Kichler Lighting 43192NI Manuel utilisateur

Taper
Manuel utilisateur
1) TURN OFF POWER.
IMPORTANT: Before you start, NEVER attempt any work without shutting off the electricity
until the work is done.
a) Go to the main fuse, or circuit breaker, box in your home. Place the main power
switch in the “OFF” position.
b) Unscrew the fuse(s), or switch “OFF” the circuit breaker switch(s), that
control the power to the fixture or room that you are working on.
c) Place the wall switch in the “OFF” position. If the fixture to be
replaced has a switch or pull chain, place those in the
“OFF” position.
2) Attach chain to fixture. Fixture loop has one chain link factory installed.
Chain has one locking link at each end. Unscrew coupling on locking link
and slip over link attached to loop. Screw coupling closed.
3) Slip threaded ring (N) then canopy (M) onto chain (W).
4) Attach chain (with fixture connected) to bottom of screw collar loop following
the same procedure as in step 1.
5) Weave electrical wire, ground wire and safety cable through
chain links no more than 3 inches apart.
6) Pass electrical wire ground wire and safety cable through
threaded ring (N), canopy (M), one of the slots in screw
collar loop (L) and into outlet box.
7) Pass safety cable through hole (See sec. 1)
8) In area above outlet box wrap cable around one of the 2 x 4’s
erected in section 1 and pull cable taut.
9) Secure cable with (2) clamps provided. NOTE: Cable is not to
be used as the only means of fixture support. Please follow
independent mounting instructions completely.
10) Connect fixture ground wire and ground wire attached to threaded rod (B or P)
to outlet box ground wire with wire connector (not provided). Never connect ground
wire to black or white power supply wires.
11) Make wire connections (connectors not provided). Reference chart below for correct connections
and wire accordingly.
12) Raise canopy (M) to ceiling.
13) Secure canopy (M) in place by screwing threaded ring (N) onto screw collar loop (L)
1) COUPER LE COURANT.
IMPORTANT: TOUJOURS couper l’électricité avant de commencer le travail.
a) Localiser le coffret à fusibles ou le disjoncteur du domicile. Mettre l’interrupteur principal en position d’Arrêt.
b) Dévisser le ou les fusibles (ou mettre le disjoncteur sur Arrêt) qui contrôlent l’alimentation vers le luminaire
ou la pièce dans laquelle le travail est effectué.
c) Mettre l’interrupteur mural en position d’Arrêt. Si le luminaire à remplacer est doté d’un interrupteur ou d’une
chaîne connectée à l‘interrupteur, placer ces éléments en position d’Arrêt.
2) Fixer la chaîne (W) au luminaire. La boucle du luminaire est dotée d’un maillon installé à l’usine. La chaîne a un maillon
ou vert fourni (X) à chaque extrémité. Dévisser l’accouplement du maillon de verrouillage et passer par le maillon fixé à la
boucle. Visser l’accouplement pour le fermer.
3) Passer l’anneau fileté (N) puis le cache (M) sur la chaîne (W).
4) Fixer la chaîne (avec le luminaire connecté) sur la partie inférieure de la boucle à vis (L) en suivant la même procédure que
celle stipulée dans l’étape 1.
5) Passer le fil électrique et le fil de terre d’un maillon à l’autre de la chaîne avec une distance maximale de 7,5 cm entre.
6) Acheminer le fil électrique et le fil de mise à la terre par l’anneau fileté (N), le cache (M), la tige filetée (B) à l’intérieur de la
boucle à vis (L) et dans la boîte à prises.
7) Acheminer le câble de support par le trou (voir la section 1).
8) Dans la zone au-dessus de la boîte enrouler le câble autour de l’une des colombes installées au cours de la section 1 et
tirer jusqu’à ce que le câble soit bien tendu.
9) Fixer le câble avec les serre-câbles (2) fournis. REMARQUE : le câble n’est pas utilisé comme le seul moyen de supporter
le luminaire. Respecter toutes les instructions de montage indépendant.
10) Connecter le fil de mise à la terre du luminaire et le fil de mise à la terre de la tige filetée (B) au fil de mise à la terre de la
boîte à prise avec les capuchons de connexion (non fournis). Ne jamais connecter le fil de mise à la terre aux fils
d’alimentation blancs ou noirs.
11) Raccorder les fils (capuchons de connexion non fournis). Se reporter au tableau ci-dessous pour les connexions
appropriées et acheminer les fils selon les instructions.
12) Soulever le cache (M) jusqu’au plafond.
