NewAge Products 12031 Mode d'emploi

Taper
Mode d'emploi
IM-FL2.002A-02
NewAge Stone Composite
Interior Flooring
Installation Guide
STOP
ATTENTION: Is your ooring damaged?
Need help or spare parts? For fastest service,
contact NewAge Products at 1-877-306-8930;
or support@newageproducts.com.
Do not return to the retailer.
2
Index
General Information - 3
Product Specications - 3
Available Interior Accessories - 4
Tools Needed - 5
Precautions - 6
Acclimation - 6
Expansion gap - 6
Recommended Blades - 6
Recommended Cutting Methods - 7
General Suboor Preparation - 8
Concrete suboors - 8
Wood suboors - 9
Radiant heating - 9
Baseboard and Quarter Round Preparation - 10
Installation Tips -11
Getting Started - 12
Flooring installation layout - 12
Installation Options - 13
Installing the Flooring (Tiles / Planks) - 14
Installing T- Molding Transition Strips - 18
Installing Multi-Purpose Reducers - 20
Care and Maintenance - 22
Warranty - 23
3
General Information
Product Specications
NewAge Stone Composite Luxury Vinyl oors have been designed to withstand busy
households and commercial spaces.
NewAge Stone Composite Luxury Vinyl oors are heavy and needs to be lifted with care.
Please use proper lifting techniques when handling the products.
For best results, mix and install planks/tiles from dierent cartons to achieve desirable
variation.
NewAge oors has been designed to be an easy drop and lock system.
Stone Composite Luxury Vinyl Plank
Single Floor Plank:
L 46in x W 8.85in x 9.5mm thickness
x5 Floor Planks in a Carton
14.15 SQFT Per Carton
Stone Composite Luxury Vinyl Tile
Single Floor Plank:
L 23in x W 12in x 9.5mm thickness
x7 Floor Tiles in a Carton
13.44 SQFT Per Carton
4
Available Interior Accessories
T-Molding Transition Strips easily
connects any two oor surfaces of the
same height.
This accessory is only available in
matching colours for the wood planks
and not stone tiles.
Product Dimension:
L 46in X W 1.65in X H 0.5in
1 T-Molding and 1 Connection Base per
kit
Multi- Purpose Reducer and Connection
Base
T-Molding Transition Strip and
Connection Base
The Multi-Purpose reducer creates a
smooth transition between two oors
with dierent heights.
This accessory only available ion
matching colours for the wood planks
and not stone tiles.
Product Dimension:
L 46in x W 2.17in x H 0.5in
1 Multi-Purpose Reducer and 1
Connection Base per kit
5
Tools Needed
Ruler
Laser level
Vacuum / Broom
Interior/ Exterior Commercial
grade Silicone Sealant
PencilTape Measure
Safety Glasses
Knee PadsFace Mask
Chisel
Spacers, tapping block
and pulling Iron
LevelerUtility Knife
Rubber Mallet
Multi Tool Cutter
Hammer
Compound Miter Saw
Ruler
Laser level
Vacuum / Broom
Interior/ Exterior Commercial
grade Silicone Sealant
PencilTape Measure
Safety Glasses
Knee PadsFace Mask
Chisel
Spacers, tapping block
and pulling Iron
LevelerUtility Knife
Rubber Mallet
Multi Tool Cutter
Hammer
Compound Miter Saw
Recommended Tools
Alternative Tools
6
Although acclimation is not required, for best results ooring could be acclimated for 24-48
hours in its desired environment before opening the cartons.
It is recommended to install the oors when the room temperature is at least 5°C (41°F) to
24°C (75.2°F).
Acclimation
Expansion gap
Precautions
Do not store Floor Tile and Plank boxes on their sides. Store all boxes horizontally at on the
oor.
Do not use heavy duty tools designed for other ooring materials or installation systems.
NewAge luxury vinyl oor tiles and planks are nished products. Do not use any ooring
nishes (wax/polish).
NewAge luxury vinyl tiles and planks are designed for the oating installation method only.
Do not glue down or secure the oor tiles and planks directly to the oor.
Before starting installation, ensure all cartons contain the correct product.
It is recommended to install your oors in bright daylight to observe any possible
imperfections, defects or damages. NewAge will not be held responsible for any costs related
to installation or visual defects post installation.
NewAge Flooring : 100 Tooth Carbide Tipped Thin Kerf Blade
NewAge T-Molding / Multi-purpose Reducers : 100 Tooth Carbide Tipped Thin Kerf Blade
NewAge 46” Silver Finishing Strips : 100 Tooth carbide tipped Aluminum Saw Blade
NewAge Flooring : High Carbon Steel End Cut Blades
NewAge T-Molding / Multi-purpose Reducers : High Carbon Steel End Cut Blades
NewAge 46” Silver Finishing Strip: A Semi Circular Bi Metal Saw Blade
Recommended Blades
Compound Miter Saw
Multi-Tool Cutter
Carefully follow instructions on page 13 “Installation Options”.
7
Tip: When using a Multi-Tool cutter on your NewAge Floor Tiles, Planks and Accessories, it
is recommended to use a slower cutting speed until you are comfortable to cut faster. This
would allow you to gain more control and avoid any errors.
