Rinnai Q205SP Guide d'installation

Catégorie
Chauffe-eau
Taper
Guide d'installation
- Do not store or use gasoline or other ammable vapors and
liquids in the vicinity of this or any other appliance.
- WHAT TO DO IF YOU SMELL GAS
- Do NOT try to light any appliance.
- Do NOT touch any electrical switch.
- Do NOT use any phone in your building.
- Immediately call your gas supplier from a neighbors phone.
Follow the gas suppliers instructions.
- If you cannot reach your gas supplier, call the re department.
8W.51.40.06 / 10.13 Changes reserved.
Installation & Servicing
Instructions
These instructions to be retained by user.
CAUTION!
Read this manual thoroughly before installing, servicing, putting
into operation or using this boiler and vent system.
WARNING!
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, personal injury
(exposure of hazardous materials)* or loss of life. Refer to the
user's information manual provided with this boiler. Installation
and service must be performed by a licensed professional, service
agency or the gas supplier (who must read and follow the supplied
instructions before installing, servicing, or removing this boiler).
CAUTION!
The user manual is part of the documentation that is delivered
to the installation's operator. Go through the information in this
manual with the owner/operator and make sure that they are
familiar with all necessary operating instructions.
NOTICE!
Installation and service must be performed by a licensed
professional, service technician or the gas supplier.
Pictured: Q85SN, Q130SN
Q85SP, Q130SP
High ef ciency condensing gas boiler
Q85SN/Q130SN/Q175SN/Q205SN/Q175CN
Q85SP/Q130SP/Q175SP/Q205SP/Q175CP
WARNING!
If you do not follow these instructions exactly, a re or explosion
may result causing property damage, personal injury or loss of life.
Address: 103 International Drive, Peachtree City, GA, 30269
Toll-free: 1-800-621-9419Fax: 678-829-1666www.rinnai.us
Français: voir page 101
Installation & Servicing Instructions Rinnai Q-Series
2
Contents of instructions
These installation instructions contain important information for the safe installation, start-up and maintenance of
boilers with capacities 85,000 through 205,000 BTU/hr.
These installation instructions are intended for licensed professionals, who have the necessary knowledge and
are approved for working on heating and gas systems.
Subject to technical changes
Changes may be made without notice to the illustrations, process steps and technical data as a result of our policy
of continuous improvement.
Updating of documentation
Please contact us if you have any suggestions for improvements or corrections.
Find our contact details on the back of this manual.
Installation & Servicing Instructions Rinnai Q-Series
3
Content
1 Safety and general instructions ........................................................4
1.1 Designated use ...................................................................4
1.2 Hazard de nitions ................................................................4
1.3 Symbol de nitions ...............................................................4
1.4 The following instructions must be followed ........................5
1.5 Follow these instructions for the space heating water .........6
1.6 Tools, materials and additional equipment ..........................6
1.7 Relevant Installation, Service and User manuals ................6
1.8 Disposal ...........................................................................7
2 Regulations and guidelines ..............................................................7
3 Description of the boiler ...................................................................8
4 Packaging and transportation ..........................................................9
4.1 Scope of delivery .................................................................9
4.2 Transportation .....................................................................9
5 Installation .........................................................................10
5.1 Requirements for the installation room .............................10
5.2 Fitting the boiler .................................................................11
5.3 Dimensions ........................................................................12
5.3.1 Plumbing Kits.....................................................................15
5.3.2 Clearences from the boiler ................................................16
5.4 Technical speci cations .....................................................17
6 Connecting the boiler .....................................................................18
6.1 Central heating system ......................................................18
6.1.1 Plumbing Kits and installation ...........................................20
6.1.2 Side mounting kit for the Low Loss Header .......................24
6.1.3 Safety valve .......................................................................24
6.1.4 Low water cut off ...............................................................24
6.2 Boiler expansion tank ........................................................25
6.3 Under oor heating system (plastic pipes) ...........................25
6.4 Gas connection .................................................................26
6.5 Hot water supply (Combi boiler Q175CNQ175CP) ...........28
6.5.1 Domestic Water quality ......................................................28
6.5.2 Domestic water treatment Accessory ................................29
6.5.3 DHW Expansion Tank ........................................................29
6.5.4 Installing a valve kit ...........................................................29
6.5.5 Pressure relief Valve for Combi boilers .............................30
6.6 Condensate drain pipe ......................................................30
6.7 Vent system and air supply system ...................................31
6.7.1 Intake / Exhaust Guidelines ...............................................31
6.7.2a Examples vent and air supply systems (concentric) .........32
6.7.2b Examples vent and air supply systems (parallel) ..............33
