Unbranded R6GP 6, 7.5 - 10 Ton Archived 2/23/12 Guide d'installation

Taper
Guide d'installation

Ce manuel convient également à

R6GP - 072/090/120 Series, A Revision
Installation Instructions
Single Package Gas Heating / Electric Cooling Rooftop Units
R6GP-090 Shown
DO NOT DESTROY THIS MANUAL. KEEP IN A SAFE PLACE FOR FUTURE REFERENCE.
FIRE OR EXPLOSION HAZARD
•Failure to follow safety warnings exactly
could result in serious injury or property
damage.
•Installationandservicemustbeperformed
byaqualiedinstaller,serviceagencyorthe
gas supplier.
Do not store or use gasoline or other
ammablevaporsandliquidsinthevicinity
ofthisoranyotherappliance.
WHAT TO DO IF YOU SMELL GAS
•Donottrytolightanyappliance.
•Donottouchanyelectricalswitch;donot
useanyphoneinyourbuilding.
•Leavethebuildingimmediately.
•Immediatelycall yourgassupplierfroma
neighbor’sphone.Followthegassupplier’s
instructions.
•Ifyoucannotreachyourgassupplier,call
theredepartment.
WARNING:
RISQUED’INCENDIEOUD’EXPLOSION
Le non-respect des avertissements de
sécurité pourrait entraîner des blessures
graves, la mort ou des dommages matériels.
L’installation et l’entretien doivent être
effectués par un installateur qualié, un
organisme de service ou le fournisseur de
gazstaller,serviceagencyorthegassupplier.
•Nepasentreposerniutiliserdel’essenceni
d’autres vapeurs ou liquides inammables
dans le voisinage de cet appareil, ni de tout
autre appareil.
QUEFAIRES’ILYAUNEODEURDEGAZ
•Nepastenterd’allumeraucunappareil.
•Netoucheràaucuninterrupteurélectrique;
n’utiliseraucuntéléphonedanslebâtiment.
•Évacuerl’immeubleimmédiatement.
•Appeler immédiatement le fournisseur de
gazenemployantletéléphoned’unvoisin.
Respecter à la lettre les instructions du
fournisseur de gaz.
•Sipersonnenerépond,appelerleservicedes
incendies.
AVERTISSEMENT
2
IMPORTANT SAFETY INFORMATION .......................3
REQUIREMENTS & CODES .......................................4
GENERAL INFORMATION ..........................................5
About the Rooftop Unit ..............................................5
Before You Install This Equipment .............................5
Locating the Unit .......................................................5
Heating Load .............................................................5
COMBUSTION AIR & VENTING..................................6
Vent Termination ........................................................6
CIRCULATING AIR SUPPLY .......................................7
Downflow to Horizontal Conversion ...........................7
Unconditioned Spaces ..............................................7
Acoustical Ductwork ..................................................7
Air Filter Requirements..............................................8
UNIT INSTALLATION ..................................................8
Packaging Removal ...................................................8
Rigging & Hoisting .....................................................8
Minimum Clearance Requirements ...........................8
Rooftop Mounting ......................................................9
Ground Level .............................................................9
Condensate Drain ...................................................10
GAS SUPPLY & PIPING ............................................10
Leak Check .............................................................11
High Altitude Deration .............................................11
Conversion to LP/Propane ......................................12
ELECTRICAL WIRING ............................................... 13
Pre-Electrical Checklist ...........................................13
Line Voltage ............................................................. 13
Grounding................................................................13
Unbalanced 3-Phase Supply Voltage ......................14
Thermostat / Low Voltage Connections ................... 14
Heat Anticipator ....................................................... 14
Blower Speed ..........................................................14
STARTUP & ADJUSTMENTS ...................................15
Pre-Start Check List ................................................15
Startup Procedures .................................................15
Air Circulation ..........................................................15
System Cooling .......................................................15
System Heating .......................................................15
Verifying & Adjusting Temperature Rise ..................16
Verifying Burner Operation ......................................16
Verifying Operation of Over-Temperature
Limit Control ............................................................16
Verifying & Adjusting Firing Rate ............................. 16
Manifold Pressure Adjustment ................................17
Refrigerant Charging ...............................................17
OPERATING SEQUENCE .........................................17
Cooling Mode ..........................................................17
Heating Mode ..........................................................17
Blower Mode ...........................................................18
UNIT MAINTENANCE ................................................18
Routine Maintenance ..............................................18
Cleaning of Burners ................................................19
Cleaning of Heat Exchanger ...................................19
COMPONENT FUNCTIONS ......................................20
TROUBLESHOOTING ...............................................21
FIGURES & TABLES .................................................22
Physical Dimensions ...............................................22
Figure 12 - 072 Series .........................................22
Figure 13 - 090 Series .........................................24
Figure 14 - 120 Series .........................................26
Table 3 - Unit Shipping Weights ...........................27
Blower Performance Data .......................................28
Table 4- R6GP Alt. Accessory Blower Drives .......28
Table 5 - 072C - 100C Series - Downflow ............29
Table 6 - 072C - 100C Series - Horizontal ...........30
Table 7 - 072C -166C Series - Downflow .............31
Table 8 - 072C - 166C Series - Horizontal ...........32
Table 9 - 090C - 200Ca Series - Downflow ..........33
Table 10 - 090C - 200Ca Series - Horizontal .......34
Table 11 - 120C - 235Ca Series - Downflow ........35
Table 12 - 120C - 235Ca Series - Horizontal .......36
Electrical Information ............................................... 37
Table 13 - Electrical Data .....................................37
Figure 15 - Ladder Diag. - 072/090/120 Series ....38
Figure 16 - W.D. - 072/090/120 Series .................39
Gas Information ....................................................... 40
Table 14 - Gas Pipe Capacities ............................ 40
Table 15 - Orifice or Drill Sizes ............................. 40
Table 16 - Heating Rise/Range ............................40
Table 17 - Gas Flow Rates ...................................41
R6 Charging Charts ................................................42
Figure 17 - R6GP-072 Series ..............................42
Figure 18 - R6GP-090 Series ..............................43
Figure 19 - R6GP-120 Series ..............................43
R6 Gas Valve Labels ...............................................44
Figure 20 - 6 & 7.5 Ton Units ...............................44
Figure 21 - 10 Ton Units .......................................45
INSTALLATION CHECKLIST ....................................48
TABLE OF CONTENTS
3
IMPORTANT SAFETY INFORMATION
Please read all instructions before servicing this equipment.
Pay attention to all safety warnings and any other special
notes highlighted in the manual. Safety markings are used
frequently throughout this manual to designate a degree
or level of seriousness and should not be ignored.
WARNING indicates a potentially hazardous situation
that if not avoided, could result in personal injury or death.
CAUTION indicates a potentially hazardous situation that
if not avoided, may result in minor or moderate injury or
property damage.
ATTENTION INSTALLERS: It is your responsibility to
know this product better than your customer. This includes
being able to install the product according to strict safety
guidelines and instructing the customer on how to operate
and maintain the equipment for the life of the product.
Safety should always be the deciding factor when installing
this product and using common sense plays an important
role as well. Pay attention to all safety warnings and any
other special notes highlighted in the manual. Improper
installation of the unit or failure to follow safety warnings
could result in serious injury, death, or property damage.
These instructions are primarily intended to assist qualified
individuals experienced in the proper installation of this
appliance. Local codes may require licensed installation/
service personnel for this type of equipment. After
completing the installation, return these instructions to
the customer’s package for future reference.
WARNING:
Improper installation, service, adjustment,
or maintenance may cause explosion, re,
electricalshockorotherhazardousconditions
whichmayresultinpersonalinjuryorproperty
damage. Unless otherwise noted in these
instructions, only factory authorized kits or
accessoriesmaybeusedwiththisproduct.
WARNING:
Donotplacecombustiblematerialonoragainst
the unit cabinet. Do not place combustible
materials, including gasoline and any other
ammablevaporsandliquids,in thevicinity
oftheunit.
WARNING:
PROPOSITION 65 WARNING: This product
contains berglass wool, a product known
to the state of California to cause cancer.
Disturbingtheinsulationofthisproductduring
installation,maintenance,orrepairwillexpose
youtoberglasswool.
• Breathingthismaterialmaycauserespiratory
irritationsormaycauselungcancer.
Fiberglass wool may also cause eye
irritation,skinsensitization,orotherallergic
responsesinsusceptibleindividuals.
Always wear goggles, disposable gloves,
longsleevedshirt,andappropriatebreathing
protectionwhenworkingnearthisinsulation.
Ifcontactwithskinoccurs,washimmediately
withsoapandwater.Incaseofcontactwith
eyes, ush immediately with water for at
least15minutes.Contactaphysicianifneeded.
WARNING:
The information listed below and must be
followed during the installation, service,
and operation of this unit. Unqualified
individualsshouldnotattempttointerpretthese
instructionsorinstallthisequipment.Failure
tofollowsafetyrecommendationscouldresult
inpossibledamagetotheequipment,serious
per
sonalinjuryordeath
.
• Thisequipmentcontainsliquidandgaseousrefrigerant
under high pressure. Installation or servicing should only
be performed by qualified trained personnel thoroughly
familiar with this type equipment.