Warning: Be sure to wear a face mask and safety glasses to protect yourself from the dust while
cutting the oor tiles, planks and accessories.
Recommended Cutting Methods
For large simple and straight cuts , use a compound miter saw.
For smaller and complicated cuts, use a multi-tool cutter.
1
2
8
General Suboor Preparation
Preparing your space - General
Correctly preparing your suboors plays a large part of a satisfactory installation. The NewAge
Stone Composite Flooring uses a “oating oor installation method which can handle minor
oor imperfections. If you have large gaps or protrusions in your suboors, NewAge Stone
Composite Flooring will not be able to cover them.
It is not suitable to install NewAge ooring on carpet. All carpet and carpet tracks should be
removed before installation.
Prior to installing your oors, use a vacuum to remove all dust and debris.
Ensure the surface is structurally sound, at, clean and dry before installing NewAge Flooring.
If your oors are wet, make sure you wait until they are fully dry before proceeding with the
install.
Leave at least a 0.5” gap between the surface of the oor and the bottom of an electric
baseboard heater to allow heat to circulate.
Suboor atness should not exceed 3/16” per 10ft (4.7mm per 3m radius). Suboors must be
leveled before starting the installation of the NewAge Stone Composite Tiles and Planks.
Chisel any uneven surfaces on the oor before starting the ooring install.
Make sure all surfaces are dry, clean and free of dust, wax, solvents, paint, grease, oils and old
glue residue.
Sand or grind any raised areas.
Gaps and holes should be lled with concrete and nished with a straight edge to even the
oor out.
It is important to test the moisture level before starting the install. Using a concrete moisture
meter, the moisture vapor emission rate should not exceed 5lbs per 1000sqft in 24hr. If In Situ
probe testing is to be carried out, according to ASTM F2170, it should not exceed 85%. These
tests would not predict the condition of your oors for long-term and would only indicate the
condition of your oors at the time of the test being conducted.
Note: If you have done concrete work in the desired space, sub-oors must properly cure and be
left to dry for at least 60 days before installing NewAge Stone Composite Flooring.
Concrete suboors
9
NewAge Stone Composite Flooring is suitable to be installed over radiant heating systems as
long as the heating element is not in direct contact with the ooring. Leave at least 1/2” gap
between the Floors and radiant heat systems.
If the radiant heating has been newly installed, leave the system on and operational for at
least 2 weeks prior to installation. This would reduce the moisture levels in the concrete.
Turn o the heating system for 24 hrs before and after installing NewAge Stone Composite
Flooring.
It is recommended for the desired room to be 5°C (41°F) to 24°C (75.2°F) prior to installation.
You may need to use other heating methods prior to install.
Radiant heating
General Suboor Preparation
Test the moisture content of wood suboor using a moisture meter. It should not exceed
12%.
Sand or plane high spots and ll all holes and gaps.
Wood suboors
Suspended wood suboors should have at least 18 inches of well-ventilated crawl space
underneath.
NewAge Stone Composite Flooring can be installed over many wood substrates as long as
the surface is smooth, at and structurally sound.
Repair any squeaky oors before installing NewAge Stone Luxury Flooring.
Note: Due to the use of power and manual tools during installation, damage may occur to the
wood suboors.
10
If there are pre-installed baseboards in need of replacement, remove old baseboards and
quarter rounds.
If new baseboards and quarter rounds need to be installed, install these items after the oors
have been completed.
Chisel any uneven surfaces on the oor and wall before starting the install.
Ensure the general space preparation has been completed before starting install. Reference
page 8.
Ensure Concrete suboor, Radiant heating or wood suboor requirements has been followed.
Reference page 8-9.
NewAge Stone Composite ooring can not be installed with pre-installed quarter rounds. All
Quarter rounds need to be removed before starting install.
Once all quarter rounds have been removed, cut approximately 11mm o the bottom of your
baseboards to have enough space for the 9.5mm oor planks or tiles.
Note: If previous oors are thicker than the new Luxury Vinyl Floors, you may need to
purchase a new door casing or plinth block.
Quarter rounds will need to be installed after the ooring is complete.
Ensure the general space preparation has been completed before starting install. Reference
page 8.
Ensure Concrete suboor, Radiant heating or Wood Suboor requirements has been followed.
Reference page 8-9.
Option 1: Installing Interior ooring before baseboards and quarter rounds.
Option 2: Installing Interior ooring with pre-installed baseboards and
quarter rounds.
Baseboard and Quarter Round Preparation
11
Installation Tips
TIP - 1 : To make installation easier and quicker, equally distance your boxes of planks or tiles
on your oors. This would allow you to better plan your install.
TIP - 2 : Cut a piece of tile/plank and use it as a tapping block.
TIP - 3: When installing ooring around door trims and it is challenging to use the click lock
proles, remove the top section of the click lock prole to allow you to slide in the plank or
tile under the installed oor. Apply the recommended silicone , on page 5, along the click
lock prole and slide it under the installed ooring. Make sure to wipe o any excess glue and
ensure glue used will dry in clear colour.