6.7.3 Installation of the vent system ...........................................34
6.7.3.1 Boiler conversion from concentric to parallel ....................35
6.7.3.2 Installing air lter ...............................................................35
6.7.4 Recommended vent/air intake terminal position ...............36
6.7.5 Direct vent closet and alcove installation ........................38
6.7.6 Dimensioning of the exhaust and air intake duct .............39
6.7.7 Combustion air and vent piping lengths. ...........................40
6.7.8 Calculation of compensation factor ...................................41
6.7.9 Room Air System (indoor combustion air) .........................42
7 External domestic hot water tanks .................................................45
8 Electrical connections ....................................................................45
9 Boiler controls .........................................................................49
9.1 Explanation of the function buttons ...................................50
10 Starting up: Filling and de-aerating the boiler and installation .......51
10.1 Requirements of the water system ....................................51
10.2 Filling the heating system ..................................................52
10.3 Hot water supply (only Q175C) .........................................53
11 Adjustments .........................................................................55
11.1 Altering adjustments ..........................................................55
11.2 Activating factory settings (green button function) ...........58
12 Isolating the boiler .........................................................................58
13 Commissioning .........................................................................59
13.1 Testing for gas leaks ..........................................................60
13.2 Testing the Ignition Safety shut off device .........................60
13.3 Checking the O
2
.................................................................61
13.4 Measuring the ionization current .......................................62
13.5 Installing the casing ...........................................................63
14 Maintenance .........................................................................63
14.1 Periodic examination of venting systems and boiler .........63
14.2 Inspection .........................................................................63
14.3 Maintenance activities .......................................................65
14.3.1 Reset service interval counter ...........................................67
14.4 Limited warranty ................................................................67
15 Parts of the boiler .........................................................................68
16 Blocks and Errors .........................................................................69
17 Spare parts .........................................................................77
18 Parts list vent system .....................................................................89
19 Common venting guidelines ...........................................................90
Appendix A - Outoor Reset Sensor Data .............................................91
Appendix B - Resistance table NTC sensors .......................................92
Installation & Servicing Instructions Rinnai Q-Series
4
1 Safety and general instructions
Please observe these instructions in the interest of your own safety.
1.1 Designated use
The boiler is designed for heating water for a central heating system and, if applicable,
generating domestic hot water. The boiler is delivered with a burner controller
(MCBA) pre-installed.The boiler can be tted with a modulating outdoor reset sensor
ARV12 (included with the boiler) or an On/Off thermostat or relay panel end switch
(accessories).
1.2 Hazard de nitions
The following de ned terms are used throughout the documentation to bring attention
to the presence of hazards of various risk levels. Notices give important information
concerning the operation of the product.
DANGER:
Indicates the presence of hazards that will cause severe personal injury, death or
substantial property damage.
WARNING:
Indicates the presence of hazards that can cause severe personal injury, death or
substantial property damage.
CAUTION:
Indicates presence of hazards that will or can cause minor personal injury or property
damage.
CAUTION:
Risk of electric shock. Indicates presence of hazards due to electric shock.
NOTICE:
Indicates special instructions on installation, operation or maintenance that are
important but not related to personal injury or property damage.
1.3 Symbol de nitions
The following (safety) symbols may be encountered in these installation instructions
and on the unit:
This symbol indicates that the unit must be stored away from freezing conditions.
This symbol indicates that the packaging and/or contents can be damaged as
a result of insuf cient care taken during transport.
This symbol indicates that, while still in its packaging, the unit must be protected
from weather conditions during transport and storage.
!
CAUTION
CAUTION
!
WARNING
NOTICE
i
!
DANGER
Installation & Servicing Instructions Rinnai Q-Series
5
1.4 The following instructions must be followed
- The boiler must only be used for its designated purpose, as described in the
Installation Instructions.
- Each unit is tted with a data plate. Consult the details on this plate to verify whether
the boiler is compliant with its intended location, e.g.: gas type, power source and
venting classi cation.
-
Only use the boiler with the accessories and spare parts listed.
- Other combinations, accessories and consumables may only be used if they are
speci cally designed for the intended application and do not affect the system
performance and the safety requirements.
- Maintenance and repairs must be performed by a licensed professional.
- Installation of a condensing gas boiler must be reported to the relevant gas utility
company and have it approved.
- You are only allowed to operate the condensing gas boiler with the vent system
that has been speci cally designed and approved for this type of boiler.
