Sterling 71141110-0 Guide d'installation

Taper
Guide d'installation
Installation and Care Guide
Guide d’installation et d’entretien
Guía de instalación y cuidado
Bath, AFD Baths and Wall Surrounds
Baignoire, baignoires DDS et murs avoisinants
Bañera, bañeras con desagüe arriba del nivel del piso y paredes
circundantes
USA: 1-800-STERLING (1-800-783-7546)
México: 001-877-680-1310
SterlingPlumbing.com
©2009 Kohler Co.
7114 Series/Séries 7114/Serie 7114
7115 Series/Séries 7115/Serie 7115
7116 Series/Séries 7116/Serie 7116 7124 Series/Séries 7124/Serie 7124
1065331-2-G
Important Information
To avoid falls, use care when entering or exiting the bath or shower.
For Bath Units
Do not bathe in water temperatures which exceed 104°F (40°C). Prolonged
immersion in hot water may induce hyperthermia. Hyperthermia occurs when the
body’s internal temperature is several degrees above the normal temperature of
98.6°F (37°C). The use of alcohol, drugs, or medications can greatly increase the
risk of fatal hyperthermia.
Use care when adding products, such as bath oil or bubble bath, as bath surfaces
may become slippery.
Renseignements importants
Pour éviter les chutes, entrer et sortir de la baignoire ou de la douche avec
précaution.
Pour les baignoires
Ne pas se baigner dans des températures excédant 104°F (40°C). Une immersion
prolongée dans l’eau chaude peut provoquer l’hyperthermie. L’hyperthermie a
lieu lorsque la température corporelle interne atteint plusieurs degrés au dessus de
la température normale de 98,6°F (37°C). La consommation d’alcool, de drogues
ou de médicaments peuvent augmenter considérablement le risque fatal
d’hyperthermie.
Utiliser de la précaution lors du rajout de produits tels que huiles de bain ou
mousse, car les surfaces de la baignoire pourraient devenir glissantes.
Información importante
Para evitar caídas, tenga cuidado al entrar o salir de la bañera o ducha.
Para bañeras
No se bañe a temperaturas que excedan de 104°F (40°C). La inmersión prolongada
en agua caliente puede producir hipertermia. La hipertermia ocurre cuando la
temperatura interna del cuerpo es varios grados superior a la temperatura
corporal normal de 98,6°F (37°C). El uso de alcohol, drogas u otros medicamentos
puede aumentar enormemente el riesgo de sufrir hipertermia fatal.
Tenga cuidado al añadir productos tales como el aceite de baño o gel de burbujas,
pues pueden hacer resbaladiza la superficie de la bañera.
1065331-2-G 2 Sterling
Thank You For Choosing Sterling
Thank you for choosing Sterling. Sterling craftsmanship offers you a rare combination of
proven performance and graceful sophistication that will satisfy you for years to come.
The dependability and beauty of your Sterling product will surpass your highest
expectations. We’re very proud of our products here at Sterling and we know you will
be too.
Please take a few minutes to study this guide. Pay special attention to the care and
cleaning instructions.
All information in this manual is based upon the latest product information available at
the time of publication. At Sterling, we constantly strive to improve the quality of our
products. We reserve the right to make changes in product characteristics, packaging or
availability at any time without notice.
Merci d’avoir choisi Sterling
Merci d’avoir choisi Sterling. Le travail soigné des artisans de Sterling vous fera
apprécier une rare combinaison de performances prouvées et une sophistication
gracieuse, qui vous satisferont pour les années à venir. La fiabilité et la beauté de votre
produit Sterling surpasseront vos plus grandes espérances. Chez Sterling, nous sommes
fiers du rendement de nos produits et nous savons que vous le serez aussi.
Veuillez prendre s’il vous plaît quelques minutes pour étudier ce guide. Prêter une
attention toute particulière aux instructions d’entretien et de nettoyage.
Toute l’information dans ce manuel est basée sur la dernière disponible au moment de la
publication. Chez Sterling, nous veillons toujours à améliorer la qualité de nos produits.
Nous nous réservons le droit d’apporter des modifications aux caractéristiques,
emballages et disponibilités des produits à tout moment, et ce sans préavis.
Gracias por elegir los productos de Sterling
Gracias por elegir los productos de Sterling. La artesanía de Sterling le ofrece una rara
combinación de rendimiento comprobado y agraciada elegancia capaces de satisfacer sus
exigencias durante muchos años. La confiabilidad y belleza de su producto Sterling
sobrepasarán sus mayores expectativas. En Sterling, nos sentimos orgullosos de nuestros
productos y sabemos que usted también lo estará.
Dedique unos minutos para leer esta guía. Preste especial atención a las instrucciones de
cuidado y limpieza.
Toda la información contenida en este manual está basada en la información más reciente
disponible al momento de su publicación. En Sterling, nos esforzamos constantemente
por mejorar la calidad de nuestros productos. Por lo tanto, nos reservamos el derecho de
efectuar cambios en las características, embalaje o disponibilidad del producto en
cualquier momento, sin previo aviso.
Before You Begin
CAUTION: Risk of product damage. Do not lift the bath using the apron brace.
Lift the bath by the rim at multiple points. Bath units in a single carton are
shipped with apron braces in the closed position.
CAUTION: Risk of product damage. To avoid rust marks on your product,
ensure the roofing nails or non-tapered flathead screws are galvanized or plated. If
using galvanized or plated non-tapered flathead screws, do not overtighten the
screws. Excessive tightening can damage the wall flange. Consult local building
codes to determine if the screws or nails must be galvanized or plated.
1065331-2-G 4 Sterling
Before You Begin (cont.)
NOTICE: The bath must be installed on an adequately supported, level subfloor. The
basin area requires no additional support when the subfloor is level and square with
the stud framing. Use shims for additional support if the subfloor is uneven. Do not
install the bath over open floor joists.
NOTICE: Only apply 100% silicone sealant to the areas where instructed to do so. Do
not add silicone sealant to any other areas. The inappropriate use of silicone sealant
may trap moisture and could result in mold, leakage, or mildew. We recommend
using colored 100% silicone sealant to match the color of the product. Use of latex
based or other caulks is not recommended. If a shower door will be added, follow the
shower door and silicone sealant manufacturer’s instructions.
NOTICE: The bath cannot be installed without the wall surrounds.