• Before beginning the installation, verify that the unit
model is correct for the job. The unit model number
is printed on the data label. Follow all precautions in
the literature, on tags, and on labels provided with
the equipment. Read and thoroughly understand
the instructions provided with the equipment prior to
performing the installation and operational checkout
of the equipment.
• Never test for gas leaks with an open ame. Use a
commercially available soap solution to check all
connections See page 11.
• Follow all precautions in the literature, on tags, and
on labels provided with the equipment. Read and
thoroughly understand the instructions provided with
the equipment prior to performing the installation and
operational checkout of the equipment.
• Thisunitisdesignedonlyforoutdoorinstallationsand
should be located with consideration of minimizing the
4
REQUIREMENTS & CODES
• Thisequipmentmustbeinstalledinaccordancewith
instructionsoutlinedinthismanual,allapplicable
local buildingcodes,and the current revisionof
theNationalFuelGasCode(NFPA54/ANSIZ223.1)
ortheNaturalGasandPropaneInstallationCode,
CAN/CGA B149.1.
• Allelectricalwiringmustbecompletedinaccordance
with local, state and national codes and regulations and
withtheNationalElectricCode(ANSI/NFPA70)orin
Canada the Canadian Electric Code Part 1 CSA C.22.1.
• The installer must comply with all local codes and
regulations which govern the installation of this type
of equipment. Local codes and regulations take
precedence over any recommendations contained in
these instructions. Consult local building codes and the
NationalElectricalCode(ANSICI)forspecialinstallation
requirements.
• Air Ducts must be installed in accordance with the
standardsoftheNationalFireProtectionAssociation
“Standards for Installation of Air Conditioning and
Ventilation Systems” (NFPA 90A), “Standard for
Installation of Residence Type Warm Air Heating and Air
ConditioningSystems”(NFPA90B),theseinstructions,
and all applicable local codes.
• ConsultTable16(page40),andtheratingplateforthe
proper circulating air flow and temperature rise. It is
important that the duct system be designed to provide
the correct flow rates and external pressure rise. An
improperly designed duct system can result in nuisance
shutdowns, and comfort or noise issues.
• Thisunitisdesignedforoutdoorinstallationsonlyand
should be located as described on page 5.
• Use only with the type of gas approvedforthis unit.
Refer to the unit rating plate.
• Provideadequatecombustionandventilationairtothe
unit. See pages 6 & 7.
• Provideadequateclearancesaroundtheairventintake
terminal as specified on page 6.
length of the supply and return ducts. Consideration
should also be given to the accessibility of fuel, electric
power, service access, noise, and shade.
• Theinstallershouldbecomefamiliarwiththeunitswiring
diagram before making any electrical connections to the
unit.SeetheunitwiringlabelorFigures15&16(pages
38&39).
• Usecautionwhenhandlingthisapplianceorremoving
components. Personal injury can occur from sharp metal
edges present in all sheet metal constructed equipment.
Combustion&VentilationAir
• US: National Fuel Gas Code (NFGC), Air for
Combustion and Ventilation
• CANADA: Natural Gas and Propane Installation
Codes(NSCNGPIC),VentingSystemsandAirSupply
for Appliances
DuctSystems
• US and CANADA: Air Conditioning Contractors
Association (ACCA) Manual Q, Sheet Metal and
Air Conditioning Contractors National Association
(SMACNA), or American Society of Heating,
Refrigeration, and Air Conditioning Engineers
(ASHRAE)FundamentalsHandbook
Electrical Connections
• US:NationalElectricalCode(NEC)ANSI/NFPA70
• CANADA:CanadianElectricalCodeCSAC22.1
Gas Piping & Gas Pipe Pressure Testing
• US:NFGCandNationalPlumbingCodes
• CANADA:NSCNGPIC
General Installation
• US:CurrenteditionoftheNFGCandtheNFPA90B.
For copies, contact the National Fire Protection
Association Inc., Batterymarch Park, Quincy, MA
02269;orAmericanGasAssociation,400N.Capitol,
N.W.,WashingtonDC20001orwww.NFPA.org.
• CANADA:NSCNGPIC.Foracopy,contactStandard
Sales, CSA International, 178 Rexdale Boulevard,
Etobicoke(Toronto),Ontario,M9W1R3Canada
Safety
• US:(NFGC)NFPA54–1999/ANSIZ223.1andthe
Installation Standards, Warm Air Heating and Air
ConditioningSystemsANSI/NFPA90B.
• CANADA:CAN/CGA-B149.1–and.2–M00National
StandardofCanada.(NSCNGPIC)
• Combustion products must be discharged outdoors.
Connect this unit to an approved vent system only, as
specified on page 6.
• Additionalcodeslistedbelowareforreferencepurposes
only and do not necessarily have jurisdiction over
local or state codes. Local codes and regulations take
precedence over any recommendations contained in
these instructions. Always consult with local authorities
before installing any gas appliance.
5
GENERAL INFORMATION
AbouttheRooftopUnit
Single Package Gas Heating / Electric Cooling Rooftop
Units are designed only for outdoor rooftop or ground level
installations and can be readily connected to the duct
system of a building. This unit has been tested for capacity
and efficiency in accordance with AHRI Standards and
will provide many years of safe and dependable comfort,
providing it is properly installed and maintained. With
regular maintenance, this unit will operate satisfactorily
year after year. Abuse, improper use, and/or improper
maintenance can shorten the life of the appliance and
create unsafe hazards.
To achieve optimum performance and minimize equipment
failure, it is recommended that periodic maintenance be
performed on this unit. The ability to properly perform
maintenance on this equipment requires certain tools
and mechanical skills.
BeforeYouInstallthisEquipment
The cooling load of the area to be conditioned must be
calculated and a system of the proper capacity selected.
It is recommended that the area to be conditioned be
completely insulated and vapor sealed.
Check the electrical supply and verify the power supply
is adequate for unit operation. Consideration should be
given to availability of electric power, service access,
noise, and shade. If there is any question concerning
the power supply, contact the local power company.
All units are securely packed at the time of shipment and
upon arrival should be carefully inspected for damage
prior to installing the equipment at the job site. Verify
coil fins are straight. If necessary, comb fins to remove
attenedorbentns.Claimsfordamage(apparentor
concealed)shouldbeledimmediatelywiththecarrier.
Please consult your dealer for maintenance information
and availability of maintenance contracts. Read all
instructions before installing the unit.
LocatingtheUnit
• Surveythejobsitetodeterminethebestlocationfor
the packaged unit. The unit should be located with
consideration of minimizing the length of the supply
and return ducts. If practical, place the equipment and
its ducts in an area where they will be shaded from
the afternoon sun, when the heat load is greatest.
Consideration should also be given to the accessibility
of fuel, electric power, service access, noise, and shade.
• Selectasolid,levelposition,preferablyonaconcrete
slab, slightly above the grade level, and parallel to the
building.
• Overhead obstructions, poorly ventilated areas, and
areas subject to accumulation of debris should be
avoided. Do not place the unit in a confined space or
recessed area where discharge air from the unit could
re-circulate back through the condenser coil.
• Sufcientclearanceforunobstructedairowthroughthe
louvered control access panel and outdoor coil must be
maintained in order to achieve rated performance. See
pages 8 - 9 for minimum clearance requirements.
• Where accessibility to combustibles clearances
aregreaterthanminimumclearances,accessibility
clearances must take preference.
• Ifpractical,placetheairconditioneranditsductsinan
area where they will be shaded from the afternoon sun,
when the heat load is greatest.
Heating Load
This unit should be sized to provide the design heating
load requirement. Heating load estimates can be made
using approved methods available from Air Conditioning
ContractorsofAmerica(ManualN);AmericanSocietyof
Heating, Refrigerating, and Air Conditioning Engineers;
or other approved engineering methods. For installations
above 2,000 ft., the unit should have a sea level input
rating large enough that it will meet the heating load after
deration for the installed elevation.
6
COMBUSTION AIR & VENTING
WARNING:
Installationmethodsotherthanthosedescribed
inthefollowingsectionsmustcomplywiththe
NationalFuelGasCodeandallapplicablelocal
codesforprovidingsufcientcombustionair
tothefurnace.
Provisions must be made during the installation of this
unit that provide an adequate supply of air for combustion.
Instructions for determining the adequacy of an
installation can be found in the current revision of the
NFGC(ANSIZ223.1/NFPA54).Consult local codes
forspecialrequirements. These requirements are for
USinstallationsasfoundintheNFGC.
• TherequirementsinCanada(B149.1)arestructured
differently. Consult with B149.1 and local code officials
for Canadian installations.
WARNING:
Combustion air must not be drawn from a
contaminatedatmosphere.Excessiveexposure
tocontaminatedcombustionairwillresultin
safetyandperformancerelatedproblems.
To maximize heat exchanger life, the combustion air
must be free of chemicals that can form corrosive acidic
compounds in the combustion gases. The recommended
source of combustion air is to use clean air from outside.
