INSTALLATION MANUAL
AIR CONDITIONER
Please read this installation manual completely before installing the product.
Installation work must be performed in accordance with the national wiring
standards by authorized personnel only.
Please retain this installation manual for future reference after reading
it thoroughly.
P/NO : MFL68047201
www.lg.com
TYPE: Floor Standing
MFL68047201
ENGLISH
FRANÇAIS
2 Floor Standing - Type Air Conditioner
Floor Standing- Type Air Conditioner Installation Manual
TABLE OF CONTENTS
Safety Precautions
..........................................................................................
3
Installation of Unit
........................................................................................
6
1) Selection of the best location.................................................................................................................................6
2) Indoor Unit Installation ...........................................................................................................................................8
3) Outdoor unit installation .........................................................................................................................................8
4) Refrigerant amount ................................................................................................................................................8
5) Installation method procedure................................................................................................................................9
6) Preparation of installation parts and tools ...........................................................................................................10
7) Preparation of piping............................................................................................................................................11
8) Connection of piping ............................................................................................................................................12
9) Precautions in bending ........................................................................................................................................12
10) Connecting the cable to the indoor unit.............................................................................................................13
11) Connecting the pipings to the outdoor unit........................................................................................................14
12) Connecting the cable to the outdoor unit...........................................................................................................14
13) Power supply and wiring ....................................................................................................................................15
14) Vacuum Drying of the connecting pipes and the indoor unit..............................................................................16
OUT-LINE OF INSTALLATION
15) Form the piping..................................................................................................................................................17
16) Installation guide at the seaside............................................................................................................................18
Final Check and Test Run ..........................................................................................19
Safety Precautions
Installation Manual 3
To prevent injury to the user or other people and property damage, the following instructions
must be followed.
Incorrect operation due to ignoring instruction will cause harm or damage. The seriousness
is classified by the following indications.
Meanings of symbols used in this manual are as shown below.
WARNING
CAUTION
This symbol indicates the possibility of death or serious injury.
This symbol indicates the possibility of injury or damage.
WARNING
Be sure not to do.
Be sure to follow the instruction.
Safety Precautions
Installation
Install the panel and the cover of
control box securely.
There is risk of fire or
electric shock.
Always install a dedicated
circuit and breaker.
• Improper wiring or
installation may cause fire or
electric shock
Use the correctly rated breaker
or fuse.
There is risk of fire or
electric shock.
Do not use a defective or
underrated circuit breaker. Use
this appliance on a dedicated
circuit.
There is risk of fire or
electric shock.
For electrical work, contact the
dealer, seller, a qualified
electrician, or an Authorized
Service Center.
Do not disassemble or repair
the product. There is risk of
fire or electric shock.
Always ground the product.
There is risk of fire or
electric shock.
ENGLISH
4 Floor Standing - Type Air Conditioner
Safety Precautions
Do not modify or extend the power cable.
There is risk of fire or electric shock.
Be cautious when unpacking and installing the
product.
Sharp edges could cause injury. Be especially
careful of the case edges and the fins on the
condenser and evaporator.
For installation, always contact the dealer or an
Authorized Service Center.
There is risk of fire, electric shock, explosion,
or injury.
Do not install the product on a defective
installation stand.
• It may cause injury, accident, or damage to
the product.
Be sure the installation area does not
deteriorate with age.
If the base collapses, the air conditioner could fall with
it, causing property damage, product failure, and
personal injury.
Do not let the air conditioner run for a long time when
the humidity is very high and a door or a window is
left open.
• Moisture may condense and wet or damage
furniture.
Do not store or use flammable gas or combustibles
near the product.
There is risk of fire or failure of product.
Operation
nilosaG
Safety Precautions
Installation Manual 5
Always check for gas (refrigerant) leakage after
installation or repair of product.
• Low refrigerant levels may cause failure of
product.
Install the drain hose to ensure that water is
drained away properly.
• A bad connection may cause water leakage.
Keep level even when installing the product.
To avoid vibration or water leakage.
Do not install the product where the noise or hot air
from the outdoor unit could damage the
neighborhoods.
• It may cause a problem for your neighbors.
Use two or more people to lift and transport the
product.
