GE Monogram MONOGRAM ZV900 Manuel utilisateur

Catégorie
Hottes
Taper
Manuel utilisateur

Ce manuel convient également à

Installation
Instructions
36Glass Canopy
Chimney Vent Hood
ZV900
49-80328
04-06 JR
14-5/8
to top of
bracket
C
L
ALIGN BOTTOM EDGE
WITH PENCIL LINE,
INDICATING BOTTOM
OF THE HOOD
Drill 2 (two) 3/16 pilot holes through studs or rear wall support
REAR WALL
MOUNTING TEMPLATE
49-80405 04-06 JR
Safety Information
2
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANTSave these instructions for
local inspector’s use.
IMPORTANT
Observe all governing codes
and ordinances.
Note to Installer Be sure to leave these
instructions with the Consumer.
Note to Consumer
Keep these instructions
with your Owner’s Manual for future reference.
Skill Level
Installation of this appliance requires
basic mechanical and electrical skills.
Completion Time — 1 to 3 Hours.
Proper installation is the responsibility of the installer.
Product failure due to improper installation is not
covered under the warranty.
For Monogram local service in your area, call
1.800.444.1845.
For Monogram service in Canada, call 1.888.880.3030
For Monogram Parts and Accessories, call
1.800.626.2002.
CAUTION:
Due to the weight and size of these vent hoods and to
reduce the risk of personal injury or damage to the
product, TWO PEOPLE ARE REQUIRED FOR PROPER
INSTALLATION.
PRUDENCE :
À cause du poids et de la taille de ces hottes et pour
reduire le risque de blessures et de dommages, IL FAUT
DEUX PERSONNES POUR FAIRE L’INSTALLATION
CORRECTEMENT.
WARNING:
To reduce the risk of fire or electrical shock, do not
use this range hood with any external solid-state speed
control device. Any such alteration from original factory
wiring could result in damage to the unit and/or create
an electrical safety hazard.
AVERTISSEMENT :
Pour réduire le risque d’incendie ou de choc électrique,
il ne faut pas utiliser cette hotte avec un régulateur de
vitesse électronique externe. Toute modification de ce
type du branchement d’usine peute endommager
l’appareil ou créer un risque de choc électrique.
TO REDUCE THE RISK OF FIRE, USE ONLY METAL
DUCTWORK.
WARNING: TO REDUCE THE RISK OF FIRE,
ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSERVE
THE FOLLOWING:
A. Use this unit only in the manner intended by the
manufacturer. If you have any questions, contact the
manufacturer.
B. Before servicing or cleaning unit, switch power off at
the service panel and lock service panel to prevent
power from being switched on accidentally. If the
service panel cannot be locked, fasten a tag or
prominent warning label to the panel.
AVERTISSEMENT :
POUR RÉDUIRE LE RISQUE D’INCENDIE, DE CHOC
ÉLECTRIQUE OU DE BLESSURES, IL FAUT OBSERVER LES
REGLES SUIVANTES :
A. Utiliser cet appareil uniquement de la maniére prévue
par le fabricant. En cas de question, consulter le
fabricant.
B. Avant toute intervention ou nettoyage, couper
l’alimentation électrique au disjoncteur et verrouiller
le panneau du disjoncteur pour éviter la mise sous
tension accidentelle. S’il n’est pas possible de
verrouiller le panneau du disconcteur, attacher un
placard ou une étiquette trés visible au panneau.
For general ventilating use only. Do not use to
exhaust hazardous or explosive materials or vapors.
Structural framing, installation work and electrical
wiring must be done by qualified person(s)
in accordance with all applicable codes and
standards including fire-rated construction.
Sufficient air is needed for proper combustion and
exhausting of gases through the flue (chimney) of
fuel burning equipment to prevent back drafting.
Follow the heating equipment manufacturer’s
guidelines and safety standards such as those
published by the National Fire Protection Association
(NFPA), and the American Society for Heating,
Refrigeration and Air Conditioning Engineers
(ASHRAE), and the local code authorities.
