Simplicity 076109 Guide d'installation

Taper
Guide d'installation
Not for
Reproduction
100/150/200 Amp Automatic
Transfer Switch
with Service Disconnect and
Symphony
®
II Power Management System
Installation Manual
Questions?
Help is just a moment away!
Call: Transfer Switch Helpline
800-743-4115 Monday - Friday 8:00 AM - 5:00 PM Central Time
Copyright © 2015 Briggs & Stratton Corporation, Milwaukee, WI, USA.
All rights reserved.
80011134 Revision A
Not for
Reproduction
2 BRIGGSandSTRATTON.COM
Thank you for your purchase of this Briggs & Stratton® automatic transfer switch. This product is designed for use with specific home
standby generators and may not function with generators or remote modules produced by other manufacturers. Seek a qualified electrical
professional to determine applicability of this equipment to equipment manufactured by others. When operated and maintained according to
the instructions in this manual, your system will provide many years of dependable service.
This manual contains safety information to make you aware of the hazards and risks associated with this system and how to avoid them.
We have made every effort to provide for a safe, streamlined and cost-effective installation. As each installation is unique, it is impossible
to know of and advise of all conceivable procedures and methods by which installation might be achieved. We do not know all possible
hazards and/or the results of each possible method or procedure. It is important that you read and understand these instructions thoroughly
before attempting to install or operate this equipment. Save these original instructions for future reference.
This transfer switch and optional remote modules require professional installation before use. Refer to the Installation section of this manual
and the installation instructions packaged with the remote modules for instructions on installation procedures. Only licensed electrical
contractors should install transfer switches and remote modules. Installations must strictly comply with all applicable federal, state and local
codes, standards and regulations. Your installer should follow the instructions completely.
Where to Find Us
You never have to look far to find Briggs & Stratton support and service for your system. Consult your Yellow Pages. There are many
authorized service dealers who provide quality service. You can also contact Technical Service by phone at 800-743-4115 between 8:00 AM
and 5:00 PM CT, or click on Find a Dealer at BRIGGSandSTRATTON.COM, which provides a list of authorized dealers.
For Future Reference
Please fill out the information below and keep with your receipt to assist in unit identification for future purchase issues.
Transfer Switch Remote Module Remote Module Remote Module Remote Module
Model Number
Revision
Serial Number
Date Purchased
PRIORITY N/A
Remote Module Remote Module Remote Module Remote Module Remote Module Remote Module
Not for
Reproduction
3
Table of Contents
Important Safety Instructions .............................4
Installation..........................................5
Home Owner Responsibilities ..........................................5
Owner Orientation ...................................................5
Installing Dealer/Contractor Responsibilities...............................5
Equipment Description ...............................................5
Delivery Inspection ..................................................6
Mounting Guidelines .................................................6
Power Wiring Interconnections ........................................11
Supervisory Control Terminals ........................................12
System Setup .....................................................14
Setting Dipswitches.................................................14
Remote Module Setup...............................................15
Testing the Automatic Transfer Switch ..................................15
Te sting the Symphony™ II Power ManagementSystem.....................16
Controls ...........................................17
Operation..........................................17
Symphony™ II Power Monitor (Optional) ................................17
Enclosure Door ....................................................17
Status LED’s ......................................................18
Remote Module LED Status Indicators ..................................19
Troubleshooting .....................................21
Transfer Switch Schematic Diagram .......................22
Transfer Switch Wiring Diagram ..........................23
Product Specfications .................................24
Not for
Reproduction
4 BRIGGSandSTRATTON.COM
Save These Instructions
Important Safety Instructions
SAVE THESE INSTRUCTIONS - This manual contains
important instructions that should be followed during
installation and maintenance of the equipment.
Safety Symbols and Meanings
The safety alert symbol indicates a potential personal injury
hazard. A signal word (DANGER, WARNING, or CAUTION) is used
with the alert symbol to designate a degree or level of hazard
seriousness. A safety symbol may be used to represent the type of
hazard. The signal word NOTICE is used to address practices not
related to personal injury.
DANGER indicates a hazard which, if not avoided, will result in
death or serious injury.
WARNING indicates a hazard which, if not avoided, could result
in death or serious injury.
CAUTION indicates a hazard which, if not avoided, could result
in minor or moderate injury.
NOTICE addresses practices not related to personal injury.
The manufacturer cannot possibly anticipate every possible
circumstance that might involve a hazard. The warnings in this
manual, and the tags and decals affixed to the unit are, therefore,
not all-inclusive. If you use a procedure, work method or operating
technique that the manufacturer does not specifically recommend,
you must satisfy yourself that it is safe for you and others. You
must also make sure that the procedure, work method or operating
technique that you choose does not render the equipment unsafe.
NOTICE Only qualified electricians should attempt installation
of this equipment, which must strictly comply with applicable
codes, standards and regulations.