• Avoid personal injury.
Do not install the product where it will be
exposed to sea wind (salt spray) directly.
• It may cause corrosion on the product.
Corrosion, particularly on the condenser and
evaporator fins, could cause product
malfunction or inefficient operation.
CAUTION
90˚
Installation
ENGLISH
6 Floor Standing - Type Air Conditioner
Installation of Unit
Installation of Unit
1. Indoor unit
There should not be any heat source or
steam near the unit.
There should not be any obstacles to
prevent the air circulation.
• A place where air circulation in the room
will be good.
• A place where drainage can be easily
obtained.
• A place where noise prevention is taken
into consideration.
• Do not install the unit near the door way.
• Ensure the spaces indicated by arrows
from the wall, ceiling, or other obstacles.
The indoor unit must keep the
maintenance space.
2. Outdoor unit
• If an awning is built over the unit to prevent
direct sunlight or rain exposure, be careful
that heat radiation from the condenser is
not restricted.
There should not be any animals or plants
which could be affected by hot air
discharged.
• Ensure the spaces indicated by arrows
from the wall, ceiling, fence or other
obstacles.
Selection of the best location
mc5
mc04
mc5
mc001
More than
50cm
ro ecneF
selcatsbo
More than 100cm
More than 50cm
More than
More than
30cm
30cm
More than
50cm
foornuS
Installation of Unit
Installation Manual 7
3. Piping length and the elevation
CAUTION:
Capacity is based on standard length and maximum allowance length is on
the basis of reliability.
Oil trap should be installed every 5~7 meters.
TP-H488TLA/C5
TP-H488TMA5
3/8" 30 20
PIPE SIZE
MODEL
GAS SIDE LIQUID SIDE
Max.
Length
A (m)
Max.
Elevation
B (m)
A
B
Indoor unit
Outdoor unit
3/4"
ENGLISH
8 Floor Standing - Type Air Conditioner
Installation of Unit
Indoor Unit Installation
Outdoor unit Installation
200mm
70mm
70mm
90mm
Wall
Core Drill
Tilt
Cut if necessary
More than 15mm
Wall
Plastic tube
(Bushing)
INSIDE OUTSIDE
1. The mounting floor should be strong and solid
enough to prevent it from vibration.
2. Drill the piping hole with 70mm diameter hole-
core drill at either the right or the left of indoor
unit. The hole should be sightly slant to the
outdoor side.
3. Insert the plastic tube through the hole.
4. Cut the extruded outside part of the plastic
tube, if necessary.
1. Install the outdoor unit on the concrete or any solid base securely and horizontally by securing it
with bolts (Ø12mm) and nuts.
2. If there is any vibration transmitted to the building, mount the rubber underneath the outdoor unit.
Refrigerant amount
Before shipment, this air conditioner is filled
with the rated amount of refrigerant including
additional amount required for air-purging,
subject to 7.5m piping length. (The rated amount
of refrigerant is indicated on the name plate.)
But when the piping length exceeds 7.5 meters,
additional charge is required according to the
following table.
Example:
In case of 10m long pipe(one-way), the amount
of refrigerant to be replenished is:
(10 - 7.5) x 70 = 175g
(Unit: g)
REFRIGERANT CHARGE
70 per 1m
MODEL
TP-H488TLA/C5
TP-H488TMA5
Installation Manual 9
Installation of Unit
Installation Method3URFHGXUH
No. Installation works Descriptions
1 Preparation of tools and installation parts Preparation of installation
2 Flaring the pipes To insert the flare nuts, mounted on the
connection parts of both indoor and
outdoor unit, onto the copper pipes.
3 Pipe bending To reduce the flow resistance of refrigerant.
4 Connection of installation parts Connection of long piping
(elbows, socket etc)
5 Tighten the flare nut (outdoor) Connecting the pipings of the outdoor unit.
6 Blowing the pipings To remove dust and scale in working.
7 Tighten the flare nut (indoor) Connecting the pipings of the indoor unit.
8 Check a gas-leakage of the connecting
part of the pipings.
9 Vacuum drying of the piping and indoor unit The air which contains moisture and which
remains in the refrigeration cycle may cause a
malfunction on the compressor
10 Open the 3-way (liquid side) and
3-way (gas side) valves.