Local codes vary. Installation of electrical
connections and grounding must comply with
applicable codes. In the absence of local codes, the
vent should be installed in accordance with National
Electrical Code ANSI/NFPA 70-1990 or latest edition.
CAUTION:To reduce risk of fire and to
properly exhaust air, be sure to duct air outside—do not
vent exhaust air into spaces within walls or ceilings or
into attics, crawl spaces or garages.
PRUDENCE :Il faut prendre soin d’installer
un conduit vers l’extérieur pour réduire le risque
d’incendie et pouvoir évacuer l’air correctement. Il ne
faut pas évacuer l’air correctement. Il ne faut pas
évacuer l’air dans l’espace entre les parois d’un mur, un
plafond ou un grenier, un espace sanitaire ou un garage.
INSTALLATION OPTIONS
NOTE: Installation height should be measured from the
cooking surface to the outer glass sides.
This hood may be installed onto a wall and vented
to the outdoors, or it can be installed for recirculating
operation. All necessary parts for recirculating
operation are supplied with the hood. No kits
required.
This hood can be installed over any Monogram
electric cooktop or gas cooktop. It cannot be
installed over a Monogram Professional cooktop
or range.
Design Information
3
CONTENTS
Design Information
Product Dimensions and Clearances ....................................................3
Installation Options ........................................................................................3
Installation Preparation
Advance Planning, Ductwork, Framing ................................................4
Power Supply ....................................................................................................4
Duct Fittings ......................................................................................................5
Tools and Materials Required ....................................................................6
Remove the Packaging ................................................................................6
Determine Installation Height ..................................................................7
Wall Mount Installation Heights ..............................................................7
Check Installation Hardware......................................................................8
Installation—Vented to the Outside
Step 1, Install Framing for Hood Support ............................................9
Step 2, Install Mounting Bracket............................................................10
Step 3, Install Duct Bracket......................................................................10
Step 4, Prepare the Hood..........................................................................11
Step 5, Mount the Hood ............................................................................12
Step 6, Level the Hood................................................................................12
Step 7, Connect Ductwork........................................................................12
Step 8, Connect Electrical ........................................................................13
Step 9, Install Duct Covers........................................................................14
Step 10, Install Filters..................................................................................14
Step 11, Finalize Installation....................................................................14
Installation—Recirculating
Ductwork, Wiring Locations ....................................................................15
Step 1, Install Framing for Hood Support..........................................15
Step 2, Install Mounting Bracket............................................................16
Step 3, Install Duct Bracket......................................................................16
Step 4, Prepare the Hood..........................................................................17
Step 5, Mount the Hood ............................................................................17
Step 6, Level the Hood................................................................................17
Step 7, Size and Cut Duct Piece ............................................................18
Step 8, Connect Electrical ........................................................................18
Step 9, Install Duct Covers........................................................................19
Step 10, Install Filters..................................................................................19
Step 11, Finalize Installation....................................................................19
PRODUCT DIMENSIONS
AND CLEARANCES
The vent hood must be installed 24 min., and
30
max. above the cooking surface. The hood
installation height above the cooking surface
depends upon ceiling height.
The telescopic duct cover conceals the ductwork
running from the top of the hood to the ceiling.
The supplied duct cover is sized to reach 8to
95ceiling heights.
The ZX90010 accessory is available for ceiling
heights of 96to 105.
*Height
to
Ceiling
7/16"
3 1/4"
35 7/8"
* The Supplied Duct Cover Fits 8to 95Ceiling
Heights. For 96to 105ceilings, order ZX90010.
*Height
to
Ceiling
20 7/16”
35 7/8”
3 1/4”
24” Min.
30” Max.
Installation Preparation
4
ADVANCE PLANNING
Determine the exact location of the vent hood.
Plan the route for venting exhaust to the outdoors.
Use the shortest and straightest duct route possible. For
satisfactory performance, duct run should not exceed 100 ft.
equivalent length for any duct configurations.
Refer to “Duct Fittings” chart to compute the maximum
permissible length for duct runs to the outdoors.