WARNING Certain components in this product and related
accessories contain chemicals known to the State of California
to cause cancer, birth defects, or other reproductive harm. Wash
hands after handling.
NOTICE Improper treatment of equipment could damage it and
shorten its life.
Use equipment only for intended uses.
If you have questions about intended use, ask dealer or contact
Briggs & Stratton Power Products.
Do not expose equipment to excessive moisture, dust, dirt, or
corrosive vapors.
Remain alert at all times while working on this equipment. Never
work on the equipment when you are physically or
mentally fatigued.
If connected devices overheat, turn them off and turn off their
circuit breaker/fuse.
Electrical Shock Read Manual
WARNING Shock Hazard. Installing low and high voltage
wire in same conduit could result in death, serious injury
and/or property damage.
Do not run low and high voltage wire in the same conduit unless
the insulation rating on ALL wiring is rated for 600V. See NEC
for more information.
WARNING Failure to properly ground equipment could cause
electrocution resulting in death or seriousinjury.
Do not touch bare wires.
Do not use equipment with worn, frayed, bare or otherwise
damaged wiring.
Do not handle electrical cords while standing in water, while
barefoot, or while hands or feet are wet.
If you must work around a unit while it is operating, stand on an
insulated dry surface to reduce shock hazard.
Do not allow unqualified persons or children to operate or
service equipment.
In case of an accident caused by electrical shock, immediately
shut down all sources of electrical power and contact local
authorities. Avoid direct contact with the victim.
WARNING Shock hazard. Equipment contains high voltage
that could result in death, serious injury and/or
property damage.
DO NOT operate this equipment imprudently or neglect its
maintenance.
Not for
Reproduction
5
Installation
We sincerely appreciate your patronage and have made significant
effort to provide for a safe, streamlined and cost-effective
installation. Because each installation is unique, it is impossible
to know of and advise the trade of all conceivable procedures and
methods by which installation might be achieved. Neither could we
know of possible hazards and/or the results of each method
or procedure.
For these reasons, only current licensed electrical professionals
should attempt system installations. Installations must strictly
comply with all applicable codes, industry standards and
regulations.
Your equipment is supplied with this Installation Manual and a
separate Operator’s Manual. These are important documents and
should be retained by the owner after the installation has
been completed.
Every effort has been made to make sure that the information
in this manual is both accurate and current. However, the
manufacturer reserves the right to change, alter or otherwise
improve the system at any time without prior notice.
Home Owner Responsibilities
To help you make informed choices and communicate effectively
with your installation contractor(s), read and understand Owner
Orientation before contracting or starting your
equipment installation.
To arrange for proper installation, contact the store at which you
purchased your equipment, your dealer, or your utility
power provider.
The equipment warranty is VOID unless the system is installed by
licensed electrical professionals.
Owner Orientation
The illustrations provided are for typical circumstances and are
meant to familiarize you with the installation options available with
your system.
Local codes, appearance, and distances are the factors that must
be considered when negotiating with an installation professional.
As the distance from the existing electrical service increases,
compensation in wiring materials must be allowed for. This is
necessary to comply with local codes and overcome electrical
voltage drops.
These factors will have a direct effect on the overall price of your
equipment installation.
Your installer must check local codes AND obtain permits before
installing the system.
• Read and follow the instructions given in this manual.
• Follow a regular schedule in caring for and using your
equipment, as specified in this manual.
Installing Dealer/Contractor Responsibilities
• Read and observe the Important Safety Instructions.
• Read and follow the instructions given in this manual.
• The installer may need to provide appropriate rated contactors
based on loads to be controlled.
• Discuss with owner their load priority preferences to decide
on remote module priority settings.
• Check federal, state and local codes and authority having
jurisdiction, for questions on installation.
• Ensure generator is not overloaded with selected loads.
If you need more information about the transfer switch, call
800-743-4115, between 8:00 AM and 5:00 PM CT.
Equipment Description
The transfer switch is designed to transfer selected loads found
in normal residential installations to standby power in the event
of a primary power outage. The load is connected either to utility
power (normal) or home standby power (generator). The transfer
switch monitors utility and generator voltages and will automatically
connect loads to the appropriate source of power.
The Symphony™ II Power Management System is highly flexible
and utilizes individual high and low voltage modules that can be
mounted anywhere between the home’s main distribution panel and
the managed appliance. Designed to communicate via your home’s
existing power wiring, the power demand and priority sequence of
up to 8 appliance loads are relayed back to the standby generator,
effectively preventing generator overload while expanding power
range and performance. The system is scalable and additional
relays can be added as a homeowner’s power management needs
change over time.
Only a licensed electrician should complete a home standby
installation. Service conduit and conductors can be wired directly
from the watt-hour meter to the transfer switch. A separate service
entrance disconnect and associated wiring is not required when
installed per applicable federal, state and local codes, standards
andregulations.
