ABB 30 ABB_PMA_MONTANL BTK-BKE Mode d'emploi

Taper
Mode d'emploi
PM BKE/BTK
Ball-joint termination/sleeve
ASSEMBLY INSTRUCTION
MONTAGEANLEITUNG
EN
DE
We reserve the right to make technical
changes or modify the contents of
this document without prior notice.
With regard to purchase orders, the agreed
particulars shall prevail. ABB AG does
not accept any responsibility whatsoever
for potential errors or possible lack of
information in this document.
We reserve all rights in this document
and in the subject matter and illustrations
contained therein. Any reproduction,
disclosure to third parties or utilisation
of its contents – in whole or in parts –
is forbidden without prior written consent
of ABB AG.
Copyright© 2023 ABB
All rights reserved
ABB Switzerland Ltd
PMA Cable Protection
Aathalstrasse 90
CH-8610 Uster
Switzerland
Tel: +41 58 585 00 11
E-mail: pma-info@ch.abb.com
www.pma.ch
The specifications and instructions for our customers in this document reflect the product
engineering level at the time of manufacturing. ABB accepts no liability for damages resulting
from unprofessional installation or misuse of the products. This disclaimer also includes
damages to third parties. It is the customer‘s responsibility to check the delivered products
and immediately notify ABB of detected faults. It is also the customer‘s responsibility to test
the delivered product on its applicability for the intended purpose. ABB will accept no liability
or responsibility for their products if a product or a ABB system is combined or used together
with third-party products, i.e. products from other companies than ABB. Jurisdiction in all legal
disputes concerning product liability have the courts of the canton of Zurich/Switzerland.
Swiss law applies. For more information go to: www.pma.ch
Die in diesem Dokument für unsere Kunden enthaltenen Angaben und Instruktionen
entsprechen dem neuesten Stand unserer Technik zum Zeitpunkt der Herstellung des
Produktes. Die ABB lehnt jede Haftung bei unsachgemässer Montage oder Verwendung sowie
Zweckentfremdung des Produktes ab. Dieser Haftungsausschluss umfasst auch allfällige
Drittschäden. Es obliegt dem Kunden, die gelieferte Ware zu prüfen und allfällig festgestellte
ngel sofort der ABB anzuzeigen. Es obliegt ferner dem Kunden, die Ware auf ihre Eignung
zwecks einer spezifischen Anwendung zu überprüfen. Die ABB lehnt jegliche Haftung für ihre
Produkte ab, wenn ein einzelnes Produkt oder ein ABB-System mit Fremdprodukten, d.h.
Produkten anderer Unternehmungen kombiniert bzw. verwendet wird. Gerichtsstand für
Streitigkeiten bezüglich Produkthaftung sind die Gerichte des Kantons Zürich/Schweiz.
Es kommt Schweizer Recht zur Anwendung. Ernzende Informationen unter: www.pma.ch
Contact
ENGLISH DEUTSCH
BTK
Position BTK half-shell along PMA conduit.
Press second half-shell onto the first one
and fix the two half-shells using the
enclosed screws.
BTK-Halbschale entlang des PMA-Wellrohrs
positionieren. Die zweite Halbschale auf die
erste dcken und die beiden Halbschalen
mit den mitgelieferten Schrauben
befestigen.
BTR + BTK
For strain relief: BTR + BTK
Position first BTR half-shell along PMA
conduit. Press second half-shell onto the
first one until it clicks. The assembled BTR
fits as an insert into the ball-shaped
middle section of the BTK.
r Zugentlastung: BTR + BTK
Erste BTR-Halbschale entlang des PMA-
Wellrohrs positionieren. Zweite Halbschale
bis zum Einrasten auf die erste drücken. Das
zusammengesetzte BTR passt als Einsatz in
die kugelförmige mittlere Sektion des BTK.
30
More about PMA
Robotics solutions
BKE
Place PMA conduit terminal in BKE half-
shell. Press second half-shell onto the first
one and fix the two half-shells using the
enclosed screws (2x for NW36 & NW48,
4x for NW70). Note: The ball-shaped design
will accommodate an optional BKS cable
star (supplied separately).
Das PMA-Wellrohrende in die BKE-
Halbschale einführen. Die zweite Halbschale
auf die erste drücken und die beiden
Halbschalen mit den mitgelieferten
Schrauben befestigen (2× für NW36 und NW
48, 4× für NW70). Hinweis: Im
kugelförmigen Design lässt sich ein
optionaler BKS-Kabelstern unterbringen
(separat geliefert).
Position the assembled BKE in the BSH
tube clamp (supplied separately), close the
fastening and press it until it clicks. The
fastening can be additionally secured with
a screw if required.
Das zusammengesetzte BKE in der BSH-
Rohrschelle platzieren (separat geliefert),
die Befestigung schließen und bis zum
Einrasten andrücken. Die Befestigung kann
bei Bedarf zusätzlich mit einer Schraube
gesichert werden.
MONTANL BTK-BKE 03/23
Position assembled BTK in BSH tube clamp
(supplied separately), close the fastening
and press it until it clicks. The fastening
can be additionally secured with a screw if
required.
Die zusammengesetzte BKT in der BSH-
Rohrschelle platzieren (separat geliefert),
die Befestigung schließen und bis zum
Einrasten andrücken. Die Befestigung kann
bei Bedarf zusätzlich mit einer Schraube
gesichert werden.
12
3
2
1
We reserve the right to make technical
changes or modify the contents of
this document without prior notice.
