Easy installation in both
new construction and retrofit
Table of Contents
Warnings and Cautions 2
Typical Installation 2
New Construction Installation 3
Retrofit Installation 7
Operation 12
Cleaning and Maintenance 12
Troubleshooting 12
Service Parts 13
Warranty 13
© 2017 Broan
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 2
WARNING
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR
INJURY TO PERSONS, OBSERVE THE FOLLOWING:
1. Use this unit only in the manner intended by the manufacturer.
If you have questions, contact the manufacturer at the address
or telephone number listed in the warranty.
2. Before servicing or cleaning unit, switch power off at service
panel and lock the service disconnecting means to prevent
power from being switched on accidentally. When the service
disconnecting means cannot be locked, securely fasten a
prominent warning device, such as a tag, to the service panel.
3. Installation work and electrical wiring must be done by a
qualified person(s) in accordance with all applicable codes
and standards, including fire-rated construction codes and
standards.
4. Sufficient air is needed for proper combustion and exhausting
of gases through the flue (chimney) of fuel burning equipment
to prevent backdrafting. Follow the heating equipment
manufacturer’s guideline and safety standards such as those
published by the National Fire Protection Association (NFPA),
and the American Society for Heating, Refrigeration and
Air Conditioning Engineers (ASHRAE), and the local code
authorities.
5. When cutting or drilling into wall or ceiling, do not damage
electrical wiring and other hidden utilities.
6. Ducted fans must always be vented to the outdoors.
7. Use only ON/OFF switch, mechanical timer or relay-switched
control.
8. Acceptable for use over a tub or shower when connected to
a GFCI (Ground Fault Circuit Interrupter) - protected branch
circuit.
9. This unit must be grounded.
Typical Installation
CAUTION
1. For general ventilating use only. Do not use to exhaust
hazardous or explosive materials and vapors.
2. This product is designed for installation in ceilings up to a
12/12 pitch (45 degree angle). Duct connector must point up.
DO NOT MOUNT THIS PRODUCT IN A WALL.
3. To avoid motor bearing damage and noisy and/or unbalanced
impellers, keep drywall spray, construction dust, etc. off power
unit.
4. Please read specification label on product for further
information and requirements.
45° 45°
• Installation is the same for:
• Fits in 2" x 8" ceiling construction.
• Infinitely adjust the fan position
between joists from 14" to 24"
on center.
• Do not install this fan in a ceiling
thermally insulated to a value
greater than R40.
*Purchase
separately.
INSULATION*
(Place around and
over Fan Housing.)
ROOF CAP*
(with built-in
damper)
FAN
HOUSING
POWER
CABLE*
ROUND
DUCT*
ROUND
ELBOWS*
Seal gaps
around
Housing.
Seal duct
joints with
tape.
OR
Keep duct
runs short.
WALL CAP*
(with built-in
damper)
NOT FOR USE IN A COOKING AREA
Do not install above or inside this area
Floor
Cooking
Equipment
Joists I-Joists Trusses
The ducting from this fan to the outside of the building has a strong effect on the air flow, noise and en-
ergy use of the fan. Use the shortest, straighest duct routing possible for best performance, and avoid
installing the fan with smaller ducts than recommended. Insulation around the ducts can reduce en-
ergy loss and inhibit mold growth. Fans installed with existing ducts may not achieve their rated airflow.
6-inch round rigid metal duct is recommended for best performance.
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 3
1
2
3
4
Parts Bag holds
Knockout Plate
and six (6)
screws
Remove
Instruction
Sheet
Punch out Mask from
packaging. See Step 6.
New Construction Installation
Tools needed
Power screwdriver with a Phillips bit
Phillips screwdriver
Flathead screwdriver
• Pliers
Wire insulation stripper
Wire cutter
Materials needed
6" round metal ducting recommended for best performance.
Use of other ducting is acceptable but may impact performance.
Roof cap or wall cap (built-in damper recommended)
Tape to seal duct connections
Electrical wiring and supplies per local code requirements
1
Remove Packaging
2
Install
Mounting
Frame
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 4
3
1
4
2
1
2
3
New Construction Installation
3
Snap-in and
Secure Housing
4
Attach Duct Connector and Ducting
Position Housing
between joists and
crimp channel on both
sides of Mounting Frame
to lock Housing in place.