Major components of the transfer switch are a 2 pole utility
disconnect circuit breaker, a 2 pole generator disconnect circuit
breaker, a 2 pole double throw transfer switch, transfer switch
control circuit board, Symphony II power management system
control circuit board, fused utility terminals and interconnecting
wiring. All of these components are housed in a NEMA3R
enclosure that is suitable for both indoor and outdoor installations.
The transfer switch is solenoid-operated from utility or generator
inputs and contain suitable mechanical and electrical interlock
switches to eliminate the possibility of connecting the utility service
to the generator output. It has ratings capable of switching full
utility power into the residence. In addition, a manual override lever
is provided for the transfer function.
Not for
Reproduction
6 BRIGGSandSTRATTON.COM
The transfer switch control board has active circuits sensing utility
and generator voltages. It creates a signal for generator start-up,
switch transfer and retransfer when utility is restored. The transfer
switch control board provides status LED’s to indicate the power
source available.
The Symphony™ II power management system control board
contains a test button, a status LED and eight priority load LED’s. It
creates and sends signals to optional remote modules, instructing
them when to add (turn power on) or shed (turn power off) the
managedload.
The Symphony II system power line carrier technology has been
rigorously tested and has proven to be very robust. However,
certain types of devices and appliances in the home generate
‘noise’ on the power line. Such devices may include non-residential
fluorescent ballasts, dimmers, speed controls (lighting and fans),
bathroom equipment, kitchen equipment, power tools, phone
chargers, and power supplies. These types of devices have the
greatest impact on power line communication when located close
to a remote module.
AM broadcast radio, X10, power line carrier (PLC), uninterrupted
power supply (UPS), transient voltage surge suppression (TVSS)
systems, and power filter technology may also cause the Symphony
II system to not operate as intended. They may cause interference
with the Symphony II system during standby power operation.
If it is determined that power line noise is causing a communication
issue with the Symphony II system, the following changes may
remedy the issue.
• Have commercial (non consumer use) fluorescent ballasts
replaced with residential use ballasts.
• Have a EMI/RFI filter installed in series and near the
problematic device.
• Have the remote module rewired to the opposite power line
(Line 1 or Line 2) from that of the problematic device.
• Refer to Troubleshooting section.
The optional 50 Amp remote module is designed for control by
the Symphony II system to add or shed appliance loads connected
to it based on a user-defined priority setting. This remote module
manages 120VAC or 240VAC, single or double pole loads up to
50 amperes. The remote module’s relay state is normally open. Its
components are housed in a NEMA4 enclosure suitable for indoor
and outdoorinstallations.
The optional low voltage remote module is designed for control
by the Symphony II system to add or shed an air conditioner, heat
pump, or low voltage contactor controlled loads based on a user-
defined priority setting. The remote module is housed in a NEMA4
enclosure suitable for indoor and outdoor installations.
Delivery Inspection
After opening the carton, carefully inspect the transfer
switch components for any damage that may have occurred
duringshipment.
If loss or damage is noted at time of delivery, have the person(s)
making delivery note all damage on the freight bill and affix his
signature under the consignor’s memo of loss or damage. If loss
or damage is noted after delivery, contact the carrier for claim
procedures. Missing or damaged parts are not warranted.
Shipment contents:
• Automatic transfer switch
• Installation and operator’s manuals
• Current transformers (2)
Optional components:
• 50 Amp module
• Low voltage module (single or dual models)
• Symphony™ II power monitor
To be supplied by installer:
• Connecting wire and conduit
• Various specialty tools/equipment
Mounting Guidelines
The transfer switch system circuitry is enclosed in a NEMA Type3R
enclosure suitable for indoor/outdoor use. Guidelines for mounting
the enclosure include:
• Install enclosure on a firm, sturdy supporting structure.
• The transfer switch enclosure must be installed with
minimum NEMA3R hardware for conduit connections.
• To prevent switch contact distortion, level and plumb the
enclosure. This can be done by placing washers between the
enclosure and the mounting surface.
• NEVER install the switch or remote modules where any
corrosive substance might drip onto the enclosure.
• Protect the switch at all times against excessive moisture,
dust, dirt, lint, construction grit and corrosivevapors.
A typical automatic transfer switch installation is depicted on
the next page. Examples of remote module installations are also
shown. It is best if the transfer switch is mounted near the utility
meter, either inside or outside. The remote module can be located
anywhere between the main distribution panel and its connected
load, either inside or outside. The remote module must be
accessible for service. Discuss layout suggestions/ changes with
the owner before beginning the system installation process
NOTICE Before drilling conduit entry holes, or any other holes,
cover and protect the switch and electronics to prevent dirt and
metal fragments from entering the mechanical and electrical
components. Failure to do so may result in damage or malfunction
of the switch.