NOTICE: If your bath is shipped with a liner, keep the liner in place until
construction is complete to prevent surface damage to the unit. If a liner is not
available, place a clean drop cloth or similar material in the bottom of the bath.
NOTE: 7114 and 7124 series models are designed to be used with a single handle
mixer valve with an escutcheon cover not exceeding 7-3/4 (19.7 cm) in width.
Read all instructions before you begin.
Observe all applicable plumbing and building codes.
This bath is designed for alcove installations.
Upon receipt, check for shortages or damage. Report any shortages or damage
immediately.
Do not remove the old fixture before you unpack and inspect the new unit.
Store the bath and wall surrounds in a safe place until you begin installation to
avoid damage.
If remodeling, measure the existing framework before removing the old bath to
make sure that the new bath will fit. Make sure that the drain is in the correct
location.
Confirm adequate mounting and connection space for the water supply and drain
installation.
The apron panel is not removable on bath units.
Sterling reserves the right to make revisions in the design of products without
notice, as specified in the Price Book.
Avant de commencer
ATTENTION: Risque d’endommagement du produit. Ne pas soulever la
baignoire par le bandeau. Soulever la baignoire par le rebord à de multiples
points. Les baignoires en emballage unique sont livrées avec des bandeaux de
renfort en position fermée.
ATTENTION: Risque d’endommagement du produit. Pour éviter les marques de
rouille sur le produit, s’assurer que des clous pour toiture ou des vis à tête plate
non coniques soient galvanisées ou plaquées. Si des vis à tête plate non coniques
galvanisées ou plaquées sont utilisées, ne pas trop serrer les vis. Un serrage
excessif peut endommager la bride du mur. Consulter les codes de bâtiment
locaux pour déterminer si les vis ou clous doivent être galvanisés ou plaqués.
NOTICE: Cette baignoire doit avoir le support nécessaire sur un sous plancher de
niveau. L’espace du bassin ne nécessite pas de support additionnel lorsque le
Sterling 5 1065331-2-G
Avant de commencer (cont.)
plancher est nivelé et d’équerre avec les montants du cadre. Utiliser des cales pour un
support additionnel si le plancher est irrégulier. Ne pas installer la baignoire sur des
solives du sol exposées.
NOTICE: N’appliquer que du mastic à la silicone à 100 % aux emplacements
indiqués. Ne pas rajouter de mastic à la silicone à d’autres endroits. L’utilisation
inappropriée du mastic à la silicone peut renfermer de l’humidité et créer ainsi des
fuites ou de la moisissure. Nous conseillons d’utiliser un mastic à la silicone à 100%
coloré pour s’assortir à la couleur du produit. L’usage de latex ou d’autres mastics
n’est pas recommandé. Si une porte de douche est ajoutée, suivre les instructions du
fabricant du mastic d’étanchéité à la silicone et de la porte de la douche.
NOTICE: La baignoire ne peut pas être installée sans les murs avoisinants.
NOTICE: Si la baignoire est expédiée avec une couverture de protection, conserver
celle-ci jusqu’à la construction complète pour éviter l’endommagement de la surface
de l’unité. Si un revêtement de protection n’est pas présent, placer une bâche ou
matériau similaire dans le fond de la baignoire.
REMARQUE: Les modèles de la série 7114 et 7124 sont conçus pour être utilisés avec
un mitigeur à une seule poignée et un couvercle d’applique dont la largeur ne
dépasse pas 7-3/4 (19,7 cm).
Veuillez lire toutes les instructions avant de commencer l’installation.
Respecter tous les codes locaux applicables de plomberie et de bâtiment.
Cette baignoire est conçue pour des installations en alcôve.
Au moment de la réception, vérifier s’ilyadespièces manquantes ou
endommagées. Reporter immédiatement tout endommagement ou toute pièce
manquante.
Ne pas retirer le vieil appareil avant d’avoir déballé et examiné le nouveau.
Conserver la baignoire et les murs avoisinants dans un endroit protégé en
attendant de commercer l’installation pour éviter tout endommagement.
Dans le cas d’une rénovation, mesurer l’espace existant avant de retirer l’ancienne
baignoire pour s’assurer que la nouvelle baignoire s’ajustera. S’assurer que le
drain soit en position correcte.
S’assurer qu’il y ait un espace adéquat de connexion pour l’alimentation d’eau et
l’installation de drain.
Le panneau du bandeau n’est pas amovible sur les unités de baignoires.
Sterling se réserve le droit d’apporter des modifications sur le design des produits
sans avis préalables, comme spécifié dans le catalogue des prix.
Antes de comenzar
PRECAUCIÓN: Riesgo de daños al producto. No levante la bañera por el
refuerzo del faldón. Levante la bañera sujetando el borde en múltiples puntos. Las
bañeras que se envían en una sola caja tienen los refuerzos del faldón en posición
cerrada.
PRECAUCIÓN: Riesgo de daños al producto. Para evitar manchas de oxidación
en el producto, asegúrese de que los clavos de techar o tornillos de cabeza plana
no cónica estén galvanizados o enchapados. Si va a utilizar tornillos de cabeza
plana no cónica galvanizados o enchapados, no apriete demasiado los tornillos.
Si los aprieta demasiado se puede dañar el reborde de la pared. Consulte los
códigos locales de construcción para determinar si los tornillos o clavos deben
estar galvanizados o enchapados.
1065331-2-G 6 Sterling
Roughing-In (cont.)
instructions for any special framing considerations.
Plan de raccordement
Séries
7114, 7124
7115
7116
Standard DDS
A 22-1/4 (56,5 cm) 24-1/4 (61,6 cm) 24-1/4 (61,6 cm) 25-1/4 (64,1 cm)
B 31-1/4 (79,4 cm) 33-1/4 (84,5 cm) 33-1/4 (84,5 cm) 37-1/4 (94,6 cm)
C 3-1/2 (8,9 cm) 2-1/4 (5,7 cm) 2-1/4 (5,7 cm) 2-1/4 (5,7 cm)
D 8 (20,3 cm) 10 (25,4 cm) 10 (25,4 cm) 11 (27,9 cm)
E 15-1/4 (38,7 cm) 16-1/4 (41,3 cm) 16-1/4 (41,3 cm) 17-1/4 (43,8 cm)
F 10 (25,4 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm)
G 73-1/4 (186,1
cm)
75-1/2 (191,8
cm)
77-1/2 (196,9
cm)
77-1/2 (196,9
cm)
H 18 (45,7 cm) 19 (48,3 cm) 21 (53,3 cm) 21 (53,3 cm)
I 2-7/8 (7,3 cm) 2-3/8 (6 cm) 2-3/8 (6 cm) 2-3/8
(6 cm)
NOTICE: Toutes les dimensions sont nominales. L’espacement du montant est de
+1/8 (3 mm)/-0. Mesurer soigneusement votre appareil avant d’en déterminer la
taille de son logement. Un calage entre le cadre du montant et l’appareil sanitaire
pourrait être nécessaire. Si un pare-feu est requis, les dimensions de raccordement
devront augmenter en fonction de l’épaisseur du matériau du pare-feu. Les
dimensions d’ouverture des montants doivent être mesurées vers le côté exposé du
matériau du mur. Les dimensions fournies dans le plan du raccordement sont
cruciales pour une bonne installation. Construire le cadre et la plomberie avec
exactitude.