CAUTION:To reduce risk of fire and to properly
exhaust air, be sure to duct air outside—do not vent exhaust
air into spaces within walls or ceilings or into attics, crawl
spaces or garages.
PRUDENCE :Il faut prendre soin d’installer un
conduit vers l’extérieur pour réduire le risque d’incendie et
pouvoir évacuer l’air correctement. Il ne faut pas évacuer l’air
correctement. Il ne faut pas évacuer l’air dans l’espace entre
les parois d’un mur, un plafond ou un grenier, un espace
sanitaire ou un garage.
Use metal ductwork only. These hoods must use
8
round duct.
Install a wall cap with damper or roof cap at the exterior
opening. Order the wall or roof cap and any transition
needed in advance.
Wall Framing for Adequate Support
This vent hood is heavy. Adequate structural support must
be provided in all types of installations. The hood must be
secured to vertical studs in the wall, or to a horizontal
support.
The vent hood should be on site before final framing and
wall finishing. This will help to accurately locate the duct
work and electrical service.
Installation will be easier if the vent hood is installed before
the cooktop and countertop are installed.
Accessory Duct Cover
This hood is shipped with a decorative duct cover for ceiling
heights of 7 11
to 9 5. ZX90010 duct cover accessory
is available to reach 9 6
to 105ceiling heights. The
accessory should be ordered with the hood and be
on site before installation begins.
POWER SUPPLY
IMPORTANT (Please read carefully)
WARNING: FOR PERSONAL SAFETY, THIS
APPLIANCE MUST BE PROPERLY GROUNDED.
AVERTISSEMENT :POUR DES RAISONS DE
SÉCURITÉ, CET APPAREIL DOIT ÊTRE CORRECTEMENT MISE
À LA TERRE.
Remove house fuse or open circuit breaker before beginning
installation.
Do not use an extension cord or adapter plug with this
appliance. Follow National electrical codes or prevailing local
codes and ordinances.
Electrical supply
These vent hoods must be supplied with 120V, 60Hz, and
connected to an individual, properly grounded branch circuit,
and protected by a 15 or 20 amp circuit breaker or time delay
fuse.
Wiring must be 2 wire with ground.
If the electrical supply does not meet the above
requirements, call a licensed electrician before proceeding.
Route house wiring as close to the installation location as
possible, in the ceiling or back wall.
Connect the hood wiring to the house wiring in accordance
with local codes.
Grounding instructions
The grounding conductor must be connected to a grounded
metal, permanent wiring system, or an equipment-grounding
terminal or lead on the hood.
WARNING:The improper connection of the
equipment-grounding conductor can result in a risk of
electric shock. Check with a qualified electrician or service
representative if you are in doubt whether the appliance is
properly grounded.
AVERTISSEMENT : Le mauvais branchement du
fil de mise à la terre peut causer un choc électrique. En cas de
doute, consulter un électricien qualifié ou un technicien pour
déterminer si l’appareil est à la terre.
CAUTION:Automatically Operated Device
To reduce the risk of injury disconnect from power supply
before servicing. This unit is equipped with an integral
disconnecting switch located inside the blower housing.
PRUDENCE :Appareil commandé
automatiquement. Afin de réduire les risques de blessure,
débranchez l’appareil de l’alimentation électrique avant de
procéder à une réparation. L’appareil est équipé d’un
sectionneur intégral situé à l’intérieur du logement du
ventilateur.
DUCT FITTINGS
Use this chart to compute
maximum permissible lengths for
duct runs to outdoors.
NOTE: Do not exceed maximum
permissible equivalent lengths!
Maximum duct length:
100 foot for 8 round duct
Flexible ducting:
If flexible metal ducting is used,
all the equivalent feet values in
the table should be doubled.
The flexible metal duct should
be straight and smooth and
extended as much as possible.
DO NOT use flexible plastic
ducting.
NOTE: Any home ventilation
system, such as a ventilation hood,
may interrupt the proper flow of
combustion air and exhaust
required by fireplaces, gas
furnaces, gas water heaters and
other naturally vented systems.
