4.
Swingpak
Base
(Optional)
a
en.
1.
Locate
supplied
wire
guide
extension.
3.
Base
Support
(Optional)
IMPORTANT:
If
an
optional
base
support
was
pur-
chased
with
the
unit,
mounting
holes
are
provided
for
fastening
the
base
support
to
the
floor.
a
WARNING:
FALLING
BOOM
can
cause
serl-
ous
personal
Injury
and
equipment
damage.
For
mounting
base
support
use,
as
a
mini-
mum,
1/2
in.
(12.7mm)
diameter,
S.A.E.
grade
5
bolts.
Use
equivalent
strength,
non-corrosive
bolts
if
unit
is
mounted
in
an
extremely
damp
environ-
ment.
2.
Loosen
bolt
on
wire
guide
fitting,
and
insert
end
of
monocoil
liner
near
cable
tie
into
fitting.
Be
sure
re
maining
end
of
monocoil
liner
is
flush
with
end
of
hose
3.
Tighten
bolt
to
secure
monocoil
liner.
Be
sure
not
to
crush
the
liner.
4-5.
PULLEY
ADJUSTMENT
(Figure
4-5)
WARNING:
ELECTRIC
SHOCK
can
kill.
a
.
Do
not
touch
live
electrical
parts.
Shut
down
welding
power
source
and
wire
feeder,
and
be
sure
that
they
cannot
be
acciden
tally
energized
before
adjusting
pulley.
a.
Uncrate
and
remove
all
packing
material
from
the
unit,
b.
Fasten
base
support
to
the
floor.
c.
Complete
Steps
cthru
g
in
Subsection
2.
Post
Support.
a
CAUTION:
EXCESSIVE
FRICTION
can
dam-
age
equipment.
Every
six
months
lubricate
swivel
to
prevent
wear.
Excessive
lubrication
is
not
required
or
recom-
mended.
Two
positions
are
available
for
adjusting
the
boom
pulley
up
or
down
to
provide
minimum
bend
in
the
wire.
A.
Adjustment
During
InstallatIon
Forsmalldiameterwire(0.023-5/64ifl.OrO.6-2.Omm),
place
pulley
shaft
in
upper
holes.
For
larger
diameter
wires
(3/32-1/8
in.
or
2.4-3.2
mm),
place
pulley
shaft
in
lower
holes.
B.
Adjustment
After
Installation
If
a
pulley
adjustment
is
necessary
because
of
a
wire
size
change,
proceed
as
follows;
1.
Retract
wire
and
change
to
new
wire
size.
a.
Uncrate
and
remove
all
packing
material
from
the
Swingpak
base.
WARNING:
FALLING
BOOM
can
cause
serl-
ous
personal
Injury
and
equipment
damage.
Mount
welding
power
source
on
Swingpak
base
before
mounting
Swingarc.
2.
Loosen
nuts
securing
pulley
shaft
to
boom.
3.
Move
shaft
to
desired
position:
Upper
holes
for
small
diameter
wires,
lower
holes
for
larger
diame
ter
wires.
4.
Tighten
nuts
to
secure
pulley
shaft.
5.
Thread
welding
wire
according
to
Section
4-18.
4-6.
DRIVE
MOTOR
VENT
SCREW
The
drive
motor
is
provided
with
a
vent
screw
which
must
be
removed
before
operating
the
wire
feeder.
The
screw
can
be
removed
through
the
hole
provided
in
the
motor
shroud.
a
CAUTION:
PRESSURE
IN
WIRE
DRIVE
MOTOR
GEAR
BOX
will
damage
motor.
Remove
vent
screw
before
operation.
Warranty
is
void
if
the
vent
screw
is
not
removed
before
operation.
4-7.
WIRE
GUIDE
AND
DRIVE
ROLL
INSTALLA
TION
(FIgures
4-2
And
4-3)
Upon
initial
installation,
or
as
a
result
of
changes
in
wire
size
and
type,
it
is
necessary
to
install
the
required
drive
rolls
and
wire
guides.
Select
drive
rolls
according
to
Table
10-1.
After
obtaining
the
appropriate
drive
rolls
and
wire
guides,
proceed
as
follows:
A.
Wire
Guide
Installation
(FIgure
4-2)
1.
For
.023
in.
-
5/64
in.
(0.6
-
2.0
mm)
wire.
a.
Insert
liner
into
inlet
wire
guide,
and
secure
with
b.
Uncrate
and
remove
all
packing
material
from
the
Swingpak
unit.
c.
Complete
Steps
c
thru
g
in
Subsection
2.
Post
Support.
a
CAUTION:
EXCESSIVE
FRICTION
can
dam
age
equipment.
Every
six
months
lubricate
swivel
to
prevent
wear.
Excessive
lubrication
is
not
required
or
recom
mended.
-
4-3.
INSTALLATION
OF
WIRE
SUPPORT
(Figure
4-1)
1.
Remove
the
securing
screws
and
lock
washers
from
the
swivel
base
(see
Figure
4-1).
2.
Place
the
wire
support
over
the
holes
in
the
swivel
base.
3.
Insert
securing
screws
with
lock
washers
and
tight-
4-4.
INSTALLATION
OF
WIRE
GUIDE
EXTENSION
(Figure
4-5)
OM-1549
Page
15