Do not crimp Housing.
Screws from Parts Bag
Top and bottom flanges
go outside Housing
Insert tab into slot
inside Housing
Screw from
Parts Bag
6" to 4" Reducer provided in select models
Tape
Tape
Tape
6" Ducting
4" Ducting
snap!
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 5
3
4
1
2
New Construction Installation
5
Connect Wires and Install Knockout Plate
Run 120VAC electrical wiring to the installation location.
Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag.
Connect wires as shown in wiring diagram.
Screw from
Parts Bag
Attach cable clamps to
Knockout Plate. Knockout
Plate mounts to outside of
Housing and may be
oriented as desired.
Connect wires
LINE
IN
GRD
WHT
BLK
GRD
WHT
WHT
WHT
BLK
RED BLU
RED
BLK
LIGHT
SWITCH
FAN
SWITCH
FAN
LIGHT
UNITSWITCH BOX
LINE
IN
GRD
WHT
BLK
GRD
WHT
WHT
WHT
BLK
RED BLU
RED
BLK
DIMMER
SWITCH
FAN
SWITCH
FAN
LIGHT
UNITSWITCH BOX
LIGHT WITH ON/OFF SWITCH
LIGHT WITH DIMMER SWITCH
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 6
1
2
3
1
1
2
3
1
New Construction Installation
6
Insert Mask and
Finish Ceiling
7
Install Grille
See Page 12 for Operations, Cleaning and Maintenance, and Troubleshooting.
Mask protects unit
during construction.
Remove before
installing Grille.
Install ceiling material.
Cut out around Housing.
CAUTION
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plugs into control assembly.
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE:
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 7
12" (30.5 cm)
1
2
Retrofit Installation
Parts Bag holds
Knockout Plate
and six (6)
screws
Existing ductwork and
wiring left in place
11" (27.9 cm)
parallel with joists
Examine the existing wiring to make sure it is not damaged. If any damage is found,
DO NOT CONTINUE INSTALLATION of this product. Contact a qualified person(s) for repair.
Remove
Instruction
Sheet
Punch out Mask from
packaging. See Step 12.
1
Remove Packaging
2
Switch Off Power
4
Examine Wiring
3
Enlarge Ceiling Opening and Remove Existing Fan
• Ruler
• Pencil
Drywall saw
Claw hammer or pry bar
Utility knife
Materials needed
Tape to seal duct connections
Existing rigid duct will require the
addition of a short length of flexible duct
Electrical wiring and supplies per
local code requirements
Tools needed
Power screwdriver with a Phillips bit
Phillips screwdriver
Flathead screwdriver
• Pliers
Wire insulation stripper
Wire cutter
WARNING
Before removing existing fan, switch power off at service panel and lock the service disconnecting
means to prevent power from being switched on accidentally. When the service disconnecting means
cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 8
2
1
2
3
4
5
1
1
2
3
3
Retrofit Installation
5
Remove Blower Assembly
6
Remove Wiring Panel
7
Insert
Mounting
Frame
Both sides
Set aside
Blower
Assembly
Set aside
Wiring Panel
Set aside
screw
Bend up
four tabs
Remove screws from
Mounting Frame
and set aside
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 9
1
2
2
1
3
4
Retrofit Installation
Screw from
Parts Bag
Screws set
aside
in Step 7
Pull existing wiring into
Housing as it is inserted
into Mounting Frame
Pull existing
ductwork
into Housing
Insert tab into
slot inside
Housing
10
Attach Ducting and Duct Connector
8
Secure
Mounting
Frame
9
Snap-in Housing
snap!
6" to 4" Reducer provided in select models
Tape
Tape
Tape
6" Ducting
4" Ducting
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 10
2
1
4
5
6
3
Retrofit Installation
11
Install Knockout Plate, Connect Wires and Reinstall Wiring Panel
Screw from
Parts Bag
Attach cable
clamps to
Knockout Plate.
Knockout Plate
mounts to inside of
Housing and may
be oriented
as desired.
Connect wires
Screw set
aside in
Step 6
Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag.
Connect wires as shown in wiring diagram.