NOTICE Use a vacuum to clean any dirt or metal shavings inside
the transfer switch. Do not use a blower or compressed air to clean
the inside of the transfer switch because debris may become lodged
in the electrical and mechanical components causing damage or
malfunction.
.
Not for
Reproduction
7
Main
Distribution
Panel
Transfer Switch
w/ Service
Disconnect and
Symphony System
Hot Water
Heater
Air
Conditioner
Generator
Watt -
Hourmeter
Service Disconnect
Optional
50A Remote
Module
Optional
LV Remote
Module
Branch
Circuits
A/C Thermostat
To thermostat and heat pump
or air handler, or air conditioner,
or furnace, or HVAC.
Example of 240VAC air conditioner load controlled
by thermostat. Thermostat controlled by low
voltage remote module.
{
Example of thermostat controlled by low voltage
remote module. Power can be supplied from a
120VAC and neutral source powered by
the generator.
Not for
Reproduction
8 BRIGGSandSTRATTON.COM
G
N
Distribution Panel
L2
L1 IN
L2
L1 IN
G
N
N
L
Dual Low
Voltage Module
#1
#2
Low Voltage
Control Wiring
To thermostat and heat pump
or air handler, or air conditioner,
or furnace, or HVAC.
Example of two 240VAC air conditioner
loads controlled by thermostat.
Thermostats controlled by dual low
voltage remote module.
To thermostat and heat pump
or air handler, or air conditioner,
or furnace, or HVAC.
Example of 240VAC heat pump load
controlled by a dual low voltage
remote module.
Not for
Reproduction
9
L2 IN
L2 OUT
L1 IN
L1 OUT
Neutral IN
Neutral OUT
L2 IN
L2 OUT
L1 IN
L1 OUT
Neutral IN
Neutral OUT
Example of two 120VAC loads
controlled by 50Amp remote
module.
Example of one 240VAC
load controlled by 50Amp
remote module.
Not for
Reproduction
10 BRIGGSandSTRATTON.COM
L2 IN
L2 OUT
L1 IN
L1 OUT
Neutral IN
Neutral OUT
Distribution Panel
L1
L2
Example of one 240VAC load controlled
by 50Amp remote module using a 3-wire
installation procedure.
Not for
Reproduction
11
Power Wiring Interconnections
NOTICE Improper installation could cause damage to the circuit
boards and shorten their life. Installing circuit boards in live
circuits will damage the board and is not covered by warranty.
ALWAYS disconnect ALL sources of power prior to servicing.
Remove all power prior to installing this equipment. Failure to
do so could cause internal damage to the board when making
electrical connections.
Turn generator to OFF position.
Turn off utility power to the standby generator and
transferswitch.
All wiring must be the proper gauge, properly supported and
protected by conduit. All wiring should be done per applicable
federal, state and local codes, standards and regulations. Obey
wire type and torque specifications printed on the terminal blocks,
neutral/ground connectors, and installation instructions.
Use installer supplied 600VAC or greater copper or aluminum wire
of a gauge that complies with the latest version of the National
Electric Code to complete the following connections between utility
power, transfer switch, generator, main distribution panel, and
optional remote modules. Apply the necessary correction factors
and wire size calculations.
1. Set generator’s circuit breaker to OFF position.
2. Set generator’s system switch to OFF position.
3. Remove 15 Amp fuse from generator control panel.
4. Turn off utility power to the standby generator and
transfer switch.
5. Connect utility service to transfer switch’s utility
service disconnect circuit breaker terminals marked
“UTILITYCONNECTION”.
6. Connect utility service neutral to transfer switch
neutralterminal.
7. Connect main distribution panel feeder conductors to transfer
switch terminals marked “LOADCONNECTION”.
8. NOTICE Connect main distribution panel neutral to transfer
switch neutral terminal.
9. Connect main distribution panel ground to transfer switch
“GND” terminal.
Assure grounding electrode conductor is connected and
bonded per applicable federal, state and local codes,
standards and regulations.
10. Connect feeder conductors from transfer switch breaker
“GENERATOR CONNECTION” terminals to generator circuit
breaker LINE1 and LINE2 terminals. Each conductor must
pass through hole of current transformer before
making connection.
11. Plug current transformer leads into “CT1” and “CT2”
terminals (C) on transfer switch control board.
33
240V
11
22
44
11
22
44
120V
120V
0
Neutral
Ground
To Transfer Switch
Line 1 Neutral
Ground
Line 2
Generator
Circuit
Breaker
CT1
CT2
DPSW2
DPSW1
J6
J5
J4
J3
J2
J1
C
WARNING Shock Hazard. Installing low and high voltage
wire in same conduit could result in death, serious injury
and/or property damage.
