure by tightening the Worm Gear (See Fig. 12).
Wall Penetration Assembly
A Wall Penetration Assembly is required when passing through a combustible
wall.
To Install:
1. Prepare an opening in the wall where the Penetration will be installed.
Refer to Table 1 for proper framing dimensions. The opening may be
round or square as long as the minimum framing dimension is
established. Additional framing may need to be added to the wall
section to provide adequate support for the Wall Penetration Assembly.
2. From the outside, position the Wall Penetration into the hole (See Fig.
13).
3. Use fasteners to secure the Wall Penetration to the wall.
4. Proceed with installing the Saf-T Vent sections routing the vent through the Wall Penetration. The Vent
must protrude at least 2 inches beyond the
Wall Penetration and must have the required
¼ inch per foot pitch towards the appliance.
5. Install the End Collar on the section of vent
that passes through the Penetration and
position the End Collar so that it is in contact
with the outlet end of the Wall Penetration
and closes off the gap between the Wall
Penetration and the Vent.
6. Secure End Collar by tightening the worm
gear.
Pair of Support Clamps
Support Clamp
Fig 10. (Support Clamps)
Fig 11. (2" Horizontal
Clearance Support)
Mounting Plate
Support Clamps
Mounting Plate
Support
Clamp
Worm Gear
Fig 12. (2" Vertical
Clearance Support)
FLOW
Horizontal Termination
End Collar
Vent Pipe
Wall Penetration
Wall Section
Vent Pipe
Fig 13. (Wall Penetration)
Fig 10. (Firestop/Support)
Firestop
Plate
Support
Clamp
Saf-T Vent
Framed
Opening
Fig 10a. (Fire Stop)
Fig 10b. (Fire Stop)
PI-GCINS 4/17
7. Using Silicone Sealant, seal any gaps between the wall, the Wall Penetration, the End Collar and Saf-T
Vent.
Wall Penetration & Horizontal Termination
The Wall Penetration & Horizontal Termination is
the standard Wall Penetration Assembly that
includes a Horizontal Termination. To install:
1. Follow Steps 1-7 in the Wall Penetration
Assembly Section.
2. Align the Termination with the Wall
Penetration so that the solid portion of the
screen is rotated to the top.
3. Secure the Termination to the Penetration
with screws.
4. The Termination may be easily removed for inspection of the venting
system (See Fig 14).
Screen Terminations
Screen Terminations are used to terminate a horizontal vent system. There
are several different Screen Termination styles available. These include the
Mitered Termination Screen, an Elbow Termination with Screen and a
Standard Screen Termination. All Screen Terminations are installed by using
either the standard Ring & Tab Connection method or the Locking Strap Joint
Connection method. All Screen Terminations must terminate a minimum of 6”
from the wall (See Fig. 15).
Roof Jack
The Roof Jack provides for vertical penetrations through non-combustible
ceiling or roof structures and also provides support for the vent system.
For installation instructions refer to instructions packaged with the Roof
Jack.
Tall Cone Flashing
The Tall Cone Flashing is for vertical terminations through a flat roof.
Note: For combustible roofs a Joist Shield must be installed prior to
installing the Flashing (See Fig. 17A).
To Install directly on Flat Roof:
1. Prepare a round or square opening in the roof. See Table 1 for
Clearance & Framing dimensions.
2. Apply weather-stripping or outdoor caulk to the bottom of the cone
plate.
3. Attach the cone to the roof using common construction methods.
4. Flash over the cone plate and seal the fastener heads using normal roofing requirements.
5. Install Vent pipe through the Tall Cone. Refer to corresponding section for instructions on installing the
Storm Collar and Rain Cap (See Fig. 17A).
To Install on Roof Curb:
1. Prepare roof curb using standard construction methods. See
Table 1 for Clearance & Framing dimensions.
2. Place the Cone on top of the curb and mark the outline of the curb
on the bottom of the cone plate.
3. Use snips to notch out the corners of the plate to match the outline
of the curb.
4. Apply weather-stripping or outdoor caulk to the bottom of the cone
plate.
Fig 14. (Wall Penetration & Horizontal Termination)
Vent Pipe
Wall Section Wall Penetration
Vent Pipe
End Collar
Horizontal Termination
FLOW
Horizontal Termination
Mitered
Termination
Elbow
Termination
Screen
Termination
Fig 15. (Horizontal Screen
Terminations)
Vent Pipe
Joist Shield
Apply
Sealant
Fig 17A. (Tall Cone Flashing
Directly on Flat Roof)
Tall Cone
Flashing
Storm
Collar Apply
Sealant
Roof Joist
Fig 17B. (Tall Cone Flashing
on Roof Curb)
Apply
Sealant
Vent Pipe
Tall Cone
Flashing
Bend
Flashing
Base Over
Curb
Roof
Curb
Apply
Sealant
Storm Collar
PI-GCINS 4/17
5. Install Cone on top of curb and bend down the extra material with duckbill pliers to create a cap which fits
over the curb.
6. Attach the cone to the roof using common construction methods.
7. Install Vent pipe through the Tall Cone. Refer to corresponding section for instructions on installing the
Storm Collar and Rain Cap (See Fig. 17B).
