– 1 –
Quick Start Guide
Attach the Brackets
1. Attach each of the front- and rear-post brackets to the switch
using four of the included bracket screws.
2. Use an additional two screws to secure each of the rear-post
brackets at the mid-point on the sides of the switch.
3. Use the screws and cage nuts supplied with the rack to secure
the switch in the rack.
Adjust Rear-Post Bracket Ears
1. Lock the position of the rear-post bracket ears using the included
position-locking screws.
You can also adjust the rear-post bracket ears to fit different rack
depths from 56 cm to 75 cm.
Ground the Switch
1. Ensure the rack is properly grounded and in compliance with
ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or
isolating surface treatment).
Caution:
The switch includes plug-in power supply (PSU)
and fan tray modules that are installed into its chassis. All
installed modules must have a matching airflow direction.
That is, if the installed power modules have a front-to-back
(F2B) airflow direction, all the installed fan tray modules
must also have a F2B airflow direction.
Attention:
Le commutateur comprend des modules
d'alimentation et de bac de ventilateurs installés sur son
châssis. Tous les modules installés doivent avoir une
direction de circulation d'air correspondante. C'est-à-dire
que tous les modules doivent avoir la même direction de
circulation d'air: avant vers arrière (F2B), ou arrière vers
avant (B2F).
Note:
The switch has the Open Network Install
Environment (ONIE) software installer preloaded on the
switch, but no switch software image. Information about
compatible switch software can be found at
www.edge-core.com.
Note:
The switch drawings in this document are for
illustration only and may not match your particular switch
model.
Caution:
Installing the switch in a rack requires two
people. One person should position the switch in the rack,
while the other person secures it using the rack screws.
Attention:
Deux personnes sont nécessaires pour installer
un commutateur dans un bâti: La première personne va
positionner le commutateur dans le bâti, la seconde va le
fixer avec des vis de montage.
E062020-AP-R04
150200002012A
www.edge-core.com
64-Port 100G Top-of-Rack Switch
AS7816-64X
1.
100G Top-of-Rack Switch
AS7816-64X
2. Rack mounting kit—2 front-post brackets, 2 rear-post
brackets, 20 screws, and 2 ear-locking screws
3. AC power cord
4. DC power cable included with 48VDC PSU only (optional)
5. Console cable—RJ-45 to DB-9
6. Grounding kit—One grounding lug, 2 M5 screws and 2
washers (For AC PSU)
7. Grounding kit—One grounding lug, 4 ring lugs, 2 M5 screws
and 2 washers (For DC PSU)
8. Documentation—Quick Start Guide (this document) and
Safety and Regulatory Information
1
2 3 5 874
*150200002012A_R04*
6