Hole position marking:
– The gap between the machine and a wall at the side must be at least 10 mm.
– Mark hole positions in accordance with the drawing, Fig. 3, Pos. B.
Fixing plinth to floor:
x
Danger!
Risk of toppling over. Risk of injury due to incorrect fitting.
• With floor fastening, secure all four plinth feet.
– Drill 4 holes 12 mm Ø approx. 65 mm deep in the floor as shown, Fig. 4, Pos. B. (Fig. 4 shows the section Fig. 3, Pos. A - A.)
– Insert 4 S12 Rawl plugs flush in the holes, Fig. 5, Pos. 1.
– Fit spacer plates as appropriate and use the spirit level to level the plinth, Fig. 5, Pos. 2.
– Secure the plinth with four 8 x 65 hexagon head wood screws, Fig. 5, Pos. 3, four 8.4 washers, Fig. 5, Pos. 4, and 4 washers,
Fig. 5, Pos. 5, to the floor.
Machine and plinth connection, Fig. 6, Pos. C:
x
Danger!
Risk of injury, particularly to the back. The relation of the weight of the machine to the physical strength of the technician must be taken
into account. For machine weight details, see the appropriate operating instructions.
Risk of crushing. When carrying out work, ensure that parts of the body, especially the hands and feet are not positioned under or
between machines.
– Place the machine on the plinth.
x
Danger!
Risk of toppling over. Risk of injury due to incorrect fitting.
• Always bolt the machine to the plinth.
– Slide the clamp over the machine foot, Fig. 7, Pos. 1.
– Insert an M6 bolt, Fig. 7, Pos. 2, with B6.4 galvanised washer, Fig. 7, Pos. 3, from above through the existing hole.
– Secure the clamp from below with a washer, Fig. 7, Pos. 4, B6.4 galvanised washer, Fig. 7, Pos. 3, and M6 nut, Fig. 7, Pos. 5, on the
M6 bolt. Tighten the parts.
– Secure all 4 machine feet in this manner.
x
Note
Fixing materials for a floating screed floor are to be provided on site.
Plinth UG 5005-30: Casing fitting:
– Fit the 2 side panels with M4 x 12.4 raised-head screws (Torx 20), Fig. 8.
– Fit the front panel with M4 x 12.4 raised-head screws (Torx 20), Fig. 8.
Machine check:
– Carry out appropriate safety checks.
– Reconnect the machine to the mains.
– Carry out a functional test either with the service programme or a wash programme.
– Check the drain connection from the machine to the on-site drain in the floor or wall for leaks.
en
Produktgruppe 591 Umbau- und Montageanweisung
7 von 28 M.-Nr. 04891571
12.09.2012 Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.