DONOTplaceanychemicalswithammableorcaustic
vaporsortheseothercorrosivechemicalsnearthe
vent termination:
• Gasoline/Kerosene
• Permanentwavesolutions
• Chlorinatedwaxesandcleaners
• Chlorinebasedswimmingpoolchemicals
• Watersofteningchemicals
• De-icingsaltsorchemicals
• Carbontetrachloride
• Halogentyperefrigerants
• Cleaningsolvents
• Cements,glues,paintremovers,varnishes,etc.
• Hydrochloricacid
• Masonryacidwashingmaterials
• PlumbingStack
Air openings in the door of the unit, warm air registers, and
return air grilles must never be restricted. If the unit does
not receive an adequate supply of air for combustion, the
flame roll-out control located above the burners will open,
turning off the gas supply to the burners. This safety device
is a manually reset switch. IMPORTANT NOTE: DO NOT
installjumperwiresacrossthiscontroltodefeatits
functionorresetthecontrolwithoutidentifyingand
correctingthefaultcondition.
If this control must be replaced, use only factory authorized
replacement parts specified in the Replacement Parts
List provided online.
Vent Termination
This unit has been equipped with an integral venting
system and designed to operate only with this venting
system. If desired, an accessory venting kit is available.
UseonlyNORDYNEapprovedventingkitlistedinthe
technicalserviceliterature.
WARNING:
Thisunitis intendedforoutdoor installation
only.Donotventtheunitthroughaconventional
ventingsystem.
A vent cover assembly has been supplied with the unit
and can be found secured to the gas controls within the
burner area of this unit. Figure 1 displays the proper
installation of the vent cover assembly over the vent outlet
of the corner panel. The fasteners used to secure the vent
cover assembly have been included on the unit end panel.
The list below summarizes the location requirements for
theventingsystemtermination:
• Thelocationoftheventterminationmustbeconsistent
withtheNationalFuelGasCode(ANSIZ223.1)orCAN/
CGA-B149 Installation Codes.
• Mustbe locatedatleast4feethorizontallyfromany
electric meters, gas meters, regulators, and relief
equipment.
• Mustbelocatedatleast3feetaboveanyforcedairinlet
located within 10 feet of unit.
• Mustbelocatedatleast4feetbelow,4feethorizontally
from, or 1 foot above any door, window, or gravity air
inlet into any building.
• Mustbelocatedatleast1footabovegradeandinstalled
in such a manner as to prevent snow accumulation from
obstructing the vent termination.
• Theventterminationmustnotbelocatedaboveany
public walkways.
• Theventcoverassemblymustbeinstalledtoassure
proper operation of the unit.
Figure1.VentCoverAssembly
7
• Makesuretheexhaustgaseswillnotimpingeonwindows
or building surfaces, which may be compromised or
damaged by condensation.
• Donotinstalltheunitinalocationwhereexhaustfrom
the vent termination will be directed into windows,
stairwells, under decks, or other recessed areas.
CIRCULATING AIR SUPPLY
WARNING:
Donotallowcombustionproductstoenterthe
returnairductworkorthecirculatingairsupply.
Failuretopreventthecirculationofcombustion
products into the living space can create
potentially hazardous conditions including
carbonmonoxidepoisoningthatcouldresult
inpersonalinjuryordeath.
Allreturnductworkmustbesecuredtotheunit
withsheetmetalscrews.Allreturnductwork
mustbeadequatelysealedandalljointsmust
betaped.Whenreturnairisprovidedthrough
thebottomoftheunit,thejointbetween the
unitandthereturnairplenummustbeairtight.
Theroofcurborcementpadonwhichtheunitis
mountedmustprovidesoundphysicalsupport
of the unit with no gaps, cracks, or sagging
betweentheunitandthecurborpad.
Returnairandcirculatingairductworkmustnot
beconnectedtoanyotherheatproducingdevice
suchasareplaceinsert,stove,etc.Doingso
mayresultinre,explosion,carbonmonoxide
poisoning,personalinjury,orpropertydamage.
This unit is designed only for use with a supply and return
duct. Air ducts should be installed in accordance with the
standards of the National Fire Protection Association
“Standard for Installation of Air Conditioning Systems”
(NFPA90A),“StandardforInstallationofResidenceType
WarmAirHeatingandAirConditioningSystems”(NFPA
90B),andallapplicablelocalcodes.NFPApublicationsare
availablebywritingto:NationalFireProtectionAssociation,
BatterymarchPark,Quincy,ME02269orvisitwww.NFPA.
org on the web.
• DesigntheductworkaccordingtoManualQbytheAir
ConditioningContractorsofAmerica(ACCA)orsimilar
commercial methods.
• Ifroof curb is installed, the ducts must be attached to
the curb hangers, not the unit.
• Duct work should be attached directly to the unit flanges
for horizontal applications.
• It is recommended that the outlet duct be equipped
with a removable access panel. This opening should
be accessible when the unit is installed in service and
shall be of a size such that the smoke or reflected
light may be observed inside the casing to indicate the
presence of leaks in the heat exchanger. The cover for
the opening shall be attached in such a manner as to
prevent leaks.
• If outside air is utilized as return air to the unit for
ventilation or to improve indoor air quality, the system
must be designed so that the return air to the unit is
notlessthan50°F(10°C)duringheatingoperation.
• Ifacombinationofindoorandoutdoorairisused,the
ducts and damper system must be designed so that the
return air supply to the furnace is equal to the return air
supply under normal, indoor return air applications.
• This unit is shipped ready for downflow duct
connections and is easily converted for horizontal
duct connections with an optional accessory kit.
See the unit Technical Sales Literature for factory
and field installed accessory information and part
numbers. This information can also be found online at
www.nordyne.com.
DownowtoHorizontalConversion
The unit is shipped ready for downflow duct connections. If
horizontal ducts are required, the unit must be converted
according to the directions in the conversion kit for both
the supply and return ducts.
Always review the horizontal kit instructions prior to
changing the air temperature limits for horizontal operation
of the gas heat exchanger.
Unconditioned Spaces
All ductwork passing through unconditioned space must be
properly insulated to prevent condensation and minimize
duct losses. Use insulation with an outer vapor barrier.
Refer to local codes for insulation material requirements.
AcousticalDuctwork
Certain installations may require the use of acoustical
lining inside the supply duct work.
• Acoustical insulation must be in accordance with the
current revision of the Sheet Metal and Air Conditioning
ContractorsNationalAssociation(SMACNA)application
standard for duct liners.
• Duct lining must be UL classified batts or blankets with
a fire hazard classification of FHC-25/50 or less.
• Fiber duct work may be used in place of internal duct
liners if the fiber duct work is in accordance with the
currentrevisionoftheSMACNAconstructionstandard
on fibrous glass ducts. Fibrous duct work and internal
acousticalliningmustbeNFPAClass1airductswhen
tested per UL Standard 181 for Class 1 ducts.
8
AirFilterRequirements
WARNING:
Neveroperatetheunitwithoutalterinplace.
Dust and lint could accumulate on internal
parts,resultinginlossofefciency,equipment
damageandpossiblere.
All return air must pass through the filters before entering
the unit. It is important that all filters be kept clean and
replaced frequently to ensure proper operation of unit.
Dirty or clogged filters will reduce the efficiency of the
unit and result in unit shutdowns. Air filter pressure drop
must not exceed 0.08 inches WC. When replacing the air
filters, a suitable air filter must be installed ahead of the
evaporator coil of the return air system. Refer to Table 1
for recommended filter sizes.
Figure3.BottomView
Crate Brackets (x4)
Long Bottom
Boards (x2)
Short Bottom
Boards (x2)
Base
Rails
Figure2.SideView
Wood Cap
Assembly
Top Crate
Brackets
Lower
Crate
Brackets
End Skid
Side Skids
UNIT
FACTORY
FILTER SIZE
QTY
R6GP-072*-(100/166)C 16x20x2 4
R6GP-090*-200C 16x20x2 4
R6GP-120*-235C 16x25x2 4
Table1.FilterSizes&Quantities
UNIT INSTALLATION
Packaging Removal
All units have been securely packaged at the point of
shipment. After unpacking the unit, carefully inspect for
apparent and concealed damage. Claims for damage
should be filed with the carrier by the consignee.
1. Remove top crate brackets and wooden cap assembly
fromtopofunit(Figure2).
2. Remove lower crate brackets, 4 side skids, and 2 end
skids from each side of unit. NOTE: DO NOT remove
baserailsfromunit.
3. Rig unit and raise up approximately 4 feet off the ground.
4.Removecratebrackets(Figure3)securinglongand
short bottom boards to underside of unit. NOTE: Some
screwsarelocatedinforkslots.
5. Remove long & short bottom boards from beneath unit.
6. Inspect unit thoroughly for shipping damage.
7. Carefully lower and position unit to it’s permanent
location.
Rigging & Hoisting
WARNING:
Toavoidtheriskofpropertydamage,personal
injury,ordeath,itistherigger’sresponsibility
toensurethatwhatevermeansareusedtohoist
theunitaresafeandadequate:
• Theliftingequipmentmustbeadequateforthe
load.RefertoTable3(page27)forunitweights.
• Theunitmustbeliftedfromtheholesinthe
baserailsusingcablesorchains.