- Please note that local permission for the vent system and the condensate water
connection to the public sewer system may be required.
You must also respect:
- The local building codes stipulating the installation rules.
- The local building codes concerning the air intake and outlet systems and the
chimney connection.
- The regulations for the power supply connection.
- The technical rules established by the gas utility company concerning the
connection of the gas connection to the local gas mains.
- The instructions and standards concerning the safety equipment for the water/
space heating system.
- The Installation Instructions for building heating systems.
- The boiler must be located in an area where leakage of the boiler or connections
will not result in damage to the area adjacent to the boiler or to lower oors of
the structure. When such locations cannot be avoided, it is recommended that a
suitable drain pan be installed under the boiler.
- The boiler must be installed in such way that the all components are protected
from water (dripping, spraying, rain etc.) during boiler operation and service.
- The boiler must not be installed on or against carpeting.
- Do not restrict or seal any air intake or outlet openings.
- If you nd any defects, you must inform the owner of the system of the defect and
the associated hazard in writing.
In failure to properly commission the boiler as described in section 13 may result
unreliable burner operation, reduced component life, and unsafe boiler operation.
DANGER. Gas is ammable and may cause an explosion.
Beware if you smell gas: there may be an explosion hazard!
If the information in these instructions is not followed exactly, a re or explosion may
result causing property damage, personal injury or death.
- Do not store or use gasoline or other ammable vapors and liquids in the vicinity
of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
- Do NOT try to light any appliance.
- Do NOT touch any electrical switch.
- Do NOT use any phone in your building.
- Immediately call your gas supplier from a neighbor’s phone. Follow the gas
supplier’s instructions.
- If you cannot reach your gas supllier, call the re department.
Should overheating occur or the gas supply fail to shut off, do not turn off or
disconnect the electrical supply to the pump. Instead, shut off the gas supply
at a location external to the boiler.
!
DANGER
!
WARNING
!
WARNING
!
WARNING
Installation & Servicing Instructions Rinnai Q-Series
6
Chemicals that are corrosive in nature should not be stored or used near the
boiler or vent termination.
1.5 Follow these instructions for the space heating water
Unsuitable heating system water can cause the formation of scale or sludge, which affects
system ef ciency. It can also cause corrosion and reduce life of the heat exchanger.
You must follow Rinnai guidelines for boiler water quality.
– Thoroughly ush the system prior to lling.
Follow the Rinnai cleaning instructions.
Never use water that has been treated by a reverse osmosis, D.I., or distilled water
to soften the water to ll the heating system.
Do not use inhibitors or other additives unless approved by Rinnai for that purpose.
When freeze protection of the heating system is desired, only use Rinnai-approved
antifreezes. The allowed maximum concentration is 50%.
When using oxygen-permeable pipes, e. g. for under oor heating systems, you
must separate the system from the boiler using plate heat exchangers.
Valve off boiler while ushing system, do not introduce any system cleaner into the
boiler loop. Flush system thoroughly to remove all system cleaner before lling boiler.
Approved antifreeze: • Rhomar RhoGard Mutli-Metal (AL safe) • Sentinel X500
(max. concentration 50%) • Noble Noburst AL • Fernox Alphi 11
Approved system cleaner: • Noble Noburst Hydronic System Cleaner • Fernox F3 Cleaner
Rhomar Hydro-Solv 9100 Sentinel X400
The system cleaners from NoBurst, Rhomar, and Fernox are not to be used in
the boiler. The boiler must be closed off (valved off) from the rest of the system
or not connected while the cleaners are in the system. The system should then
be drained and then thoroughly ushed with clean water to remove all the
system cleaner.
Approved inhibitors: • Rhomar Pro-tek 922 • Sentinel X100
Noble Noburst AL inhibitor
See the Rinnai Boiler Applications Manual or Chapter 6 and 10 of this manual for
additional information.
If problems occur when using sanitary water with a chlorine content
higher than 150 mg/l, no recourse can be made to the terms of the limited
warranty.
1.6 Tools, materials and additional equipment
For the installation and maintenance of the boiler you will need:
Standard tools for space heating, gas and water tting
Digital manometer that is capable of reading both positive and negative pressures
Combustion analyzer (intended for use with condensing boilers)
Digital multimeter
pH digital meter
Metric Allen wrenches
Metric socket wrenches
In addition, a handtruck with a fastening belt is useful.