To minimize the chance of
interruption of such naturally
vented systems, follow the
heating equipment manufacturer’s
guidelines and safety standards
such as those published by NFPA
and ASHRAE.
This Hood Must Use an
8Round Duct.
5
Installation Preparation
Total
Equivalent Quantity Equivalent
Duct Piece Dimensions Length* Used Length
Round, 1 ft.
straight (per foot
length)
3-1/4x 12 1 ft.
3-1/4x 24 (per foot
straight length)
8round
90° elbow 15 ft.
8round
45° elbow 8 ft.
3-1⁄4x 12
90° elbow 11 ft.
3-1/4x 12or
45° elbow 6 ft.
3-1/4x 12
90° flat elbow 24 ft.
8round to
3-1/4x 12
or 3-1/4 x 24transition 1 ft.
3-1/4x 12to 8
round transition 8 ft.
8round
to 3-1/4 x 12or
transition 90° elbow 16 ft.
3-1/4x 12to 8round
round transition 90° elbow 17 ft.
8round
wall cap
with damper 30 ft.
3-1/4x 12wall cap
with damper 30 ft.
8round
roof cap 26 ft.
8round
roof vent 26 ft.
*Actual length of straight duct plus duct fitting
equivalent. Equivalent length of duct pieces are
based on actual tests conducted by GE Evaluation
Engineering and reflect requirements for good
venting performance with any ventilation hood.
Total Duct Run
Installation Preparation
REMOVE THE PACKAGING
CAUTION: LIFT THE HOOD OUT OF THE BOX
BY THE CENTER METAL PORTION. DO NOT LIFT BY THE
GLASS SIDES.
PRUDENCE : LEVEZ LA HOTTE À
L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION TAL
CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.
CAUTION: Wear gloves to protect against
sharp edges.
PRUDENCE : Portez des gants pour éviter
les blessures causées par les tranchants.
Grasp the hood by the metal insert in the center
and lift straight up and out of the box.
Remove and properly discard the plastic wrapping.
Remove parts box, duct covers and other
packaging.
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Tape measure
Knife
Spirit level
Wire cutter/stripper
Wire nuts
Electric drill with 5/16and 3/8bits
Phillips and flat blade screwdrivers
Hammer
Pliers
Safety glasses
Duct tape
Tape to mount template
Gloves to protect against sharp edges
120V 60Hz. 15 or 20 Amp, 2 wire with
ground Properly grounded branch circuit
Strain relief for junction cover
8round metal duct, length to suit
installation
Saw, jig saw or reciprocating saw
Measuring tape
Electric drill
with 5/16” and
3/8” Bits
12” long
Phillips
head
screwdriver
Safety glasses
Gloves
Spirit level
Knife
Wire
cutter/stripper
Flat blade
screwdriver
Hammer
Pliers
Duct tape
Masking tape
Wire nuts
Strain relief
Saw, jig saw or
reciprocating
saw
6
8round metal duct,
length to suit
installation
7
Wall Mount ZV900
Installation Heights
Actual *Possible
Ceiling *Possible VENTED RECIRCULATING
Height Installation Height Installation Height
711 24to 26 24to 26
80 24to 27 24to 27
81 24to 28 24to 28
82 24to 29 24to 29
83 24to 30 24to 30
84 24to 30 24to 30
85 24to 30 24to 30
86 24to 30 24to 30
87 24to 30 24to 30
88 24to 30 24to 30
89 24to 30 24to 30
810 24to 30 25to 30
811 24to 30 26to 30
90 25to 30 24to 30
91 26to 30 24to 30
92 27to 30 24to 30
93 28to 30 24to 30
94 29to 30 24to 30
95 30 25to 30
96 24to 30 24to 30
97 24to 30 24to 30
98 24to 30 24to 30
99 24to 30 24to 30
910 24to 30 24to 30
911 24to 30 24to 30
10 24to 30 24to 30
101 24to 30 24to 30
102 25to 30 24to 30
103 26to 30 25to 30
104 27to 30 26to 30
105 28to 30 27to 30
*Based on 36countertop height.