En cas d’installation de cette baignoire avec porte de douche, se référer aux instructions
du fabricant de la porte de douche pour toutes considérations particulières du cadrage.
Diagrama de instalación
Serie
7114, 7124
7115
7116
Estándar AFD
A 22-1/4 (56,5 cm) 24-1/4 (61,6 cm) 24-1/4 (61,6 cm) 25-1/4 (64,1 cm)
B 31-1/4 (79,4 cm) 33-1/4 (84,5 cm) 33-1/4 (84,5 cm) 37-1/4 (94,6 cm)
C 3-1/2 (8,9 cm) 2-1/4 (5,7 cm) 2-1/4 (5,7 cm) 2-1/4 (5,7 cm)
D 8 (20,3 cm) 10 (25,4 cm) 10 (25,4 cm) 11 (27,9 cm)
E 15-1/4 (38,7 cm) 16-1/4 (41,3 cm) 16-1/4 (41,3 cm) 17-1/4 (43,8 cm)
F 10 (25,4 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm)
G 73-1/4 (186,1
cm)
75-1/2 (191,8
cm)
77-1/2 (196,9
cm)
77-1/2 (196,9
cm)
H 18 (45,7 cm) 19 (48,3 cm) 21 (53,3 cm) 21 (53,3 cm)
I 2-7/8 (7,3 cm) 2-3/8 (6 cm) 2-3/8 (6 cm) 2-3/8
(6 cm)
Sterling 9 1065331-2-G
Construct the Framing (cont.)
Construct 2x4 stud framing for your particular installation according to the
Roughing-In section.
Ensure that the framing for each stud is plumb and square within 1/8 (3 mm).
Shimming will be required if tolerances are not met.
If possible, construct an access panel in the plumbing end wall to simplify future
maintenance of all plumbing connections.
Construire le cadrage
REMARQUE: Se référer à la section plan de raccordement pour les dimensions.
Provisions cadrage
AVERTISSEMENT: Risque d’endommagent du produit et de la propriété. La
baignoire doit être supportée par le plancher.
Installer le plancher (obligatoire). La baignoire doit être positionnée de manière à
permettre le drainage à travers les charpentes exposées ou dalles et pour faciliter
l’installation de la plomberie.
En cas d’installation d’une porte de douche : Se reporter aux instructions du
fabricant de la porte de douche pour tous encadrement particulier. Il pourrait être
approprié de rajouter des montants pour supporter la porte pivot de douche.
Des montants doivent être plus ou moins positionnés tel qu’illustré dans la section
« Plan de raccordement » pour attacher correctement les clips d’attache et fixer la
bride murale. D’autres emplacements de montants sont optionnels sauf ceux qui
doivent être conformes aux codes de bâtiments locaux. Des montants peuvent
aussi permettre l’installation de raccords de plomberie et toute porte de douche.
Localiser les montants de la porte de douche comme indiqué par le fabricant.
REMARQUE: Si les murs avoisinants seront installés sur un mur en maçonnerie,
prendre des dispositions pour les connexions de la plomberie. Pour la plomberie,
construire un cadre séparé à un minimum de 6 (15,2 cm) du mur en maçonnerie.
Pour les autres murs, utiliser des tasseaux de 2x2 pour simuler l’emplacement des
cales.
S’assurer que le montant extérieur soit correctement positionné avec les brides de
mur verticales. Le rebord extérieur du montant devrait s’aligner avec le rebord de
la bride du mur. Séries 7115 devraient être à 33-1/4 (84,5 cm) du mur arrière.
Séries 7114 et 7124 devraient être à 31-1/4 (79,4 cm) du mur arrière. séries 7116
devraient être à 37-1/4 (94,6 cm) du mur arrière.
NOTICE: Les accessoires qui requièrent un renfort ou un support ne sont pas
recommandés pour cette installation. Installer ces accessoires pourrait annuler la
garantie.
S’assurer que de la fibre ou autre isolation souple ne tombe pas dans le canal
d’eau. Couvrir ou sceller tout matériau libre. Le cas échéant peut causer une
infiltration d’eau du canal d’eau dans l’isolation entraînant de la moisissure, fuite.
S’assurer que les canaux soient libres de tout débris après l’installation.
Pour baignoires à drain au-dessus du sol
S’assurer que la tuyauterie du drain puisse passer dans le mur et que le support
de charge du mur soit satisfait. Modifier le cadrage ou rehausser le plancher tel
que requis pour obtenir un dégagement.
Construire un cadrage de montant de 2x4 pour votre installation particulière selon
la section « Plan de raccordement ».
Sterling 11 1065331-2-G
Construya la estructura de postes de madera (cont.)
Si es posible, construya un panel de acceso en la pared lateral que tiene las
conexiones de plomería para simplificar el mantenimiento futuro de todas las
conexiones de plomería.
2. Prepare the Subfloor
NOTICE: The bath supports must rest directly on a level subfloor.
NOTICE: Squeaking may develop if the bath is installed over a subfloor other than
plywood. To prevent squeaking, place a pad between the bath and the subfloor and
positioned under the bath supports. We recommend that the pad be made of spun
bonded polypropylene landscape fabric or spun bonded house wrap material. Do not
use roofing felt.
NOTICE: The drain line must be installed in accordance with the drain
manufacturer’s instructions. Locate the drain line and trap using the dimensions
given in the Roughing-In section.
For above-the-floor drain installations, cut the hole in the floor for the drain line.