• Spreaderbarsarerequiredtoprotecttheunit
and ensure even loading. See Figure 4.
• Keeptheunitinanuprightpositionatalltimes.
Theriggingmustbelocatedoutsidetheunits
centerofgravity.RefertoFigures12-14(pages
22-27)forlocatingthecenterofgravity.
• All panels mustbe securelyin place during
riggingandhoisting.
MinimumClearanceRequirements
R6GP units are certified as combination heating and
cooling equipment for outdoor installation only. Figure 5
(page9)displaystheminimumclearancestocombustible
materials for both Downflow and Horizontal discharge.
R6GP units may be installed on non-combustible surfaces
when used with bottom supply and return air ducts.
9
Figure 4. Rigging & Hoisting
LIFTING
BEAM
CABLE OR CHAIN
SPREADER
BAR
SPREADER
BAR
BASE
RAIL
BASE
RAIL
Top of unit
to be
unobstructed
Recommended Clearances
for Servicibility
Minimum Required
Clearances to Combustibles
36"
36"
36"
36"
48"
48"
60"
48"
Figure5.UnitClearanceRequirements
Figure 7. Concrete Mounting Pad
3” min
Figure6.RoofCurb
Roof
Curb
Units may be installed on wood flooring or on Class A,
B, or C roof covering material as long as the following
requirementsaremet:
• Ifusingsidesupplywithreturnairducts,thehorizontal
discharge kit must be installed prior to unit installation.
• Ifusingbottomdischargewithreturnairductsaroofcurb
must be installed prior to unit installation. See Rigging
and Hoisting section on page 8 for setting of the unit.
Rooftop Mounting
Rooftop installations must be located according to local
buildingcodesorordinancesandtheserequirements:
• The roof must be capable of handling the weight of the
unit.Forunitweights,seeTable3(page27).Reinforce
the roof if necessary.
• Theappropriateaccessoryroofcurb(Figure6)mustbe
installed prior to unit installation. The roof curb must be
square and level to ensure proper condensate drainage.
Pleasefollowallinstructionsprovidedwiththekit.
WARNING:
Neverdrillorpunchholesinunitbasewhen
installingdownowunits.Leakagemayoccur
ifbottompanispunctured.
• On bottom discharge applications, the supply and
return air ducts must be attached to the roof curb duct
supports, not the unit. Install all ductwork before setting
unit on curb or frame.
• Framesupportmustbeconstructedusingnoncombustible
materials. Full perimeter support is required under the
unit. Supports must be made of steel or weather resistant
wooden materials. The unit must be square and level
to ensure proper condensate drainage.
• Theframemustbehighenoughtoensureprevention
of any moisture from entering the unit. Recommended
heighttounitbaseis8”(20cm)forbothDownowand
Horizontal installations.
• Secure roof curb or frame to roof using acceptable
mechanical methods per local codes.
Ground Level
Ground level installations must be located according to
localbuildingcodesorordinancesandtheserequirements:
• Clearancesmustbeinaccordancewiththoseshown
in Figure 5.
• Aconcretemountingpad(Figure7)mustbeprovided
and separate from the building foundation. The pad
must be level to ensure proper condensate disposal
and strong enough to support the unit’s weight. The slab
heightmustbeaminimumof3”(8cm)abovegradeand
with adequate drainage.
• Units require horizontal supply and return kit for
horizontal installations.
• Ductwork should be attached directly to anges on
panels supplied in horizontal duct conversion kits.
10
Condensate Drain
The method for disposing of condensate varies according
to local codes. Consult your local code or authority having
jurisdiction.
Condensateisdrainedfromtheunitthrougha3/4”(19mm)
PVCpipelocatedonthefrontsideoftheunit(Figure8).
Forproperdrainage,installa3”(8cm)Min.trapbetween
the drain line and an open vent of the same size. Avoid
areas where condensate drainage may cause problems.
The condensate drain line must be J-trapped using field
supplied parts and may be combined with other drain lines
when routed to the drain.
When connecting rigid drain line, hold any fittings with a
wrench to prevent twisting. Donotovertighten!
3”
Min
Roof Curb
Condensate
Drain
Figure 8. Condensate Drain
FIRE OR EXPLOSION HAZARD
•Failuretofollowsafetywarningsexactly
couldresultinseriousinjuryorproperty
damage.
•Installationandservicemustbeperformed
byaqualiedinstaller,serviceagencyor
thegassupplier.
•Donotstoreorusegasolineorother
ammablevaporsandliquidsinthe
vicinityofthisoranyotherappliance.
WHAT TO DO IF YOU SMELL GAS
•Donottrytolightanyappliance.
•Donottouchanyelectricalswitch;donot
useanyphoneinyourbuilding.
•Leavethebuildingimmediately.
•Immediatelycallyourgassupplierfrom
aneighbor’sphone.Followthegas
supplier’sinstructions.
•Ifyoucannotreachyourgassupplier,call
theredepartment.
WARNING:
RISQUED’INCENDIEOUD’EXPLOSION
• Lenon-respectdesavertissementsdesécurité
pourraitentraînerdesblessuresgraves,lamort
ou des dommages matériels.
• L’installationetl’entretiendoiventêtreeffectués
par un installateur qualié, un organisme de
service ou le fournisseur de gazstaller, service
agencyorthegassupplier.
• Ne pas entreposer ni utiliser de l’essence ni
d’autresvapeursouliquidesinammablesdansle
voisinage de cet appareil, ni de tout autre appareil.
QUEFAIRES’ILYAUNEODEURDEGAZ
• Nepastenterd’allumeraucunappareil.
Ne toucher à aucun interrupteur électrique;
n’utiliseraucuntéléphonedanslebâtiment.
• Évacuerl’immeubleimmédiatement.
• Appelerimmédiatementlefournisseurdegazen
employantletéléphoned’unvoisin.Respecterà
la lettre les instructions du fournisseur de gaz.
• Si personne ne répond,appeler le service des
incendies.
AVERTISSEMENT:
GAS SUPPLY & PIPING
11
IMPORTANT NOTES:
• Allgaspipingmustbeinstalledincompliancewith
localcodesandutilityregulations.Intheabsence
oflocalcodesthegaslineinstallationmustcomply
withthelatesteditionoftheNationalFuelGasCode
ANSI Z223.1 or CAN/CGA B149 Installation Codes.
• Somelocalcodesrequiretheinstallationofamanual
mainshut-offvalveandgroundjointunionexternal
tothefurnace.Theshut-offvalveshouldbereadily
accessibleforserviceand/oremergencyuseSee
Figure9(page12).Consultthelocalutilityorgas
supplier for additional requirements regarding
placementofthemanualmaingasshut-off.
• Gaspipingmustneverruninorthroughairducts,
chimneys,gasvents,orelevatorshafts.
• Compoundsusedtosealjointsongaspipingmust
beresistanttotheactionsofLPpropanegas.
• Themaingasvalveandmainpowerdisconnectto
thefurnacemustbeproperlylabeledbytheinstaller
incaseemergencyshutdownisrequired.
• An1/8inchNPTpluggedtapmustbeinstalledin
thegaslineimmediatelyupstreamofthegassupply
connectiontothefurnaceforusewhenmeasuring
thegassupplypressure.Theplugshouldbereadily
accessibleforserviceuse.
• Adriplegshouldbeinstalledintheverticalpipe
runtotheunit(Figure9).
This unit is shipped from the factory for natural gas
operation at sea level elevation and is equipped with a
#36oriceateachburner.Table14(page40),listsgas
pipe capacities for standard pipe sizes as a function of
length in typical applications based on nominal pressure
drop in the line.
This unit only has right side gas entry. When connecting
the gas, provide clearance between the gas supply line
and the entry hole in the unit’s casing to avoid unwanted
noise and/or damage to the unit. A typical gas service
hookupisshowninFigure9(page12).
LeakCheck
After the gas piping to the unit is complete, all connections
must be tested for gas leaks. This includes pipe connections
at the main gas valve, emergency shutoff valve and other
gas connectors.
The soap and water solution can be applied on each
joint or union using a small paintbrush. If any bubbling is
observed, the connection is not sealed adequately and
must be retightened. Repeat the tightening and soap
check process until bubbling ceases.
IMPORTANT NOTES:
• Ifpressuretestingthegassupplylinesatpressures
greaterthan1/2psig(14inchesWC),theunitmust
bedisconnectedfromthegassupplypipingsystem
topreventdamagetothegasvalve.
• Ifthetestpressureislessthanorequalto1/2psig
(14inchesWC),theunitmustbeisolatedfromthe
gassupplylinebyclosingthemanualshut-offvalve.
HighAltitudeDeration
High altitude application with this unit depends on the
installation altitude and the heating value of the gas. At
high altitudes, the heating value of natural gas is always
lower than the heating value at sea level.
All installations of this equipment must be made in
accordancewiththeNationalFuelGasCodeorwithlocal
jurisdiction codes. For installations at exactly 2,000 feet
in altitude or under, the installer does not need to derate
the heat exchanger performance. For any installation that
exceeds 2,000 feet, please see the following instructions
andexample:
WARNING:
Thereductionofinputratingnecessaryforhigh
altitudeinstallationmayonlybeaccomplished
withfactorysuppliedorices.Donotattemptto
drilloutoricesintheeld.Improperlydrilled
orices may cause re, explosion, carbon
monoxidepoisoning,personalinjuryordeath.
