Vertiv Geist™ Quick Installation Guide

Catégorie
Unités de distribution d'énergie (PDU)
Taper
Quick Installation Guide
Vertiv™ Geist™ Upgradeable PDU
and Universal PDU
Quick Installation Guide
VM1246/SL-70646_REVE_06-23 1
Installing the rPDU
a. Using appropriate hardware,
mount the unit to the rack.
b. Plug the PDU into an
appropriately rated and
protected branch circuit
receptacle.
WARNING! PDUs supplied with
external ground stud have high
touch current. Earth connection is
essential prior to connecting
supply.
A #8 grounding stud, ring terminal
and nut have been provided on the
face of the device to facilitate
attachment to earth. Reference the
conductor size in the power cord
and PDU rating for appropriate
sizing of the external earth
conductor. Aix the provided ring
terminal to this wire, following
manufacturer’s installation
instructions. Place the ring terminal
on the grounding stud and torque
the nut to the appropriate torque
listed in the table below. Attach the
other end of the conductor to your
facility’s earthing system.
c. Plug in the devices that are to be
powered by the PDU.
d. Power-on the devices that are to
be powered by the PDU.
NOTE: Sequential power-up is
recommended to avoid high inrush
current.
Installing the Universal PDU:
The Universal Power Distribution
Units (UPDU) are equipped with a 7
or 8-wire Panel Mount connector.
These units are intended to be
mated with a Facility Side Cable
(FSC) available for the unit. The FSC
connects to a single-phase AC Mains
circuit, a 3-phase WYE or Delta AC
Mains circuit. The Universal PDUs are
provided with IEC C13- and/or IEC
C19-type outlets for connection to
external devices.
IMPORTANT: Mount the UPDU to
the rack before plugging the FSC
into UPDU. Ensure that the plastic
guide on the FSC plug is in line with
the channel of the UPDU inlet to
properly plug in the FSC. See image
below for reference points on the
outer shells of connectors.
Environmental
Temperature Operating Storage
Basic, Upgradeable Basic,
Metered, Unit Monitored
0°C to 60°C (32°F
to 140° F)
-40°C to 70°C (-40°F
to 158°F)
Upgradeable Switched, Outlet
Monitored –Horizontal
0°C to 60°C (32°F
to 140°F) 48A Max
-40°C to 70°C (-40°F
to 158°F)
Upgradeable Switched, Outlet
Monitored – Vertical
0°C to 60°C (32°F
to 140°F) at 50%
per receptacle load
-40°C to 70°C (-40°F
to 158°F)
Universal Power Distribution
Unit
0°C to 60°C* (32°F
to 140°F)
-40°C to 70°C (-40°F
to 158°F)
NOTE: DU00X2R1-18C137-0H02A9F00-S is 45°C (113°F) maximum (100% of
maximum current rating) / 60°C (140°F) maximum (50% of maximum
current rating)
Humidity Operating Storage
All PDUs 5% to 95%
(non-condensing)
5% to 95%
(non-condensing)
Elevation Operating Storage
All PDUs 0 m to 3,050 m (0
ft. to 10,000 ft.)
0 m to 12,200 m (0 ft.
to 40,000 ft.)
Stud/Nut/Size Wire Size Torque -in.-lb. (Nm)
#8 <8AWG (10mm2)16.5 (1.86)
#8 8AWG (10mm2)27 (3.05)
M5 <8AWG (10mm2)16.5 (1.86)
M5 8AWG (10mm)27 (3.05)
1/4”–20* >8AWG (10mm2)27 (3.05)
NOTE: The wire retaining set screw in the associated terminal must be
torqued to 16.5 in-lb (1.86 NM).
1. Using appropriate hardware, mount
the unit to the rack.
2. Plug the
FSC
into the Universal PDU.
NOTE: It may be necessary to install
a cable support in order to reduce
strain on the Panel Mount connector.
2 VM1246/SL-70646_REVE_06-23
Item Description Item Description
1Plug Reference Point 3Inlet Channel
2Plug Plastic Guide 4Inlet Reference Point
3. Plug the FSC into an appropriately
rated and protected branch circuit.
4. Plug in the devices to be powered
by the Universal PDU.
NOTE: For devices powered by the
Geist UPDU, sequential power up is
recommended to avoid high inrush
current.
Input Rating Facility Side
Cable
# Of
Circuit
Breakers
Panel Mount
Connector
Current
(MAX) Voltage Frequency
24A 200 to 240 VAC 50/60 Hz Single-Phase 6
7-Wire, 3 Inch
40 A 200 to 240 VAC, 3W+PE 50/60 Hz 4-wire Delta 6
24 A (UL) /
32 A (CE)
200 to 240/346-415 VAC,
3W+N+PE
50/60 Hz 5-wire WYE 6
48 A 100 to 240 VAC 50/60 Hz Single-Phase 3
8-Wire, 1.5 Inch
24 A 100 to 240 VAC 3~ 50/60 Hz 4-wire Delta 3
16 A 100 to 240/208–415 VAC 3~ 50/60 Hz 5-wire WYE 3
48 A (UL) /
63 A (CE)
100 to 240 VAC 50/60 Hz Single-Phase 6
48 A 100 to 240 VAC 3~ 50/60 Hz 4-wire Delta 6
24 A (UL) /
32 A (CE)
100 to 240/208–415 VAC 3~ 50/60 Hz 5-wire WYE 6
Vertiv™ Geist™ Upgradeable PDU GU2
Quick Installation Guide
VM1246/SL-70646_REVE_06-23 3
Vertiv™ Geist™ Upgradeable PDU GU2
Quick Installation Guide
Configuring IP Addressable
Units
The PDU is equipped with an RJ45
Ethernet port for connection to an
existing network. The PDU is
configured with the following default
network settings to allow unit
configuration:
IP address: 192.168.123.123
Subnet Mask: 255.255.255.0
Gateway: 192.168.123.1
The local PC network connection
must be configured as follows:
IP Address: 192.168.123.x (where x is
2-253, except 123)
Subnet Mask: 255.255.255.0
Gateway: <leave blank>
To Replace The IMD Module:
IMPORTANT: Photos for these steps
are shown on next page.
