JADE BATH 11111 RUE COLBERT, ANJOU, QC, H1J 2S1 TEL: 1.866.333.0555 - JADEBATH.COM - INFO@JADEBATH.COM
Box content
1. Mounting brackets
2. FLoor screws
3. Plastic anchors
4. Bowl Mounting screw
Necessary tools
1. Drill
2. Hammer
3. Screwdriver
4. Glue (for glass)
5. Triagular ruler
Step 3
Draw a cross guideline
at the point which is
305mm (12”) away from
the roughing in center to
the wall.
Step 4
Using the tracing sheet,
cut out the drain hole and
then align it onto the floor
flange.
Step 5
Drill 2 8mm holes using
the tracing sheet, for the
ground screws.
Step 6
Insert the plastic anchors
to the floor. Then
attach the Type Seven
Installation Brackets
using the floor screws.
Contenu de la boite.
1. Équerres en Plastique
2. Vis à plancher
3. Chevilles en plastique
4. Vis de montage
Outils necessaire
1. Perceuse
2. Marteau
3. Tournevis
4. colle (pour vitre)
5. Équerre
Étape 3
Mesurer à partir du mur
12po. Veuillez marquer
l’endroit en dessinant un
croix. Assurez-vous que
le guide est centré sur
cette croix.
Étape 4
A l’aide de la feuille de
traçage, découper la
sortie du drain et ensuite
alignez-là sur la bride
du sol.
Étape 5
Percer 2 trous de 8mm
à l’aide de la feuille de
traçage, pour les vis du
sol.
Étape 6
Insérez les chevilles en
plastique au plancher.
Ensuite fixez les équerres
d’installation de type
sept à l’aide des vis à
plancher.
Manuel D’Instruction
Instruction Manual
ÉTAPE 1 - STEP 1
ÉTAPE 4 - STEP 4
ÉTAPE 2 - STEP 2
ÉTAPE 5 - STEP 5 ÉTAPE 6 - STEP 6
ÉTAPE 3 - STEP 3