RISQUED’INDENDIEOUD’EXPLOSION
Le non-respect des avertissements de sécurité
pourraitd’entraînerdesblessuresgraves,lamort
ou des dommages matériels.
Ne jamais utiliser une flamme nue por
vérier la présence des fuites de gaz. Pour la
véricationdetouslesjoints,utiliserplutôtune
solution savonneuse commerciale fabriquée
spéciquementpurladétectiondesfuitesdegaz.
Unincendieouuneexplosionpeutentraînerdes
dommagesmatériels,desblessuresoulamort.
AVERTISSEMENT:
FIRE OR EXPLOSION HAZARD
Failuretofollowsafetywarningsexactlycould
resultinseriousinjuryorpropertydamage.
Nevertestforgasleakswithanopename.
Useacommerciallyavailablesoapsolution
madespecicallyforthedetectionofleaksto
checkallconnections.Areorexplosionmay
result causing property damage, personal
injuryorlossoflife.
WARNING:
12
• Ifinstallingthisunitabove2,000feet,theinputratemust
bereduced4%per1,000feetofaltitude(Example:12%
at3,000feet,16%at4,000feet,etc).Alwaysroundup
to the next highest value of 1,000. So an installation
at 3,120 feet is derated by 16% due to rounding up to
4,000. NOTE: This deration is necessary to compensate
for low atmospheric pressure at high altitudes. Generally
this will require obtaining the gas heating value from the
local gas utility and replacing the burner orifices.
• Table15(page40)liststhecorrectoricesizetouse
at different altitudes. To determine the unit rating and
orifice size, see the installation example.
• Afterchangingtheorices,itisrequiredthatyoumeasure
the gas input rate by clocking the gas meter and using
the local gas heating value. See section on Verifying
and Adjusting the Firing Rate on page 16.
IMPORTANT NOTE: Observe the action of the
burnerstomakesurethereisnoyellowing,lifting
orashbackoftheame.
Conversion to LP/Propane
WARNING:
The furnace was shipped from the factory
equippedtooperateonnaturalgas.Conversion
to LP/propane gas must be performed by
qualied service personnel using a factory
supplied conversion kit. Failure to use the
properconversionkitcancausere,explosion,
propertydamage,carbonmonoxidepoisoning,
personalinjury,ordeath.
INSTALLATION EXAMPLE:
Elevation: ..................................................3,890 feet
TypeofGas: .................................................. Natural
Unit Model: ................................... R6GP-090C200C
At 4,000 feet, the unit needs to be derated by 4% for
each 1,000 feet of elevation. This equates to 16% or
less than the sea level rating of 200,000 Btu/h.
1. Determineunitinputrating:
[200kx(100-16)%]=168,000Btuh.The required
heating rate for 3,890 feet is 168,000 Btu/h.
2. Determineoricesize:
FromTable15(page40),ndtheUnitModelNumber.
Follow across the row and stop at the 2,000-4,000
elevation column. For this example, the orifice size
displayed is #38. Install one #38 orifice in every burner
and check firing rate. In this example, the firing rate
must not exceed 168,000 Btu/h.
Figure9.TypicalGasServiceConnection
1. All piping must comply with local codes, ordinances, and/or National Fuel Gas Codes.
2. A manual shutoff valve must be installed within 6 feet of this equipment.
3. Always include a drip leg in piping.
NOTES:
Gas Valve
Gas Valve
Riser
3 in.
Minimum
Horizontal
Drop
Piped Gas Supply
Tubing Gas Supply
3 in.
Minimum
Horizontal
Drop
Gas Valve
3 in.
Min.
Riser
Piped Gas Supply
In the U.S., if installing the unit above 2,000 ft., refer
to Table 15 to determine the correct orifice size. When
conversion is complete, verify the input rate is correct as
listed in the tables. Approved conversion kit must be used.
Pleasefollowtheinstructionsprovidedwitheachkit.
13
Line Voltage
• Electricalconnectionsmustbeincompliancewithall
applicable local codes and ordinances, and with the
currentrevisionoftheNationalElectricCode(ANSI/
NFPA 70). For Canadian installations the electrical
connections and grounding shall comply with the current
Canadian Electrical Code (CSA C22.1 and/or local
codes).
• Providepowersupplyfortheunitinaccordancewiththe
unit wiring diagram and the unit rating plate. The line
voltage to the unit should be supplied from a dedicated
branch circuit containing the correct fuse or circuit
breaker for the unit.
• Anelectricaldisconnectmustbelocatedwithinsight
ofandreadilyaccessibletotheunit. This switch shall
be capable of electrically de-energizing the outdoor unit.
See unit data label for proper incoming field wiring. Any
other wiring methods must be acceptable to authority
having jurisdiction.
• Awiringdiagramislocatedontheinsidecoverofthe
control access panel of the outdoor unit. The installer
should become familiar with the wiring diagram before
making any electrical connections to the outdoor unit.
SeeFigures15&16(pages38&39).
• Ifanyoftheoriginalwiressuppliedwiththeunitmust
be replaced, they must be replaced with material of the
same voltage, gauge, and temperature rating.
• Connecttheline-voltageleadstotheterminalsonthe
contactor inside the control compartment.
• Useonlycopperwireforthelinevoltagepowersupply
to this unit. Use proper code agency listed conduit and
connector for connecting the supply wires. Use of rain
tight conduit is recommended.
• Unitsareshippedfromthefactorywiredfor230or460
volt operation. On 208-230V units being placed into 208
volt operation, remove the lead from the transformer
terminal marked 240V and connect it to the terminal
marked 208V.
• Overcurrentprotectionmustbeprovidedatthebranch
circuit distribution panel and sized as shown on the
unitratinglabelandaccordingtotheNationalElectric
Code and applicable local codes. NOTE: See the unit
rating plate for maximum circuit ampacity and maximum
overcurrent protection limits.
Grounding
WARNING:
Theunitcabinetmusthaveanuninterruptedor
unbrokenelectricalgroundtominimizepersonal
injuryifanelectricalfaultshouldoccur.Do not
use gas piping as an electrical ground
!
This unit must be electrically grounded in accordance
with local codes or, in the absence of local codes, with
theNationalElectricalCode(ANSI/NFPA70)ortheCSA
C22.1 Electrical Code. Use the grounding lug provided in
the control box for grounding the unit.
ELECTRICAL SHOCK, FIRE OR EXPLOSION
HAZARD
Failuretofollowsafetywarningsexactlycould
resultinseriousinjuryorpropertydamage.
Improper servicing could result in dangerous
operation, serious injury, death or property
damage.
• Before servicing, disconnect all electrical
powertofurnace.
• Whenservicingcontrols,labelallwiresprior
todisconnecting.Reconnectwirescorrectly.
• Verifyproperoperationafterservicing.
WARNING:
RISQUEDECHOCÉLECTRIQUE,D’INCENDIE
OUD’EXPLOSION
Le non-respect des avertissements de sécurité
pourrait entraîner
unfonctionnementdangereux
del’appareil,
desblessuresgraves,lamortou
des dommages matériels.
Un entretein incorrect pourrait entraîner un
fonctionnementdangereuxdel’appareil,des
blessuresgraves,lamortoudesdommages
matériels
• Couper toute alimentation électrique au
générateurd’airchaudavantdeprodéder
auxtravauxd’entretein.
• Aumomentdel’entretiendescommandes,
étiqueteztousleslsavantdelesdébrancher.
S’assurerdelesraccordercorrectement.
S’assurer que l’appareil fonctionne
adéquatementaprésl’entretien.
AVERTISSEMENT:
ELECTRICAL WIRING
Pre-ElectricalChecklist
Verify that the voltage, frequency, and phase of the
supply source match the specifications on the unit rating
plate.
Verify that the service provided by the utility is sufficient
to handle the additional load imposed by this equipment.
SeeTable13(page37)ortheunitwiringlabelforproper
high and low voltage wiring.
Verify factory wiring is in accordance with the unit wiring
diagram. Inspect for loose connections.
For 3 phase units always check the phase balance
(page14).
14
Example:
AB=451V
BC=460V
AC=453V
2. Determine the average voltage in the power supply.
3.Determinethemaximumdeviation:
4. Determine percent of voltage
imbalance by using the results
from steps 2 & 3 in the following
equation.
maxvoltage deviation
fromaverage voltage
=100 x
averagevoltage
% Voltage Imbalance
6
454
100
x
=1.32%
Example:
1. Measure the line voltages
of your 3-phase power
supply where it enters the
building and at a location
that will only be dedicated
totheunitinstallation(at
the units circuit protection
ordisconnect).
Unbalanced3-PhaseSupplyVoltage
Voltage unbalance occurs when the voltages of all phases
of a 3-phase power supply are no longer equal. This
unbalance reduces motor efficiency and performance.