NOTE: Be sure to have the new IMD
module ready for installation
immediately after removal of the old
IMD.
1. Remove the disposable ESD
wriststrap from the package,
remove the adhesive backing and
attach the strap to the PDU. Put
the wriststrap on your arm so that
it has contact with bare skin.
2. Insert the Vertiv IMD Removal Tool
as shown. Be sure to press the tool
in level, pressing in until the tool
is flush with the face of the IMD.
Some older versions may require
overlays to be removed prior to
inserting the tool.
3. Carefully pull the tool and the
IMD straight out about 2 inches.
Remove the tool from the IMD.
CAUTION: The IMD is still
connected internally. Do not pull
it more than 2 inches from the
chassis.
4. Gently unplug the connector from
the IMD.
IMPORTANT: Ensure that you have
the wrist strap on before proceeding.
See Step 1 for more information.
5. Connect the cable to the
replacement IMD module.
6. Place the cable into the strain-relief
slot in the IMD’s housing as shown.
7. Tuck the excess cable back into the
PDU, and slide the IMD straight in.
Press with both thumbs until the IMD
snaps into place.
To contact Vertiv Technical Support: visit www.Vertiv.com
© 2023 Vertiv Group Corp. All rights reserved. Vertiv™ and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp. All other names and logos referred to are trade names,
trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness here, Vertiv Group Corp. assumes no responsibility,
and disclaims all liability, for damages resulting from use of this information or for any errors or omissions. Specifications, rebates and other promotional oers are subject to change at Vertivs
sole discretion upon notice.
4 VM1246/SL-70646_REVE_06-23
Vertiv™ Geist™ Upgradeable PDU GU2
Quick Installation Guide
1 2 3
4
56
7
Vertiv™ Geist™ aufrüstbare PDU
und universelle PDU
Schnellinstallationsanleitung
VM1246/SL-70646_REVE_06-23 5
Installation der rPDU
a. Montieren Sie das Gerät mit
geeignetem Werkzeug am Rack.
b. Schließen Sie die PDU an eine
entsprechend belastbare und
geschützte Netzsteckdose des
Abzweigstromkreises an.
WARNUNG! PDUs, die mit einem
externen Erdungsbolzen
ausgestattet sind, haben einen hohen
Berührstrom. Vor dem Anschließen
der Stromversorgung ist zwingend
eine Erdverbindung erforderlich.
Zum Herstellen der Erdverbindung
sind an der Vorderseite des Geräts
ein Erdungsbolzen (Nr. 8), ein
Ringkabelschuh und eine Mutter
angebracht. Um die geeignete Stärke
des externen Erdungsleiters zu
ermitteln, ziehen Sie bitte die
Leiterstärke in den Netzkabel- und
PDU-Nennwerten zurate. Befestigen
Sie den mitgelieferten
Ringkabelschuh gemäß den
Installationsanweisungen des
Herstellers am Draht. Setzen Sie den
Ringkabelschuh auf den
Erdungsbolzen und ziehen Sie die
Mutter entsprechend dem in der
nachstehenden Tabelle angegebenen
Drehmoment an. Das andere Ende
des Leiters schließen Sie am
Erdungssystem Ihrer Anlage an.
c. Schließen Sie die Geräte an, die
von der PDU mit Strom versorgt
werden sollen.
d. Schalten Sie die Geräte ein, die
von der PDU mit Strom versorgt
werden sollen.
HINWEIS: Es wird empfohlen, die Geräte
nacheinander einzuschalten, um einen
hohen Einschaltstrom zu vermeiden.
Installation der universellen PDU:
Die universellen Power Distribution
Units (UPDU) sind mit einem 7- oder
8-adrigen Steckverbinder zur
Plattenmontage ausgestattet. Diese
Geräte sind für die Verbindung mit
einem für das Gerät erhältlichen
werkseitigen Kabel vorgesehen. Das
werkseitige Kabel wird an einen
einphasigen Wechselstromkreis bzw.
einen dreiphasigen Stern- oder
Dreieck-Wechselstromkreis
angeschlossen. Die universellen PDUs
sind mit Ausgängen vom Typ IECC13
und/oder IECC19 zum Anschluss an
externe Geräte ausgestattet.
WICHTIG: Montieren Sie die UPDU
am Rack, bevor Sie das werkseitige
Kabel in die UPDU einstecken. Stellen
Sie sicher, dass die Kunststoführung
am Stecker des werkseitigen Kabels
Umgebungsbedingungen
Temperatur Betrieb Lagerung
Basisversion, aufrüstbare
Basisversion, gemessen,
anlagenüberwacht
0°C bis 60°C -40°C bis 70°C
Aufrüstbar, geschaltet,
ausgangsüberwacht– horizontal
0°C bis 60°C
48A Max
-40°C bis 70°C
Aufrüstbar, geschaltet,
ausgangsüberwacht– vertikal
0°C bis 60°C bei
50% je
Buchsenlast
-40°C bis 70°C
Universelle Power Distribution Unit
0°C bis 60°C* -40°C bis 70°C
HINWEIS: DU00X2R1-18C137-0H02A9F00-S ist maximal 45°C (100% des
max. Nennwerts) / maximal 60°C (50% des max. Nennstroms)
Luftfeuchtigkeit Betrieb Lagerung
Alle PDUs 5% bis 95% (nicht
kondensierend)
5% bis 95% (nicht
kondensierend)
Höhe Betrieb Lagerung
Alle PDUs 0 m bis 3.050 m 0 m bis 12.200 m
Bolzen-/
Muttergröße Drahtstärke Drehmoment Nm
Nr. 8 <8AWG (10mm2) 1,86
Nr. 8 8AWG (10mm2)3,05
M5 <8AWG (10mm2) 1,86
M5 8AWG (10mm)3,05
1/4”–20* >8AWG (10mm2)3,05
HINWEIS: Die den Draht haltende Stellschraube in der entsprechenden
Anschlussklemme muss mit einem Drehmoment von 1,86Nm angezogen werden.
am Kanal des UPDU-Eingangs
ausgerichtet ist, damit das Kabel
korrekt eingesteckt wird. Im folgenden
Bild sehen Sie Referenzpunkte zu den
Außenhüllen von Steckverbindern.