LINE
IN
GRD
WHT
BLK
GRD
WHT
WHT
WHT
BLK
RED BLU
RED
BLK
LIGHT
SWITCH
FAN
SWITCH
FAN
LIGHT
UNITSWITCH BOX
LINE
IN
GRD
WHT
BLK
GRD
WHT
WHT
WHT
BLK
RED BLU
RED
BLK
DIMMER
SWITCH
FAN
SWITCH
FAN
LIGHT
UNITSWITCH BOX
LIGHT WITH ON/OFF SWITCH
LIGHT WITH DIMMER SWITCH
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 11
1
2 3
1
2
3
1
Retrofit Installation
12
Reinsert and Secure Blower Assembly
13
Install Grille
If ceiling repairs are needed, place Mask in Housing
after Blower Assembly is secured. See New Construction
Installation Step 6. Remove Mask before installing Grille.
Screws from Parts Bag
CAUTION
Power must be disconnected (see page 2, WARNING item 2) before inserting motor plugs into control assembly.
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE:
1
2 3
1
2
3
1
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 12
WARNING Before servicing or cleaning unit,
switch power off at service panel and lock the service
disconnecting means to prevent power from being
switched on accidentally. When the service disconnecting
means cannot be locked, securely fasten a prominent
warning device, such as a tag, to the service panel.
Operation
To Operate Fan
Use an ON/OFF switch to operate this ventilator.
It is normal for this ventilation fan to take approximately 5
seconds to start running after it is turned on.
To Operate Lights
The fan and light can be operated independently, using
separate switches. The light may be operated with a
dimmer switch. See wiring diagrams.
Cleaning and Maintenance
To Clean
For quiet and efficient operation, long life and attractive
appearance, remove Grille and vacuum interior of unit
with a dusting brush attachment.
The Motor is permanently lubricated and never needs
oiling. If the motor bearings are making excessive or
unusual noises, replace the Control Assembly and Motor.
CAUTION
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE:
DO NOT remove motor plug to stop spinning motor.
Power must be disconnected (see WARNING above) before
motor plug is removed or inserted into control assembly.
Troubleshooting
Symptom: The fan does not run.
Check for an open fuse or circuit breaker in the building’s
service panel.
Check that the two (2) plug-in connections for the Motor
and the Control are seated firmly in place.
Check that the Blower Wheel spins freely.
Symptom: The fan runs erratically.
Check that the Blower Wheel is firmly attached to the
Motor shaft and both spin freely.
Symptom: The fan seems noisy.
Check that the back draft damper in the fans Duct
Connector pivots freely. Screws used to attach the duct to
the Duct Connector may be preventing the damper from
opening.
• Check that the back draft damper in the wall or roof cap
pivots freely. These dampers are sometimes mistakenly
painted shut or obstructed by bird and insect debris..
XB50L1
n
XB80L1
n
XB110L1 Installation Guide
Page 13
5
10
12
1
3
6
7
4
8
9
11
13
2
Service Parts
Order replacement
parts by Part No.,
not by Key No.
Key No. Part No. Description
1 97018349 Mounting Frame
2 97018721 Knockout Plate & Screws
3 97018382 Housing
4 97020893 Wiring Panel/Harness Assembly
5 97020849 Control Assembly & Motor (XB50L1)
97020848 Control Assembly & Motor (XB80L1)
97020847 Control Assembly & Motor (XB110L1)
6 97018331 Duct Connector - 6"
7 99111513
6" to 4" Reducer (models XB50L1 and XB80L1 only)
8 99020301 Blower Wheel
9 97019371 Scroll Assembly (XB50L1, XB80L1)
97018768 Scroll Assembly (XB110L1)
10 97020827 Grille Assembly (includes 11, 12)
11 99140208 Grille Spring (2 req’d)
12 99111711 Lens (2 req’d)
13 99271625 LED Driver
Broan Ventilation Fan/Lights Limited Warranty
WARRANTY PERIOD: Broan warrants to the original consumer purchaser of its
Broan Ventilation Fan/Light (the “Fan”) that your Fan (excluding lamps/bulbs) will
be materially free from defects in materials or workmanship for a period of three
(3) years from the date of original purchase. The warranty on the lamps/bulbs
provided with the Fan is one (1) year and does not cover lamp/bulb breakage.