For maintenance of the boiler you will need, apart from standard tools for space
heating, gas and water ttings the following items:
- Rinnai toolkit Q and E-Series
NOTICE
i
NOTICE
i
NOTICE
i
Installation & Servicing Instructions Rinnai Q-Series
7
1.7 Relevant Installation, Service and User manuals
Approved vent system
Rinnai Boiler Applications Manual
– User manual
1.8 Disposal
Dispose of the boiler packaging in an environmentally sound manner.
Dispose of components of the heating system (e.g. boiler or control device), that
must be replaced in an environmentally responsible manner.
2 Regulations and guidelines
The installation must comply to the requirements of the authority having jurisdiction
or, in the absence of such requirements, to the latest edition of the National Fuel Gas
Code, ANSI Z223.1/NFPA 54. In Canada, installation must be in accordance with
the requirements of CAN/CSA B149.1, Natural Gas and Propane Installation Code.
Where required by the authority having jurisdiction, the installation must comply to
the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
Install CO detectors per local regulations. Boiler requires an inspection every 2 years or
4000 hours and maintenance every 4 years or 8000 hours. See maintenance section
chapter 14.
Operating Limits of the boiler:
Max. boiler temperature: 176 °F (80 °C)
Max. operating pressure: 45 psi (3 bar)
Max. Allowable Working Temperature ASME: 200 °F (93 °C)
Max. Allowable Working Pressure ASME: 45 psi (3 bar)
The hot water distribution system must comply with all applicable codes and
regulations. When replacing an existing boiler, it is important to check the condition
of the entire hot water distribution system to ensure safe operation.
Installation & Servicing Instructions Rinnai Q-Series
8
3 Description of the boiler
The Rinnai Q boiler is a room sealed, condensing and modulating central heating
boiler, with an optional integrated DHW cylinder (integrated DHW on the Q175C only).
The QxxS boiler models have the ability to control a domestic hot water indirect tank.
The boiler is provided with a compact stainless steel heat exchanger with smooth
tubes. This design is a well engineered principle using durable materials.
The boiler burns gas for supplying heat. The heat is transferred in the heat exchanger
to the water in the central heating system. By cooling down the exhaust gases
condensate is formed. This results in high ef ciency. The condensate, which has
no effect on the heat exchanger and the function of the boiler, is drained through a
condensate collector trap.
The boiler is provided with an intelligent control system (CMS Control Management
System). The boiler anticipates the heat demand of the central heating system or the
domestic hot water facility system.
When an outdoor sensor is connected to the boiler it will operate weather dependantly
using outdoor reset. This means that the boiler control measures the outside
temperature and supply temperature. With this data the boiler calculates the optimal
supply temperature for the installation.
Explanation of the type indication: Rinnai Q205SN
Q = Type
205 = Nominal load in (x1,000) BTU
S = System/Solo (C = Combi)
N = Natural Gas (P = Propane Gas)
Different boilertypes:
Room sealed boiler
The boiler retreives its
combustion air from outside
then discharges the ue
gasses to the outside.
Condensing
Retrieves heat as much as
possible from the ue gasses.
Water condensates on the
heat exchanger.
Modulating
Stepless higher or lower
burning according to the heat
demand.
System/Solo boilers: Combi boiler with integrated DHW cylinder
Q85SN, Q130SN Q175SN, Q205SN Q175CN
Q85SP, Q130SP Q175SP, Q205SP Q175CP
Installation & Servicing Instructions Rinnai Q-Series
9
4 Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
Please check if the packaging is intact.
Check if all the items listed are included in the delivery.
The supply kit contents:
!
CAUTION
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Description
Q85S
Q130S
Q175S
Q205S
Q175C
Boiler with:
Outdoor reset sensor ARV12 1 1 1
Compression ring Ø15 brass 4
Compression ring Ø22 brass 2
Compression ring Ø28 brass 2
Compression ring Ø35 brass 2 2
Bolt M5X16mm 1 1 1
Cover air supply Ø120/Ø80 1 1 1
Gasket vent system ø80 1 1 1
Power cable pull safety Q-Series 1 1 1
Flue pipe Ø 80 PP 1 1 1
Nut 15mm compression fitting 2
Nut W1.1/8x1/14 22 Compression fitting 1
Nut W1.3/8"x1/14 28 compression fitting 2
Nut W1.610x1/14 35 compression fitting 2 2
Screw 6X60mm 5 5 5
Lip-ring flue pipe ø80 1 1 1
Feed through + plug flue gas 1 1 1
Cap de-aerator 1 1 1
Adapter fitting 15mm x 3/4"NPT ext. 2
Adapter fitting 22mm x 3/4"NPT ext. 1
Flue adapter Ø80/Ø3" pps UL appr. 2 2 2
Flow restriction MR01 FG 21,0L red 1
Wall mounting suspension bracket 1 1 1
Plumbing kit Q85S/Q130S 1 1
Plumbing kit Q175S/Q175C/Q205S 1
3/4" Gas valve 1 1 1
Template on inside of package 1 1 1
Installation & Service Instructions 1 1 1
User information manual 1 1 1
Warranty document 1 1 1
ICSL book 1 1 1
Amoun
t
Installation & Servicing Instructions Rinnai Q-Series
10
5 Installation
5.1 Requirements for the installation room
- The room where the boiler will be placed must always be free from freezing
conditions.