1. Montieren Sie das Gerät mit
geeignetem Werkzeug am Rack.
2. Schließen Sie das
werkseitige Kabel
an die universelle PDU an.
HINWEIS:
Unter Umständen muss
ein Kabelhalter installiert werden, um
die Belastung des Steckverbinders
zur Plattenmontage zu reduzieren.
6 VM1246/SL-70646_REVE_06-23
Vertiv™ Geist™ aufrüstbare PDU GU2
Schnellinstallationsanleitung
Element Beschreibung Element Beschreibung
1 Stecker-Referenzpunkt 3 Eingangskanal
2 Stecker-Kunststoführung 4 Eingang-Referenzpunkt
3. Schließen Sie das werkseitige
Kabel an einen entsprechend
belastbaren und geschützten
Versorgungsstromkreis an.
4. Schließen Sie die Geräte an, die
von der universellen PDU mit
Strom versorgt werden sollen.
HINWEIS: Bei Geräten, die
über die Geist UPDU mit Strom
versorgt werden, empfiehlt sich ein
sequenzielles Einschalten, um einen
hohen Einschaltstrom zu vermeiden.
Eingangsleistung Werkseitiges
Kabel
Anzahl
Trennschalter
Steckverbinder zur
Plattenmontage
Stromstärke
(MAX) Spannung Frequenz
24A 200 bis 240VAC 50/60Hz Einphasig 6
7-adrig, 78mm
40 A 200 bis 240 VAC, 3W+PE 50/60Hz 4-adrig Dreieck 6
24A (UL)/
32A (CE)
200 bis 240/346-415 VAC,
3W+N+PE
50/60Hz 5-adrig Stern 6
48 A 100 bis 240VAC 50/60Hz Einphasig 3
8-adrig, 38 mm
24 A 100 bis 240 VAC 3~ 50/60Hz 4-adrig Dreieck 3
16 A
100 bis 240/208–415 VAC 3~
50/60Hz 5-adrig Stern 3
48A (UL)/
63A (CE)
100 bis 240VAC 50/60Hz Einphasig 6
48 A 100 bis 240 VAC 3~ 50/60Hz 4-adrig Dreieck 6
24A (UL)/
32A (CE)
100 bis 240/208–415 VAC 3~
50/60Hz 5-adrig Stern 6
VVM1246/SL-70646_REVE_06-23 7
Vertiv™ Geist™ aufrüstbare PDU GU2
Schnellinstallationsanleitung
Konfigurieren von IP-
adressierbaren Geräten
Die PDU ist mit einem RJ45-
Ethernet-Anschluss für die
Verbindung mit einem bestehenden
Netzwerk ausgestattet. Die PDU ist
für den Betrieb im Netzwerk und die
Gerätekonfiguration mit den
folgenden Standardeinstellungen
konfiguriert:
IP-Adresse: 192.168.123.123
Subnetzmaske: 255.255.255.0
Gateway: 192.168.123.1
Die Netzwerkverbindung des lokalen
PCs muss wie folgt konfiguriert
werden:
IP-Adresse: 192.168.123.x (wobei x
für 2-253 steht, außer 123)
Subnetzmaske: 255.255.255.0
Gateway: <leer belassen>
Austauschen des IMD-Moduls:
WICHTIG: Fotos für diese Schritte
finden Sie auf der nächsten Seite.
HINWEIS:
Achten Sie darauf, dass
das neue IMD-Modul direkt zur
Installation bereitliegt, wenn Sie das
alte IMD-Modul entfernt haben.
1. Nehmen Sie das Antistatikarmband
aus der Verpackung, ziehen Sie
die Folie vom Klebestreifen ab
und befestigen Sie das Band an
der PDU. Legen Sie das Armband
so auf Ihren Arm, dass es direkten
Kontakt mit Ihrer Haut hat.
2. Setzen Sie das Vertiv IMD-
Ausbauwerkzeug wie gezeigt
ein. Achten Sie darauf, das
Werkzeug waagerecht und
gerade einzuführen, sodass es
bündig mit der Vorderseite des
IMD abschließt. Bei bestimmten
älteren Ausführungen müssen
ggf. Abdeckungen abgenommen
werden, bevor das Werkzeug
eingesetzt werden kann.
3. Ziehen Sie das Werkzeug und das
IMD-Modul vorsichtig und geradlinig
50mm heraus. Entfernen Sie das
Werkzeug vom IMD.
VORSICHT: Das IMD-Modul ist
immer noch intern verbunden.
Ziehen Sie es nicht weiter als
50mm aus dem Gehäuse heraus.
4. Ziehen Sie den Stecker vorsichtig
vom IMD-Modul ab.
WICHTIG: Sie müssen das
Antistatikarmband anlegen, bevor Sie
fortfahren. Siehe Schritt1 für weitere
Informationen.
5. Schließen Sie das Kabel an das
Ersatz-IMD-Modul an.
6. Platzieren Sie das Kabel in den
Zugentlastungs-Slot im Gehäuse des
IMD, wie in der Abbildung gezeigt.