Do not run low and high voltage wire in the same conduit unless
the insulation rating on ALL wiring is rated for 600V. See NEC
for more information.
WARNING Shock Hazard. Failure to properly wire equipment could
cause electrocution resulting in death or seriousinjury.
DO NOT connect the ground conductor to the neutral connection in the
remote module.
All modules must have a dedicated neutral connection.
Not for
Reproduction
12 BRIGGSandSTRATTON.COM
12. Connect conductor from transfer switch neutral terminal to
generator NEUTRAL terminal. Observe generator control panel
labeling for terminalidentification.
13. Connect conductor from transfer switch “GND” terminal to
generator control panel “GROUND” terminal.
Assure generator equipment grounding conductor is
connected per applicable federal, state and local codes,
standards and regulations.
14. Using minimum #14 AWG conductors, connect the transfer
switch “UTILITY 240 VAC” terminals (A) to generator’s “240
VAC” terminals via two-pole connector (B) supplied with
generator.
NOTICE TxRx and TxRx GND communication wiring must be connected
for the Symphony II System to
operate properly.
15. Using minimum #18 AWG twisted pair copper or aluminum
conductors, no greater than 200 ft. in length, 300 volt
75°C-90°C, connect “T/R” and “GND” terminals on transfer
switch control board (B) to the generator’s control panel (A)
“TxRx” and “TxRx GND” terminals via ten pin connector or
eight pin terminal. Count down to the proper pin location on
the generator control board since visual alignment with its
decal can bemisleading:
16. Install optional remote modules using the installation
instructions provided with each module. Set each module to
the agreed-upon priority setting.
17. Tighten all wire connections/fasteners to proper torque.
See label inside transfer switch enclosure or values listed in
remote module installation instructions for proper
torque values.
Supervisory Control Terminals
To avoid undesirable operation, we recommend loads be managed
only with low voltage or 50 Amp remote modules. Do not use the
transfer switch control board supervisory control terminals
(if present).
The illustration on the following page shows a completed transfer
switch installation. Your actual layout will vary.
Illustration callouts are:
A - From utility watt-hour meter
B - Current transformers
C - Transfer switch
D - Symphony™ II system control board
E - T/R and GND to Generator
F - Transfer switch control board
G - Neutral terminal
H - Neutral bus
J - Ground bus
K - Main distribution panel
L - UTILITY 240VAC to Generator
M - Two pin connector or Two pin terminal block
N - Ten pin connector or Eight pin terminal block
P - Generator circuit breaker
R - Generator
S - Generator Neutral terminal
T - Generator Ground terminal
U - Transfer switch ground terminal
V - Load connection to distribution panel
W - Generator disconnect circuit breaker
X - Utility disconnect circuit breaker
Y - Utility connection
Z - Generator connection
A
B
A
B
OR
Not for
Reproduction
13
Typical Transfer Switch shown
G
LINE1
LINE2
N
240
VAC
L
1
L
2
N
G
L
1
L
2
N
OR
A
D
E
F
G
T
S
H
U
M
X
P
N
Y
K J
V
R
CB
L
W
M
N
Not for
Reproduction
14 BRIGGSandSTRATTON.COM
System Setup
You must perform the following before operating the system:
• If generator is installed in an area regularly subjected to
temperatures below 40°F (4°C), select a 50 second warm up
time by moving jumper JP2 (C) installed on transfer switch
control board from ‘20’ position to ‘50’position.
• Set the DPSW1 (A) and DPSW2 (B) dipswitches on the
transfer switch control board to match the kW rating of the
home standby generator, as described in SettingDipswitches.
Setting Dipswitches
Dipswitches are used to adjust control board operation based
on generator capacity. DPSW1 and DPSW2 switches are set to
correspond to total system kW rating. Dipswitch DPSW1 (A) has
units of 1,000 watts; Dipswitch DPSW2 (B) has units of
10,000 watts.
Set dipswitches with power removed from the transfer switch to
ensure proper control system operation. If dipswitches are set
when power is present at transfer switch, a power reset needs to be
performed before the new dipswitch settings will take effect. Power
reset is when all power is removed from the transfer switch and
then reintroduced after 30 seconds.
NOTICE A transfer switch fault message will occur on standby
generator control board if dipswitches are not properly established
as noted above.
The “On” position for the dipswitches is the switch number ON
THE TRANSFER SWITCH CONTROL BOARD, not on the switch. For
example, for an 18,000 watt generator, set DPSW2 dipswitch 10 to
“On” position. Set DPSW1 dipswitch 8 to “On” position. 10,000 plus
8000 equals 18,000 watts.
Set only one switch to “On” position
on DPSW1 andDPSW2.
Refer to following chart for proper switch selection(s).