Someunderlyingcausesofvoltageunbalancemayinclude:
Lack of symmetry in transmission lines, large single-phase
loads, and unbalanced or overloaded transformers. A
motor should never be operated when a phase imbalance
in supply is greater than 2%. Perform the following steps
todeterminethepercentageofvoltageimbalance:
In this example, the measured line voltages were
451, 460, and 453. The average would be 454 volts
(451+460+453=1,364/3=454).
Theamountofphaseimbalance(1.32%)issatisfactory
since the amount is lower than the maximum allowable
2%. Please contact your local electric utility company if
your voltage imbalance is more than 2%.
Example:
Fromthevaluesgiveninstep1,theBCvoltage(460V)
isthegreatestdifferenceinvaluefromtheaverage:
460-454=6
454-451=3
454-453=1
Highest Value
Figure10.Typical2-StageHeat/Cool
ThermostatConnection
Y1
Y2
W2
W1
G
RH
RC
Y1
Y2
W2
W1
G
R
Indoor
Thermostat
Sub-Base
Unit Low Voltage
Terminal
T-Stat Wire
Gauge
Recommended T-Stat Wire
Length-Ft.(UnittoT-Stat)
18 Ga. 0 - 60
16 Ga. 61 - 130
Field Supplied Wiring - - - - - Use Solid Class II Copper Wire
• Atwo-stageheating/coolingthermostatisrequiredfor
R6GP series units. Select a thermostat which operates
in conjunction with the installed accessories. See Figure
10 for proper wire gauge and their recommended lengths
for typical thermostat connections.
• The low voltage wires must be properly connected
to the units low voltage terminal block. Route 24V
control wires through the gas furnace side of the unit.
Recommended wire gauge and wire lengths for typical
thermostat connections are shown in Figure 10.
• Thethermostatshouldbemountedabout5feetabove
theooronaninsidewall.DONOTinstallthethermostat
on an outside wall or any other location where its
operation may be adversely affected by radiant heat from
fireplaces, sunlight, or lighting fixtures, and convective
heat from warm air registers or electrical appliances.
Refer to the thermostat manufacturer’s instruction sheet
for detailed mounting information.
Thermostat/LowVoltageConnections
• SinglePackageGasHeating/ElectricCoolingRooftop
Units are designed to operate with a 24 VAC Class II
control circuit. The control circuit wiring must comply
with the current provisions of the NEC (ANSI/NFPA
70)andwithapplicablelocalcodeshavingjurisdiction.
Thermostat connections should be made in accordance
with the instructions supplied with the thermostat.
Heat Anticipator
Verify if the thermostat being used for the installation has a
heat anticipator setting. This function allows the thermostat
to anticipate the space heating rate and time the burner
to shutoff accordingly. Always refer to the thermostat
manufacturers instructions for the correct settings.
BlowerSpeed
The blower speed is preset at the factory but must
be verified at each installation. For optimum system
performance and comfort, it may be necessary to change
the factory set speed. Refer to Blower Performance Data
(Tables5-12,pages29-36)forproperoperatingrange.
Always ensure drive belt is secure and tensioned properly.
Also inspect variable pitch sheaves for proper tightness
of the set screws
15
Startup Procedures
WARNING:
Thisunitisequippedwithcrankcaseheaters.
Allow 24 hrs for heating of the refrigerant
compressor crankcase prior to start up and
anytimethepowerhasbeenremovedformore
than 12 hrs. Failureto complymay result in
damage or cause premature failure of the
system.
• Checkall electricalwiring forloose connectionsand
tighten as required.
• Checkunitforreturnairltersandcondensatetrap.
• Closeallelectricaldisconnectstoenergizethesystem.
Air Circulation
1. Set thermostat system switch to OFF and the fan switch
toON.
2. Verify the blower motor runs continuously. Check for
airdeliveryattheregister(s).Ensurethatthereareno
obstructions at the registers or in the ductwork.
3. Set thermostat fan switch to AUTO and verify the blower
shuts down immediately.
NOTE: If blower is turning opposite of arrow direction,
shut off main power to the unit and switch any two field
wires at the disconnect. DO NOT alter unit wiring.
SystemCooling
1. Set the thermostat system switch to COOL and the fan
switch to AUTO.
2. Lower the thermostat temperature switch below
room temperature and observe that the blower, both
compressorsandfans)energize.
3. Verify blower is turning in direction indicated by arrow
and air discharged at the register is cooler than room
temperature.
4. Verify HI and LO refrigerant pressures.
NOTE: If refrigerant pressures are abnormal and blower
is rotating in the opposite direction of the arrow, shut off
main power to the unit and switch any two field wires at
the disconnect. Ensure proper rotation of the blower. DO
NOTalterunitwiring.Listenforanyunusualnoises.Locate
the source and correct as needed.
5. Allow the unit to run for several minutes. Set the
temperature selector above room temperature and
verify that the fan, blower, and compressors cycle off
with the thermostat.
SystemHeating
1. Set the thermostat to the lowest setting.
2. Follow the startup procedures on this page or the
operating instruction label inside the louvered control
access panel.
3. Set the thermostat above room temperature and verify
theOperatingSequence(page17).
CAUTION
Toavoidpersonalinjuryorpropertydamage,
makecertainthatthemotorleadsdonotmake
contactwithanyuninsulatedmetalcomponents
oftheunit.
Tochangetheblowerspeed:
1. Disconnect all electrical power to the unit and remove
the blower access panel.
2. Loosen the motor tension bars to allow removal of the
blower belt from the motor sheave.
3. Loosen top set screw on motor sheave and turn clockwise
toclose(increasesblowerspeed),orcounterclockwise
toopen(decreasesblowerspeed).
4. Replace belt on pulleys and position motor mounting
plate to correct position for proper belt tension.
5. Tighten tension bar bolts.
STARTUP & ADJUSTMENTS
Pre-StartCheckList
Verify unit is properly supported.
Verify unit is level for proper condensate drainage.
Verify all clearance requirements are met. Airflow to
and from the outdoor coil must be unrestricted.
Verify the ductwork is adequately sealed to prevent air
leakage. Insulate if necessary.
Verify the line voltage power leads are securely
connected and the unit is properly grounded.
Verify low voltage wires are securely connected to the
correct leads in the low voltage area of the control box.
Verify gas line pressure. For natural gas, the line pressure
mustnotexceed10.0inchesWC(0.36psig),orbeless
than5.5inchesWC(0.20psig).ForLPgas,theline
pressuremustnotexceed14inchesWC(0.51psig)
andmustnotbelessthan11.0inchesWC(0.40psig).
Verify the flame roll-out control is closed.
IMPORTANTNOTE:Thissafetydeviceisamanually
resetswitch.Ifnecessary,presstheredbuttonto
reset the control. DO NOT install a jumper wire
across the control to defeat its function. If the
controlreopensuponstart-up,DONOTresetthe
controlwithoutidentifyingandcorrectingthefault
conditionwhichcausedthecontroltotrip.
Verify the gas line has been purged and all connections
are adequately sealed. To check for gas leakage, see
Leak Check section on page 11.
Verify the indoor blower is properly set for the installation.
Verify the outdoor fan turns freely.
Verify the power supply branch circuit overcurrent
protection is properly sized.
Verify all exterior panels have been reinstalled and
securely fastened.
Verify the thermostat is wired correctly and preset for
initial operation. Set the thermostat system switch to
OFF and the fan switch to AUTO.
16
4. Verify that the compressor and outdoor fan motor are
not energized.
5. Run the unit and after approximately five minutes, set
the thermostat below room temperature. Verify the
shutdownsequence(seeOperatingSequence).
Verifying&AdjustingTemperatureRise
Verify the temperature rise through the unit is within the
range specified on the unit data label. Temperature rises
outside the specified range could result in premature heat
exchanger failure.
1. Place thermometers in the return and supply air stream
as close to the unit as possible. The thermometer on the
supply air side must be shielded against direct radiation
from the heat exchanger to avoid false readings.
2. Adjust all registers and duct dampers to the desired
position. Run the unit for 10 to 15 minutes before
taking any temperature readings. The temperature
rise is the difference between the supply and return air
temperatures.
NOTE: For typical duct systems, the temperature rise will
fallwithintherangespeciedonthedatalabel(withthe
blowerspeedatthefactoryrecommendedsetting)shown
in Table 16, page 40. If the measured temperature rise falls
outside the specified range, it may be necessary to change
the blower speed. Lowering the blower speed increases
the temperature rise and a higher speed decreases the
temperature rise.
The unit is equipped with a belt driven blower and variable
pitch motor sheave. The selection of a sheave setting
should be based on the desired CFM and the duct system
parameters.RefertotheACCA’sManualQforacomplete
description of how to determine these parameters and
Manual N for determination of the commercial load
requirements. The blower performance data can be found
inTables5-12(pages29-36).
The integrated control is designed to start the circulating air
blower 40 seconds after the gas valve opens and turn the
blower motor off 150 seconds after the gas valve is closed.
VerifyingBurnerOperation
WARNING:
Uninsulatedlivecomponentsareexposedwhen
thelouveredcontrolaccesspanelisremoved.
1. Remove the louvered control access panel to ensure
there is power to the unit.