Pitched Roof Flashing
The Pitched Roof Flashing is for vertical terminations through a
non-combustible pitched roof. Note: For combustible roofs model
CI-Plus flashing and Vent pipe should be used, refer to CI-Plus
installation instructions for details.
To Install:
1. Prepare a round or square opening in the roof. See Table
1 for Clearance & Framing dimensions.
2. Apply weather-stripping or outdoor caulk to the bottom of
the cone plate.
3. Attach the cone to the roof using common construction
methods.
4. Flash over the cone plate and seal the fastener heads
using normal roofing requirements.
5. Install Vent pipe through the Tall Cone. Refer to corresponding section for instructions on installing the
Storm Collar and Rain Cap (See Fig. 18).
Storm Collar
The Storm Collar is designed to shed rain away from the flashing opening.
To install:
1. Place the Storm Collar over the last segment of vent and slide it down to where it is 2” above the outlet of
the flashing. This 2” air space will release any buildup of heat from inside the cone.
2. Depending on the type of storm collar you have, tighten the worm gear or the bolts on the tab to secure
the Storm Collar to the vent. Apply silicone sealant over the joint between the vent pipe and the Storm
Collar (see Figs. 17A, 17B & 18).
Rain Cap
The Rain Cap terminates the vertical vent system and
prevents rain from entering the vent. The Rain Cap includes
a Storm Collar that is used to attach the rain cap to the vent
system.
To Install:
1. Refer to Vertical Termination Requirements section
for guidelines for locating the Rain Cap.
2. Depending on the type of Storm Collar you have,
loosen either the worm gear or the bolts on the
Storm Collar and slide the collar down over the pipe
(See Fig. 19).
3. Install the Rain Cap onto the last vent pipe segment. Note: To allow removal of the Rain Cap for
inspection Do NOT Seal joint with sealant.
4. Raise the Storm Collar up so that it is directly on the Locking Strap or Ring and Tab Joint and tighten
Worm Gear or Bolts to secure Rain Cap to the Vent.
Appliance Connectors
Connect the Saf-T Vent system to the appliance flue collar as directed in the appliance manufacturer’s
instructions. If the appliance flue collar is not designed for direct connection to the Saf-T Vent system, a special
appliance adapter may be required. See Heat-Fab appliance adapter chart, the appliance manufacturer’s
instructions or contact Heat-fab for recommended adapters.
Fig 18. (Pitched Cone Flashing)
Storm Collar
Apply
Sealant
Roof
Vent Pipe
Pitched Cone
Flashing
Storm Collar
Vent Pipe
Fig 19. (Rain Cap)
Rain Cap
PI-GCINS 4/17
Notes:
PI-GCINS 4/17
Combustion & Ventilation Air:
In order for appliances and their vent / chimney systems to operate properly they require a
plentiful supply of clean combustion and ventilation air. Requirements for such combustion and
ventilation air are found in the installation and maintenance instructions accompanying the appliance as
well as in vent manufacturer's literature and various mechanical codes. Seek and follow guidelines
provided there when installing an appliance / vent system.
In addition to a plentiful source, it is very important for the combustion air to be free of certain
chemical contaminants that can be very corrosive in nature to the appliance and / or venting system
during and as a result of the combustion process.
In some cases, the use of indoor air is acceptable with the exceptions stated below. However,
wherever possible, it is best to take combustion air directly from the outside, unless outdoor air has
contaminant vapors nearby as listed below.
The following common list of substances need to be avoided in all instances since vapors
associated with them if mixed with the combustion air can be extremely corrosive to the appliance
and / or venting system. *Please note this list is not exclusive as to substance or effect and may be
supplemented at any time.
a. Permanent wave solutions h. Cleaning solvents (i.e.
perchloroethylene)
b. Chlorinated waxes and cleaners i. Printing inks, paint removers, varnishes,
etc.
c. Chlorine based swimming pool chemicals j. Hydrochloric acid
d. Water softening chemicals k. Cements and glues
e. De-icing salts or chemicals l. Laundry room detergents, fabric
softeners
f. Carbon tetrachloride m. Masonry acid washing materials
g. Halogen type refrigerants
Corrosion of the vent / chimney caused by the use of contaminated combustion air voids the
warranty on these products.
Flue gas condensate with PH levels below 2.5 may also void the warranty. PH levels should be
monitored regularly and if below 2.5, should be addressed with the boiler OEM on methods to raise it.
Maintenance Procedures:
Normal operation of gas burning appliances does not result in deposits of combustible soot in venting
systems. However, a poorly adjusted or malfunctioning appliance can deposit soot and other debris
which can enter the vent system. As with all vents, the Saf-T Vent system should be inspected at least
annually for the presence of deposits of soot or debris. Any such accumulation should be removed and
the appliances adjusted to eliminate future accumulation.
At regular periods the system should also be inspected for signs of leakage of condensate or
combustion by-products at all joints. If any leakage is found the connected appliances should be
turned off and the leaks repaired.
If the system incorporates a drain hose from either an in-line fitting or from a drain tee then the hose
must be inspected periodically to assure that water remains in the trap loop. If a proper trap loop is not
maintained exhaust from the connected appliances may accumulate in the building area.
2017 Heatfab is a registered trademark of
Johnson Controls, Inc. in the United States and
other countries.