This warranty does not cover accessories, such as speed controls, that may be
purchased separately and installed with the Fan.
The limited warranty period for replacement parts, and for Fans repaired or
replaced under this limited warranty, shall continue for the remainder of the
original warranty period.
NO OTHER WARRANTIES: THE FOREGOING WARRANTIES ARE
EXCLUSIVE AND IN LIEU OF ANY OTHER WARRANTIES, EXPRESS OR
IMPLIED. BROAN DISCLAIMS AND EXCLUDES ALL OTHER EXPRESS
WARRANTIES, AND DISCLAIMS AND EXCLUDES ALL WARRANTIES
IMPLIED BY LAW, INCLUDING WITHOUT LIMITATION THOSE OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. TO THE
EXTENT THAT APPLICABLE LAW PROHIBITS THE EXCLUSION OF IMPLIED
WARRANTIES, THE DURATION OF ANY APPLICABLE IMPLIED WARRANTY
IS LIMITED TO THE PERIOD SPECIFIED FOR THE EXPRESS WARRANTY.
Some states do not allow limitations on how long an implied warranty lasts, so
the above limitation may not apply to you. Any oral or written description of the
Fan is for the sole purpose of identifying it and shall not be construed as an
express warranty.
REMEDY: During the applicable limited warranty period, Broan will, at its
option, provide replacement parts for, or repair or replace, without charge,
any Fan or part thereof, to the extent Broan finds it to be covered by and in
breach of this limited warranty. Broan will ship the repaired or replaced Fan
or replacement parts to you at no charge. You are responsible for all costs for
removal, reinstallation and shipping, insurance or other freight charges incurred
in the shipment of the Fan or part to Broan. This warranty does not cover (a)
normal maintenance and service, (b) normal wear and tear, (c) any Fans or
parts which have been subject to misuse, abuse, abnormal usage, negligence,
accident, improper or insufficient maintenance, storage or repair (other than
repair by Broan), (d) damage caused by faulty installation, or installation or use
contrary to recommendations or instructions, (e) any Fan that has been moved
from its original point of installation, (f) damage caused by environmental or
natural elements, (g) damage in transit, (h) natural wear of finish, (i) Fans in
commercial or nonresidential use, or (j) damage caused by fire, flood or other
act of God. This warranty covers only Fans sold in the United States or through
U.S. distributors authorized by Broan.
EXCLUSION OF DAMAGES: BROAN’S OBLIGATION TO PROVIDE
REPLACEMENT PARTS, OR REPAIR OR REPLACE, AT BROAN’S OPTION,
SHALL BE YOUR SOLE AND EXCLUSIVE REMEDY UNDER THIS LIMITED
WARRANTY AND BROAN’S SOLE AND EXCLUSIVE OBLIGATION. BROAN
SHALL NOT BE LIABLE FOR INCIDENTAL, INDIRECT, CONSEQUENTIAL OR
SPECIAL DAMAGES ARISING OUT OF OR IN CONNECTION WITH THE FAN,
ITS USE OR PERFORMANCE. Incidental damages include but are not limited
to such damages as loss of time and loss of use. Consequential damages
include but are not limited to the cost of repairing or replacing other property
which was damaged if the Fan does not work properly.
Some states do not allow the exclusion or limitation of incidental or
consequential damages, so the above limitation or exclusion may not apply to
you. This warranty gives you specific legal rights, and you may also have other
rights, which vary from state to state.
This warranty supersedes all prior warranties and is not transferable from the
original consumer purchaser.
BROAN SHALL NOT BE LIABLE TO YOU, OR TO ANYONE CLAIMING UNDER
YOU, FOR ANY OTHER OBLIGATIONS OR LIABILITIES, INCLUDING, BUT
NOT LIMITED TO, OBLIGATIONS OR LIABILITIES ARISING OUT OF BREACH
OF CONTRACT OR WARRANTY, NEGLIGENCE OR OTHER TORT OR ANY
THEORY OF STRICT LIABILITY, WITH RESPECT TO THE FAN OR BROAN’S
ACTS OR OMISSIONS OR OTHERWISE.