ACCESSORY ZX90010 SUPPLIED
DETERMINE INSTALLATION HEIGHT
Telescopic duct covers are provided to conceal
the ductwork running to the ceiling.
This hood can be installed for recirculating
operation. No kits required.
The vent hood must be installed 24
min. and
30
max. above the cooking surface. The hood
installation height, from the cooking surface to the
bottom of the hood, depends upon ceiling height.
Installation Preparation
24” Min.
30” Max.
36” Min.
ACCESSORY ZX90010
NOTE: Measure
installation height
from the cooking
surface to the outer
glass portion of the
hood.
ACCESSORIES:
Order ZX90010 accessory for ZV900 wall mount
hood to reach ceiling heights between 9
6 and
10
5. This accessory contains one 40 long duct
cover.
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with the hood and check contents.
Installation Preparation
2
9-7/8"
11-1/2"
12"
27-3/4"
Mounting bracket
1 charcoal filter for
recirculating installation
2-piece decorative duct
cover (dimension shown
for reference only)
Air deflector for
recirculating
installation only
Duct bracket
14-5/8
to top of
bracket
C
L
ALIGN BOTTOM EDGE
WITH PENCIL LINE,
INDICATING BOTTOM
OF THE HOOD
Drill 2 (two) 3/16pilot holes through studs or rear wall support
REAR WALL
MOUNTING TEMPLATE
49-80405 04-06 JR
Wall mount template
8
HARDWARE PACKAGE
Locate and count
screws
3 wood
screws
3 wall
fasteners
3 wall bracket
screws
12 hood
attachment
screws
27-3/4
12-7/8
23-7/8
11-1/2
Stainless steel filter
2 thumb
screws
9
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT
Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
Install a horizontal support at least 1
x 6
between two wall studs at the bottom mounting
bracket installation location. The horizontal support
must be flush with the room side of the studs.
Use cleats behind both sides of the support to
secure to wall studs.
Reinstall drywall.
1
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Installation Instructions
Centerline of
installation
space
View from rear
cleats
1 x 6 min.
mounting
support
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
Locate the template packed with the literature.
Measure 36 from the floor to the top of the cooking
surface. Add hood installation height determined on
page 7. Mark that location.
Use a level to draw a straight pencil line on the wall.
Tape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
Measure 5-1/2
from the back wall to the centerline
of an 8-1/2
hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness
to the 5-1/2
dimension.
Wall Ducting:
If ductwork will vent to the rear:
Use a level to draw a line straight up from the
centerline on the template.
Measure at least 26
above the pencil line that
indicates the bottom installation height, to the
centerline of an 8-1/2
dia. duct hole. (Hole may
be elongated for duct elbow.)
HOUSE WIRING LOCATION:
The junction box is located on the top left side
of the hood.
Wiring should enter the back wall at least 22
above
the bottom of the hood, and within 6
of the left side
of the centerline.
5-1/2 centerline to wall
8-1/2 dia. hole
FOR CEILING VENT DUCTING
Centerline 26 above
the marked bottom
pencil line for
installation height.
FOR WALL VENT DUCT
INSTALLATION—VENTED TO THE OUTSIDE
Ceiling
8-1/2 min. opening for ductwork
Installation Instructions
INSTALL DUCT BRACKET
The duct bracket should be installed against the
back wall and flush with the ceiling. This bracket will
hold the duct cover in place at the top.
Secure the bracket to the wall:
Align the marked centerline on the bracket with
the centerline on the wall.
Mark 2 screw hole locations in the wall.
Drill 3/16
pilot holes in the marked locations.
If pilot holes do not enter studs, enlarge the holes
to 3/8
and install wall fastener anchors.
Drive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
Secure the bracket to the wall with wood screws
and/or fasteners.
3
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
• With the template taped in place, use a punch to
mark mounting bracket screw locations.