Directives d’installation et d’entretien
Saf-T Vent® Modèle EZ Seal Plus/EZ 316
et Modèle GC Plus/GC 316
Paroi simple
connecteur d’évent à gaz,
doublage de cheminée & évents aux gaz spéciaux (É-U) / évent de type BH pour
appareils de catégorie I/II (Canada)
Pour l’évacuation des appareils léger résidentiels et commerciaux
pour appareils de catégorie I, II, III & IV.
Modèle EZ Seal Plus/EZ 316 - Diamètres 6 à 16 pouces - Pour utilisation avec pression
positive, neutre et pression négative jusqu’à 9po à la colonne d’eau
Modèle GC Plus/GC 316 Diamètres 18 à 32 pouces - Pour utilisation avec pression
positive, neutre et pression négative jusqu’à 15po à la colonne d’eau
IMPORTANT : Ne pas installer ce produit avant d’avoir lu et assimilé parfaitement ces directives
d’installation. Le fait de ne pas se conformer à ces directives pourra résoudre en une installation
fautive et annuler toute garantie explicite.
Suivez ces directives tel qu’indiquées.
Examinez toutes les composantes pour des dommages possibles lors du transport
avant de procéder à l’installation.
L’assemblage approprié des joints est essentiel pour une installation sécuritaire. Vérifiez
rigoureusement les joints lorsque l’assemblage est complété.
Ce système d’évacuation doit être supporté conformément à ces directives.
Vérifiez le mouvement libre de l’évent à travers les murs, les plafonds, et le toit.
Ce système d’évacuation doit pouvoir de dilater et de contracter librement.
Ne mélangez pas les tuyaux, les raccords et les méthodes d’assemblage de différents
manufacturiers.
Testé et répertorié
selon les normes
UL1738 & ULC S636
par Underwriters Laboratories, Inc.
5030 Corporate Exchange Blvd
Grand Rapids, MI 49512
Call 800 772-0739
Fax 800 972-1421
www.heatfab.com
INFORMATION D’APPLICATION
Les systèmes d'évacuation de gaz Saf-T Vent modèle EZ Seal Plus/EZ 316 et modèle GC Plus/GC 316 peuvent être utilisés pour
évacuer les appareils certifiés à gaz de catégorie I, II, III, IV et certains appareils à évacuation directe, dont la température des gaz de
combustion ne dépasse pas 288°C (550°F).
Lorsqu'ils sont utilisés comme gaine de reliage pour cheminée en maçonnerie, les
systèmes dvacuation de gaz Saf-T Vent EZ Seal Plus /EZ 316 (jusqu’à 10 po de diamètre) peuvent être utilisés pour évacuer
les appareils à condensation au mazout et les appareils à gaz de catégorie I, II, III, IV. Le système Saf-T Vent EZ Seal Plus/EZ
316 est destiné à être utilisé avec des appareils qui produisent des pressions d'évent positives de 9 pouces de colonne d'eau ou
moins et le modèle GC Plus/GC 316 est destiné à être utilisé avec des appareils qui produisent des pressions dévent positives
de 15 pouces de colonne deau ou moins. Les composants du modèle Saf-T Vent EZ Seal Plus, EZ 316, GC Plus et GC 316
sont compatibles et peuvent être combinés pour les installations Comme ces types d'appareils peuvent produire des gaz de
ventilation sous pression positive et/ou à leur point de rosée ou à proximité, des considérations spéciales d'installation peuvent
être nécessaires. Installer en conformité avec ces instructions et celles du fabricant de l'appareil. Consultez les instructions du
fabricant de l'appareil pour connaître la longueur horizontale maximale du connecteur de l'évent ainsi que toute restriction sur la
hauteur totale de l'évent, le dimensionnement approprié de l'évent, les considérations courantes en matière d'évacuation et les
procédures de raccordement de l'évent à l'appareil. L'installation doit être conforme aux codes nationaux, régionaux, et locaux
en vigueur. Contactez l'autorité compétente avant de commencer tout travail afin d'obtenir les permis nécessaires.
Considérations avant linstallation :
Une planification appropriée avant l’installation est essentielle pour éviter les contacts avec la plomberie ou le filage électrique
dissimulé à l’intérieur des murs, des planchers ou du plafond et maintenir les dégagements appropriés. Une pente continue en
ligne droite d’au moins ¼ de pouce (2 degrés) à partir de la base sur les longueurs horizontales doit être maintenue afin
d’évacuer adéquatement le système des résidus de condensation corrosifs. Assurez-vous de planifier un nombre suffisant de
supports pour tout le système afin de maintenir la pente requise en ligne droite et retenir le système en place.
Reportez-vous à la section de combustion et de ventilation à la dernière page pour directives relatives à l'alimentation d’air.
Sécurité personnelle
Utilisez des gants et lunettes de sécurité durant l'installation. De plus, portez un appareil respiratoire approuvé contre les
poussières et les vapeurs lorsque vous êtes en contact avec l'isolation du bâtiment. Il faut utiliser des échafaudages et/ou des
échelles appropriés et sûrs. Vérifiez qu'il n'y a pas d'antennes, de câbles électriques ou d'autres obstacles au-dessus de votre
tête avant de monter une échelle ou un échafaudage et lorsque vous travaillez avec des conduits sur une structure de toit.