7. Verstauen Sie das überschüssige
Kabel wieder in der PDU und
schieben Sie das IMD gerade hinein.
Drücken Sie mit beiden Daumen, bis
das IMD einrastet.
Der technische Kundendienst von Vertiv ist erreichbar unter: www.Vertiv.com
© 2023 Vertiv Group Corp. Alle Rechte vorbehalten. Vertiv™ und das Vertiv-Logo sind Marken oder eingetragene Marken der Vertiv Group Corp. Alle anderen erwähnten Namen und Logos sind
Handelsnamen, Marken oder eingetragene Marken der jeweiligen Eigentümer. Obwohl alle Vorkehrungen getroff en wur den, um die Richtigkeit und Vollständigkeit dieser Informationen zu
gewährleisten, übernimmt Vertiv Group Corp. keine Verantwortung und lehnt jede Haftung für Schäden ab, die durch die Verwendung dieser Informationen oder durch Fehler oder Auslassungen
entstehen. Spezifikationen, Rabatte und andere Werbeangebote können im alleinigen Ermessen von Vertiv auf Mitteilung geändert werden.
8 VM1246/SL-70646_REVE_06-23
Vertiv™ Geist™ aufrüstbare PDU GU2
Schnellinstallationsanleitung
1 2 3
4
56
7
PDU universal y PDU actualizable
Vertiv™ Geist™
Guía de instalación rápida
VM1246/SL-70646_REVE_06-23 9
Instalación de la rPDU
a. Utilizando el hardware apropiado,
monte la unidad en el rack.
b. Conecte la PDU a un receptáculo
de circuito derivado debidamente
clasificado y protegido.
ADVERTENCIA: Las PDU que
incluyen un perno de conexión a
tierra externo tienen una corriente
de contacto alta. Antes de conectar
la alimentación, es esencial realizar
la conexión a tierra.
Se incluye un perno de conexión a
tierra del número 8, un terminal de
anillo y una tuerca en la parte
delantera del dispositivo para facilitar
su conexión a tierra. Consulte el
tamaño del conductor en el cable de
alimentación y la clasificación de la
PDU para obtener el tamaño
adecuado del conductor a tierra
externo. Coloque el terminal de anillo
incluido en este cable, siguiendo las
instrucciones de instalación del
fabricante. Coloque el terminal de
anillo en el perno de conexión a tierra
y apriete la tuerca hasta alcanzar el
par de apriete adecuado que se indica
en la tabla siguiente. Conecte el otro
extremo del conductor al sistema de
conexión a tierra de su instalación.
c. Enchufe los dispositivos que deben
recibir alimentación de la PDU.
d. Encienda los dispositivos que deben
recibir alimentación de la PDU.
NOTA: Se recomienda un encendido
secuencial para evitar una entrada
de corriente alta.
Instalación de la PDU universal:
Las unidades de distribución de
alimentación universal (UPDU) están
equipadas con un conector de
montaje en panel de 7 u 8 cables.
Estas unidades están diseñadas para
acoplarlas con un cable lateral de
instalación (FSC, por sus siglas en
inglés) disponible para la unidad.
El
cable lateral de instalación se
conecta a un circuito de red de CA
monofásico o a un circuito de red de
CA trifásico WYE o Delta.
Las PDU
universales están provistas de
salidas tipo IEC C13 y/o IEC C19 para
la conexión a dispositivos externos.
IMPORTANTE: Monte la UPDU en el
rack antes de enchufar el cable lateral
de instalación en la UPDU. Asegúrese
de que la guía plástica en el enchufe
del cable lateral de instalación esté
alineada con el canal de la entrada de
la UPDU para poder enchufar
correctamente el cable lateral de
instalación. Consulte en la imagen
Requisitos ambientales
Temperatura En funcionamiento En almacenamiento
Básica, básica actualizable,
medida y monitoreada por unidad
De 0°C a 60°C De -40°C a 70°C
Conmutada actualizable, salida
monitoreada – Horizontal
De 0°C a 60°C
48A máx.
De -40°C a 70°C
Conmutada actualizable, salida
monitoreada – Vertical
De 0°C a 60°C al
50% según la carga
del receptáculo
De -40°C a 70°C
Unidad de distribución de
alimentación universal
De 0°C a 60°C* De -40°C a 70°C
NOTA: DU00X2R1-18C137-0H02A9F00-S es de 45°C máximo (100% de la
capacidad nominal de corriente máxima)/60°C máximo (50% de la
capacidad nominal de corriente máxima)
Humedad En funcionamiento En almacenamiento
Todas las PDU Del 5% al 95% (sin
condensación)
Del 5% al 95% (sin
condensación)
Elevación En funcionamiento En almacenamiento
Todas las PDU De 0m a 3.050 m De 0m a 12.200 m
Tamaño del
perno/tuerca Tamaño del cable Par de apriete Nm
N.°8 <8AWG (10mm2) 1,86
N.°8 8AWG (10mm2)3,05
M5 <8AWG (10mm2) 1,86
M5 8AWG (10mm)3,05
1/4”-20* >8AWG (10mm2)3,05
NOTA: El tornillo de fijación del cable en el terminal asociado debe apretarse
a 1,86Nm.
siguiente los puntos de referencia en
las carcasas externas de los
conectores.
1. Utilizando el hardware apropiado,
monte la unidad en el rack.
2. Enchufe el
cable lateral de instalación
en la PDU universal.
NOTA:
Puede ser necesario instalar
un soporte de cable para reducir la
tensión en el conector de montaje en
panel.
10 VM1246/SL-70646_REVE_06-23
PDU actualizable Vertiv™ Geist™ GU2
Guía de instalación rápida
Elemento Descripción Elemento Descripción
1Punto de referencia del enchufe 3Canal de entrada
2Guía plástica del enchufe 4Punto de referencia de la entrada
3. Conecte el cable lateral de
instalación en un circuito derivado
debidamente clasificado y
protegido.
