2
Installation
1. Attach the bottom-casting unit by hooking over the
lower tabs at the fi rebox sides.
2. Attach the top-casting unit by hooking over the four
tabs at the fi rebox sides.
3. Place the barrier screen on the
lower casting ledge to align it
to the upper casting and push
it against the upper casting so
the clips snap into place.
# Description Qty Number
1 Top Casting unit 1 3000452
2 Top Right Side Bracket 1 3000118
3 Top Left Side Bracket 1 3000117
4 Bottom Casting unit 1 3000453
5 Bottom Right Side Bracket 1 3000155
6 Bottom Left Side Bracket 1 3000156
7 Door Hinge Bolt 1 100D201
8 Washer - Hinge Bolt 1 100B810
9 Barrier Screen 1 4003294
Repair Parts List
Clearances
Designed and Manufactured by / for
Miles Industries Ltd.
190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1
Tel. 604-984-3496 Fax 604-984-0246
www.valorfi replaces.com
Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.
Outer Trim
Supplied
Separately
34-7/8” (887 mm)
31-1/8” (780 mm)
3/4”
(19 mm)
Maintenance
The cast iron and the screen can be brushed with a
soft brush. To remove the screen, push it sideways and
pull on the opposite side then remove it completely.
If the barrier becomes damaged, the barrier shall
be replaced with the manufacturer’s barrier for this
appliance.
To clean the stove glass window, refer to the owner’s
manual supplied with the appliance. DO NOT clean
with ammonia.
1
2
3
4
5
9
8
7
6
WARNING
DO NOT TOUCH THE BARRIER SCREEN OR
DO NOT TOUCH THE BARRIER SCREEN OR
THE CAST FRONT WHILE THEY ARE HOT!
THE CAST FRONT WHILE THEY ARE HOT!
Let the fireplace cool first before cleaning it.
Let the fireplace cool first before cleaning it.
FOR SAFETY PURPOSE, ensure the
FOR SAFETY PURPOSE, ensure the
barrier screen is re-installed on the
barrier screen is re-installed on the
fireplace front after maintenance.
fireplace front after maintenance.
!