- Do not store or use gasoline or other ammable vapors and liquids in the
vicinity of this or any other appliance.
- Never use or store any chlorinated detergents or halogenated hydrocarbons
(e.g. in spraycans, solvents and detergents, paints, adhesives) in proximity
of the boiler.
- The boiler must be installed in such a way that it is protected from water
(dripping, spraying, rain, etc.) during operation and service (circulator
replacement, condensate trap, control replacement, etc.)
- This boiler is for intended for indoor installations only.
Products to avoid present in boiler room
and/or around combustion air intake
Spray cans containing chloro-/fluorcarbons
Ammonium and/or ammonium solutions
Permanent wave solutions (hair product)
Chlorinated waxes and/or cleaners
Swimming pool chemicals based on chlorine
Calcium chloride used for thawing
Sodium chloride used for water softening
Refrigerant leaks
Paint or varnish removers
Hydrochloric acid/muriatic acid
Cements and glues
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents
found in household laundry rooms
Adhesives used to fasten building products and
other similar products
Areas likel
y
to have contaminants
Dry cleaning/laundry areas and establishments
Swimming pools
Metal fabrication plants
Beauty shops
Refrigeration repair shops
Photo processing plants
Auto body shops
Plastic manufacturing plants
Furniture refinishing areas and establishments
New building construction
Remodeling areas
Garages with workshops
!
DANGER
Installation & Servicing Instructions Rinnai Q-Series
11
5.2 Fitting the boiler
- Remove the packaging materials.
- Do not tear the packaging. Take notice of the presence of the mounting
template at the inside of the carton wrapper.
- Lay the boiler on its back during unpacking. When unpacking, the casing can
be removed from the boiler. This part can be kept apart during installation. It
must be placed on the boiler and xed with the screw behind the door before
the boiler is started up.
Turn the boiler to its side and remove the wall bracket from the back of the
boiler by removing the 2 screws.
The boiler can be mounted practically to any wall with the suspension bracket and the
enclosed mounting equipment.
- The wall must be at and of suf cient strength in order to be able to securely hold
and support the boiler weight with its water content.
- Take note of the necessary space around the boiler for installation of venting
system, pipework and servicing. See drawing in section 5.3.
The location of the boiler can be determined by using the template which is printed
on the inside the boiler package wrapping. Remember to account for the spacing of
the plumbing kit.
- Drill the necessary holes using the template
- Install the mounting bracket to the wall using the supplied mounting materials
Lifting and carrying precautions.
To avoid personal injury please follow these recommendations:
- Always lift the boiler with 2 people or use special equipment.
- When lifting the boiler, bend the knees, and keep the back straight and feet
apart.
- Do not lift and twist at the same time.
- Lift and carry the boiler close to the body.
- Wear protective clothing and gloves to protect from any sharp edges.
Lift the boiler only by the boiler's rear wall. Do not lift using the pipes on the
bottom of the boiler or the vent connections on the top of the boiler.
- Dispose the packaging materials.
!
CAUTION
NOTICE
i
NOTICE
i
!