NOTICE
Air density is less at high altitudes, resulting in less
available engine power. Specifically, engine power will decrease 3.5%
for each 1,000 feet (300 meters) above sea level and 1% for each 10°
F (5.6°C) above 77°F (25°C). Generators located in these conditions
must have the transfer switch programmed appropriately for this
power decrease.
NOTICE Use extreme caution when setting dipswitches or
damage to control board will result.
Use a pencil or small piece of plastic to set the dipswitch.
NEVER use a screwdriver or any type of metal object to set
dipswitches.
CT1
CT2
DPSW2
DPSW1
J6
J5
J4
J3
J2
J1
CA B
kW Rating
of
Generator
DPSW
#1 “ON”
Position
DPSW
#2 “ON”
Position
7kW 7 0
8kW 8 0
9kW 9 0
10kW* 0 10
11kW* 1 10
12kW 2 10
13kW* 3 10
14kW 4 10
15kW 5 10
16kW 6 10
17kW 7 10
18kW 8 10
19kW 9 10
20kW 0 20
30kW 0 30
45kW 5 40
48kW 8 40
50kW 0 50
60kW 0 60
* For generators with a rating that includes 500 Watts, round down to
next lowest rating
(example: 13.5 kW set to 13kW)
A
B
A
B
Not for
Reproduction
15
Remote Module Setup
Each remote module features a priority selector (D) that permits
control of load-add or load-shed sequence. Priority number is
identified on clear protective barrier. Diagrams of each module are
shown in Status LED’s, later in this manual. Priority 1 is the highest
priority - devices set to this priority will be the first load(s) added or
last load(s) shed in a load management situation. Priority 8 is the
lowest priority.
Priority 9 and 10 are lockouts. Remote module(s) set to these
priorities will remain unpowered during any utility poweroutage. An
unlimited amount of remote modules can be assigned to priority
9 or 10.
In consultation with the homeowner, set each remote module’s
priority selector switch to the desired priority position. Assign a
different priority to each remote module for optimum operation.
Testing the Automatic Transfer Switch
Turn the utility service disconnect circuit breaker feeding the
transfer switch contactor to the OFF position. The system’s
automatic sequence described below will initiate. To return to utility
power, turn the utility service disconnect circuit breaker to the
ON position.
Utility Fail
The generator senses when utility voltage is below 70percent of
nominal. Engine start sequence is initiated after 6second time
delay.
Engine Warm-Up
Time delay to allow for engine warm-up before transfer. Use jumper
on transfer switch control board to select delay of
20seconds or 50 seconds.
Transfer
Transfer from utility to generator supply occurs after voltage is
above set levels. The transfer switch control board LED lights will
change from green (utility) to red (generator) and the Symphony II
status light will change blink status from Blink Blink_Pause_Blink
Blink to Blink_Pause_Blink. Minimum engine run time is 5 minutes
after transfer.
Load Management
Five minutes after transfer to generator power, the remote modules
energize connected load(s) if generator power is available, starting
with the highest priority (1) through the lowest priority (8). There is
a 10 second delay between each sequential activation.
The P1 through P8 LED’s (A) on the Symphony II control board will
illuminate to show loads being added.
Loads connected to remote modules set to priorities 9 and 10
remain off for the duration of a utility power outage.
Utility Pickup
Voltage pickup level is 80 percent of nominal voltage.
Retransfer
Retransfer from generator to utility power is approximately 10
seconds after utility voltage supply is above pickup level and
minimum run time is completed. All remote module(s) will remain
OFF for five minutes after the power transfer.
Engine Cool Down
Engine will run for 60 seconds after retransfer.
D
WARNING Shock Hazard. Equipment contains high voltage
that could cause electrocution resulting in death or
serious injury.
Testing must only be performed by qualified personnel.
Do not operate this equipment imprudently, carelessly or neglect
its maintenance.
Not for
Reproduction
16 BRIGGSandSTRATTON.COM
Te sting the Symphony™ II Power ManagementSystem
The Symphony II system can be tested under either utility power
or generator power. Only one priority LED and associated remote
module will be powered (ON) at a time during test mode.
• If TEST is not pressed again within 4 minutes AND testing is
being done under utility power, all managed loads will resume
operation under utility power after a five minute delay.
• If TEST is not pressed again within 4 minutes AND testing is
being done under generator power, managed loads will be
added in the priority order set for eachload.
The test procedure in generator mode is as follows:
1. Turn the utility service disconnect circuit breaker feeding the
transfer switch contactor to the OFFposition.
2. After transfer to generator power, verify communication LED
is green on each remote module.
3. Press the TEST button (B) on the Symphony II system control
board. The Symphony II system control board priority 1 LED
(C) and load connected to remote module set to priority 1 will
turn ON.
4. Verify signal was received by remote module set to priority
one. Follow the test guidelines for each module:
50 Amp Module: Relay contacts will be closed. Relay and
communication LED’s will be green. Appliance/load will
have power.