For through-the-floor drain installations, cut the hole in the floor for the drain
assembly. The drain connection should be made directly under the overflow drain.
Leave room to connect the piping.
Verify the subfloor is level. If the subfloor is not level, proceed to the Level the
Subfloor subsection below.
Level the Subfloor (Optional)
IMPORTANT! If you intend to install this product using a mortar cement bed, do not
level the subfloor at this time. Proceed to the Install the Rough Plumbing section of
this installation guide.
NOTICE: Mortar cement is required to level an uneven subfloor. Do not use plaster,
gypsum cement, or drywall compound for this application, as these materials do not
provide adequate structural support.
Spread a layer of mortar cement on the subfloor where the bath supports will be
located.
Préparer le plancher
NOTICE: Les supports de la baignoire doivent reposer directement sur un sol nivelé.
NOTICE: Des grincements peuvent avoir lieu si la baignoire est installée sur un
plancher autre que contreplaqué. Pour éviter les grincements, placer un patin entre la
baignoire et le plancher et sous les supports de la baignoire. Nous recommandons
que le patin soit fabriqué en tissu pour jardinage en polyester filé-lié ou en matériau
de couverture de maison filé-lié. Ne pas utiliser de goudron.
NOTICE: La ligne du drain doit être installée conformément aux instructions du
fabricant. Localiser la ligne du drain et le siphon en utilisant les dimensions données
dans la section « Plan de raccordement » de ce guide.
Pour les installations de drain au-dessus du sol, découper le trou dans le sol pour
la ligne du drain.
Pour les installations de drain dans le sol, découper le trou dans le sol pour la
ligne du drain. La connexion du drain devrait être effectuée directement sous le
drain du trop-plein. Laisser de l’espace pour connecter la tuyauterie.
Sterling 13 1065331-2-G
Préparer le plancher (cont.)
Vérifier que le plancher est nivelé. Si le plancher n’est pas nivelé, procéder à la
section « Niveler le plancher » ci-dessous.
Niveler le plancher (optionnel)
IMPORTANT! Si ce produit est destiné à être installé en utilisant du mortier, ne pas
niveler le plancher à cet instant. Procéder à la section « Installer la plomberie de
raccordement » de ce guide d’installation.
NOTICE: Du mortier est requis pour niveler un plancher. Ne pas utiliser de plâtre
dur ou de pâte à joint pour cette application car ces produits ne procurent pas de
support structurel adéquat.
Étendre une couche de mortier sur le plancher à l’emplacement des supports de la
baignoire.
Prepare el subpiso
AVISO: Los soportes de la bañera deben apoyarse directamente sobre un subpiso
nivelado.
AVISO: Si la bañera se instala en un subpiso que no sea de madera contrachapada, es
posible que con el tiempo se produzcan rechinidos. Para evitar los rechinidos coloque
un material acolchado entre la bañera y el subpiso, colocado debajo de los soportes
de la bañera. Recomendamos un material acolchado de lona de hilo de polipropileno
encolado de uso para jardinería o material de envolver doméstico de hilo encolado.
No utilice fieltro de techar.
AVISO: La línea del desagüe se debe instalar según las instrucciones del fabricante
del desagüe. Coloque la línea de desagüe y la trampa utilizando las dimensiones
provistas en la sección Diagrama de instalación.
Para instalaciones con desagüe arriba del nivel del piso, perfore el orificio en el
piso para la línea de desagüe.
Para instalaciones con desagüe a través del piso, perfore el orificio en el piso para
el ensamble de desagüe. La conexión de desagüe debe hacerse directamente bajo
el rebosadero de desagüe. Deje espacio para conectar las tuberías.
Verifique que el subpiso esté a nivel. Si el subpiso no está nivelado, continúe en la
subsección Nivele el subpiso a continuación.
Nivele el subpiso (opcional)
¡IMPORTANTE! Si va a instalar este producto utilizando una capa de cemento
mortero, no nivele el subpiso en este momento. Continúe en la sección Instale las
tuberías de plomería en esta guía de instalación.
AVISO: Se requiere cemento mortero para nivelar un subpiso desparejo. No utilice
yeso, cemento de yeso o pasta para paneles de yeso para esta aplicación, puesto que
estos materiales no proporcionan el soporte estructural adecuado.
Aplique una capa uniforme de cemento mortero en el subpiso donde se colocarán
los soportes de la bañera.
1065331-2-G 14 Sterling
Installer la plomberie de raccordement
Séries
7114 et 7124 7115
7116
Standard DDS
A 15-1/4 (38,7 cm) 16-1/4 (41,3 cm) 16-1/4 (41,3 cm) 17-1/4 (43,8 cm)
B 10 (25,4 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm)
REMARQUE: Prévoir un accès à toutes les connexions de la plomberie pour faciliter
tout entretien futur. Inclure un accès à l’arrière du mur de plomberie c’est
possible.
REMARQUE: La dimension illustrée du coude de douche est une hauteur
recommandée.
REMARQUE: Les modèles de la série 7114 et 7124 sont conçus pour être utilisés avec
une valve à une seule poignée et un couvercle d’applique dont la largeur ne dépasse
pas 7-3/4 (19,7 cm).
REMARQUE: Le mur d’extrémité de plomberie ne peut pas être installé avec le
tuyau du bec en place. L’utilisation d’un raccord en coude est recommandée. Une fois
le mur d’extrémité de plomberie installé, le tuyau du bec peut être vissé ou soudé
dans le coude. Choisir un raccord en coude approprié pour l’application basé sur les
besoins d’accès. Voir l’illustration.
Installer les tubes d’alimentation d’eau conformément aux instructions du
fabricant. Boucher les alimentations et s’assurer de l’absence de fuites.
Attacher les lignes d’alimentations au cadrage du montant.
Installer la valve conformément aux instructions du fabricant. Ne pas installer la
bague à ce moment.
Instale las tuberías de plomería
Serie
7114 y 7124 7115
7116
Estándar AFD
A 15-1/4 (38,7 cm) 16-1/4 (41,3 cm) 16-1/4 (41,3 cm) 17-1/4 (43,8 cm)
B 10 (25,4 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm) 9-1/4 (23,5 cm)
NOTA: Provea el acceso a todas las conexiones de plomería para facilitar el
mantenimiento futuro. Provea acceso en la parte posterior de la pared que lleva las
conexiones de plomería, siempre que sea posible.