13) Fixer le cache (M) en vissant l’anneau fileté (N) sur la boucle à vis (L).
M
N
W
X
L
P
NOTE: NEC CODE (314.24) requires that ceiling outlet boxes in the United States support
up to 50 lbs. This fixture exceeds 50 lbs. and must be installed using an outlet box
approved for up to 100 lbs. or independently of the existing outlet box. Installation
hardware and instructions are provided for both.
MOUNTING TO A 100 lb. MAX. APPROVED OUTLET BOX
1) Support cable from fixture (see sec. 3) must pass through outlet box. Drill 3/16” diameter
hole in outlet box if no other holes are available.
2) Screw threaded rod (B) from parts bag into pipe coupling (A) until threaded rod is
flush with top of pipe coupling. Secure in place by tightening allen head screw (C)
with provided wrench.
3) Pass threaded pipe (B) through mounting strap (D).
4) Screw hexnut (H) onto threaded rod (B).
5) Slip ground lug (F) and lockwasher (J) onto threaded rod (B).
6) Thread screw collar loop (L) onto threaded rod (B) until threaded
rod is flush with hole on lower side of screw collar loop.
7) Secure screw collar loop (L) in place by tightening
hexnut (H) down against groundlug (F),
lockwasher (J) and screw collar loop.
8) Assemble mounting strap (D) and assembled
parts to outlet box using screws provided
with outlet box.
9) Trial fit canopy (M) over screw collar loop.
Approximately one half of the screw collar
loop exterior threads should be exposed below
canopy. To increase length of assembly loosen
hexnut (H) and unscrew screw collar loop no
more then two complete turns. To shorten,
loosen allen head screw (C). Screw threaded
pipe into coupling until desired height is met.
10) After desired position is found, remove
canopy and tighten allen head screw (C)
and anti-rotational screw located next to
center hole inside mounting strap (D).
REMARQUE: le code national de l’électricité (NEC-314.24) requiert que les boîtes
à prises au plafond installées aux États-Unis puissent supporter un poids de 23 kg.
Ce luminaire pèse plus de 23 kg et doit être installé à l’aide d’un boîtier à prises
agréé jusqu’à 45 kg ou indépendamment de la boîte à prises existante.
Le matériel d’installation et les instructions sont fournies pour les deux.
MONTAGE À UNE BOITE À PRISES AGRÉÉE DE 45 KG MAX.
1) Le câble de support du luminaire (voir la section 3) doit passer par la boîte
à prises. Percer un trou de 3/16 po de diamètre dans la boîte à prises si
aucun autre trou n’est disponible.
2) Visser la tige filetée (B) qui se trouve dans le sac à pièces sur
l’accouplement du tube (A) jusqu’à ce que la tige filetée soit
alignée avec la partie supérieure de l’accouplement du tube.
Bloquer en serrant les vis Allen (D) avec la clé fournie (C).
3) Passer la tige filetée (B) par le support de montage (D).
4) Visser l’écrou hexagonal (H) sur la tige filetée (B).
5) Passer la cosse de masse (F) et la rondelle de blocage (J) sur la tige filetée (B).
6) Visser la boucle à vis (L) sur la tige filetée (B) jusqu’à ce que la tige filetée s’aligne
au trou situé sur le côté inférieur de la boucle à vis.
7) Fixer la boucle à vis (L) en resserrant l’écrou hexagonal (H) contre la cosse
de masse (F), la rondelle de blocage (J) et la boucle à vis.
8) Assembler le support de montage (D) et les pièces montées à la boîte à
prises à l’aide des vis fournies avec la boîte à prises.
9) Loger temporairement le cache (M) sur la boucle à vis. Environ la moitié
des filets externes de la boucle à vis doivent être visibles sous le cache.
Pour augmenter la longueur de l’assemblage, desserrer l’écrou hexagonal (H)
et ne dévisser la boucle à vis que de deux tours complets. Pour raccourcir,
desserrer la vis allen (C). Visser la tige filetée dans l’accouplement jusqu’à
ce que la hauteur souhaitée soit atteinte.
10) Après avoir trouvé la position souhaitée, enlever le cache et resserrer la vis allen (C)
et la vis anti-rotation située près du trou central à l’intérieur du support de montage (D).
U.L. APPROVED 100LB. MAX.