4. Enchufe los dispositivos que
recibirán la alimentación de la PDU
universal.
NOTA: En el caso de los dispositivos
alimentados por la Geist UPDU, se
recomienda un encendido secuencial
para evitar una entrada de corriente
alta.
Clasificación de entrada Cable lateral de
instalación
Cant. de
disyuntores
de circuito
Conector de
montaje en panel
Corriente
(MÁX.) Voltaje Frecuencia
24 A De 200 a 240V de CA 50/60Hz Monofásico 6
7 cables, 78mm
40 A De 200 a 240V de CA,
3W+PE
50/60Hz 4 cables Delta 6
24A (UL)/
32A (CE)
De 200 a 240/346-415VCA,
3W+N+PE
50/60Hz 5 cables WYE 6
48 A De 100 a 240V de CA 50/60Hz Monofásico 3
8 cables, 38 mm
24 A De 100 a 240V de CA 3~ 50/60Hz 4 cables Delta 3
16 A De 100 a 240/208-415V de
CA 3~
50/60Hz 5 cables WYE 3
48 A (UL)/
63 A (CE)
De 100 a 240V de CA 50/60Hz Monofásico 6
48 A De 100 a 240V de CA 3~ 50/60Hz 4 cables Delta 6
24A (UL)/
32A (CE)
De 100 a 240/208-415V de
CA 3~
50/60Hz 5 cables WYE 6
VM1246/SL-70646_REVE_06-23 11
PDU actualizable Vertiv™ Geist™ GU2
Guía de instalación rápida
Configuración de las unidades
con dirección IP
La PDU está equipada con un puerto
Ethernet RJ45 para la conexión a
una red existente. La PDU está
configurada con los siguientes
ajustes de red predeterminados que
permiten configurar la unidad:
Dirección IP: 192.168.123.123
Máscara de subred: 255.255.255.0
Puerta de enlace: 192.168.123.1
La conexión de la red local de la PC
debe configurarse de la siguiente
manera:
Dirección IP: 192.168.123.x (donde x
es 2-253, excepto 123)
Máscara de subred: 255.255.255.0
Puerta de enlace: <dejar en blanco>
Para remplazar el módulo del
IMD:
IMPORTANTE: Las fotos de estos
pasos se muestran en la siguiente
página.
NOTA:
Asegúrese de tener el nuevo
módulo del IMD listo para su
instalación inmediatamente después
de retirar el IMD antiguo.
1. Retire la pulsera antiestática
desechable del paquete, retire el
soporte adhesivo y fije la correa a
la PDU. Póngase la pulsera en el
brazo para que esté en contacto
directo con la piel.
2. Inserte la herramienta de
extracción del IMD Vertiv como se
muestra. Asegúrese de presionar la
herramienta a nivel, presione hasta
que la herramienta quede nivelada
con la superficie delantera del
IMD. Algunas versiones anteriores
pueden requerir que se retiren los
revestimientos antes de insertar la
herramienta.
3. Tire con cuidado de la herramienta
y del IMD hacia fuera unos 50mm.
Retire la herramienta del IMD.
PRECAUCIÓN: El IMD sigue
conectado internamente. No lo
saque más de 50mm del chasis.
4. Desconecte suavemente el conector
del IMD.
IMPORTANTE: Asegúrese de llevar
puesta la pulsera antes de proceder.
Consulte el paso 1 para obtener más
información.
5. Conecte el cable al módulo del IMD
de repuesto.
6. Coloque el cable en la ranura de
alivio de tensión en la carcasa del
IMD como se muestra.
7. Vuelva a introducir el exceso de
cable en la PDU y deslice el IMD
directamente hacia adentro. Presione
con ambos pulgares hasta que el IMD
quede ajustado en su lugar.
Para ponerse en contacto con el servicio de asistencia técnica de Vertiv, visite www.Vertiv.com
© 2023 Vertiv Group Corp. Todos los derechos reservados. Vertiv™ y el logotipo de Vertiv son marcas comerciales o marcas comerciales registradas de Vertiv Group Corp. Todos los demás nombres y
logotipos mencionados son nombres comerciales, marcas comerciales o marcas comerciales registradas de sus respectivos propietarios. Aunque se han tomado todas las precauciones para garantizar la
exactitud y la integridad de la información incluida en el presente documento, Vertiv Group Corp. no asume ninguna responsabilidad, y rechaza toda responsabilidad legal, por los daños y perjuicios resultantes
del uso de esta información o causados por cualquier error u omisión. Las especificaciones, descuentos y demás ofertas promocionales están sujetos a posibles cambios a entera descripción previo aviso de
Vertiv.
12 VM1246/SL-70646_REVE_06-23
PDU actualizable Vertiv™ Geist™ GU2
Guía de instalación rápida
1 2 3
4
56
7
PDU Atualizável e PDU Universal
Vertiv™ Geist™
Guia de instalação rápida
VM1246/SL-70646_REVE_06-23 13
Instalação da rPDU
a. Instale a unidade no rack usando
as ferramentas adequadas.
b. Ligue a PDU a um receptáculo
de circuito ramificado protegido
e com a tensão correta.
ADVERTÊNCIA! PDUs com pino terra
externo têm alta tensão de toque. É
essencial que o terra seja conectado
antes da entrada de alimentação.
Um pino terra nº 8, um terminal de
compressão tipo anel e uma porca
foram fornecidos com o dispositivo
para facilitar o aterramento.
Consulte o tamanho do condutor
no cabo e alimentação e a tensão
da PDU para saber o tamanho
correto do condutor externo de
aterramento. Fixe o terminal de
compressão tipo anel a esse fio
seguindo as instruções de
instalação do fabricante. Coloque o
terminal de compressão tipo anel
no pino terra e aperte a porca até
atingir o torque correspondente
listado na tabela abaixo. Conecte a
outra extremidade do condutor ao
sistema de aterramento do local.
c. Conecte os dispositivos que
serão alimentados pela PDU.
d. Ligue os dispositivos que serão
alimentados pela PDU.