Low Voltage Module (Single or Dual): Verify continuity
across low voltage control wiring contacts (A).
Communication LED will be green. Appliance/load will
have power.
5. Press the TEST button on the Symphony II system control
board. The priority 1 LED and load connected to remote
module set to priority 1 will turn OFF.
50 Amp Module: If off, relay LED status is off.
Communication LED status is green.
Low Voltage Module (Single or Dual): If off, low voltage
communication LED status is green. Continuity will not be
measured across low voltage contacts.
The priority 2 LED (D) and load connected to remote module
set to priority 2 will turn ON. Repeat step 4 for each priority
number being managed.
6. Each subsequent press of the TEST button cycles to the next
lower priority, through priority 8. After priority 8, press TEST
button one time to exit test mode. The system will reset and
be ready to add loads in 5 minutes.
7. To return to utility power, turn the utility disconnect circuit
breaker to the ON position. All managed loads will be turned
off and turn back on after 5 minutes.
LED
LED
LED
LED
LED
LED
LED
LED
LED
B
D
C
A
Closed
Open
A
WARNING Shock Hazard. Equipment contains high voltage
that could cause electrocution resulting in death or
serious injury.
Testing must only be performed by qualified personnel.
Do not operate this equipment imprudently, carelessly or neglect
its maintenance.
Not for
Reproduction
17
Controls
Other than a Manual Override lever, there are no operator controls
because this is an automatic transfer switch. The manual override
is to be used only by licensed professionals. Information on handle
use can be obtained by calling Technical Service at 800-743-4115.
Operation
To select automatic transfer operation, do the following:
1. In transfer switch, set utility disconnect circuit breaker
to ON position.
2. In transfer switch, set generator disconnect circuit breaker to
ON position.
3. Install 15 Amp fuse in generator’s control panel.
4. Set generator’s circuit breaker to ON position.
5. Set generator’s system switch to AUTO position.
The system will now be in automatic operation mode.
When the generator is providing power to the transfer switch, the
transfer switch control board is constantly monitoring generator
power and communicating with the Symphony II system
control board.
The Symphony II system will control up to 8 priorities, with priority
9 and 10 as lockouts. When total generator load meets a preset
value, the Symphony II system control board will start shedding
loads, starting with the lowest priority (highest number) load. The
Symphony II system will add or shed managed loads based on the
generator output capacity and priority settings.
The Symphony II system waits 10 seconds between adding
or shedding each load to permit the system to stabilize. If too
much load demand is seen, the Symphony II system will shed all
managed loads quickly to prevent the generator from overloading.
Once the load demand has stabilized, the Symphony II system will
re-load the generator after a 5 minute delay, as describedabove.
There is a minimum five minute delay between the time utility
power is lost and priority 1 loads are energized by the
Symphony II system.
Be aware that managed heating element energy loads (such as
electric range burners, oven, or space heaters) that were ON
when utility power was lost, will be ON when the generator begins
supplying power. It is advised that the owner check all such
managed devices to ensure they are turned OFF before generator
power appears.
Managed devices like clothes dryers that require pressing a START
button will not resume operation unless the START button is
pressed after generator power begins.
Enclosure Door
To open the transfer switch door, remove the two
exterior thumb screws (A) and carefully lift off door.
To close and secure the door, push door closed
against enclosure making sure that the tab on the
enclosure fits into the slot on the door. While in this
position, the door can rest on the tab (B) at the bottom
of the enclosure. Reinstall both thumb screws to finger
tight. Enclosure door MUST be closed and secured at
all times except when system is being serviced.
Symphony™ II Power Monitor (Optional)
For your convenience, a Symphony II Power Monitor is available,
which provides a visual “on/off” status of each managed appliance/
load. A series of LED lights are ON when an appliance has
generator power and OFF when the appliance is in a shed mode or
does not have power. When on generator power, the consumer can
see which appliances are beingmanaged.
A decal is provided that can be labeled with the managed
appliances/loads and placed next to each priorityLED.
The monitor is plugged into any convenient standard outlet within
the home and constantly receives system status via the power
line communication technology utilized by the Symphony II Power
Management System during generator power.
A
B
Not for
Reproduction
18 BRIGGSandSTRATTON.COM
Symphony II Power Monitor (Optional)
POWER LIGHT (E)
When lit, indicates that monitor
detects outlet power.
When not lit, indicates that no
power is present at outlet.
COMM (communication status)
LIGHT (F)
When lit, indicates that unit
is receiving signals from the
Symphony II controller.
When not lit, indicates that utility
power is present or a fault in
Symphony II controller.
Status LED’s
Described below are the system’s LED indicators and the conditions
each LED color represents:
Transfer Switch Control Board
STATUS LED
RED (A) means GENERATOR power is present.
GREEN (B) means UTILITY power is present.