Outils indispensables à l’installation
Outils de construction standard, y compris, mais sans s'y limiter, un ruban à mesure, pinces et tournevis, scies et/ou
cisailles, perceuses, des toiles de protection, échelle/échafaudage, vêtements de sécurité et de protection individuelle.
finitions:
AL 29-4C – Est un alliage d'acier inoxydable super ferrique conçu par Allegheny Ludlum pour résistance exceptionnelle
aux attaques d’ions de chlorure, corrosion par piqûres ou caverneuse ou sous contraintes. Les matériaux équivalents
fabriqués par d'autres fabricants peuvent être identifiés par le code UNS S44735.
316L Acier inoxydable austénitique au chrome-nickel contenant du molybdène. Le type 316L est une version à très faible
taux de carbone du type 316 qui minimise les dépôts de carbure nuisibles dus au soudage. Le type 316L est utilisé
dans les applications où l'immunité aux précipitations de carbure dues au soudage, assurant une résistance optimale à
la corrosion. Le 316L peut être identifié par le code UNS S31603.
Appareil catégorie I - Un appareil qui fonctionne avec une pression statique d'évent non positive et avec une température
de gaz d'évent qui évite la production excessive de condensat dans l'appareil.
Appareil catégorie II - Un appareil qui fonctionne avec une pression statique d'évent non positive et avec une température
de gaz d'évent qui peut provoquer une production excessive de condensat dans l'appareil.
Appareil catégorie III - Un appareil qui fonctionne avec une pression statique d'évent positive et avec une température de
gaz d'évent qui évite une production excessive de condensat dans l'appareil.
Appareil catégorie IV - Un appareil qui fonctionne avec une pression statique d'évent positive et une température de gaz
d'évent qui peut provoquer une production excessive de condensat dans l'appareil.
Matériaux combustibles - Tout matériau fabriqué ou revêtu de bois, de papier compressé, de fibres végétales ou
d'autres matériaux susceptibles de s'enflammer ou de brûler. Ces matériaux sont considérés comme combustibles
même s'ils sont ignifugés, traités contre le feu ou plâtrés (NFPA 54/ANSI Z2223.1-2006).
Dégagement aux matériaux combustibles et encadrement exigés
Le tableau 1 indique le DÉGAGEMENT MINIMAL REQUIS ENTRE LESPACE AÉRIEN ET LES MATIÈRES
COMBUSTIBLES. EZ Seal Plus/EZ 316 – 6 à 16 pouces et le modèle GC Plus/GC 316 sont essentiellement destinés à
être installés dans un enclos ayant une résistance incendiaire et non combustibles ou à être installés non cloisonnés. Ce
gagement d'espace aérien est nécessaire pour un fonctionnement sûr de l'évent. Si vous ne respectez pas ces
dégagements, vous risquez de surchauffer les matériaux de construction et de provoquer un incendie.
Temp. Max
des gaz
d'évacuation
6-12" 230°F* 0"* 0"*
14-32" 194°F* 0"* 0"*
6-10" 300°F 1" 1"
6-12" 550°F 2" 2"
14" 550°F 3" 3"
16" 550°F 4" 4"
18" 550°F 4" 4"
20-22" 550°F 5" 5"
24-26" 550°F 6" 6"
28-32" 550°F 7" 7"
0":
Suffisant pour passer les tuyaux
Tailles
Dégagement minimale aux combustibles
Dimension d'encadrement min.
(Traversant un mur ou toit)
Non cloisonné
Vertical Horizontal
(ID + 7") X (ID + 7")
N/A (Raccord d'évent à gaz seulement)
(ID + 5") X (ID + 5")
(ID + 5") X (ID + 5")
(ID + 5") X (ID + 5")
(ID + 7") X (ID + 7")
(ID + 7") X (ID + 7")
(ID + 7") X (ID + 7")
0":
Suffisant pour passer les tuyaux
* Permis dêtre complètement cloisonnés avec des combustibles à un dégagement de 0” selon ULC-S636
Traversée vertical (plancher, plafond et toit)
Lorsque l'évent traverse un plafond, un plancher ou toit combustibles, un coupe-feu (p/n 5x18CI) ou un solin de toit doit être
installé. Voir le tableau 1 pour la dimension de l'encadrement requise et référez vous à la section du coupe-feu et de
solin pour les instructions d'installation. Les traverses de planchers, plafonds et toits non combustibles ne nécessitent
pas de coupe-feu ou solin de toit.
Traversée horizontal (mur)
Lorsque l’évent traverse un mur combustible nécessitent lutilisation dune virole murale, pour des températures relatives
avec des dégagements. Voir le tableau 1 pour la dimension de l’encadrement et référez-vous à la section de la virole
murale pour les instructions dinstallations. Les traverses de mur non combustibles ne nécessitent pas une virole murale.
INSTALLATIONS TYPIQUE
En plus des conceptions illustrées aux figures 1 et 2, ce système peut être installé dans n'importe quelle combinaison verticale
et horizontale, non cloisonné, à condition que les dégagements soient respectés selon le tableau de dégagement 1 et que la
longueur totale et le nombre de raccords ne dépassent pas les exigences du fabricant de l'appareil. Ce système peut être
installé dans une cheminée de maçonnerie existante.
Chapeau ou autre terminaison
Solin et collet de solin
Voir tableau 1
Pour dégagement min.