OBSERVÃO: recomenda-se ligar
em sequência para evitar uma
entrada alta de corrente.
Instalação da PDU Universal:
As UPDU (Unidades de Distribuição
de Energia Universal) são equipadas
com um conector de suporte para
painel com 7 ou 8 fios. Elas devem ser
acopladas com um cabo FSC (lateral
local) disponível para a unidade. O
cabo FSC é conectado a um circuito
de AC monofásico, um WYE trifásico
ou um circuito de CA delta. As PDUs
Universais incluem tomadas do tipo
IEC C13 e/ou IEC C19 para conexão
com dispositivos externos.
IMPORTANTE: instale a UPDU no
rack antes de conectar o cabo FSC à
UPDU. Verifique se a guia plástica no
plugue do cabo FSC está alinhada ao
canal da entrada da UPDU para
conectar corretamente ao cabo FSC.
Na imagem abaixo, veja os pontos de
Ambiental
Temperatura Durante a operação Armazenamento
Básico, Básico atualizável,
Com medidas,
Monitoramento da unidade
0 °C a 60 °C -40 °C a 70 °C
Comutado atualizável,
Monitoramento da tomada
– horizontal
0 °C a 60 °C
48 A máx.
-40 °C a 70 °C
Comutado atualizável,
Monitoramento da tomada
– vertical
0 °C a 60 °C a 50%
por carga do
receptáculo
-40 °C a 70 °C
Unidade de Distribuição de
Energia Universal
0 °C a 60 °C* -40 °C a 70 °C
OBSERVÃO: DU00X2R1-18C137-0H02A9F00-S tem um máximo de
45 °C (100% da tensão máxima da corrente)/máximo de 60 °C (50% da
tensão máxima da corrente)
Umidade Durante a operação Armazenamento
Todas as PDUs 5% a 95% (sem
condensação)
5% a 95% (sem
condensação)
Elevação Durante a operação Armazenamento
Todas as PDUs 0 m a 3.050 m 0 m a 12.200 m
Pino/Porca/
Tamanho Tamanho do fio Torque Nm
Nº 8 < 8 AWG (10 mm2) 1,86
Nº 8 8 AWG (10 mm2)3,05
M5 < 8 AWG (10 mm2) 1,86
M5 8 AWG (10 mm)3,05
1/4"–20* > 8 AWG (10 mm2)3,05
OBSERVÃO: o fio que prende o parafuso no terminal associado precisa
ter um torque de 1,86 NM.
referência nos invólucros externos
dos conectores.
1. Instale a unidade no rack usando as
ferramentas adequadas.
2. Ligue o cabo
FSC
na PDU Universal.
OBSERVÃO:
pode ser necessário
instalar um suporte de cabo para
reduzir a pressão sobre o conector do
suporte para painel.
14 VM1246/SL-70646_REVE_06-23
PDU Atualizável GU2 Vertiv™ Geist™
Guia de instalação rápida
Item Descrição Item Descrição
1Ponto de referência do plugue 3Canal de entrada
2Guia plástica do plugue 4Ponto de referência da entrada
3. Conecte o cabo FSC a um circuito
ramificado protegido e com a
tensão correta.
4. Conecte os dispositivos que serão
alimentados pela PDU Universal.
OBSERVÃO: para dispositivos
alimentados pela UPDU Geist,
recomenda-se ligar em sequência
para evitar uma entrada alta de
corrente.
Tensão de entrada
Cabo FSC Nº de
disjuntores
Conector de suporte
do painel
Corrente
(MÁX.) Tensão Frequência
24 A 200 a 240 VAC 50/60 Hz Unifásico 6
7 fios, 78 mm
40 A 200 a 240 VAC, 3W+PE 50/60 Hz Delta de 4 fios 6
24 A (UL)/
32 A (CE)
200 a 240/346-415 VAC,
3W+N+PE
50/60 Hz WYE de 5 fios 6
48 A 100 a 240 VAC 50/60 Hz Unifásico 3
8 fios, 38 mm
24 A 100 a 240 VAC 3~ 50/60 Hz Delta de 4 fios 3
16 A 100 a 240/208–415 VAC 3~ 50/60 Hz WYE de 5 fios 3
48 A (UL)/
63 A (CE)
100 a 240 VAC 50/60 Hz Unifásico 6
48 A 100 a 240 VAC 3~ 50/60 Hz Delta de 4 fios 6
24 A (UL)/
32 A (CE)
100 a 240/208–415 VAC 3~ 50/60 Hz WYE de 5 fios 6
VM1246/SL-70646_REVE_06-23 15
PDU Atualizável GU2 Vertiv™ Geist™
Guia de instalação rápida
Configuração de unidades com
endereço IP configurável
A PDU é equipada com uma porta
Ethernet RJ45 para se conectar a
uma rede existente. A PDU conta
com as seguintes configurações de
rede padrão para possibilitar a
configuração da unidade:
Endereço IP: 192.168.123.123
Máscara de sub-rede:
255.255.255.0
Gateway: 192.168.123.1
A conexão com a rede local de PC
precisa ser configurada da seguinte
maneira:
Endereço IP: 192.168.123.x (em que
x é 2-253, exceto 123)
Máscara de sub-rede:
255.255.255.0
Gateway: <deixar em branco>
Para substituir o módulo IMD:
IMPORTANTE: as fotos destas
etapas estão na página seguinte.
OBSERVÃO:
certifique-se de
preparar o novo módulo IMD para
instalação logo após a remoção do
IMD antigo.