NOTA: La dimensión que se muestra para el codo de ducha es una altura
recomendada.
NOTA: Los modelos serie 7114 and 7124 están diseñados para utilizar una válvula de
una manija con una cubierta de chapetón que no exceda 7-3/4 (19,7 cm) de ancho.
NOTA: La pared lateral que lleva la plomería no se puede instalar sin antes tener el
tubo del surtidor en su lugar. Se recomienda el uso de un adaptador de codo. Una
vez instalada la pared lateral que lleva la plomería, el tubo del surtidor se puede
roscar o soldar en el codo. Elija el adaptador de codo adecuado para su aplicación en
base a sus necesidades de acceso. Consulte la ilustración.
Instale los tubos de suministro de agua según las instrucciones del fabricante de la
grifería. Tape los suministros y verifique que no haya fugas.
1065331-2-G 16 Sterling
Position the Bath (cont.)
Position the pad under the bath supports.
Position and adjust the bath until its outside edge is flush with the framing.
Verify that the bath is level and well supported by the subfloor.
If the bath is not level, shim using metal, hardwood, or other durable material.
Reposition and shim the bath until it is aligned with the framing and level.
If the bath cannot be directly bonded to the subfloor or if decreased movement is
desired, consider installing an optional mortar cement bed.
Install a Mortar Cement Bed (Optional)
NOTE: If a mortar cement bed will be installed, the pad is not required.
Remove the bath and pad from the alcove.
NOTE: Do not use plaster, gypsum cement, or drywall compound for this
application, as they will not provide adequate structural support.
NOTE: The bath supports must rest directly on the subfloor.
Build a dam to keep the flooring material clear of the drain area.
Spread a 2 (5.1 cm) layer of mortar cement on the subfloor, spreading it so that
each area of the bath that will contact the subfloor has mortar cement. Do not
spread the mortar cement around the drain area. Allow room for the mortar
cement to expand from the weight of the bath.
Immediately move the bath into position.
Verify that the bath is level and resting on all supports.
Clean the bath to reduce the risk of damaging the surface.
Place a clean drop cloth or other similar material into the bottom and over the
outside edge of the bath. Be careful not to scratch the surface of the unit.
Positionner la baignoire
NOTICE: Ne pas soulever ni déplacer la baignoire par le bandeau ou des montants
du bandeau. Afin d’éviter d’endommager la baignoire, soulever sur les côtés de la
baignoire.
NOTICE: Ne pas supporter le poids de charge de la baignoire par le périmètre du
rebord. Le périmètre du rebord doit être soutenu de manière adéquate, mais il ne doit
pas supporter le poids de charge de la baignoire.
REMARQUE: Garder une bâche de protection en place au fond de la baignoire
jusqu’à ce que la construction soit complète.
Installer les raccord du drain et du trop plein à la baignoire selon les instructions
du fabricant qui accompagnent le produit.
NOTICE: Des grincements peuvent avoir lieu si la baignoire est installée sur un
plancher autre que contreplaqué. Pour éviter les grincements, placer un patin entre la
baignoire et le plancher et sous les supports de baignoire. Nous recommandons que
le patin soit fabriqué en tissu pour jardinage en polyester filé-lié ou en matériau de
couverture de maison filé-lié. Ne pas utiliser de goudron.
NOTICE: Ne pas retirer les clips attachés à la baignoire. Les clips sont requis pour
assurer une bonne installation des murs.
Positionner le patin sous les supports de la baignoire.
Positionner et ajuster la baignoire jusqu’à ce que le rebord extérieur soit égal au
cadrage.
1065331-2-G 18 Sterling
Positionner la baignoire (cont.)
Vérifier que la baignoire soit nivelée et bien supportée par le plancher.
Dans le cas échéant, caler la baignoire en utilisant du métal, bois massif, ou autre
matériau durable. Repositionner et caler la baignoire jusqu’à ce qu’elle soit alignée
et nivelée avec le cadrage.
Si la baignoire ne peut directement être attachée au plancher ou si un mouvement
diminué est désiré, considérer l’installation d’un lit de mortier optionnel.
Installer un lit de mortier (Optionnel)
REMARQUE: Si un lit de mortier est installé, le coussinet n’est pas requis.
Retirer la baignoire et le patin de l’alcôve.
REMARQUE: Ne pas utiliser de plâtre dur ou de pâte à joint pour cette application
car ces produits ne procurent pas de support structurel adéquat.
REMARQUE: Les blocs de renfort de la baignoire doivent s’appuyer directement sur
le sol brut.
Construire une digue pour garder le matériau de sol à l’écart de l’emplacement du
drain.
Étaler une couche de mortier de 2 (5,1 cm) sur le plancher, de manière à ce que la
baignoire soit en contact avec le plancher à mortier. Ne pas étaler le mortier
autour du drain. Laisser de l’espace au mortier pour s’étendre par le poids de la
baignoire.
Déplacer immédiatement la baignoire à sa place.
S’assurer que la baignoire soit nivelée et qu’elle repose sur tous les supports.
Nettoyer la baignoire pour réduire le risque d’endommagement de la surface.
Placer une bâche propre ou matière similaire au fond de la baignoire et sur le
rebord extérieur de la baignoire. Veiller à ne pas rayer la surface de l’unité.
Coloque la bañera
AVISO: No levante ni mueva la bañera sosteniéndola por el faldón ni los refuerzos
del faldón. Para evitar daño a la bañera, levántela por los lados de la bañera.
AVISO: No apoye el peso de la bañera por el perímetro del borde. El perímetro del
borde debe tener el soporte adecuado, pero no debe soportar el peso de la bañera.
NOTA: Mantenga una lona gruesa o tela de protección en el fondo de la bañera hasta
terminar la construcción.
Instale el montaje del desagüe y rebosadero en la bañera según las instrucciones
del fabricante del desagüe.
AVISO: Si la bañera se instala en un subpiso que no sea de madera contrachapada, es
posible que con el tiempo se produzcan rechinidos. Para evitar los rechinidos coloque
un material acolchado entre la bañera y el subpiso, colocado debajo de los soportes
de la bañera. Recomendamos un material acolchado de lona de hilo de polipropileno
encolado de uso para jardinería o material de envolver doméstico de hilo encolado.
No utilice fieltro de techar.
AVISO: No retire los clips que están instalados en la bañera. Los clips se requieren
para asegurar la instalación correcta de las paredes.