OUTLET BOX AND HARDWARE
(SOLD SEPARATELY)
BOÎTE À PRISES ET MATÉRIEL DE 45
KG MAX AGRÉÉS
(PIÈCES VENDUES SÉPARÉMENT)
C
A
B
D
M
L
J
F
H
Date Issued: 4/26/13 IS-43192-CB
1A
Connect Black or
Red Supply Wire to:
Connect
White Supply Wire to:
Black White
*Parallel cord (round & smooth) *Parallel cord (square & ridged)
Clear, Brown, Gold or Black
without tracer
Clear, Brown, Gold or Black
with tracer
Insulated wire (other than green)
with copper conductor
Insulated wire (other than green)
with silver conductor
*Note: When parallel wires (SPT I & SPT II)
are used. The neutral wire is square shaped
or ridged and the other wire will be round in
shape or smooth (see illus.)
Neutral Wire
Connecter le fil noir ou
rouge de la boite
Connecter le fil blanc de la boîte
A Noir A Blanc
*Au cordon parallèle (rond et lisse)
*Au cordon parallele (à angles droits el strié)
Au bransparent, doré, marron, ou
noir sans fil distinctif
Au transparent, doré, marron, ou
noir avec un til distinctif
Fil isolé (sauf fil vert) avec
conducteur en cuivre
Fil isolé (sauf fil vert) avec
conducteur en argent
*Remarque: Avec emploi d’un fil paralléle
(SPT I et SPT II). Le fil neutre est á angles
droits ou strié et l’autre fil doit étre rond ou
lisse (Voir le schéma).
Fil Neutre
CLAMP
SERRE-
CÂBLE
STRUCTURAL BRIDGING
MEMBER
POUTRE TRAVERSIÈRE
DE FORCE
SAFETY CABLE
CÂBLE DU SUPPORT
3
Were here to help 866-558-5706
Hrs: M-F 9am to 5pm EST
FIXTURE ASSEMBLY
1) Screw loop onto threaded pipe on top of fixture.
For ease in assembly, proceed to section 3. Remaining steps in
fixture assembly can be completed easier with fixture hanging.
2) Screw end of threaded pipe with hexnut into hole in bottom of
fixture.
3) Pass hole in bottom trim over end of threaded pipe.
4) Thread finial onto end of threaded pipe. Tighten finial finial
to secure shade in place. (DO NOT over tighten.)
5) Set glass down over socket.
6) Thread socket ring onto socket. Tighten socket ring to secure
glass in place. (DO NOT over tighten.)
MONTAGE DU LUMINAIRE
1) Visser la boucle sur le tube fileté sur la partie supérieure du
luminaire.
Pour faciliter l’assemblage, passer à la section 3. Les étapes
restantes du montage du luminaire peuvent être exécutées plus
facilement avec le luminaire suspendu.
2) Visser l’extrémité du tube filetée de l’écrou hexagonal dans le
trou dans le fond du luminaire.
3) Passer la garniture inférieure sur le tube fileté.
4) Visser l’ornement sur le tube fileté. (NE PAS serrer avec
excès).
5) Installer le verre sur la douille.
6) Vissez l’anneau de la douille sur la douille. Serrer l’anneau de
la douille pour fixer le verre en place. (NE PAS serrer avec
excès).
MOUNTING TO A STANDARD OUTLET BOX
MEANS OF SUPPORT MUST BE ERECTED ABOVE OUTLET BOX.
BELOW IS ONE SUGGESTED METHOD.
1) Screw threaded rod (P) from parts bag into pipe coupling (A) until
threaded pipe is flush with top of pipe coupling. Secure in place by
tightening allen head screw (C) with provided wrench.
2) Slip mounting strap (D) over provided 1/2-13UNC threaded rod (P).
3) Remove knockout in top of outlet box.
4) Support cable from fixture (see sec. 3) must pass through outlet box.
Drill 3/16” diameter hole in outlet box if no other holes are available.
5) In area above outlet box pass threaded rod (P) through hole in
center of outlet box.
6) Lay a 2x4 across ceiling joist on either side of threaded rod (P).
7) Secure 2x4’s in place by toe-nailing or other means.
8) Screw hexnut (H) onto threaded rod (P).
9) Slip ground lug (F) and lockwasher (J) onto threaded rod (P).
10) Thread screw collar loop (L) onto threaded rod (P) until threaded
pipe is flush with hole on lower side of screw collar loop.
11) Secure screw collar loop (L) in place by tightening hexnut (H)
down against ground lug (F), lockwasher (J) and screw collar loop.
12) Temporarily slip canopy (M) over screw collar loop (L).
Approximately one half of the screw collar loop exterior
threads should be exposed below canopy.