Fig 1. (Termination verticale)
Voir tableau 1.
Pour dégagement min.
Voir tableau 1
pour dégagement min.
Voir tableau 1 (pour
Dimension d’encadrement
De la virole murale)
Fig 2. (Termination horizontale)
Terminaison
horizontale
Voir tableau 1
pour dégagement min.
Tuyau de drainage
Support
vertical
Support
horizontal
Support
Vertical
Appareil
Voir tableau 1
pour dimension
d’encadrement
Min.
Coupe-feu de toit ou
Solin de toit support
Remarques:
1. Un système non cloisonné doit avoir au moins un côté ouvert (matériau combustible sur un maximum de 3 côtés).
2. Les dégagements réduits peuvent être obtenus en utilisant des enclos incombustibles.
3. Un système complètement cloisonné avec un matériau combustible n’est pas permis.
4. Ne placez pas d'isolant dans les espaces de dégagement requis autour du système d'évacuation, sauf si ces
instructions suggèrent le contraire et que l'isolant est spécifié ou fourni.
5. Les enclos incombustibles nécessitent un espace d’air de 0 pouce.
LIMITES DE ROUTE DE LÉVENT LONGUEURS ÉQUIVALENTES MAXIMALES
Afin de s'assurer que le système d'évacuation n'est pas trop restrictif en termes de débit, reportez-vous à la longueur
maximale d'évacuation spécifiée par le fabricant de l'appareil. Afin d'avoir compte des virages dans le système (qui causent
une résistance supplémentaire à l'écoulement), la plupart des fabricants recommandent d'utiliser une méthode de
"longueur équivalente" pour déterminer les limites. Grâce à cette méthode, les coudes et tés sont attribuer une "longueur
équivalente" (en pieds). Si la somme des longueurs droite et des "longueurs équivalentes" supplémentaires (dues aux
virages) dépasse la limite spécifiée par le fabricant, la route n'est pas autorisée. Voir les instructions du fabricant de
l’appareil pour de plus amples informations Si les instructions du fabricant de l'appareil ne donnent pas la longueur
équivalente des raccords standard, utilisez le tableau 3 pour déterminer la longueur équivalente de l'évent.
EXIGENCES GÉNÉRALES POUR L’INSTALLATION
1. Dans les cas où les directives du fabricant de l'appareil entrent en conflit avec les
exigences de ce document, les directives du fabricant de l'appareil ont préséance
sur ce document.
2. Le non-respect à n'importe quelle de ces exigences peut enfreindre les codes
locaux, de l'état/province, nationaux, ainsi que de créer des conditions qui
pourraient causer des dommages catastrophiques à la propriété ou des blessures
corporelles.
3. Le raccord d'évent horizontal doit être incliné vers le haut en direction de la
terminaison d'au moins 1/4 po (305mm) par pied et être installé de manière que
tout condensat retourne vers l'appareil ou le drain en ligne et ne soit pas retenu
dans aucune partie du système d'évent.
4. Si requis dans les directives du fabricant de l'appareil, un raccord de drainage doit
être placé aussi près que possible de la sortie d'évacuation de l'appareil. Un raccord de drainage est requis à tous les
30 pieds de conduit. Si un raccord de drainage n'est pas fourni avec l'appareil, installez un drain en ligne Saf-T Vent
ou un té avec un couvercle de té de drainage. Éliminez adéquatement le condensat recueilli.
5. Les appareils multiples de catégorie III ou IV ne peuvent pas être interconnectés à une partie quelconque du système
d'évacuation, à moins que le fabricant de l'appareil ait spécifiquement approuvé l'ingénierie du système d'évacuation.
Un appareil de catégorie III ou IV ne peut pas être relié à une partie quelconque d'un système d'évacuation utilisé avec
un appareil à tirage naturel ou à hotte aspirante, sauf si un système à tirage mécanique homologué est installé.
6. Pour les systèmes d'évacuation qui traversent toute zone située au-dessus de celui ou l'appareil localisé (sauf les
logements pour une ou deux familles), les codes exigent que le système d’évent devrait être entouré d'un enclos ayant
une résistance incendiaire égale ou supérieure que celle du plancher ou du toit qu’il traverse. Dans les constructions
résidentielles d’une ou deux familles, le système doit être cloisonné lorsqu'il traverse des espaces occupés. L'enclos
doit être fabriquée de manière à permettre l'inspection de l'évent.
7. Lorsqu'un appareil au gaz est installé dans le même endroit que des substances halogènes peuvent exister
(réfrigérants, solvants, produits blanchissants, sels, etc.), un apport d'air de l'extérieur doit être utilisé pour la
combustion.
8. Si le conduit est de 5 pieds ou plus et doit traverser une zone non chauffée (comme les greniers, les espaces vides,
l'extérieur des bâtiments ou au-dessus des lignes de toit), il est recommandé que le système soit converti au CI Plus/CI
316 pour éviter la condensation et le gel.
9. Le système d'évent ne doit pas être installé dans, à travers ou à l'intérieur d'un autre évent ou d'une autre cheminée
utilisée.
10. Un autre appareil ne peut pas évacuer dans l'espace de la cheminée à l'extérieur du conduit Saf-T Vent. Toutefois, si
l'espace est suffisant et si toutes les instructions du fabricant et les codes sont respectés, une gaine de cheminée séparée
peut être installée dans la cheminée pour évacuer un autre appareil.