With regard to purchase orders, the agreed
particulars shall prevail. ABB AG does
not accept any responsibility whatsoever
for potential errors or possible lack of
information in this document.
We reserve all rights in this document
and in the subject matter and illustrations
contained therein. Any reproduction,
disclosure to third parties or utilisation
of its contents – in whole or in parts –
is forbidden without prior written consent
of ABB AG.
Copyright© 2023 ABB
All rights reserved
ABB Switzerland Ltd
PMA Cable Protection
Aathalstrasse 90
CH-8610 Uster
Switzerland
Tel: +41 58 585 00 11
E-mail: pma-info@ch.abb.com
www.pma.ch
Contact
INSTRUCTIONS DE MONTAGE
INSTRUCCIONES DE MONTAJE
FR
ES
FRANÇAIS ESPAÑOL
Les spécifications et instructions destinées à nos clients dans le présent document reflètent le
niveau d’innierie des produits au moment de la fabrication. ABB ne saurait être tenu responsable
des dommages résultant d’une installation ou d’une utilisation non professionnelle ou impropre de
ses produits. Cela inclut également les dommages caus à des tiers. Il est de la responsabilité du
client de vérifier les produits livs et de signaler imdiatement à ABB tout défaut éventuel. Il est
également de la responsabilité du client de tester le produit livré afin de s’assurer qu’il est adapté à
l’usage spécifique envisa. ABB décline toute responsabilité concernant ses produits si un produit
ou un système ABB est combiné ou utilisé conjointement à des produits de tierces parties, à savoir
des produits d’autres soctés que ABB. Pour tous les litiges concernant la responsabilité du fait des
produits, les tribunaux du canton de Zurich/Suisse sont compétents.La législation suisse
s’applique. Pour de plus amples informations, veuillez consulter le site: www.pma.ch
Las instrucciones y especificaciones de este documento para nuestros clientes reflejan el nivel
de ingeniea del producto en el momento de fabricarlo. ABB no acepta responsabilidad por
daños que resulten de la instalacn o aplicacn no profesional o del mal uso. Esta cusula
también incluye daños a terceros. Es responsabilidad del cliente comprobar los productos
entregados y notificar inmediatamente a ABB los defectos encontrados. Tambn es
responsabilidad del cliente probar el producto entregado para su aplicación específica.
ABB no aceptará responsabilidad sobre sus productos si un producto o sistema ABB se
combina o se usa junto a productos de terceros, es decir, productos de otras empresas que no
sean ABB. La jurisdiccn sobre cualquier disputa legal referente a responsabilidad de producto
corresponde a los tribunales del cantón de Zurich/Suiza. Se aplicará la ley suiza. Para más
información consult: www.pma.ch
MONTANL BTK-BKE 03/23
BTK
Positionner la demi-coquille BTK le long de
la gaine PMA. Appuyer la deuxième partie
de la demi-coquille sur la premre et fixer
les deux ensemble en utilisant les vis
fournies.
Coloque la mitad BTK a lo largo del
conducto PMA. Presione la segunda mitad
sobre la primera y fije las dos mitades por
medio de los tornillos suministrados.
BTK + BTR
Avec décharge de traction : BTR + BTK
Positionner la première demi-coquille BTR
sur la gaine PMA, puis la deuxme jusqu’à
entendre un clic. Le BTR assemblé s’insert
au centre du BTK.
Para aliviar la tensn: BTR + BTK
Coloque la primera mitad BTR a lo largo del
conducto PMA. Presione la segunda mitad
sobre la primera mitad hasta que haga clic.
El BTR montado se puede insertar en la
sección esférica del BTK
.
BKE
Positionner l’extrémité de la gaine PMA
dans la demi-coquille BKE. Appuyer la
deuxième demi-coquille sur la première et
fixer les deux ensemble en utilisant les vis
fournies (2x pour NW36 et NW48, 4x pour
NW70). Remarque : la conception en forme
de boule peut accueillir en option un passe-
câbles BKS (fourni séparément).
Coloque el extremo del conducto PMA en la
mitad BKE. Presione la segunda mitad
sobre la primera y fije las dos mitades por
medio de los tornillos suministrados
(2 para NW36 & NW48, 4 para NW70).
Nota: El diseño esférico ayuda a acomodar
cualquier boquilla de paso BKS opcional
(se suministra por separado).
Positionner le BKE assemblé dans le
support pour gaines BSH (livré
séparément). Fermer la fixation et appuyer
jusqu’à entendre un clic. La fixation peut
être comptée par une vis si nécessaire.
Coloque el BKE montado en la abrazadera
de tubo BSH (se suministra por separado),
cierre la fijación y presione hasta que haga
clic. La fijación se puede asegurar de forma
adicional con un tornillo en caso necesario.
Positionner le BTK assemblé dans le
support pour gaines BSH (livré
séparément), fermer la fixation et appuyer
jusqu’à entendre un clic. La fixation peut
être comptée par une
vis si nécessaire.
Coloque el BTK montado en la abrazadera
de tubo BSH (se suministra por separado),
cierre la fijación y presione hasta que haga
clic. La fijación se puede asegurar de forma
adicional con un tornillo en caso necesario.
12
3
2
1
PM BKE/BTK
Ball-joint termination/sleeve
30
More about PMA
Robotics solutions
  • Page 1 1
  • Page 2 2

ABB 30 ABB_PMA_MONTANL BTK-BKE Mode d'emploi

Taper
Mode d'emploi