WARNING
Installation & Servicing Instructions Rinnai Q-Series
12
5.3 Dimensions
dimensions Q85S, Q130S, Q175S and Q205S figure 1
C
E
F
A
T
B
Q
R
B
H
J
K
G
H
J
K
D
W
C
E
F D
Q
G
A
P
U
T
P
U
R
X
Y
X
Y
Z
dimensions Q175C figure 2
T
B
R
H
J
K
G
D
aa
C
E
F
Q
S
A
P
U
X
Y
Z
O
N
L
aa
V1
aa
V2
V1
V2
V1
V2
Installation & Servicing Instructions Rinnai Q-Series
13
dimensions table 1
Boiler type Combi
Q85SN/Q85SP Q175SN/Q175SP
Q130SN/Q130SP Q205SN/Q205SP Q175CN/Q175CP
inch / mm inch / mm inch / mm
A Height 26.8" / 680 26.8" / 680 26.8" / 680
B Width 19.7" / 500 26" / 660 39.4" / 1000
C Depth 15.2" / 385 15.2" / 385 15.2" / 385
D Left side / vent 13.2" / 335 19.5" / 495 19.5" / 496
E Center to center / vent and air supply 4.7" / 120 4.7" / 121 4.7" / 122
F Back / vent 10.6" / 270 10.6" / 270 10.6" / 270
G Left side / gas pipe 2.6" / 65 2.6" / 65 2.6" / 65
H Left side / supply pipe 7.8" / 199 7.8" / 199 7.8" / 199
J Left side / return pipe 16.8" / 428 19.8" / 504 19.8" / 504
K Left side / condensate pipe 14.6" / 370 20.9" / 530 20.9" / 530
L Left side / expansion pipe 23.2" / 590
N Left side / cold water pipe 34.8" / 885
O Left side / hot water pipe 37.6" / 955
P Pipe length of g* 0.7" / 18 0.7" / 18 0.7" / 18
Q Pipe length of c* 2" / 50 2" / 50 2" / 50
R Pipe length of f and r* 17.7" / 450 18.5" / 470 18.5" / 470
S Pipe length of e, k and w* 3.5" /89
T Back / Center of pipe c* 1" / 25 1" / 25 1" / 25
U Back / Center of pipe g* 1.6" / 40 1.6" / 40 1.6" / 40
V1
Back / Center of pipe f, r, e, k and w* 2" / 50 2" / 50 2" / 50
V2
Back / Center of pipe f and r* 2.1" / 54 2.1" / 54 2.1" / 54
W
Pipe length vent co-axial
Pipe length vent parallel
2.6" / 65
5.8" / 147
2.6" / 65
5.8" / 147
2.6" / 65
5.8" / 147
X Bottom side boiler to center safety valve 7.7" / 195 8" / 200 8" / 200
Y
Bottom side boiler to center header 10.2" / 260 10.4" / 265 10.4" / 265
Z
Center to center of f and r* 9" / 229 12" / 305 12" / 305
aa
Depth plumbing kit 5.6" / 142 5.6" / 142 5.6" / 142
*) See figure 3
Solo
Dimensions
Installation & Servicing Instructions Rinnai Q-Series
14
connection diameters table 2
boiler connections figure 3
Connection for combustion air supply and vent system
Boiler type Combi
Q85SN/Q85SP Q175SN/Q175SP
Q130SN/Q130SP Q205SN/Q205SP Q175CN/Q175CP
Vent system / Combustion air supply
80/125mm 80/125mm 80/125mm
Gas pipe
g 3/4"M-NPT 3/4"M-NPT 3/4"M-NPT
Supply pipe boiler side - f1
28mm 35mm 35mm
system side - f2
1¼"M-NPT 1½"M-NPT 1½"M-NPT
Return pipe boiler side - r1
28mm 35mm 35mm
system side - r2
1¼"M-NPT 1½"M-NPT 1½"M-NPT
Condensate pipe c
0.95" / 24mm 0.95" / 24mm 0.95" / 24mm
Expansion pipe e
0.87"x ¾"M-NPT /
22mm
Cold water pipe k
0.6"x ¾"M-NPT /
15mm
Hot water pipe w
0.6"x ¾"M-NPT /
15mm
Supply pipe indirect tank.
In case of optional internal
3 way valve.
t 1"M-NPT
Solo
Dimensions
g f1 r1 c
f2 r2
g f1 r1 c
e k w
f2 r2
g f1 r1 c
t
f2 r2
Installation & Servicing Instructions Rinnai Q-Series
15
5.3.1 Plumbing Kits
Rinnai boilers are supplied with a Plumbing kit from factory. Find below the dimensions.
See chapter 6.1 for additional information.
