2
Figure 2. Primary air Shutter location
Figure 3.
Install new injector.
For U.S & Canada per
ANSI Z21.88-2005•CSA 2.33-2005, CAN/CGA 2.17
For installations from 610-1370 meters (2000-4500 ft.)
the orifice sizes (DMS) for natural and propane gas are
#39 and #53 respectively. See data plate for additional
information. For high altitude installations consult the
local gas distributor or the authority having jurisdic-
tion for proper rating methods. If the installer must
convert the unit to adjust for varying altitudes, the
information sticker must be filled out and applied to
the appliance at the time of the conversion.
Cet appareil est equippé pour des altitudes compries
entre 0 et 2000 pieds (0-610 m ) seulement.
Derating Procedure
1. Turn off gas supply to the stove and disconnect
from electical power source.
2. Remove the glass frame. See fig. 1.
3. Loosen the primary air shutter wingnut and push
the stem all the way back. Fig. 2.
4. Pull the Burner Plate forward to disengage it from
the burner orifice and lift it out of the firebox.
5. Locate the main burner injector. See fig. 3. Slide
the Air Shutter out of the way and use a 1/2” open
end wrench or deep-well socket to remove the
burner orifice from the brass orifice holder. Re-
place with the orifice supplied in the kit. Tighten
securely.
6. Reinstall the Burner Plate by engaging the ven-
turi tube with the Air Shutter. BE CERTAIN THE
BURNER IS LEVEL AND SECURELY SEATED ON THE
SUPPORT LEGS ON THE FIREBOX FLOOR.
7. Apply the Conversion Notice label to the rating
plate or base of the valve compartment.
8. Install the burner media, (Log Set, River Rocks, or
glass embers) according to the instructions in the
Owner’s Manual.
9. Apply anti-seize lubricant to the socket head glass
frame screws before reinstalling the glass frame.
10. Gas Pressure Test: See Owner’s Manual, page 15.
System Check: See Owner’s Manual, pages 22-23.
High Altitude Adjustment Kit
LP #156821 / NG #156822
Tools required:
• 1/2” & 13 mm open end wrench or deep-well socket
• 4 mm allen wrench
Conversion Kit Contents:
• 1 Burner Injector (#52 for LP / #38 mm for NG)
• Conversion Label
• Conversion instructions
Figure 1. Remove glass frame.
Injector
Primary Air
Shutter
Figure 4. High Altitude Conversion Label.
This appliance has been converted for use at an
altitude of___________ .
Orifice Size: __________ Manifold Press. _______
Input Btu/Hr. _________ Fuel Type ___________
Date: ___/___/___ Converted by:_____________
Cet appreeil a été converti au _____ Injecteur_____
Pression à la tubulure d’alimentation ___________
Déoit calorifique ___________
Jøtul North America, Inc. 55 Hutcherson Dr. Gorham, Maine 04038
11.08 138947