Coloque el material acolchado debajo de los soportes de la bañera.
Coloque y ajuste la bañera hasta que el filo exterior quede al ras con la estructura
de postes de madera.
Sterling 19 1065331-2-G
Préparer la baignoire et le plancher (cont.)
REMARQUE: La baignoire doit être fixée en place à l’aide des clips (fournies).
S’assurer que les dispositifs d’attache sont galvanisés ou finis par galvanoplastie.
Vérifier que les montants sont à 1/8 (3 mm) de la baignoire aux emplacements
recommandés du clip ou des clous pour toiture. Caler si nécessaire.
Se référer à la section « Plan de raccordement » pour les emplacements
recommandés de clips.
Au côté du montant, positionner la lèvre inférieure du clip sous la bride de la
baignoire tel qu’illustré.
Glisser le clip entre le centre du montant et de la baignoire.
Utiliser des pinces pour plier le bord du clip sur la bride de la baignoire.
Répéter ces étapes pour les clips restants.
Sécuriser les clips aux montants avec des clous pour toiture à large tête ou des vis
à tête plate non-coniques. Utiliser de la précaution afin d’éviter de cogner la
baignoire avec un marteau.
Prepare la bañera y el subpiso
NOTA: Para evitar dañar el acabado de la bañera, asegúrese de colocar un trapo u
otro protector en la bañera antes de continuar.
NOTA: La bañera se debe fijar con los clips (provistos). Asegúrese de que los herrajes
sean galvanizados o enchapados.
Verifique que los postes de madera estén dentro de 1/8 (3 mm) de la bañera en
los lugares recomendados para los clips o clavos de techar. Utilice cuñas si es
necesario.
Consulte la sección Diagrama de instalación para obtener los lugares
recomendados para los clips.
En el lado del poste, coloque el labio inferior del clip debajo del reborde de la
bañera, como se muestra.
Deslice la clip en su lugar entre el centro del poste y la bañera.
Utilice unas pinzas para doblar la lengüeta del clip arriba del reborde de la
bañera.
Repita estos pasos con los demás clips.
Fije los clips a los postes con clavos de techar o tornillos de cabeza plana no
cónica. Tenga precaución para evitar golpear la bañera con el martillo.
1065331-2-G 22 Sterling
6. Pre-Fit the Wall Surrounds
NOTICE: Install the back wall first.
Ensure the bath surface is free of debris. This will minimize the gaps between the
wall surrounds and the bath surface.
Position the back wall with the wall tabs engaged in the bath slots, and the clips
are locked behind the back wall. (1)(2)
Position the end wall top pins into the back wall pivot joint and pivot the wall
into position until the retention clips lock behind the end wall. (3)
NOTE: If holes for plumbing fixtures need to be drilled, remove the clips prior to
assembling the end wall. Reattach the clips for final assembly of the wall set.
Verify that the end walls are flush against the edge of the bath. If adjustment is
needed, push or pull the bath to allow the end walls to rest on the bath.
Push the bath into position and verify that all walls are properly aligned with the
studs at the top and vertical wall flanges. If needed, add shims to bring the studs
into contact with the walls.
Munir les murs avoisinants
NOTICE: Installer d’abord le mur arrière.
S’assurer que la surface de la baignoire est libre de tout débris. Ceci limitera les
espaces entre les murs avoisinants et la surface de la baignoire.
Positionner le mur arrière avec les languettes du mur engagées dans les rainures
de la baignoire, et les clips verrouillés derrière le mur arrière. (1)(2)
(2)
(3)
Wall Tab
Languette du mur
Lengüeta de la pared
Bath Slot
Rainure de la baignoire
Ranura de la bañera
(1)
Back Wall
Mur arrière
Pared posterior
End Wall
Mur d'extrémité
Pared lateral
Bath/Baignoire/Bañera
Clip/Clip/Clip
Pin
Tige
Clavija
Pivot Joint
Joint pivot
Junta pivotante
Sterling 23 1065331-2-G
Munir les murs avoisinants (cont.)
Positionner les tiges supérieures du mur d’extrémité dans le joint pivot du mur
arrière en position jusqu’à ce que les clips de rétention se verrouillent derrière le
mur d’extrémité. (3)
REMARQUE: Si les orifices des appareillages de plomberie ont besoin d’être percés,
retirer les clips avant d’assembler le mur d’extrémité. Rattacher les clips pour
l’assemblage final du jeu de mur.
S’assurer que les murs d’extrémité soient d’égalité contre le rebord de la baignoire.
Si un réglage est nécessaire, pousser ou tirer la baignoire afin de permettre aux
murs d’extrémité de reposer sur la baignoire.
Pousser la baignoire en position et vérifier que tous les murs soient proprement
alignés avec les montants au niveau des brides supérieures et verticales. Si besoin,
ajouter des cales pour amener les montants en contact avec les murs.
Ajuste inicial de las paredes circundantes
AVISO: Instale primero la pared posterior.
Asegúrese de que la superficie de la bañera esté libre de suciedad. Esto reducirá al
mínimo las separaciones entre las paredes circundantes y la superficie de la
bañera.
Coloque la pared posterior con las lengüetas de la pared encajadas en las ranuras
de la bañera, y los clips asegurados detrás de la pared posterior. (1)(2)
Coloque las clavijas superiores de la pared lateral dentro de la junta pivotante de
la pared posterior y pivotee la pared a su posición hasta que los clips se aseguren
detrás de la pared lateral. (3)
NOTA: Si es necesario taladrar orificios para los productos de plomería, retire los
clips antes de ensamblar la pared lateral. Vuelva a fijar los clips para el ensamble final
del juego de paredes.
Verifique que las paredes laterales estén al ras contra el filo de la bañera. Si es
necesario ajustar, empuje o jale la bañera para permitir que las paredes laterales
descansen en la bañera.
Empuje la bañera a su posición y verifique que todas las paredes estén bien
alineadas con los postes de madera en los rebordes superior y vertical de las
paredes. Si es necesario, añada cuñas para poner los postes de madera en contacto
con las paredes.
1065331-2-G 24 Sterling
Préparer les murs avoisinants
Préparer le mur d’extrémité de plomberie
REMARQUE: Des orifices pour le mitigeur, la douche, et le bec doivent être découpés
dans le mur d’extrémité de plomberie.