2. Set the thermostat above room temperature and observe
the ignition sequence. The burner flame should carry
over immediately between all burners and should extend
from each burner without lifting off, curling, or floating.
The flames should be blue, without yellow tips.
3. After verifying flame characteristics, set the thermostat
below room temperature and verify that the burner flame
extinguishes completely.
VerifyingOperationofOver-Temperature
Limit Control
To verify operation of the over-temperature limit control,
make sure the louvered control access panel is in place
and that there is power to the unit.
1. Block the return airflow to the unit by installing a close-
off plate in place of or upstream of the filter.
2. Set the thermostat above room temperature and verify
the unit operates with the correct sequence of operation
(seeOperatingSequence).
NOTE: The over-temperature limit control should function
to turn off the gas valve within approximately four minutes
(exacttimedependsontheefciencyoftheclose-offwhen
blockingthereturnair).Thecirculatingairandcombustion
blowers should continue to run when the over-temperature
limit control switch opens.
3. Remove the close-off plate immediately after the over-
temperature limit control opens. If the unit operates
for more than four minutes with no return air, set the
thermostat below room temperature, shut off power to
the unit, and replace the over-temperature limit control.
Verifying&AdjustingFiringRate
The firing rate must be verified for each installation to
prevent over-firing of the unit.
CAUTION:
Donotre-drilltheburnerorices.Iftheorice
sizemustbechanged,useonlyneworices.
IMPORTANTNOTE:Theringratemustnotexceed
therate shownon the unit data label.Ataltitudes
above2,000ft.,itmustnotexceedthatonthedata
labelless4%foreach1,000ft.
Followthestepsbelowtodeterminetheunitringrate:
• Forinstallationsat2,000feetandless,theringrate
is the same as shown on the unit rating label.
• Forinstallationsabove2,000feet,computethering
rate as shown in the installation example on page 12.
1. Obtain the gas heating value from the gas supplier
(HHV).
2. Shut off all other gas fired appliances.
3. Start the unit in heating mode and allow it to run for at
least three minutes.
4.Measure the time (in seconds) required for the gas
meter to complete one revolution.
5. Convert the time per revolution to cubic feet of gas per
hourusingTable17(page41).
6. Multiply the gas flow rate in cubic feet per hour by the
heating value of the gas in Btu per cubic foot to obtain
theringrateinBtuperhour.SeeExample(page17):
7. Adjustments to the firing rate can be made by adjusting
the gas manifold pressure. See the High Altitude Deration
section(pages11&12)foradditionalinformationof
firing rate at elevations above 2000 ft.
17
Manifold Pressure Adjustment
The manifold pressure must be set to the appropriate
valueforyourinstallation.Toadjustthemanifoldpressure:
1. Obtain the required manifold pressure setting from
Table15(page40).NOTE: The values listed in the table
is based on sea level values. At higher altitudes, the
heating value of gas is lower than the sea level heating
value.
2. Remove the regulator cap. Turn the high fire
adjusting screw clockwise to increase the pressure or
counterclockwise to reduce the pressure.
3. Replace the regulator cap after adjustments are
complete.
RefrigerantCharging
WARNING:
Ifrepairsmakeitnecessaryforevacuationand
charging,itshouldonlybedonebyqualied,
trainedpersonnelthoroughlyfamiliarwiththis
equipment.Somelocalcodesrequirelicensed
installation/service personnel to service this
type of equipment. Under no circumstances
should the owner attempt to install and/or
servicethisequipment.
Failuretocomplywiththiswarningcouldresult
inpropertydamage,personalinjury,ordeath.
The R6 Series packaged gas/electric units are fully charged
at the factory and when installed accordingly, no charging
is required. The refrigerant charge can be checked and
adjusted through the service ports provided on the units.
Use only gauge lines which have a “Schrader” depression
device present to actuate the valve. Refer to Figures 17
-19(pages42-43)
Refrigerant charging must be done by qualified personnel
familiar with safe and environmentally responsible
refrigerant handling procedures. See Unit Rating Plate
for the proper type and amount of refrigerant.
Example:
• Timefor1revolutionofagasmeterwitha1
cubicfootdial=40seconds.
• FromTable17read90cubicfeetgasperhour.
• Localheatingvalueofthegas(obtainedfrom
gassupplier)=1,040Btupercubicfoot.
• Inputrate=1,040x90=93,600Btuh.
OPERATING SEQUENCE
The operating sequences for the heating, cooling, and fan
modes are described below. Refer to the wiring diagrams
(Figures15&16,pages38&39).
Cooling Mode
1. On a call for cooling the thermostat closes, applying 24
VAC to Y1, G, & Y2 if Stage 2 cooling is calling.
2. G applies 24VAC to the main circulating blower circuit.
3. Y1 & Y2 apply 24VAC through all safety switches before
energizing their respective contactors.
4. When the thermostat is satisfied the contactors are
de-energized.
5. The circulating blower motor de-energizes immediately.
Heating Mode
1. On a call for heat, the thermostat closes, applying 24
VAC to the W1terminal(andW2 terminal if Stage 2
heatisrequired).
2. The integrated control monitors the safety circuit at all
times. If either the roll-out switch or the over-temperature
limit controls open, the gas valve will not energize.
The main blower continues to operate until the over-
temperature limits close, the flame roll-out switch is
manually reset, or the thermostat is satisfied.
3. The integrated control checks all safety switches at
the beginning of each heating cycle. If closed, the
combustion blower performs a 10 second pre-purge.
4. The integrated control will then supply power to the
direct spark ignitor and immediately energizes the gas
valve.
NOTE: Burner operation begins in high fire mode
with both Stage 1 and Stage 2 gas valve energized,
independent of the thermostat call for Stage 2 heat. If
after 30 seconds of operation with no call for Stage 2
heat, the integrated control will resume heating operation
in low fire mode of operation and Stage 2 gas valve is
de-energized.
5. The flame must be proven through the flame sensor in
10 seconds to hold the gas valve open. The integrated
control will monitor the gas flame with the flame sensor
for the entire time the gas valve is open. If for any reason
the gas flame drops out, the gas valve will immediately
close. After 30 second purge, the integrated control will
try to ignite fourteen more times.
6. The main air blower will start and continue to run 40
seconds after the gas valve opens.
7. When the thermostat is satisfied, the integrated control is
de-energized. The gas valve and combustion blower de-
energize immediately while the main air blower continues
to run through the blower off delay of approximately 150
seconds.
8. If the unit fails to prove flame after fifteen ignition
attempts, it will go into a soft lockout. The unit will re-
18
attempt the start-up procedure every hour until the
thermostat is satisfied or 24 VAC power is removed
from the unit for a minimum period of 5 seconds. NOTE:
SeeTroubleshootingsection(page21)foracomplete
list of heating operation fault codes.
BlowerMode
1. On a call for fan operation, the thermostat applies 24
VAC directly to the blower contactor.
2. The circulating blower is energized immediately.
UNIT MAINTENANCE
ELECTRICAL SHOCK, FIRE OR EXPLOSION
HAZARD
Failuretofollowsafetywarningsexactlycould
resultinseriousinjuryorpropertydamage.
Improper servicing could result in dangerous
operation, serious injury, death or property
damage.
• Before servicing, disconnect all electrical
powertofurnace.
• Whenservicingcontrols,labelallwiresprior
todisconnecting.Reconnectwirescorrectly.
• Verifyproperoperationafterservicing.
WARNING:
RISQUEDECHOCÉLECTRIQUE,D’INCENDIE
OUD’EXPLOSION
Le non-respect des avertissements de sécurité
pourrait entraîner
unfonctionnementdangereux
del’appareil,
desblessuresgraves,lamortou
des dommages matériels.
Un entretein incorrect pourrait entraîner un
fonctionnementdangereuxdel’appareil,des
blessuresgraves,lamortoudesdommages
matériels
• Couper toute alimentation électrique au
générateurd’airchaudavantdeprodéder
auxtravauxd’entretein.
• Aumomentdel’entretiendescommandes,
étiqueteztousleslsavantdelesdébrancher.
S’assurerdelesraccordercorrectement.
S’assurer que l’appareil fonctionne
adéquatementaprésl’entretien.
AVERTISSEMENT:
NOTE: These maintenance instructions are primarily
intended to assist qualified technicians experienced in
the proper maintenance and operation of this appliance.
To achieve optimum performance from the air conditioner
and minimize equipment failure, it is recommended that
periodic maintenance be performed on this unit. The
ability to properly perform maintenance on this equipment
requires certain mechanical skills and tools. Please consult
your dealer for maintenance information and availability
of maintenance contracts.
Routine Maintenance
Please consult your dealer for maintenance information
and availability of maintenance contracts.At a minimum,
routinemaintenanceshouldincludethefollowingitems:
CAUTION:
Usecarewhenremovingpartsfromthisunit.
Personal injury can result from sharp metal
edgespresentinallequipmentofsheetmetal
construction.
Air Filters
WARNING:
Neveroperatetheunitwithoutltersinplace.
Dust and lint in the return air can build up
on internal components, resulting in loss of
efciency,equipmentdamage,andpossiblere.