Drill 3/16
pilot holes in 2 of the punched locations
in the lower bracket.
Remove the template.
Use wood screws to secure the mounting bracket
to the wall. The screws must engage wall studs or
the installed horizontal mounting support.
Check to be sure that the bracket is level.
2
14-5/8
to top of
bracket
C
L
ALIGN BOTTOM EDGE
WITH PENCIL LINE,
INDICATING BOTTOM
OF THE HOOD
Drill 2 (two) 3/16pilot holes through studs or rear wall support
REAR WALL
MOUNTING TEMPLATE
49-80405 04-06 JR
INSTALLATION—VENTED TO THE OUTSIDE
10
11
Installation Instructions
PREPARE THE HOOD
Place the hood on a padded surface.
Position the motor housing at the back of the hood.
Electrical connectors should face the front, with
rear mounting hooks at the back.
Slip the bottom flange of the motor housing into
the side slots at the top rear opening.
Carefully lay the hood on its back.
Fasten the hood to the motor housing from the
bottom, using 6 screws.
Join two cable connectors at the front of the hood.
4
Rear
mounting
hooks
INSTALLATION—VENTED TO THE OUTSIDE
Engage flange on motor
housing into slots
Rear view
Bottom view
Rear side
Front side
To Lights
To
Control
Panel
CONNECT DUCTWORK
Install ductwork, making connections in the
direction of airflow as illustrated.
Push duct over the exhaust outlet and damper.
Secure joints in ductwork with sheetmetal screws.
Wrap all duct joints and the flange connections
with duct tape for an airtight seal.
CAUTION:Do not use sheet metal screws
at the hood flange connection. Doing so will prevent
proper damper operation. Seal connection with
tape only.
PRUDENCE :
Il ne faut pas utiliser de vis autoraurdeuses à la
connexion du collet de la hotte. Ceci empêcherait
le bon fonctionnement du registre. N’utiliser que du
ruban adhésif pour assurer l’étanchéité du raccord.
7
Duct tape
over seam
and screw
Screw
Airflow
Installation Instructions
INSTALLATION—VENTED TO THE OUTSIDE
12
MOUNT THE HOOD
WARNING:2 people are required to lift and
position the hood onto the mounting bracket.
AVERTISSEMENT :
If faut deux personnes pour lever et mettre en place
la hotte sur le support de montage.
Lift the hood onto the mounting bracket.
• Position a spirit level at the bottom of the hood to
check side to side leveling.
5
LEVEL THE HOOD
This hood has built-in levelers on the mounting hooks
at each side. Use a long Phillips screwdriver from the
front to access the levelers.
Use the top screw hole in the leveler to raise or lower
the hood on that side.
Use the bottom screw hole to pull the hood tight
against the wall surface.
Mark hole location at the bottom of the hood.
Remove the hood. If the bottom screw hole does not
enter a stud, enlarge the hole to 3/8 and install wall
fastener anchors.
Place the hood back onto the mounting bracket,
check level again and install the wall fastener.
6
Screw hole
Levelers
13
Installation Instructions
INSTALLATION—VENTED TO THE OUTSIDE
CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING:If house wiring is not 2-wire
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be sure
to use U.L. approved anti-oxidant compound and
aluminum-to-copper connectors.
AVERTISSEMENT :
Si la maison n’est pas câblee avec deux fils et un
fil de terre, l’installateur doit installer un fil de terre.
Quand les fils sont en aluminium, il faut prendre soin
d’utiliser des connecteurs aluminium à cuivre avec
une pâte antioxydante approuvée par U.L.
Remove junction box cover and knockout on the
left side.
Secure the house wiring to the junction box with
a strain relief.
Connect white leads to branch circuit white lead.
Connect black leads to branch circuit black lead.
Connect green/yellow leads to branch circuit green
lead or bare ground lead.
Secure all connections with wire nuts on each
electrical connector.
Push wires into junction box and replace cover.
Be sure wires are not pinched.
Secure J-Box cover with original screw.