Longueurs équivalentes
Raccord
Longueur
équivalante
Tuyau dévent
1’ par 1’
Té “botte
10’
Coude 90 degrés
10’
Coude 70 degrés
8’
Coude 45 degrés
5’
Coude 30 degrés
4’
Coude 15 degrés
3’
Tableau 2
EXIGENCES D’INSTALLATION HORIZONTALE
1. Si la terminaison traverse un mur combustible, le système doit se terminer par une bague murale et une terminaison
Saf-T Vent, tel que requis par le fabricant de l'appareil.
2. La terminaison horizontale doit être située au moins 12 po (0,3m) au-dessus du niveau du sol ou de la ligne de neige
prévue (n'oubliez pas de tenir compte de la neige et de la glace qui tombent des objets situés au-dessus), et à au moins 7
pi (2,1m) au-dessus du niveau du sol lorsqu'elle est adjacente à une allée publique. Il doit également se terminer à au
moins 4 pi (1,2m) en dessous, 4 pi (1,2m) horizontalement ou 1 pi (0,3m) au-dessus de toute porte, fenêtre, prise d'air
frais, compteur ou régulateur, sauf si l'appareil est répertorié différemment. La terminaison doit être à un minimum de 6 pi
(1,8m) de l'entrée d'air de combustion de tout appareil. Un jugement approprié peut exiger des distances plus importantes
en fonction de la taille de l'équipement installé ou des conditions du site. Consultez l'autorité locale qui ont juridiction.
3. La terminaison doit être éloignée des arbres, arbustes ou d'éléments décoratifs, car les gaz de combustion pourraient
causer des dommages.
4. La distance horizontale équivalente totale du système
d'évacuation, du collier de l'appareil à l'extérieur de la
terminaison, ne doit pas être inférieure à 14 pouces.
5. Un support horizontal est requis à tous les 6 pi (1,8m).
EXIGENCES D’INSTALLATION VERTICALE
1. Le système doit se terminer à au moins 3 pieds au-
dessus de la ligne du toit et à au moins 2 pieds plus haut
que toute partie du bâtiment située à moins de 10 pieds.
2. Lorsque la terminaison se trouve à une hauteur de plus
de 6 pieds au-dessus du toit, l'évent doit être soutenu
par une section d’haubanage Saf-T Vent. Reportez-
vous à la section support d’haubanage dans ces
instructions.
3. Le système d'évacuation doit se terminer par l'une des
terminaisons Saf-T, sauf si une terminaison ou un dispositif d'évacuation mécanique approuvé est spécifié ou fourni par le
fabricant de l'appareil.
4. La distance totale continue du système d'évacuation, du collier
de l'appareil jusqu'à la terminaison, ne doit pas dépasser celle
spécifiée dans les instructions d'installation du fabricant de
l'appareil. Lors de la ventilation d'appareils à tirage naturel la
terminaison doit se trouver à au moins 5 pieds au-dessus du
coupe-tirage le plus haut. Dans le cas contraire, un dispositif
mécanique de tirage homologué est requis.
5. Des supports verticaux sont requis après chaque transition à la
verticale. Des supports verticaux sont également requis au-
dessus de chaque coude décalé. Voir le tableau 3 pour les
limites des supports verticaux.
MÉTHODE D’ÉTANCHÉITÉ ET DE RACCORDEMENT DE JOINTS
Le modèle EZ Seal Plus/EZ 316 (Diatres 6po à 16po) est relié avec la méthode d’anneau et languettes. EZ Seal Plus/EZ
316 est fabriqué avec un joint installé en usine à l'intérieur de l'extrémité femelle (sortie), ce qui rend inutile l'utilisation de tout
autre produit d'étanchéité.
Connexion:
Remarque:
EZ 316 utilise un joint en silicone rouge pour le raccordement, il est nécessaire d’appliquer du lubrifiant pour joint (p/n
7001SIL-5, vendu séparément) sur le joint lors de l'assemblage du tuyau. Appliquez le lubrifiant directement sur le joint à
l'intérieur de l'extrémité femelle du tuyau, sur les deux bords du joint.
EZ Seal Plus utilise un joint FKM noir pour le raccordement, il
est recommandable d’appliquer du lubrifiant pour joint (p/n 7001SIL-
5, vendu séparément) ou d’eau savonneuse lors de lassemblage du
tuyau. Appliquez le lubrifiant directement sur le joint à l'intérieur de
l'extrémité femelle du tuyau, sur les deux bords du joint.
1. Raccordez les pièces à l'aide de l'anneau et languettes de
connexion. Voir Fig 5A.
a. Pour raccorder, éloigner l'anneau de l'extrémité mâle pour permettre un dégagement pour les languettes de
l'extrémité femelle.
b. Engagez les deux sections en vous assurant que les languettes restent à l'extérieur de l'évent.
c. Une fois les sections sont complètement engagées, glisser l'anneau vers le bas sur les languettes, en vous
assurant que toutes les languettes sont contenues dans l'anneau.
d. Repliez les languettes sur l'anneau pour terminer le joint. Remarque : certaines pièces de terminaison sont
équipées d'un collier de serrage à la place de l'anneau. Dans ce cas, le collier de serrage est serré sur les
languettes. Il n'est pas nécessaire de replier les languettes sur le collier.