2.0”
50mm
2.1”
54mm
142
[5.6”]
9”
229mm
3.9”
100mm
8.6”
219mm
4.7”
119mm
5.2”
131mm
14.2”
360mm
16.4”
416mm
17.6”
448mm
2.0”
50mm
2.1”
54mm
[5.6”
142mm
10.2”
260mm
12”
305mm
15”
381mm
4.7”
120mm
5.2”
133mm
17.2”
438mm
19.7”
501mm
18.6”
474mm
Plumbing Kit 3
Suitable for:
Q175SN / Q175SP
Q175CN / Q175CP
Q205SN / Q205SP
Plumbing Kit 2
Suitable for:
Q85SN / Q85SP
Q130SN / Q130SP
Plumbing kit 2 gure 4
Plumbing kit 3 gure 5
Installation & Servicing Instructions Rinnai Q-Series
16
5.3.2 Clearences from the boiler
A
A
clearances to the boiler table 3
wall
2"
50
ceiling
Min. 10" /
250mm
15.7"
400
24"
600
service clearances to the boiler figure 6
For closet installation: clearance is 1” / 25mm from the front.
Low Loss Header
Clearances to combustible and non-combustible is 0 inch for sides, top, front and oor/ground
The recommended service clearance to the bottom of the low loss header is 12 inches.
2"
50
Installation & Servicing Instructions Rinnai Q-Series
17
5.4 Technical speci cations
Technical specifications Table 4
Combi
Q175CN Q85SN Q130SN Q175SN Q205SN
Boiler type Q175CP Q85SP Q130SP Q175SP Q205SP
Input Hs CH BTU/hr 175,000 85,000 130,000 175,000 205,000
kW 51 25 38 51 60
Q
n
Output non-condensing CH
BTU/hr 157,000 77,000 117,000 157,000 184,000
kW 45.9 22.5 34.2 45.9 54.0
Q
n
Output EN677 efficiency CH
BTU/hr 172,400 84,000 127,600 172,400 202,200
kW 50.2 24.7 37.3 50.2 59.1
Q
n
Output AFUE CH
BTU/hr 167,500 82,000 124,900 167,500 196,100
kW 48.8 24.1 36.5 48.8 57.4
Efficiency at 98.6/86°F (36/30°C) part
load, Hs, EN677 CH
% 98.5 98.8 98.2 98.5 98.5
AFUE according IBR % 95.0 95.4 95.4 95.0 95.0
O
2
(at full load)
%
Electr. power consumption max. W 210 137 144 210 234
Electr. power consumption stand by W
Current V/Hz
Fuse rating A
Degree of protection acc. EN 60529
Weight (empty) lbs / kg 196 / 89 110 / 50 117 / 53 141 / 64 141 / 64
Water content CH gallon / liter 1.8 / 7 0.9 / 3.5 1.3 / 5 1.8 / 7 1.8 / 7
Water content DHW gallon / liter 3.7 / 14
Water content Plumbing Kit gallon / liter 0.74 / 2.8
Q-Series
Natural gas: 4.4 - 4.7 (Propane: 4.8 - 5.1)
IPX0D
14
120Vac/60Hz
5AF & 4AT
0.58 / 2.2 0.74 / 2.8
After run time pump CH min
After run time pump DHW min
P
MS
Water pressure min.-max.
PSI / bar
P
MW
Water pressure DHW max.
PSI / bar 150 / 10
n.a. n.a. n.a. n.a.
Flow temperature max. °F / °C
Pump type UPER 20-78 UPER 20-58 UPER 20-78 UPER 20-78 UPER 20-78
A
vailable pump hei
g
ht CH
(
'
T = 25K
)
PSI / kPa 2.9 / 20 5.2 / 36 3.0 / 21 2.9 / 20 5.5 / 38
Approvals ASME, CSA ASME, CSA ASME, CSA ASME, CSA ASME, CSA
DHW flow
(
at 'T50°F
)
gallon/min 6.2
DHW flow
(
at 'T27.8°C
)
liter/min 23.5
DHW flow
(
at 'T75°F
)
gallon/min 4.1
DHW flow
(
at 'T41.7°C
)
liter/min 15.5
Max. DHW flow rate gallon/min 6.2
liter/min 23.5
Pressure difference DHW PSI / bar 4.3 / 0.3
CSA number
CRN number
2183087
5
1
14-43 / 1-3
176 / 80
8101.7CL
Installation & Servicing Instructions Rinnai Q-Series
18
6 Connecting the boiler
The boiler has the following connection pipes;
- The central heating circuit pipes.
These must be connected to the Plumbing Kit by means of adapter ttings.
See further chapter 6.1;
- The gas supply pipe.
It is provided with a 3/4" male thread into which the tail piece of the gas valve can
be screwed. See further chapter 6.4;
- The condensation drain pipe.
It consists of an oval 1" (24 mm) plastic pipe. The drain pipe can be connected to
this by means of an open connection. If the open connection is tted in a different
location, then the pipe can be lengthened by means of a 1 1/4" (32 mm) PVC
sleeve. See further chapter 6.6;
- The vent system and air supply system.