It is recommended that the air filters be inspected and
cleaned or replaced every three to four weeks using filters
of likesizeandkind.Table1 (page 8) lists the factory
installed filter sizes and quantities for each unit.
IMPORTANTNOTE:R6GPunitsareequippedwith2”
pleateddisposablelters.Filterrackisadjustablefor
1”permanenttypelters.DONOTuse1”disposable
lters.
Blower Compartment
Build up of dirt and lint on the blower and motor can create
excessive loads on the motor resulting in higher than
normal operating temperatures and possible shortened
service life. It is recommended that the blower compartment
be cleaned monthly during heating and cooling seasons
to remove any dirt and lint that may have accumulated in
the compartment or on the blower and motor. Inspect the
blower drive belt for cracks, excessive wear and proper
tension after cleaning the compartment.
Condensate Drain & Outdoor Coil
Inspect the condensate drain and outdoor coil at the
beginning of each cooling season. Remove any debris.
Cleantheoutdoorcoilandhailguardlouvers(optional)
as necessary using a mild detergent and water. Rinse
thoroughly with water.
19
Electrical
WARNING:
Thisunit mayhavemore than oneelectrical
supply.Toavoidriskofelectricalshock,personal
injury,ordeath,disconnectallelectricalpower
totheunitbeforeperforminganymaintenance
or service.
CAUTION:
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
Inspect the electrical connections for tightness at the
beginning of each heating and cooling season. Service
as necessary.
Motor / Bearing Lubrication
WARNING:
Lubrication of the motors in this unit is not
required. Do not lubricate any motor in this
product.
• Theblowerassemblyinthisunitisequippedwithtwo
support bearings. The support bearings are sealed
cartridge units and require no further lubrication.
• Theindoorblowermotorispre-lubricatedatthefactory
and does not require additional lubrication.
• Thecombustionairblowermotorandoutdoorfanmotors
are equipped with pre-lubricated sealed ball bearings.
Nofurtheroilingisrequiredforthelifeofthisproduct
Heat Exchanger & Burner Maintenance
WARNING:
Holesintheheatexchangercancauseproducts
ofcombustiontoenterthestructure.Replace
theheatexchangerifleaksarefound.Failure
topreventproductsofcombustionfrombeing
circulatedintotheoccupiedspacecancreate
potentially hazardous conditions including
carbonmonoxidepoisoningthatcouldresult
inpersonalinjuryordeath.
The unit should operate for many years without excessive
scale buildup in the heat exchanger, however, the heat
exchanger, the vent system, and the burners should be
inspectedandcleaned(ifrequired)byaqualiedtechnician
annually to ensure continued safe operation. Particular
attention must be given to identify deterioration from
corrosion or other sources.
Vent Cover Assembly
Inspect and clean the screen of the vent cover assembly
at the beginning of each heating and cooling seasons.
Cleaning of Burners
It is recommended that the burners be inspected and
cleanedperiodically(ifrequired)byaqualiedtechnician
annually to ensure continued safe operation. Particular
attention must be given to identify deterioration from
corrosion or other sources. If the burners must be cleaned,
follow the steps below.
1. Shut off the gas supply to the unit either at the meter
or at a manual valve in the supply piping.
2. Turn off all power to the unit and set the thermostat to
the lowest temperature setting.
3. Remove the louvered access panel from the unit.
4. Turn the gas control knob to the “OFF” position.
CAUTION:
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
5. Disconnect the wires from the gas valve, ignitor, and
flame sensor.
6. Using two wrenches, separate the ground-joint union
in the gas supply piping at the unit.
7. Remove the piping between the gas valve and the
ground-jointunion(ifnecessary).
8. Remove four screws securing the burner assembly to
the unit.
9. Carefully remove the burner assembly from the unit.
DO NOT DAMAGE THE IGNITOR WHILE REMOVING
THE BURNER ASSEMBLY.
10. Inspect the burners for accumulated dust or debris.
If necessary, carefully clean them with a soft wire
brush and/or the nozzle of a vacuum cleaner. DO
NOT DAMAGE THE IGNITOR OR FLAME SENSOR
WHILE CLEANING THE BURNER.
11. Replace all the parts in reverse order from which they
were removed.
12. Follow the lighting instructions found on the right
side door to return the unit to operation. Verify proper
operation after servicing.
CleaningofHeatExchanger
If the heat exchanger must be cleaned due to soot or
scale build up, follow the steps below.
1. Shut off the gas supply to the unit either at the meter
or at the manual valve in the gas supply piping.
2. Turn off all power to the unit and set the thermostat to
the lowest temperature setting.
20
WARNING:
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
3. Disconnect the wires from the gas valve, ignitor, and
flame sensor.
4. Using two wrenches, separate the ground-joint union
in the gas supply piping at the unit.
5. Remove the piping between the gas valve and the
ground-joint union, if necessary.
6. Remove the four screws securing the burner assembly
to the unit.
7. Carefully remove the burner assembly from the unit. DO
NOT DAMAGE THE IGNITOR OR FLAME SENSOR
WHILE REMOVING THE BURNER ASSEMBLY.
8. Remove three nuts securing the combustion blower to
the collector pan.
9. Remove the complete combustion blower from the unit.
10. Remove the screws securing the collector box cover
to the unit and remove cover plate.
11. Remove the screws securing the balance plate to the
collector box and the balance plate.
12. Remove the turbulator from each heat exchanger tube.
13. Attach a round wire brush to a length of high grade
stainless steel cable, such as drain cleanout cable.
Attach the other end of the spring cable to a variable
speed reversible drill. Slowly insert and rotate the cable
into the top portion of the heat exchanger. Operate the
drill alternating between forward and reverse, working
the cable in and out several times to obtain sufficient
cleaning. Repeat this sequence for each heat exchanger
tube.
14. Remove all loosened debris from the heat exchanger
tubes using a vacuum cleaner.
15. Using a light, check the condition of the upper and
lower sections of the heat exchanger tube.
16. Inspect the burners and if necessary, clean them
carefully with a soft wire brush and/or the nozzle of a
vacuum cleaner. DO NOT DAMAGE THE IGNITOR OR
FLAME SENSOR WHILE CLEANING THE BURNER.
17. Replace all the parts in reverse order from which they
were removed. NOTE: If screws or other hardware are
corroded, replace only with corrosion resistant stainless
steel hardware of similar design.
18. Follow the operating instructions found on the right
side door and the User’s Information Manual to return
the unit to operation.
High Pressure Switch - This factory installed switch
is designed to de-energize the unit when excessive
pressure occurs due to abnormal conditions. Under normal
conditions, the switch is closed. If the discharge pressure
rises above 650 psig, then the switch will open and de-
energize the outdoor unit. The switch is a manually reset
type and will remain open until the button on top of the
switch is depressed.
IndoorCoilFreezeProtectionThermostats - The freeze
protection switches are designed to protect the indoor
coils from ice and frost accumulations in the event of a
loss of airflow by preventing the liquid refrigerant from
reaching the compressors. During normal operation, the
switches are closed and will open if the coil temperature
reaches28°F(-2°C).Theswitcheswillcloseifthecoil
temperaturereaches57°F(12°C).
LowPressureSwitch - This factory installed switch is
designed to protect the compressor from a loss of charge.
Under normal conditions, the switch is closed. If the suction
pressure falls below 5 psig, then the switch will open and
de-energize the outdoor unit. The switch will close again
once the suction pressure increases above 20 psig.
Over-Temperature Limit Control - The over-temperature
limit control acts to prevent the air temperature leaving the
unit from exceeding the maximum outlet air temperature.
If the limit opens, the blower limit relay will energize. The
circulating air blower and combustion blower will continue
to operate if the over-temperature limit control opens.
The descriptions below are various functional components
that affect the operation and shutting down of this unit.
Some of these components and their locations are shown
inFigure11(page21).
If any component on this unit must
be replaced, use only factory authorized replacement parts
specified in the Replacement Parts List provided online.
CentrifugalSwitch - The centrifugal switch acts to verify
that the inducer motor is running. Combustion gases are
drawn through the heat exchanger tubes and vented
through the vent system.
Flame Roll-Out Control - The flame roll-out control acts
to verify that the burner flame is being drawn into the heat
exchanger tubes. If the burner flame is not being drawn
into the heat exchanger tubes, the roll-out control will
open within several seconds. The combustion blower will
continue to operate if the flame roll-out control opens until
it is manually reset.
Flame Sensor - The flame sensor acts to prove that flame
has carried over from the ignitor to the right-most burner. If
no flame is sensed, the unit will be shut down automatically
and attempt two additional ignition trials before going into
lockout. Recovery from lockout requires a manual reset
by either resetting the thermostat or removing 24 volts
for a period of 5 seconds. If the thermostat is still calling
for heat after one hour the control will automatically reset
and attempt to ignite the burner again.
Gas Valve - The gas valve controls the flow of gas to
the burners in both low and high fire. When the valve is
energized, it automatically opens and regulates the gas
pressure to the manifold.
COMPONENT FUNCTIONS
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48

Unbranded R6GP 6, 7.5 - 10 Ton Archived 2/23/12 Guide d'installation

Taper
Guide d'installation
Ce manuel convient également à