Le modèle GC Plus/GC 316 (Diamètres 18po à 32po) est relié en
utilisant la méthode de bride de blocage. GC Plus/GC 316 requiert
l’usage dun scellant détanchéité pour le procès d’assemblage à chaque
jointure.
Connexion:
1. Retirez la bride de blocage de l'évent (voir Fig. 5B).
2. Essuyez/nettoyez les extrémités de sortie et d'entrée du tuyau
GC Plus/GC316 avec des linguettes alcoolisées.
3. Appliquez un cordon de 1/4po d'un scellant à haute température
en ligne droite continue sur la circonférence intérieure à 3/4 po de
l'extrémité de l'évent. N'utilisez pas de motif en zig-zag lors de
l'application du produit d'étanchéité.
4. Lissez le cordon à l'aide d'un instrument plat ou d'un doigt
humidifié (voir Fig. 5B).
5. Insérez l'embout le (sortie) dans l'embout femelle (entrée), et alignez les languettes de verrouillage sur les
deux pièces.
6. Entourez la bride de blocage autour du joint de manière à ce que les languettes sortant de l'évent s'alignent et
s'engagent dans les fentes de la bride de blocage. REMARQUE : Les languettes situées sur l'embout mâle des coudes
et des tés sont libres de pivoter afin que l'évent puisse être aligné dans la direction désirée.
7. Installez le boulon et l'écrou à travers les languettes de la bride de blocage et serrez à l'aide d'un tournevis ou d'une
douille de 7/16po. ATTENTION : NE SERREZ PAS trop la bride car cela pourrait entraîner l'effondrement de l'évent
(voir Fig 5B).
Drains de condensat:
Lorsqu'un drain de condensat interne ne fait PAS partie de l'appareil :
Une ligne de drainage est fortement recommandée, comme un té, té
“botte” et couvercle de té de drain séparé. Installez la pièce de
drainage aussi près que possible de la buse d’évacuation de
l’appareil.
Utilisez le té "botte" pour passer de l'horizontale à la verticale et fixez
le couvercle du té de drainage à la branche appropriée du té (voir Fig
6A).
Un drain de condensation est requis à tous les 30 pieds d’évent
horizontal et/ou près du fond d’une cheminée verticale.
Utilisez la section de drainage en ligne pour un parcours horizontal
droit. Faites pivoter le raccord de manière que le tuyau de drain soit
orienté vers le bas et soit aussi vertical que possible (voir Fig. 6B).
Une trousse de tuyaux de drain de condensation est disponible pour
diriger la condensation dans un endroit approprié, i.e. drain de
plancher ou un raccord d’évacuation pour drain sanitaire. Un siphon
doit être formé dans le tuyau de drainage et doit être d’un diamètre au
moins quatre fois plus grand que la pression estimée de la cheminée
de l’appareil en pouce de la colonne d’eau ou 3 pouces, le plus grand
des deux. Sécurisez le siphon avec une attache pour câble. Avant de
terminer l’assemblage, le siphon doit être amorcé en versant une
petite quantité d’eau dans le tuyau de drainage. Inspectez au moins
une fois par année pour vérifier que le siphon est amorcé.
Respectez tous les codes du bâtiment et nationaux pour le drainage des
liquides acides condensés.
Dans les climats froids, n'installez pas un drain de condensat à l'extérieur du bâtiment. Ceci pourrait entraîner des conditions
de gel dangereuses sur les surfaces près du drain et pourrait endommager le système d’évent et/ou l'extérieur du bâtiment.
Nous ne serons PAS tenus responsables pour les dommages corporels ou à la propriété causés par la formation de glace.
Section ajustable
La section de longueur ajustable sert de longueur variable entre
autres pièces lorsqu’une longueur spécifique ne peut être utilisée
et élimine le besoin de couper les longueurs au chantier. Pour
l'installer, référez-vous aux instructions d'installation fournies
avec la longueur ajustable. (Voir Fig. 7).
Longueurs modifiablesDécoupe de longueurs standard
Le système Saf-T Vent EZ Seal/EZ 316 est conçu de manière
que, dans la plupart des cas, il n’est pas nécessaire de découper
les longueurs standard. Cependant, il peut arriver que les
longueurs standard et longueur ajustable ne soient pas
suffisants. Dans ce cas, une longueur standard de Saf-T Vent
peut être découpée sur place.
Pour découper une longueur standard:
1. Mesurez la distance de longueur requise (Dim A),
additionner 3 po au résultat. (Voir Fig.8).
2. Mesurez du bout femelle (extrémité avec languettes), la
distance A + 3po et marquez-la sur le tuyau.
3. Couper les tuyaux avec une scie abrasive, un couteau
au plasma ou une cisaille à métaux.
Pour obtenir une coupe droite, créez une ligne en
enroulant du ruban de masquage autour du côté de rebut du point de
coupe. Si vous utiliser une cisaille, commencer la coupe à l’embout
mâle et suivre une ligne en spirale autour du tuyau jusquà ce que
vous atteigniez la ligne de coupe.