This warranty covers only replacement or repair of defective Fans or parts
thereof at Broan’s main facility and does not include the cost of field service
travel and living expenses.
Any assistance Broan provides to or procures for you outside the terms,
limitations or exclusions of this limited warranty will not constitute a waiver of
such terms, limitations or exclusions, nor will such assistance extend or revive
the warranty.
Broan will not reimburse you for any expenses incurred by you in repairing or
replacing any defective Fan, except for those incurred with Broan’s prior written
permission.
HOW TO OBTAIN WARRANTY SERVICE: To qualify for warranty service, you
must (a) notify Broan at the address or telephone number stated below within
seven (7) days of discovering the covered defect, (b) give the model number and
part identification and (c) describe the nature of any defect in the Fan or part.
At the time of requesting warranty service, you must present evidence of the
original purchase date.
Broan, 926 West State Street, Hartford, WI 53027
(1-800-637-1453)
www.broan.com
If you must send the Fan or part to Broan, as instructed by Broan, you must
properly pack the Fan or part—Broan is not responsible for damage in transit.
Warranty
99045908A
XB50L1
n
XB80L1
n
XB110L1
X1 | Ventilador para ventilación
con una única velocidad,
con iluminación regulable
GUÍA PARA LA INSTALACIÓN
LEA Y CONSERVE ESTAS INSTRUCCIONES
Instalador: entregue esta guía al dueño de casa.
Registre su producto en línea en el sitio www.broan.com/register.
Instalación sencilla tanto en
construcciones nuevas como
en modernizaciones
Tabla de contenido
Advertencias y precauciones 2
Instalación típica 2
Instalación en una construcción nueva 3
Instalación en modernizaciones 7
Funcionamiento 12
Limpieza y mantenimiento 12
Identificación y solución de fallas 12
Repuestos 13
Garantía 13
XB50L1
n
XB80L1
n
XB110L1 Guía para la instalación
Página 2
ADVERTENCIA
PARA REDUCIR EL RIESGO DE INCENDIO, SHOCK ELÉCTRICO
O DAÑOS A LAS PERSONAS, RESPETE LAS SIGUIENTES
INSTRUCCIONES:
1. Utilice esta unidad sólo para el uso que describe el fabricante.
Si tiene alguna pregunta, comuníquese con el fabricante a la
dirección o al número de teléfono que aparece en la garantía.
2. Antes de realizar el servicio o de limpiar la unidad, corte el
suministro eléctrico en el panel de servicio y bloquee el servicio
desconectando los medios que evitan que se conecte la energía
en forma accidental. Cuando no se puedan bloquear los medios
que desconectan el servicio, coloque un dispositivo de alarma
importante, como por ejemplo una etiqueta, en el panel de
servicio.
3. Las tareas de instalación y el cableado eléctrico deben ser
realizados por una persona/personas calificada/s según lo
establecen todos los códigos y las normas aplicables, entre los
que se incluyen códigos y normas para las construcciones con
calificación contra incendios.
4. Se requiere suficiente aire para una correcta combustión y escape
de gases a través del regulador de tiro (chimenea) del equipo
que funciona a combustible para evitar contracorrientes. Siga las
indicaciones del fabricante del equipo de calefacción y las normas
de seguridad como las publicadas por la Asociación Nacional de
Protección contra Incendios (NFPA) y la Sociedad Estadounidense
de Ingenieros en Calefacción, Refrigeración y Aire Acondicionado
(ASHRAE) y las autoridades locales regulatorias.
5. Al cortar o perforar las paredes o los techos, no dañe el cableado
eléctrico u otros servicios que no se encuentran a la vista.
6. Los ventiladores conectados a conductos siempre deben tener
ventilación hacia el exterior.
7. Use solamente un interruptor de ENCENDIDO/APAGADO, un
temporizador mecánico o un control de relé-interruptor.
8. La unidad sólo debe conectarse a un circuito de alimentación
protegido por un interruptor de circuito para fallas con conexión a
tierra (ICFT).
9. Esta unidad debe estar conectada a tierra.
Instalación típica
PRECAUCIÓN
1. Sólo debe utilizarse para ventilación general. No utilizar para
ventilar materiales y vapores peligrosos o explosivos.