11 Form the pipings To prevent heat loss and sweat
12 Checking the drainage (indoor unit) To ensure if water flow drain hose of indoor unit.
13 Connecting the cable between outdoor Preparation of the operating
and indoor unit
14 Connecting the main cable to outdoor unit
15
Cooling
operation
(Use the remote control or display of the
indoor unit)
ENGLISH
10 Floor Standing - Type Air Conditioner
Installation of Unit
Preparation of installation parts and tools
No. Installation Parts, Tools Use
1 Flaring tool 6.35 - Ø 19.05) Flaring the pipes
2 Remear Remove burrs from cut edges of pipes.
3 Pipe cutter (MAX 35mm Copper pipe) Cutting the pipings
4 Wrench (H5, H4 hexagonal wrench) To open the service valve
5 Pipe bender Bending the pipings
6 Leak detector Check a gas-leakage of connecting part
of the pipings
7 Manifold gauge
To measure the pressure, to charge the refrigerant
8 Charge-nipple To connect the bombe
9 Vacuum pump To remove the air in the pipe.
10 Charge cylinder balance To measure the refrigerant amount
11 Bombe (Freon-22) Gas charge
Cleaning the pipe
12 Spanner To tighten the connecting parts of the pipings
13 Monk
ey spanner
14 Driver(
, )
15 Benchi (150mm) Cutting the wires
16 Tapeline To measure the length
17 Core drill
To make holes through the concrete wall and blocks
18 Voltmeter, Amperemeter, Clampmeter To measure the current and voltage
19 Insulation resistance tester To measure the insulation resistance
20 Glass thermometer
To measure the intake and outlet air temperature of the indoor unit
21 Copper tubes To use the connecting pipings
22 Insulation material To cover the connecting pipings
23 Tape To finish the connecting pipings
24 Electrical Leakage Breaker To shut off the main power
25 Cable
To connect the cable from outdoor unit to indoor unit
26 Drain hose sockets, elbows To remote the condensing water
Installation Manual 11
Installation of Unit
Preparation of Piping
Main cause of gas leakage is defect in flaring
work. Carry out correct flaring work in the
following procedure.
1. Cut the pipes and the cable.
Use the accessory piping kit or the pipes
purchased locally.
Measure the distance between the indoor
and the outdoor unit.
Cut the pipes a little longer than measured
distance.
Cut the cable 1.5m longer than the pipe
length.
2. Burrs removal
Completely remove all burrs from the cut
cross section of pipe/tube.
Put the end of the copper tube/pipe to
downward direction as you remove burrs in
ord
er to avoid to let burrs drop in the tubing.
3. Putting nut on
• Remove flare nuts attached to indoor and
outdoor units, than put them on pipe/tube
having completed burr removal.
(Not possible to put them on after flaring work)
4. Flaring work
Carry out flaring work using dedicated
flaring tool for R-22 as shown below.
Firmly hold copper tube in a bar(or die) as
indicated dimension in the table above.
5. Check
Compare the flared work with figure below.
If flare is noted to be defective, cut off the
flared section and do flaring work again.
Copper
tube
90°
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Inclined
Inside is shining without scratches
Smooth all round
Even length
all round
Surface
damaged
Cracked Uneven
thickness
= Improper flaring =
Outside diameter A
mm inch mm
Ø6.35 1/4 0~0.5
Ø9.52 3/8 0~0.5
Ø12.7 1/2 0~0.5
Ø15.88 5/8 0~1.0
Ø19.05 3/4 0~1.0
ENGLISH
12 Floor Standing - Type Air Conditioner
Installation of Unit
Connection of piping
• Align the center of the pipings and suffciently
tighten the flare nut with fingers.
• Finally, tighten the flare nut with troque
wrench until the wrench clicks.
When tightening the flare nut with troque
wrench, ensure the direction for tightening
follows the arrow on the wrench.
1.
If it is necessary to bend or stretch the
tubing, use the spring which is attached to
the tubing in stead of pipe bender.
• Please make a careful notice to make a
smooth line.