8
House wiring
J-Box
cover
Knockout
J-Box
cover
INSTALL DUCT COVERS
Place the decorative duct
covers on top of the hood.
NOTE: The inside (upper)
duct piece has holes on one
end. The holes are intended
for use when the hood is
installed for recirculating
purposes. Slide the inside end
into the outer piece; the vent
holes should not be visible in
this installation.
The inside duct piece must slip into the folded ends
of the outer section.
Extend the inner duct upward to the ceiling
bracket.
Secure duct cover to ceiling bracket with 2 screws.
9
Installation Instructions
INSTALLATION—VENTED TO THE OUTSIDE
14
Mounting
screws
INSTALL FILTERS
IMPORTANT: Check to be sure that the main
ON/OFF switch next to the motor is in the ON
position.
Remove protective film on the filters.
Tip the filter into the left or right side of the
opening. Lift the filter to the opposite side and
into the filter lock.
To remove the filter, pull the filter lock downward.
10
FINALIZE INSTALLATION
Check to be sure all tape and packaging materials
have been removed.
Refer to the Owner’s Manual for operating
instructions.
11
NOTE: The charcoal filter is not required for this
installation.
Duct cover
support bracket
Upper
duct cover
Lower duct
cover seat
Filter Lock
Duct cover
support bracket
Lower duct
cover
15
Installation Instructions
INSTALLATION—RECIRCULATING
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
Locate the template packed with the literature.
Measure 36
from the floor to the top of the cooking
surface. Add hood installation height determined on
page 7. Mark that location.
Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
HOUSE WIRING LOCATION:
The junction box is located on the top left side of
the hood.
Wiring should enter the back wall at least 22
above the bottom of the hood, and within 6
of the centerline.
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT:
Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
Install a horizontal support at least 1
x 6
between two wall studs at the bottom mounting
bracket installation location. The horizontal support
must be flush with the room side of the studs.
Use cleats behind both sides of the support to
secure to wall studs.
Reinstall drywall.
1
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
Centerline of
installation
space
View from rear
cleats
1 x 6 min.
mounting
support
Ceiling
Installation Instructions
INSTALLATION—RECIRCULATING
16
INSTALL DUCT BRACKET
The duct bracket should be installed against the
back wall and flush with the ceiling. This bracket will
hold the duct cover in place at the top.
Secure the bracket to the wall:
Align the marked centerline on the bracket with
the centerline on the wall.
Mark 2 screw hole locations in the wall.
Drill 3/16
pilot holes in the marked locations.
If pilot holes do not enter studs, enlarge the holes
to 3/8
and install wall fastener anchors.
Drive screws, by hand, into the fasteners to allow
anchors to expand. Remove the screws.
Secure the bracket to the wall with wood screws
and/or fasteners.
3
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
• With the template taped in place, use a punch to
mark mounting bracket screw locations.
Drill 3/16
pilot holes in 2 of the punched locations
in the lower bracket.
Remove the template.
Use wood screws to secure the mounting bracket
to the wall. The screws must engage wall studs or
the installed horizontal mounting support.
Check to be sure that the bracket is level.
2
14-5/8
to top of
bracket
C
L
ALIGN BOTTOM EDGE
WITH PENCIL LINE,
INDICATING BOTTOM
OF THE HOOD
Drill 2 (two) 3/16pilot holes through studs or rear wall support
REAR WALL
MOUNTING TEMPLATE
49-80405 04-06 JR
17
Installation Instructions
INSTALLATION—RECIRCULATING
PREPARE THE HOOD
Place the hood on a padded surface.
Position the motor housing at the back of the hood.
Electrical connectors should face the front, with
rear mounting hooks at the back.
Slip the bottom flange of the motor housing into
the side slots at the top rear opening.
Carefully lay the hood on its back.
Fasten the hood to the motor housing from the
bottom, using 6 screws.
Join two cable connectors at the front of the hood.
4
Rear
mounting
hooks
Engage flange on motor
housing into slots
Rear view
Bottom view
Rear side
Front side
To Lights
To
Control
Panel
MOUNT THE HOOD
WARNING:2 people are required to lift and
position the hood onto the mounting bracket.