2. Este producto está diseñado para instalarse en techos con
una pendiente de hasta 12/12 (ángulo de 45 grados).
El conector del conducto debe estar orientado hacia arriba.
NO MONTAR ESTE PRODUCTO SOBRE LA PARED.
3. Para evitar daños en los cojinetes del motor y/o impulsores
desbalanceados y ruidosos, mantenga el rociado para los
paneles de yeso, el polvo de la construcción, etc., lejos de la
unidad eléctrica.
4. Lea la etiqueta con las especificaciones del producto para
obtener más información y conocer los requisitos.
45° 45°
La instalación es similar para:
Se adapta a la construcción de un
techo de 5 cm x 20 cm (2 x 8 pulg.)
Ajustar sin límite la posición del
ventilador entre las vigas a una
distancia de 35,5 cm a 61 cm
(14 a 24 pulg.) del centro.
NO UTILIZAR EN UN ÁREA DONDE SE COCINA
No instalar sobre o dentro de esta área
Piso
Artefacto para
cocinar
Vigas Vigas en Cerchas
forma de I
*Comprar por separado.
AISLACIÓN*
(Colocar alrededor y sobre
el compartimiento para el ventilador).
CAPUCHÓN
PARA TEJADO*
(con regulador
de tiro
incorporado)
VENTILADOR
COMPARTIMIENTO
CABLE DE
ALIMENTACIÓN*
CONDUCTO
CIRCULAR*
CODOS
CIRCULARES*
Sellar las
cavidades
alrededor del
compartimiento.
Sellar las uniones
del conducto
con cinta.
O
Asegurarse
de que los
conductos
sean cortos.
CAPUCHÓN
DE PARED*
(con regulador
de tiro incorporado)
Los conductos desde este ventilador hacia el exterior del edificio tienen un gran efecto sobre el flujo de aire, el ruido y el uso de energía
del ventilador. Utilice el tramo de conductos más corto y recto posible para obtener un desempeño óptimo y evite instalar el ventilador
con conductos menores que los recomendados. El aislamiento alrededor de los conductos puede reducir la pérdida de energía e inhibir
el desarrollo de moho. Los ventiladores instalados en conductos existentes podrían no obtener el flujo de aire nominal.
Para un mejor desempeño, se recomienda utilizar conductos metálicos redondos y rígidos de 6 pulg. (15.2 cm).
XB50L1
n
XB80L1
n
XB110L1 Guía para la instalación
Página 3
1
2
3
4
La bolsa de las
piezas contiene
una placa
metálica y seis
(6) pernos
Retire la hoja de
instrucciones
Retire la máscara del
envase. Consulte el Paso 6.
Instalación en una construcción nueva
Herramientas necesarias
Destornillador eléctrico con punta Phillips
Destornillador Phillips
Destornillador de cabeza plana
• Pinza
Pelacable para la aislación de los cables
Pinza cortacable
Materiales necesarios
Conducto circular de metal de 6 pulg. recomendado para un mejor
rendimiento.
Se acepta el uso de otro tipo de conducto pero esto puede afectar el rendimiento.
Capuchón para tejado o de pared (se recomienda utilizar uno con regulador
de tiro incorporado)
Cinta para sellar las conexiones de los conductos
Cables y accesorios eléctricos en cumplimiento de la normativa local
1
Retire el envase
2
Instale
el bastidor
de montaje
XB50L1
n
XB80L1
n
XB110L1 Guía para la instalación
Página 4
3
1
4
2
1
2
3
Instalación en una construcción nueva
3
Coloque el
compartimiento
a presión
y asegúrelo
4
Fije el conector del conducto y los conductos
Ubique el compartimiento
entre las vigas y ajuste el
canal a ambos lados del
bastidor de montaje para
que el compartimiento
quede asegurado
en su lugar.
No ajuste el
compartimiento.
Pernos de la bolsa de piezas
Las bridas superior e inferior
deben ir por fuera del compartimiento
Introduzca la pestaña en
la ranura en el interior del
compartimiento
Perno de la
bolsa de
piezas
Algunos modelos cuentan con un
adaptador de 6 a 4 pulg.
Cinta
Cinta
Cinta
Conducto
de 6 pulg.
Conducto
de 4 pulg.