Se référer aux instructions du fabricant pour les dimensions nécessaires des
orifices. Vérifier que toute applique, bride, ou plaque soit assez large pour couvrir
le trou du composant.
Disposer et marquer l’emplacement de la ligne centrale du mitigeur, de la douche,
et du bec sur le côté arrière du mur d’extrémité. (1)
Percer des trous-pilotes de 1/4 (6 mm) aux emplacements marqués à partir du
côté arrière du mur d’extrémité. (2)
ATTENTION: Risque d’endommagement du produit. La non-observation des
instructions concernant la direction de découpe de la lame peut endommager la
finition du mur d’extrémité de plomberie. Découper les orifices à partir du côté
avant du mur pour: scies cylindriques, outils rotatifs, scie sauteuse à main, ou
autres scies avec lame coupante par mouvement de pression. Découper les orifices
à partir du côté arrière du mur pour autres scies avec lame coupante par
mouvement de tirage.
Découper avec précaution les orifices de raccord au diamètre correct. (3) Se référer
aux instructions du fabricant de la garniture pour un bon diamètre.
Bien nettoyer la baignoire de tous débris pour réduire le risque
d’endommagement de la surface.
Accessoires optionnels
NOTICE: Ne pas installer des accessoires nécessitant un renfort ou support. Des
installations nécessitant un forage dans les murs avoisinants ne sont pas
recommandées. Une telle installation pourrait annuler la garantie.
Se référer aux instructions du fabricant de l’accessoire pour une bonne installation.
Si un forage est requis, marquer et percer les emplacements de l’accessoire sur le
côté arrière du mur. Ne pas sécuriser l’accessoire à ce moment.
1065331-2-G 26 Sterling
Secure the Wall Surrounds (cont.)
Secure the wall flanges across the top of the wall surrounds at every stud location.
Add shims if necessary to bring the studs into contact with the bath flange.
Cover the framing around the wall surrounds with water-resistant wall material. If
covering the top wall flanges with water-resistant wall material, a furring strip
approximately 1/4 (6 mm) thick will be required in each of the back corners on
the end wall sides.
Seal the joints between the bath and the finished wall material with 100% silicone
sealant. If desired, the top horizontal seam between the back wall and the end
wall can also be sealed. Allow the silicone sealant to cure according to the sealant
manufacturer’s instructions.
Sécuriser les murs avoisinants
ATTENTION: Risque d’endommagement du matériel. Les murs avoisinants
doivent reposer à 1/32 (1 mm) (épaisseur d’une carte de crédit) de la baignoire
pour assurer la bonne gestion de l’eau et éviter les fuites.
S’assurer que les murs avoisinants sont proprement sécurisés et reposent sur la
baignoire. Les rebords avants des murs d’extrémité doivent être d’égalité par
rapport au rebord avant de la baignoire. Si un espace existe, tirer les murs
d’extrémité légèrement vers l’avant.
La largeur du mur arrière est plus étroite dans l’angle arrière. Ajouter des tasseaux
selon le besoin pour supporter la cloison sèche. Si les tasseaux ne sont pas utilisés,
l’installation de cloison-sèche pourrait être difficile.
ATTENTION: Risque d’endommagement du produit. Si des vis à tête plate et
non coniques sont utilisées au lieu de clous pour toiture, ne pas trop serrer les
vis. Un serrage excessif peut endommager la bride du mur.
En commençant par la base des murs d’extrémité vers le haut, sécuriser les murs
d’extrémité aux montants approximativement tous les 12 (30,5 cm). Si des clous
pour toiture sont utilisés, clouer à travers les encoches des brides du mur. Si des
vis à tête plate non coniques sont utilisées, serrer à travers les encoches des brides
du mur. Ne pas trop serrer les vis à tête plate non coniques.
REMARQUE: Laisser un espace de 1/8 (3 mm) entre e rebord du mur avoisinant et
le matériau du mur fini. Lorsque scellé, cet espace réduira la possibilité d’infiltration
d’eau sur le matériau du mur.
S’assurer que de la fibre ou autre isolation souple ne tombe pas dans le canal
d’eau. Couvrir ou sceller tout matériau libre. Le cas échéant peut causer une
infiltration d’eau du canal d’eau dans l’isolation entraînant de la moisissure, fuite.
S’assurer que les canaux soient libres de tout débris après l’installation.
Sécuriser les brides du mur au-dessus des murs avoisinants à chaque
emplacement de montant. Ajouter des cales si nécessaire pour amener les
montants en contact avec la bride de la baignoire.
Couvrir le cadrage autour des murs avoisinants avec du matériau hydrorésistant.
Dans le cas de couverture de brides murales avec un matériau hydrorésistant, un
tasseau d’approximativement 1/4 (6 mm) d’épaisseur sera requis dans chaque
angle arrière des côtés du mur d’extrémité.
Sceller les joints entre la baignoire et le matériau du mur fini à l’aide de mastic à
la silicone à 100%. Si désiré, la rainure horizontale supérieure entre le mur arrière
et le mur d’extrémité peut aussi être scellée. Laisser prendre le mastic à la silicone
selon les instructions du fabricant.
Sterling 29 1065331-2-G
Complete the Installation (cont.)
Install the showerhead according to the manufacturer’s instructions.
Check all connections for leaks.
CAUTION: Risk of property damage. If holes have been or must be drilled to
properly install your accessory, we recommend applying 100% silicone sealant into
the drilled holes before securing the accessory to the wall surround to avoid
possible water damage. Follow the accessory manufacturers’ instructions.
Improperly installed accessories could cause leaks and may void the warranty.
If applicable, apply 100% silicone sealant into the previously drilled holes in the
wall surround. Refer to the accessory manufacturer’s instructions to properly
secure the accessory to the wall surround.
If applicable, install all other accessories according to the manufacturer’s
instructions.
If a shower door will be installed, refer to the shower door manufacturer’s
instructions to complete the shower door installation. Only apply silicone sealant
where instructed to do so.
If a shower curtain will be used, ensure the rod is installed above the wall
surrounds.
Terminer l’installation
ATTENTION: Risque d’endommagement du matériel. Un joint d’étanchéité doit
sortir autour du drain et du trop-plein. Le joint étanche doit prévenir tout
dommage.
Installer le vidage au siphon selon les instructions du fabricant qui accompagnent
le produit.
Installer la garniture du robinet, bec de baignoire, la porte de douche, et tout
accessoire selon les instructions du fabricant.