1. Remova a pulseira ESD descartável
da embalagem, remova o adesivo
e prenda a fita à PDU. Coloque a
pulseira no seu braço de modo que
ela tenha contato com sua pele.
2. Insira a ferramenta de remoção de
IMD Vertiv conforme mostrado.
Pressione a ferramenta no mesmo
nível, até que ela esteja rente à
superfície do IMD. Para algumas
versões mais antigas, pode ser
necessário remover algumas
camadas antes de inserir a
ferramenta.
3. Puxe a ferramenta e o IMD
cuidadosamente para fora a
cerca de 50 mm. Remova a
ferramenta do IMD.
CUIDADO: o IMD ainda está
conectado internamente. Não o
puxe mais de 50 mm do chassi.
4. Remova o conector do IMD
delicadamente.
IMPORTANTE: antes de continuar,
certifique-se de que você esteja
usando a pulseira. Veja a Etapa 1 para
saber mais.
5. Conecte o cabo ao módulo IMD de
substituição.
6. Coloque o cabo na abertura de alívio
de tensão do compartimento do IMD,
conforme mostrado.
7. Recoloque o cabo excedente na
PDU e deslize o IMD para dentro.
Pressione com os dois dedões até
encaixar o IMD.
Para entrar em contato com o suporte técnico da Vertiv, visite www.Vertiv.com
© 2023 Vertiv Group Corp. Todos os direitos reservados. Vertiv™ e o logotipo da Vertiv são trademarks ou marcas comerciais registradas da Vertiv Group Corp. Todos os demais nomes e
logotipos mencionados neste documento são nomes comerciais, trademarks ou marcas comerciais registradas de seus respectivos proprietários. Embora toda precaução tenha sido tomada
para assegurar a exatidão e a integridade deste documento, a Vertiv Group Corp. não assume nenhuma responsabilidade e isenta-se de qualquer responsabilidade por danos resultantes do uso
destas informações ou por quaisquer erros ou omissões. Especificações, descontos e outras ofertas promocionais estão sujeitos a mudanças a exclusivo critério da Vertiv mediante aviso.
16 VM1246/SL-70646_REVE_06-23
PDU Atualizável GU2 Vertiv™ Geist™
Guia de instalação rápida
1 2 3
4
56
7
PDU évolutive et PDU universelle
Vertiv™ Geist™
Guide d’installation rapide
VM1246/SL-70646_REVE_06-23 17
Installation de larPDU
a. Installez l’unité dans le rack à
l’aide du matériel approprié.
b. Branchez laPDU dans la prise
d’un circuit de dérivation
protégé, dont la puissance
nominale est adaptée.
AVERTISSEMENT! Les PDU
dotées d’une borne de mise à la
terre externe ont un courant de
contact élevé. Il est essentiel
d’assurer une connexion à la terre
avant de brancher l’alimentation.
Une borne de mise à la terre #8,
une cosse à anneau et un écrou ont
été prévus à cet eet à l’avant de
l’équipement. Vérifiez la taille du
conducteur du cordon
d’alimentation et la valeur nominale
de la PDU pour connaître la taille
appropriée du conducteur de mise
à la terre externe. Fixez la cosse à
anneau fournie à ce fil en suivant
les instructions d’installation du
fabricant. Placez la cosse à anneau
sur la borne de mise à la terre et
serrez l’écrou au couple approprié
indiqué dans le tableau ci-dessous.
Fixez l’autre extrémité du conducteur
au système de mise à la terre de votre
installation.
c. Branchez les équipements qui
doivent être alimentés par la PDU.
d. Mettez sous tension les
équipements qui doivent être
alimentés par la PDU.
REMARQUE: une mise sous tension
séquentielle est recommandée pour
éviter tout courant d’appel élevé.
Installation de la PDU universelle:
Les rampes d’alimentation électrique
universelles (UPDU) sont équipées d’un
connecteur à montage sur panneau à 7
ou 8fils. Ces unités sont destinées à
être raccordées avec un câble côté
installations (FSC) disponible pour
l’unité en question. Le FSC est raccor
à un circuit d’alimentation secteur
monophasé, à un circuit d’alimentation
triphasé en étoile ou à un circuit
d’alimentation secteur en triangle. Les
PDU universelles sont fournies avec des
prises de type CEIC13 et/ou CEIC19
pour leur raccordement à des
équipements externes.
IMPORTANT: installez l’UPDU dans
le rack avant de brancher leFSC à
l’UPDU. Vérifiez que le guide en
plastique de la fiche du FSC s’adapte
au filetage d’entrée de l’UPDU pour
un branchement correct du FSC.
Spécifications environnementales
Température En fonctionnement Stockage
De base, évolutive de base, à
compteur, unité surveillée
0°C à 60°C -40°C à 70°C
Évolutive, commutée, prises
surveillées – Horizontale
0°C à 60°C
48A max.
-40°C à 70°C
Évolutive, commutée, prises
surveillées – Verticale
0°C à 60°C à 50%
par charge de prise
-40°C à 70°C
Rampe d’alimentation
électrique universelle
0°C à 60°C* -40°C à 70°C
REMARQUE: DU00X2R1-18C137-0H02A9F00-S: 45°C maximum (100% du
courant nominal maximal) / 60°C maximum (50% du courant nominal maximal)
Humidité En
fonctionnement
Stockage
Toutes les PDU 5 à 95% (sans
condensation)
5 à 95% (sans
condensation)
Altitude En
fonctionnement
Stockage
Toutes les PDU 0 à 3050m 0 à 12200m
Borne/écrou/
taille Taille du fil Couple Nm
#8 <8AWG (10mm2) 1,86
#8 8AWG (10mm2)3,05
M5 <8AWG (10mm2) 1,86
M5 8AWG (10mm)3,05
1/4”–20* > 8AWG (10mm2)3,05
REMARQUE: la vis de retenue du fil dans la borne associée doit être serrée
au couple de 1,86Nm.