¡Presione
hasta que
trabe!
XB50L1
n
XB80L1
n
XB110L1 Guía para la instalación
Página 5
3
4
1
2
Instalación en una construcción nueva
5
Conecte los cables e instale la placa metálica
Extienda un cableado eléctrico de 120 VCA hasta el sitio de la instalación.
Utilice conectores aprobados por UL para asegurar el cableado hasta la placa metálica que se incluye en la bolsa de piezas.
Conecte los cables como se muestra en el diagrama de cableado.
Perno de la
bolsa de
piezas
Fije las abrazaderas de los
cables a la placa metálica.
La placa metálica debe
montarse
en el exterior del
compartimiento
y se la puede ubicar
en la dirección deseada.
Conecte los cables
LINEA
DE
ENTRADA
TRA
BLC
NEG
TRA
BLC
BLC
BLC
NEG
ROJ AZL
ROJ
NEG
INTERRUPTOR
DE LUZ
INTERRUPTOR
DE VENT.
VENT.
LUZ
UNIDADCAJA DE INTERRUPTORES
TRA
BLC
NEG
TRA
BLC
BLC
BLC
NEG
ROJ AZL
ROJ
NEG
REGULADOR DE
INTENSIDAD
INTERRUPTOR
DE VENTILATOR
VENT.
LUZ
LINEA
DE
ENTRADA
UNIDADCAJA DE INTERRUPTORES
LUZ CON INTERRUPTOR DE ENCENDIDO / APAGADO
LUZ CON REGULADOR DE INTENSIDAD
XB50L1
n
XB80L1
n
XB110L1 Guía para la instalación
Página 6
1
2
3
1
Instalación en una construcción nueva
6
Introduzca la
máscara y
acondicione
el techo
7
Instale la rejilla
La máscara protege
la unidad durante la
construcción. Retírela
antes de instalar la
rejilla.
Instale el material del techo.
Corte alrededor del
compartimiento.
PRECAUCIÓN
Si el motor estaba desconectado, se debe desconectar la
electricidad (vea la página 2, ADVERTENCIA, punto 2) antes
de insertar los enchufes del motor en el conjunto de control.
PARA PREVENIR DAÑOS EN EL MOTOR/CONTROL:
1
2
3
1
XB50L1
n
XB80L1
n
XB110L1 Guía para la instalación
Página 7
12" (30.5 cm)
1
2
Instalación en modernizaciones
La bolsa de
las piezas
contiene una
placa metálica
y seis (6) pernos
Los conductos existentes
y los cables permanecerán
en su sitio
ADVERTENCIA
Antes de retirar el ventilador existente, desconecte el suministro eléctrico en el panel de servicio y bloquee el servicio
desconectando los medios para evitar que se active el suministro de energía en forma accidental. Cuando no se
puedan bloquear los medios que desconectan el servicio, coloque un dispositivo de alarma importante, como por
ejemplo una etiqueta, en el panel de servicio.
Verifique el cableado existente para asegurarse de que no esté dañado. En caso de determinar algún daño,
NO CONTINÚE CON LA INSTALACIÓN de este producto. Comuníquese con la(s) persona(s) calificada(s)
para realizar la reparación.
Retire la hoja de
instrucciones
Retire la máscara del
envase. Consulte el Paso 12.
1
Retire el envase
2
Desconecte el suministro de energía
4
Verifique el cableado
3
Aumente la abertura del techo y retire el ventilador existente
• Regla
• Lápiz
Sierra para paneles de yeso
Martillo de orejas o palanca
Cuchillo multiuso
Herramientas necesarias
Destornillador eléctrico con punta Phillips
Destornillador Phillips
Destornillador de cabeza plana
• Pinza
Pelacable para la aislación de los cables
Pinza cortacable
27,9 cm (11 pulg.)
paralelo a las vigas
Materiales necesarios
Cinta para sellar las conexiones de los
conductos
Los conductos rígidos existentes requerirán el
agregado de tramos cortos de un conducto
flexible
Cables y accesorios eléctricos en
cumplimiento de la normativa local
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40

Broan-NuTone XB50L1 Mode d'emploi

Taper
Mode d'emploi
Ce manuel convient également à