It consists of a concentric connection 3"/5" (80/125 mm). The boiler can be converted
to a twin pipe connection that will accept 80mm ue and intake air or with the use
of the included adapters 3” PVC / CPVC ue and intake. See further chapter 6.7.
- Cold and hot water pipes for domestic hot water (DHW).
Combi boilers only: These consist of 3/4" (15 mm) copper pipe and can be
connected to the installation by means of 3/4" M-NPT adapter ttings. See further
chapter 6.5;
The pipes to be connected to the boiler must be cleaned before connecting in
order to prevent dirt from entering and damaging the boiler.
6.1 Central heating system
Connect the central heating system according to its instructions.
The boiler pipes can be connected to the installation by means of compression ttings.
Reducers should be used for connecting to thick-walled pipe (welded or threaded).
When removing the plastic sealing caps from the pipes, dirty testing water may
drain from the boiler.
A Plumbing Kit must be tted to the boiler.
The boiler, when used in connection with a refrigeration system, must be
installed so the chilled medium is piped in parallel with the boiler with appropriate
valves to prevent the chilled medium from entering the boiler.
The boiler piping system of a hot water boiler connected to heating coils located
in air handling units where they may be exposed to refrigerated air circulation
must be equipped with ow control valves or other automatic means to prevent
gravity circulation of the boiler water during the cooling cycle.
NOTICE
i
NOTICE
i
NOTICE
i
NOTICE
i
NOTICE
i
Installation & Servicing Instructions Rinnai Q-Series
19
Boiler basic piping gure 7
T
P
Low Loss Header
V1
Service valve
V2
Service valve
1
2
3
4
56
7
89
1. shut off valve
2. system circulator
3. check valve
4. balancing valve
5. boiler drain valve
6. dirt trap
7. air separator
8. automatic ll valve
9. back ow preventer
10. expansion tank
11. bypass for system cleaning
10
11
Installation & Servicing Instructions Rinnai Q-Series
20
6.1.1 Plumbing Kit installation
Rinnai supplies speci c Plumbing Kits with each boiler type, which must be tted
directly underneath the boiler on the supply and return pipe. Find in chapter 5.3 the
dimensions. Use of the Rinnai boiler without the plumbing kit will void the warranty.
To protect the entire heating system we recommend installing a dirt particle trap
in the return circuit. When the boiler is installed to an existing heating system
this trap is required. Use of a Y strainer is not permitted as a substitute for a
dirt trap.
- Install shut-off valves immediately before and after the dirt particle lter to allow
the trap to be cleaned.
- Position 3 ( gure 8) is a garden hose thread boiler drain that can be used to drain
the boiler or add water treatment additives to the system such as inhibitors or
glycol.
- Position 4 ( gure 8) is the supply connection for an indirect tank when used with
the optional 3-way valve kit.
- For information on locating the expansion tank and system ll, please see the
Rinnai Boiler Applications Manual.
Thoroughly ush all pipes and radiators. We recommend the use of a Rinnai
approved system cleaner. Please refer to the list of approved Rinnai system
cleaners in this chapter.
- Refer to the installation template and chapter 5.3 for the pipe connection dimensions.
The plumbing kit is not intended to support the weight of the piping. Appropriate
piping supports should be used to support all attached piping to the boiler and
plumbing kit.
NOTICE
i
NOTICE
i
Plumbing Kit installation gure 8
5
9
Compression fittings.
Parts:
1. Nut
2. Ferrule
3. Fitting
Fitting instructions:
1. Push the complete
fitting over the pipe as
far as possible. Ferrule
should be over the
pipe completely.
2. Turn the nut handtight
clockwise.
3. Use 2 wrenches, one
to hold the fitting on
its place, the other
for tighten the nut
clockwise in 3/4 turn.
21
3
1. Plumbing kit
2. Safety valve
3. Drain and Purge connection
4. DHW ow connection
in case of optional
internal 3 way valve
5. Bronze adapter ttings
6. Service valves*
7. Flow
8. Return
9. Pressure gauge*
2
1
3
4
6
8
7
* After installation of the plumbing kit to
the boiler the pressure gauge and both
handles of the service valves must be
mounted. Be sure the gauge is tted leak
free and that the handles are secured with
the supplied nuts.
NOTICE
i
NOTICE
i
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186

Rinnai Q205SP Guide d'installation

Catégorie
Chauffe-eau
Taper
Guide d'installation

dans d''autres langues