• Hold the tubing with your two hands closely
and then bend or stretch it slowly not to
make any crack.
• Remember that the radius (R) should not
exceed 70mm (Refer to Fig. 1)
2. Do not repeat the bending process to prevent
the tubing from cracking or crushing.
3. Keep in mind that the bending part should
not be cracked and make the radius (R) as
long as possible (Refer to Fig. 2)
PIPE SIZE TORQUE
1/4" 1.8 Kg
.
m
3/8" 4.2 Kg
.
m
1/2" 5.5 Kg
.
m
5/8" 5.5 Kg
.
m
3/4" 6.5 Kg
.
m
1. Move the indoor tubing and drain hose to the hole
• Remove tubing holder and pull the tubing out of the chassis.
2. Replace the tubing holder into original position
3. Route the tubing and the drain hose staight backwards.
4. Insert the connecting cable into the indoor unit through the hole.
• Do not connect the cable to the indoor unit
• Make a small loop with the cable for easy connection later.
5. Tape the tubing and the connecting cable.
6. Indoor unit installation.
7. Connecting the pipings to the indoor unit.
Precautions in bending
Indoor unit tubing
Flare nut
Pipings
Torque wrench
Spanner
Spring
R70mm
(Fig. 1)
(Fig. 2)
R
Installation of Unit
Installation Manual 13
Connecting the Cable to Indoor Unit
The inside and outside connecting cable can be connected after opening the inlet grille.
To outdoor unit
Knock off
1. Open the inlet grille manually.(Fig.1)
2. Open the terminal block cover with driver( ).
3. Connect the cables(LG doesn't sypply) to the Terminal Block in the front Bracket. (Fig.2)
4. Secure the terminal block cover to the original position with the screw.
5. Knock off the hole for connecting wires
(Fig. 3).
6. Close the inlet grille.
(Fig.1)
(Fig.3)
Detail Wiring of Fig.2
(Fig.2)
H/P Model
1(L) 2(N) 3
4
ENGLISH
14 Floor Standing - Type Air Conditioner
Installation of Unit
Connecting pipings to the outdoor unit
1. Align the center of the pipings and
sufficiently tighten the flare nut with fingers.
2. Finally tighten the flare nut with torque
wrench until the wrench clicks.
When tightening the flare nut with torque
wrench, ensure the direction for tightening
follows the arrow on the wrench.
1. Open the control board cover from the
outdoor unit by removing the screws.
2. Connect wires to the terminals on the control
board individually and secure the cables
onto the control board with clamp.
3. Secure the control board cover to the
original position with the screws.
CAUTION: Perform grounding
This product should be grounded.
Defective grounding could cause an
electric shock.
Gas side piping
Liquid side piping
Torque wrench
Outdoor unit
PIPE SIZE TORQUE
1/4" 1.8 Kg
.
m
3/8" 4.2 Kg
.
m
1/2" 5.5 Kg
.
m
5/8" 5.5 Kg
.
m
3/4" 6.5 Kg
.
m
Connecting the cables to the outdoor unit
H/P Model
Power supply should include the grounded wire.
1(L) 2(N) 3
4
R
POWER SUPPLY
S T N
TO INDOOR UNIT
3 4 51(L) 2(N)
Installation of Unit
Installation Manual 15
E NG LIS
Power Supply and Wiring
The unit is completely wired internally at the
factory according to general rule of electrical
technology, but local rules, if they are required,
should be complied with.
1. Power supply
Power source must fulfill the following
conditions:
The working voltage should be higher than
90% and lower than 110% of the rated
voltage marked on the name plate.
The starting voltage should be higher than
85% of the rated voltage marked on the
name plate.
Voltage
Time
Starting point
Power source voltage
working voltage
Starting voltage
Provide a recognized circuit breaker as
below between power source and unit.
A disconnection device to adequately
disconnect all supply lines must be fitted.
(for service operations)
The screws which fasten the wiring in the
casing of electrical fittings are liable to
come loose from vibrations to which the
unit is subjected during the course of
transportation. Check them and make sure
that they are all tightly fastened.
(If they are loose, it could give rise to burn-
out of the wires.)
See to it that the starting voltage is
maintained at more than 90 percent of the
rated voltage marked on the name plate.