Symphony II System Control Board
STATUS LED (C)
Single Blink-Pause means unit is operating on GENERATORpower.
Double Blink–Pause means unit is operating on UTILITYpower.
PRIORITY LIGHTS/LED’s (D & G)
When green LED is lit, indicates that optional remote module set to
that priority is supplying power to connected load during generator
power.
When not lit, indicates that optional remote module set to that
priority is set to OFF (being managed and Symphony II System is
not allowing power to the unit).
All lights/LED’s are OFF when utility power is present.
Remote Module LED Status Indicators
Symphony II System does not communicate or manage appliances/
loads when utility power is present.
NOTICE When looking at LED’s, make sure you look straight on
and not at an angle.
CT1
CT2
DPSW2
DPSW1
J6
J5
J4
J3
J2
J1
A B
E
F
G
312113
LED
LED
LED
LED
LED
LED
LED
LED
LED
C D
Not for
Reproduction
19
Low Voltage (Single and Dual) Models Status LED (G) is used to indicate communication status.
Utility power present:
• Normal State
- Orange LED - No communication and appliances/loads
cannot be managed by Symphony II System
• Problem State (see Troubleshooting)
- No LED - No power to low voltage control board; verify
correct wiring
- Green LED - Broken LED; replace low voltage module
- Red LED - Fault in system; verify current transformer
connections, verify terminations on orange and yellow
communication wires
Generator power present:
• Normal State
- Green LED - Signal communication detected and
appliances/loads can be managed after 5 minute delay
• Problem State (see Troubleshooting)
- No LED - No power to low voltage control board; verify
correct wiring
- Orange LED - Signal communication not detected; verify
correct wiring
- Red LED - Fault in system; verify current transformer
connections, verify terminations on orange and yellow
communication wires
C
D
B
A - Low Voltage Control Wiring Terminal Contacts
B - Priority Selector
C - Power/Line Connection
D - Neutral Connection
E - Transparent plastic cover
F - Ground connection (optional)
G - Status LED
H - Plastic Barrier
A
G
H
E
F
Not for
Reproduction
20 BRIGGSandSTRATTON.COM
50 Amp Model
LED’s are for signal communication status and relay position
status.
Utility power present:
• Normal State
Relay Position Status LED (C)
- Green LED - Relay is closed; power available to appliance/
load
Signal Communication Status LED (D)
- Orange LED - No communication and appliances/loads
cannot be managed by Symphony II System
• Problem State (see Troubleshooting)
Relay Position Status LED (C)
- No LED - Power not available to managed appliance/load;
5 minute delay has not expired, verify correct wiring
- Red LED - 50 Amp relay contacts in incorrect state;
replace 50 Amp module
Signal Communication Status LED (D)
- No LED - No power to 50 Amp control board; verify
correct wiring
- Green LED - Broken LED; replace 50 Amp module
- Red LED - Fault in system; verify current transformer
connections, verify terminations on orange and yellow
communication wires
Generator power present:
• Normal State
Relay Position Status LED (C)
- Green LED - Relay is closed; power available to appliance/
load
- No LED - Relay open, no power, Symphony II is
managing load
Signal Communication Status LED (D)
- Green LED - Signal communication detected and
appliances/loads are being managed after 5 minute delay
• Problem State (see Troubleshooting)
Relay Position Status LED (C)
- No LED - Power not available to managed appliance/load;
5 minute delay has not expired, verify correct wiring
- Red LED - 50 Amp relay contacts in incorrect state;
replace 50 Amp module
Signal Communication Status LED (D)
- No LED - No power to 50 Amp control board; verify
correct wiring
- Orange LED - Signal communication not detected; verify
correct wiring
- Red LED - Fault in system; verify current transformer
connections, verify terminations on orange and yellow
communication wires
When Calling for Assistance
You must have the Model Number and Serial Number from each
transfer switch or remote module ID label at hand if it is necessary
to contact a local service center regarding service or repair. Obtain
this information from the unit ID labels located on or inside device.
For convenience, record the information on the inside front cover of
this manual.
To contact Briggs & Stratton call 800-743-4115, between 8:00 AM
and 5:00 PM CT.
Installation Inspection
Before placing the system into service, inspect the entire installation
carefully.
This completes the installation and startup instructions. The
operator’s manual provides full details on Operation, Maintenance,
and Troubleshooting for the Automatic Transfer Switch.
A - Priority Selector
B - 50 Amp Relay
C - Relay Status LED
D - Signal Communication LED
E - Neutral Connection
F - Load Connection
G - Power/Line Connection
H - Ground Connection
F - Trasparent plastic cover
L2 IN L2 OUT
L1 IN
L1 OUT
NEUTRAL
IN
NEUTRAL
OUT
A
B
C
D
EFG
H
J
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72

Simplicity 076109 Guide d'installation

Taper
Guide d'installation