13) Temporarily screw threaded ring (N) onto screw collar loop (L).
14) In area above outlet box pull up on threaded rod (P) until canopy
is snug against ceiling.
15) Slide mounting strap (D) down threaded rod (P) and against 2x4’s.
16) Screw pipe coupling (A) down threaded rod (P) until pipe coupling
is snug against mounting strap (D) and canopy (M) is snug against
ceiling.
17) Tighten allen head screw (C).
18) Secure mounting strap (D) in place by laying diagonally across
both 2x4’s and driving two #10 x 1” sheet metal or equivalent
screws (not provided) through holes at ends of mounting strap.
Tighten anti-rotational hex screw located next to center hole
inside mounting strap (D) with provided allen wrench..
NOTE: Mounting strap (D) must be secured to prevent rotation.
19) Remove threaded ring (N) and canopy (M).
MONTAGE À UNE BOÎTE À PRISES STANDARD
LES MOYENS DE SUPPORT DOIVENT INSTALLÉS
AU-DESSUS DE LA BOÎTE À PRISES. MÉTHODE SUGGÉRÉE
1) Visser la tige filetée (P) qui se trouve dans le sac à pièces sur l’accouplement du
tube (A) jusqu’à ce que la tige filetée soit alignée avec la partie supérieure
de l’accouplement du tube. Bloquer en serrant les vis Allen (C) avec la clé fournie.
2) Passer le support de montage (D) sur la tige filetée (P) de 1/2-13UNC.
3) Enlever l’alvéole défonçable en haut de la boîte à prises.
4) Le câble de support du luminaire (voir la section 3) doit passer par la boîte à
prises. Percer un trou de 3/16 po de diamètre dans la boîte à prises si aucun autre
trou n’est disponible.
5) Au-dessus de la boîte à prises, passer la tige filetée (P) par le trou au centre de la
boîte à prises.
6) Placer une colombe deux par quatre à travers les solives de plafond de chaque
côté de la tige filetée (P).
7) Fixer bien les colombes en les clouant en biais ou par d’autres moyens.
8) Visser l’écrou hexagonal (H) sur la tige filetée (P).
9) Passer la cosse de masse (F) et la rondelle de blocage (J) sur la tige filetée (P).
10) Visser la boucle à vis (L) sur la tige filetée (P) jusqu’à ce que le tube fileté s’aligne
avec le trou du côté inférieur de la boucle à vis.
11) Fixer la boucle à vis (L) en serrant l’écrou hexagonal (H) contre la cosse de masse
(F) et la rondelle de blocage (J) et la boucle à vis.
12) Passer temporairement le cache (M) sur la boucle à vis (L). La moitié du filetage
extérieur de la boucle à vis doit être visible sous le cache.
13) Visser temporairement la bague filetée (N) sur la boucle à vis (L).
14) Au-dessus de la boîte à prises, tirer sur la tige filetée (P) jusqu’à ce que le cache
soit bien serré contre le plafond.
15) Faire glisser en aval le support de montage (D) le long de la tige filetée contre la
partie supérieure des colombes.
16) Visser l’accouplement du tube (A) sur la tige filetée (P) jusqu’à ce que
l’accouplement du tube soit bien contre le support de montage (D) et que le
cache (M) se trouve contre le plafond.
17) Resserrer la vis allen (C).
18) Fixer le support de montage (D) en plaçant diagonalement les deux colombes
deux par quatre et en vissant deux vis à tôle No 10 x 1 po ou des vis équivalentes
(non fournies) par les trous aux extrémités du support de montage. Resserrer les
écrous hexagonaux anti-rotation situés près du trou central à l’intérieur du support de
montage (D) avec la clé allen fournie.
REMARQUE: le support de montage (D) doit être bien fixé pour empêcher toute
rotation.
19) Enlever l’anneau fileté (N) puis le cache (M).
CEILING JOIST
SOLIVES DE
PLAFOND
2 x 4
C
A
D
N
M
P
H
F
J
L
IS-43192-CB
1B
LOOP
BOUCLE
FINIAL
ORNEMENT
THREADED PIPE
TUBE FILETÉ
2
BOTTOM TRIM
GARNITURE INFÉRIEURE
HEXNUT
ECROU HEXAGONAL
SOCKET RING
ANNEAU DE LA DOUILLE
GLASS
VERRE
  • Page 1 1
  • Page 2 2

Kichler Lighting 43192NI Manuel utilisateur

Taper
Manuel utilisateur

dans d''autres langues