AVERTISSEMENT :
If faut deux personnes pour lever et mettre en place
la hotte sur le support de montage.
Lift the hood onto the mounting bracket.
• Position a spirit level at the bottom of the hood to
check side to side leveling.
5
LEVEL THE HOOD
This hood has built-in levelers on the mounting hooks
at each side. Use a long Phillips screwdriver from the
front to access the levelers.
Use the top screw hole in the leveler to raise or lower
the hood on that side.
Use the bottom screw hole to pull the hood tight
against the wall surface.
Mark hole location at the bottom of the hood.
Remove the hood. If the bottom screw hole does not
enter a stud, enlarge the hole to 3/8 and install wall
fastener anchors.
Place the hood back onto the mounting bracket,
check level again and install the wall fastener.
6
Screw hole
Levelers
CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING:If house wiring is not 2-wire
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be
sure to use U.L. approved anti-oxidant compound
and aluminum-to-copper connectors.
AVERTISSEMENT :
Si la maison n’est pas câblee avec deux fils et un
fil de terre, l’installateur doit installer un fil de terre.
Quand les fils sont en aluminium, il faut prendre soin
d’utiliser des connecteurs aluminium à cuivre avec
une pâte antioxydante approuvée par U.L.
Remove junction box cover and knockout on the
left side.
Secure the house wiring to the junction box with
a strain relief.
Connect white leads to branch circuit white lead.
Connect black leads to branch circuit black lead.
Connect green/yellow leads to branch circuit
green lead or bare ground lead.
Secure all connections with wire nuts on each
electrical connector.
Push wires into junction box and replace cover.
Be sure wires are not pinched.
Secure J-Box cover with original screw.
8
Installation Instructions
INSTALLATION—RECIRCULATING
18
SIZE AND CUT DUCT PIECE
Hold upper air deflector
with duct connector
against the ceiling.
Measure from the bottom
of the air deflector to the
top of the hood as
shown. Reduce that
dimension by 1
to
facilitate installation.
The duct will cover
and overlap the deflector
and the hood outlets.
Cut the duct piece to size and
slip onto the bottom of the
deflector.
Place the assembled deflector
and duct over the exhaust
outlet.
Hold the assembly against the
duct bracket.
Drive 4 screws into the bottom
of the deflector and into the
bracket.
Use duct tape to seal duct
to the deflector and at the
exhaust outlet.
7
Measure
length
Deflector
Duct
length
Knockout
J-Box
cover
House wiring
J-Box
cover
19
Installation Instructions
INSTALLATION—RECIRCULATING
INSTALL FILTERS
IMPORTANT: Check to be sure that the main
ON/OFF switch next to the motor is in the ON
position.
Charcoal filter
Install the black charcoal filter into the center
opening. Secure the filter with thumbscrews on
each side.
Metal filter
Tip the filter into the left or right side of the
opening. Lift the filter to the opposite side and into
the filter lock.
To remove the filter, pull the filter lock downward.
10
FINALIZE INSTALLATION
Remove all tape and packing material.
Refer to the Owner’s Manual for operating
instructions.
11
INSTALL DUCT COVERS
Place the decorative duct
covers on top of the hood.
NOTE: The inside piece has
holes on one end intended for
use when the hood is installed
for recirculating purposes.
Be sure the vented end is at
the top; the vent holes will
be visible in this installation.
The inside duct piece must slip
into the folded ends on the outer
section.
Extend the inner duct upward to the ceiling
bracket.
Secure duct cover to ceiling bracket with 2 screws.
9
Mounting
screw holes
Vent holes
Duct cover
support bracket
Upper
duct cover
Lower duct
cover
Lower duct
cover seat
Filter Lock
Duct cover
support bracket
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21

GE Monogram MONOGRAM ZV900 Manuel utilisateur

Catégorie
Hottes
Taper
Manuel utilisateur
Ce manuel convient également à

dans d''autres langues