12
Getting Started
Flooring installation layout
It is recommended to lay the long side of the Planks or Tiles parallel to the longest wall or
main window of the room.
When installing the oors, stagger the tiles/planks to ensure a secure installation .
To determine the number of rows of tile/planks are required, measure the width of the room
and width of the planks or tiles.
Divide the width of the room by the width of the planks / tiles to get the number of rows
required.
If the last row is less than the width of a full tile or plank, cut the rst row accordingly such
that the rst row and last rows are of even widths.
L
W
13
Ensure you have followed the recommended steps on page 10.
Once your space has been prepared and all quarter rounds have been removed , line your tile
or plank along the edge of your baseboard.
This will need to remain the same along the perimeter of the room.
Quarter rounds will be installed once oors have been completed.
Option 2 : Installing NewAge Interior Flooring with pre-installed
baseboards and quarter rounds.
Installation Options
Option 1 : Installing NewAge Interior ooring before installing baseboards
and quarter rounds.
Ensure you have followed the recommended steps on page 10.
Once your space has been prepared , measure 3/8” from your wall and rst tile / plank. The
3/8” gap will need to remain as your expansion gap along the perimeter of the room.
Baseboards and quarter rounds will be installed once the oors have been completed.
3/8”
14
Installing the Flooring (Tiles / Planks)
a
b
c
d
Make sure the open click lock proles of
the rst tile is at the bottom and right
hand side away from the walls.
Place the second tile, on a slight angle,
against the rst oor tile. Slide the tile to
position.
2 3
c
c
d
d
a
b
Parts required
Note: Installation layout for the Stone Tiles and Wood planks are the same.
If installing Transition Strips and Multipurpose Reducers, refer to page 18 before starting the install.
Stone Composite
Luxury Vinyl Tiles
Tape Measure
Interior / Exterior
Commercial grade
Silicone sealant
Stone Composite
Luxury Vinyl Planks
Or
Rubber Mallet
1
Make sure you have followed the recommended space preparation and read through the
dierent Install Options on page 12-13. Ensure you have measured the correct expansion gap.
15
Using a rubber mallet, tap along the drop
click prole with medium force to secure a
tight seam.
Place the tapping block along the open
click prole of the short edge and tap over
it with a rubber mallet. This ensures a tight
install.
4
5
Installing the Flooring (Tiles / Planks)
Make sure the edges are aligned perfectly.
Place the tapping block on the open click
prole of the long edge and tap over it
with a rubber mallet to align the tiles.
Follow steps 1 to 7 for remaining row of
tiles. Measure the space left for the last tile
using a tape measure.
76
8 9
Cut the tile to required length. Refer to
the page 7 for “Recommended Cutting
Method . Note: Ensure there is proper
clearance from the wall based on your
preferred installation.
16
f
e
g
Installing the Flooring (Tiles / Planks)
f
e
Place your tile on an angle along the long
edge of the rst row and drop the tile
down. Repeat steps 4 - 7 for each tile.
Place your second tile on an angle along
the long edge of the rst row and drop the
tile down. Note: Make sure your tiles are
cliped into each other properly along the
long and short edge.
12
e
ef
f
11
Note: When starting the second row, cut the rst tile in half or use the leftover from the rst row.
Install the last tile of the rst row.
10
f
f g
g
17
Note: When starting the second row, cut the rst tile in half or use the leftover from the rst row.
13
Installing the Flooring (Tiles / Planks)
Follow steps 1 to 12 for remaining row of tiles.
Note: Once all oors have been installed, baseboards and quarter rounds may now be
installed to complete your space.
18
Compound Miter Saw
T-Molding Transition Strip
Connection Base
Interior/ Exterior Commercial
grade Silicone Sealant
9.5mm Floor
9.5mm NewAge
Flooring
Parts required
Cut the T-molding transition strip and
connection base to required length using
a compound miter saw.
Stick the connection base to the oor
adjacent to the adjoining ooring. Make
sure the wide edge of the connection base
is facing towards the ooring that is to be
laid.
Evenly apply silicone to the back side of
the connection base.
1
3
2
Installing T- Molding Transition Strip
19
Lay the last row of tiles on the wide edge of connection base. This would would connect two
adjoining oors of the same height.
Snap the T-Molding into the base, pushing it all the way down until the strip is in place. Make
sure both edges of the molding is pushed all the way to the oor.
5
4
Installing T- Molding Transition Strip
Note: Wipe o the excessive adhesive at the corners with a clean cloth.
20
Multi-Purpose Reducer
Connection Base
Interior/ Exterior Commercial
grade Silicone Sealant
Compound Miter Saw
9.5mm NewAge
Flooring
Floor
Parts required
Cut the Multi-Purpose reducer and
connection base to required length using
a compound miter saw.
Stick the connection base to the
oor. Make sure the wide edge of the
connection base is facing towards the
ooring that is to be laid.
Evenly apply silicone to the back side of
the connection base.
1
3
2
Installing Multi-Purpose Reducer
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54

NewAge Products 12031 Mode d'emploi

Taper
Mode d'emploi

dans d''autres langues