Pour identifier les points de repère
sur l’enveloppe externe du
connecteur, reportez-vous à
l’illustration ci-après.
1. Installez l’unité dans le rack à l’aide
du matériel approprié.
2. Branchez le FSC dans la PDU universelle.
REMARQUE:
il peut s’avérer
nécessaire d’installer un support de
câble afin de réduire les contraintes
subies par le connecteur à montage
sur panneau.
18 VM1246/SL-70646_REVE_06-23
PDU GU2 évolutive Vertiv™ Geist™
Guide d’installation rapide
Élément Description Élément Description
1Point de repère de la fiche 3Filetage d’entrée
2Guide en plastique de la
fiche
4Point de repère d’entrée
3. Branchez le FSC dans un circuit de
dérivation protégé, de puissance
nominale appropriée.
4. Branchez les équipements qui
doivent être alimentés par la PDU
universelle.
REMARQUE: pour les équipements
alimentés par l’UPDU Geist, une
mise sous tension séquentielle
est recommandée pour éviter tout
courant d’appel élevé.
Entrée nominale Câble côté
installations
Nombre de
disjoncteurs
Connecteur à
montage sur
panneau
Intensité
(MAX.) Tension Fréquence
24A 200 à 240Vc.a. 50/60Hz Monophasé 6
7fils, 78mm
40A 200 à 240Vc.a., 3W+PE 50/60Hz 4fils en triangle 6
24A (UL)/
32A (CE)
200 à 240/346-415Vc.a.,
3W+N+PE
50/60Hz 5fils en étoile 6
48A 100 à 240Vc.a. 50/60Hz Monophasé 3
8fils, 38mm
24A 100 à 240Vc.a.3~ 50/60Hz 4fils en triangle 3
16A 100 à 240/208–415Vc.a. 3~ 50/60Hz 5fils en étoile 3
48A (UL)/
63A (CE)
100 à 240Vc.a. 50/60Hz Monophasé 6
48A 100 à 240Vc.a.3~ 50/60Hz 4fils en triangle 6
24A (UL)/
32A (CE)
100 à 240/208–415Vc.a. 3~ 50/60Hz 5fils en étoile 6
VM1246/SL-70646_REVE_06-23 19
PDU GU2 évolutive Vertiv™ Geist™
Guide d’installation rapide
Configuration d’unités
adressables par IP
La PDU est équipée d’une voie
Ethernet RJ45 pour le raccordement
à un réseau existant. La PDU est
configurée avec les paramètres
réseau par défaut suivants pour
permettre la configuration des
unités:
Adresse IP: 192.168.123.123
Masque de sous-réseau:
255.255.255.0
Passerelle: 192.168.123.1
La connexion réseau du PC local doit
être configurée comme suit:
Adresse IP: 192.168.123.x (sachant
que x est 2-253, sauf 123)
Masque de sous-réseau:
255.255.255.0
Passerelle: <laissez vierge>
Pour remplacer le module IMD:
IMPORTANT: ces étapes sont
illustrées à la page suivante.
REMARQUE:
le nouveau module
IMD doit être prêt à être installé
immédiatement après le retrait de
l’ancien module IMD.
1. Retirez le bracelet antistatique
jetable de l’emballage, enlevez le
support adhésif et fixez le bracelet
sur laPDU. Placez le bracelet
antistatique sur votre bras afin qu’il
soit en contact direct avec votre
peau.
2. Insérez l’outil de retrait du module
IMD Vertiv comme illustré. Alignez
l’outil sur la face avant du module
IMD et insérez-le complètement.
Sur certaines versions antérieures,
il est possible que vous deviez
d’abord retirer des plaques de
recouvrement avant d’insérer l’outil.
3. Tirez délicatement sur l’outil fixé
au moduleIMD pour les sortir
d’environ 50mm, puis retirez l’outil
du moduleIMD.
ATTENTION: le module IMD est
toujours raccordé à l’intérieur. Ne le
sortez pas de plus de 50mm du
châssis.
4. Débranchez délicatement le
connecteur du module IMD.
IMPORTANT: enfilez le bracelet
antistatique avant de continuer.
Reportez-vous à l’étape1 pour en
savoir plus.
5. Branchez le câble au module IMD de
rechange.
6. Insérez le câble dans la fente anti-
traction du boîtier du module IMD,
comme illustré.
7. Placez le câble en excès dans la PDU
et glissez le module IMD à l’intérieur
de celle-ci. Appuyez sur le module
IMD avec les deux pouces jusqu’à ce
qu’il s’enclenche.
Pour contacter l’équipe d’assistance technique de Vertiv, consultez le site www.Vertiv.com.
© 2023 Vertiv Group Corp. Tous droits réservés. Vertiv™ et le logo Vertiv sont des marques de commerce ou des marques déposées de Vertiv Group Corp. Tous les autres noms et logos mentionnés
sont des noms commerciaux, des marques de commerce ou des marques déposées de leurs détenteurs respectifs. Toutes les mesures nécessaires ont été prises afin de garantir l’exactitude et
l’exhaustivité des informations contenues dans ce document. Vertiv Group Corp. rejette néanmoins toute responsabilité en cas de dommages découlant de l’utilisation de ces informations ou d’erreurs/
omissions quelles qu’elles soient. Les spécifications, les remises et les autres off res promotionnelles sont susceptibles d’être modifiées à l’entière discrétion de Vertiv, sur avis préalable.
20 VM1246/SL-70646_REVE_06-23
PDU GU2 évolutive Vertiv™ Geist™
Guide d’installation rapide
1 2 3
4
56
7
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56

Vertiv Geist™ Quick Installation Guide

Catégorie
Unités de distribution d'énergie (PDU)
Taper
Quick Installation Guide

dans d''autres langues