Retirer la pellicule protectrice couvrant la baignoire.
Ouvrir les lignes d’alimentation d’eau, puis faire couler l’eau pour chasser tout
débris.
Fermer la valve.
Installer la pomme de douche conformément aux instructions du fabricant.
Vérifier s’ilyadesfuites dans les connexions.
ATTENTION: Risque d’endommagement du matériel. Si des orifices ont été ou
doivent être découpés pour proprement installer l’accessoire, nous recommandons
d’appliquer du mastic à la silicone à 100% dans les orifices percés avant de
sécuriser l’accessoire au mur avoisinant afin d’éviter tout endommagement
possible par eau. Suivre les instructions du fabricant de l’accessoire. Les
accessoires non-installés correctement pourraient causer des fuites et annuler la
garantie.
Si applicable, appliquer du mastic à la silicone à 100% dans les orifices
préalablement percés dans le mur avoisinant. Se référer aux instructions du
fabricant de l’accessoire pour proprement sécuriser ce dernier au mur avoisinant.
Si applicable, installer tous les autres accessoires conformément aux instructions
du fabricant.
Si la porte de la douche est installée, se reporter aux instructions du fabricant de
la porte de la douche afin de terminer l’installation de la porte de la douche.
N’appliquer que du mastic à la silicone l’on en est instruit.
Si un rideau de douche est utilisé, s’assurer que la tringle est installée au-dessus
des murs avoisinants.
Sterling 31 1065331-2-G
Troubleshooting (cont.)
Dépannage
Ce guide de dépannage est seulement destiné à une aide générale. Seul un représentant
agréé devrait corriger tout problème sérieux.
Symptômes Causes probables Action recommandée
1. Une fuite est détectée
sous la baignoire.
A. Fuite de la
tuyauterie.
A. Retirer le panneau d’accès à
l’extrémité du drain, si fourni.
Inspecter la tuyauterie d’alimentation
et raccords de toutes fuites. Remplir
la baignoire au-dessus de la
connexion du drain du trop-plein.
Vérifier s’ilyadesfuites dans la
connexion du drain et du trop-plein
et la tuyauterie. Réparer toutes les
fuites de tuyau.
B. Un défaut
d’étanchéité ou de joint
aux trous dans les murs
finis ou murs
avoisinants.
B. Desserrer ou retirer les couvercles
ou brides selon les recommandations
du fabricant. Remplacer tous joints
défectueux. Appliquer du mastic à la
silicone à 100% ou autre comme
requis.
2. Dégâts d’eau aux
murs finis.
A. Joint au mur fini
non scellé.
A. Sceller le joint avec du mastic à la
silicone à 100% selon les instructions
du fabricant.
Procedimiento para resolver problemas
Esta guía para resolver problemas está diseñada únicamente como ayuda general. Un
Representante Autorizado debe corregir los problemas graves.
Síntomas Causas probables Acción recomendada
1. Se ha detectado una
fuga bajo la bañera.
A. Fugas en las
tuberías.
A. Desmonte el panel de acceso en el
lado del desagüe, si está provisto.
Revise los tubos de suministro y las
conexiones para ver si hay fugas.
Llene la bañera hasta que esté por
encima de la conexión del rebosadero
de desagüe. Compruebe la conexión
del desagüe y rebosadero así como
las tuberías para ver si hay fugas.
Repare las fugas en las tuberías.
B. El sellador o el
empaque está averiado
en los orificios a través
de las paredes acabadas
o circundantes.
B. Afloje o retire las tapas o bridas
según las recomendaciones del
fabricante. Reemplace los empaques o
sellos que hayan fallado. Aplique
sellador 100% de silicona u otro
sellador según se requiera.
2. Daños causados por
el agua en las paredes
acabadas.
A. La junta de la pared
acabada no está sellada.
A. Selle la junta con sellador 100% de
silicona según las instrucciones del
fabricante.
Sterling 33 1065331-2-G
Care and Cleaning Instructions
For best results, keep the following in mind when caring for your STERLING product:
Always test your cleaning solution on an inconspicuous area before applying to
the entire surface.
Wipe surfaces clean and rinse completely with water immediately after applying
cleaner. Rinse and dry overspray that lands on nearby surfaces.
Do not allow cleaners to sit or soak.
Use a soft, dampened sponge or cloth. Never use an abrasive material such as a
brush or scouring pad to clean surfaces.
Do not use abrasive cleansers or acidic solvents on Vikrell surfaces as they may
cause surface dullness or discoloration.
Wipe your bath or shower unit with a soft cloth after each use to prevent a
buildup of soap and scum.
Extreme heat such as that generated by cigarettes or portable heaters can damage
Vikrell surfaces. Do not use such items near your bath or shower unit.
For detailed cleaning information and products to consider, visit
www.sterlingplumbing.com/support.html. To order Care & Cleaning information, call
1-800-456-4537.
Instructions d’entretien et de nettoyage
Pour de meilleurs résultats, prendre ce qui suit en considération lors de l’entretien de
votre produit STERLING:
Toujours tester la solution de nettoyage sur une surface la moins évidente avant
de l’appliquer sur la totalité de la surface.
Essuyer les surfaces et rincer complètement avec de l’eau immédiatement après
l’application du nettoyant. Rincer et sécher tout éclaboussement sur les surfaces
avoisinantes.
Ne pas permettre aux nettoyants de reposer.
Utiliser une éponge ou un chiffon doux et humide. Ne jamais utiliser de matériau
abrasif tel que brosse ou éponges à récurer pour nettoyer les surfaces.
Ne pas utiliser de nettoyants abrasifs ou de dissolvants acides sur les surfaces
Vikrell car cela pourrait créer un ternissement ou décolorer la surface.
Essuyer la douche avec un chiffon doux après chaque utilisation pour éviter
l’accumulation de savon et de crasse.
Une chaleur extrême, telle que celle dégagée par des cigarettes ou des appareils de
chauffage portatifs, peut endommager les surfaces Vikrell. Ne pas utiliser de tels
articles près de la baignoire ou l’unité de douche.
Pour une information détaillée de nettoyage et des produits à considérer, visiter
www.sterlingplumbing.com/support.html. Pour commander l’information d’entretien -
nettoyage, composer le 1-800-456-4537.
1065331-2-G 34 Sterling
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40

Sterling 71141110-0 Guide d'installation

Taper
Guide d'installation