4. Limer les bavures et les rebords rugueux causés par la coupe avant
l’assemblage. Si la rondeur des tuyaux est distordue lors du
découpage, arrondissez soigneusement les embouts avec vos
pouces.
5. Appliquer un scellant à la silicone de haute température sur le joint
coupé.
6. Assembler le joint en suivant les étapes ci-dessus.
7. L’anneau doit être utilisé pour retenir les languettes.
Supports verticaux et horizontaux
Pour une installation adéquate, les supports verticaux et/ou horizontaux
doivent être installés pour soutenir lévent Saf-T. Consulter le tableau 3 pour
connaitre la distance minimale d’espacement et la section
correspondante pour direction de linstallation du support.
Remarque : Pour toutes les options de support, assurez-vous que le
dégagement minimum aux combustibles est respecté. Ne jamais
percer ou visser à travers du système dévent.
Section de support d’haubanage
Le support d'haubanage est une courte section de tuyau avec des
équerres attachés. Ces équerres permettent d'attacher un câble
d'hauban, une tige filetée ou tout autre support métallique
semblable pour soutenir le système d'évent. Pour installer :
Raccorder la section d'haubanage à l'évent en utilisant la méthode
de raccordement standard. Fixez les haubans ou les renforts
métalliques aux équerres sur la section d'haubanage. Ancrez les
équerres ou les renforts à la structure du bâtiment capable de
supporter la charge de l'évent (voir Fig. 9).
Espace entre les supports
Diamètres
Espacement
vertical
Espacement
horizontal
6” à 12”
20’
Tous les six (6)
pieds et après
chaque
transition de la
verticale à
l’horizontale
14” à 18”
12’
20” à 24
10’
26” à 32” 6’
Tableau 3. (Exigences de support
verticaux et horizontaux)
Coupe-feu
Lorsque l'évent traverse un plafond ou un plancher, un coupe-feu (5x18CI) doit être
installé. Pour l'installer : Déterminez la dimension exacte de l'encadrement (voir
tableau 1) et clouez le coupe-feu à la solive (Fig. 10a). Faites passer l'évent à travers
le coupe-feu.
Attention à l'isolation dans les greniers - Remarque : lors de l'installation d'un coupe-
feu dans les combles, le coupe-feu doit être situé sur le haut de la solive afin d'éviter
que l'isolation ne tombe dans la solive. Maintenez toute l'isolation du grenier à la
distance minimale appropriée du tuyau en installant une enceinte ou un dispositif
comparable autour du tuyau.
Colliers de support
Les colliers de support peuvent être suspendus à des tiges ou câbles. Ils peuvent être
utilisés séparément comme collier en selle pour asseoir l`évent ou ils peuvent être
utilisés par deux pour fixer l'évent et suspendus à une seule tige ou un seul câble
(voir Fig. 10b).
Support horizontal avec dégagement EZ Seal Plus/EZ 316
Le support horizontal avec dégagement (diamètres de 3po à 10po) fournit un
support horizontal et maintient un dégagement minimum de 2 pouces au mur. Pour
l'installer : Fixez la plaque de montage au mur en installant des attaches dans les
trous pilotes de la plaque de montage et dans le mur. Installez une paire de collier
de support autour de l'évent, et fixez le collier de support au support horizontal en
installant un boulon à travers les languettes de montage des colliers de support et à
travers le trou pilote du support horizontal de 2po (voir Fig. 11).
Support vertical avec dégagement EZ Seal Plus/EZ 316
Le support vertical avec dégagement (diamètres de 5po à 10po) fournit un support
vertical et maintient un dégagement spécifique aux matières combustibles. Pour
l'installer : Fixez la plaque de montage au mur en installant des attaches dans les trous
pilotes de la plaque de montage et dans le mur. Installez les colliers de serrage autour
de l’évent et sécurisez en place (voir Fig. 12).
Virole murale
Une virole murale est requise lorsque quun mur combustible est traversé.
Pour linstaller:
1. Préparez une ouverture dans le mur pour installer la virole murale.
Référez-vous au tableau 1 pour les dimensions d'encadrement
adéquates. L'ouverture peut être ronde ou carrée pourvu que la
dimension minimale de l'encadrement soit respectée. Il peut être
nécessaire d'ajouter une ossature supplémentaire à la section du mur
pour assurer un support adéquat à la virole murale.
2. De l'extérieur, positionnez la virole murale dans l'ouverture (voir Fig.
13).
3. Utilisez des attaches pour fixer la virole murale au mur.
4. Procédez à l'installation des sections d'évent Saf-T en faisant passer l'évent à travers de la virole murale. L'évent doit
dépasser d'au moins 2 pouces la virole murale et doit avoir
l'inclinaison requise de ¼ pouce par pied vers l'appareil.
5. Installez le collet de bout sur la section de l'évent qui
passe à travers de l'ouverture et positionnez le collet de
bout de façon à ce qu'il soit en contact avec l'extrémité
de sortie de la virole murale et ferme l'espace entre la
virole murale et l'évent.
6. Secure End Collar by tightening the worm gear.
7. À l'aide d'un scellant au silicone, scellez les espaces
entre le mur, virole murale, collet de bout et l'évent Saf-T.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24

HeatStar 9050360 Le manuel du propriétaire

Taper
Le manuel du propriétaire
Ce manuel convient également à

dans d''autres langues