The following troubles would be caused by
voltage drop-down.
Vibration of a magnetic switch, damage on
the contact point there of, fuse breaking,
disturbance to the normal function of a
overload protection device.
2. Wiring
After the confirmation of the above conditions, prepare the wiring as follows:
UNIT Circuit breaker capacity
20A
TP-H488TLA/C5
TP-H488TMA5
mm
2
UNIT VOLTS
Conductor
cross-sectional
area
TP-H488TLA/C5
TP-H488TMA5
3.3
380-415V
Use the power supply cord(Rubber
insulation, type H07RN-F approved by IEC)
s'tcudorp eht rof elbatius
electriccal
capacity.
ENGLISH
16 Floor Standing - Type Air Conditioner
Installation of Unit
Vacuum Drying of the Connecting Pipes and the Indoor Unit
The air which contains moisture remaining in the refrigeration cycle may cause a malfunction on the
compressor.
1. Confirm that both the liquid side valve and the gas side valve are set to the closed position.
2. After connecting the piping, check the joints for gas leakage with gas leak detector.
3. Remove the service port nut, and connect the gauge manifold and the vacuum pump to the service
port by the charge hose.
4. Vacuum the indoor unit and the connecting pipes until the pressure in them lowers to below -
76cmHg.
5. Remove the valve stem nuts, and fully open the stems of the 2-way and 3-way valves with a hexagon
wrench.
6. Tighten the valve stem nuts of the 2-way valve and 3-way valve.
7. Disconnect the charge hose and fit the nut to the service port.
(Tightening torque: 1.8kg.m)
Indoor unit
Outdoor unit
Liquid side
CLOSEOPEN
Vaccum pump
Gas side
Closed
Closed
2-way valve/
3-way valve
3-way
valve
Installation of Unit
Installation Manual 17
Form the Piping
1. Wrap the connecting portion of indoor unit
with the insulation material and secure it with
two Plastic Bands. (for the right piping)
If you connect an additional drain hose,
the end of the drain-outlet should be kept
distance from the ground. (Do not dip it
into water, and fix it on the wall to avoid
swinging in the wind.)
2. Tape the Piping, and Connecting Cable from
down to up.
3. Form the piping gathered by taping along the
exterior wall and fix it onto the wall by saddle
or equivalent.
1. Tape the piping and connecting cable from
down to up.
2. In order to prevent water from entering the
room, form a trap and tape the piping.
3. Fix the piping onto the wall with saddle or
bracket.
In case of the outdoor unit is installed below
position of the indoor unit.
In case of the outdoor unit is installed upper
position of the indoor unit.
Trap
Trap
Seal a small opening around
the piping with gum type sealer.
Gas side
piping
Main cable
Tube PE
Foam
Connecting
Cable
(For heater)
Connecting
Cable
Trap is required to prevent the electrical parts
from entering the water.
ENGLISH
Final Check and Test Run
Installation Manual 19
After installing the unit, perform the final check
and running test as follows:
Final check points
Is the unit securely mounted?
Is the installation location adequate?
Is the water piping work adequately and
without leakage?
Are trapped drain lines installed at
condensate drain connections?
Has the refrigeration cooling cycle been
kept sealed?
Is the electrical wiring adequate and are
the screws tightened on terminals?
After the above final checkings, prepare the
running test as follows:
Connect compound gauges to the check
joints at discharge and suction sides of
the compressor.
Turn all switches "OFF".
Turn the main switch "ON".
Running test should be accomplished as follows:
Set operation switch at "FAN" and the fan
will start. Check to ensure that the fan
sounds normal.
Next, set it at "COOL" and the
compressor will start. Check to ensure
that the compressor sounds normal.
Check discharge and suction pressure on
the compound gauges.
Check working voltage, phase balance
and running current.
Check to ensure that the thermistor
functions properly.
Check to ensure that the high pressure
control switch functions correctly.
Final Check and Test Run
ENGLISH
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61

LG TPNH488TMA5.ANWBAAS Guide d'installation

Catégorie
Climatiseurs split-system
Taper
Guide d'installation
Ce manuel convient également à

dans d''autres langues