Fortress Technologies PURE VIEW GLASS BALUSTER AL13 HOME Installation Instructions Manual

Taper
Installation Instructions Manual
1
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
PURE VIEW GLASS BALUSTER FOR AL
13
HOME
INSTALLATION INSTRUCTIONS
Pure
View®
BALAUSTRE DE VIDRIO PURE VIEW PARA AL
13
HOME
INSTRUCCIONES DE INSTALACIÓN
PANNEAUX À BALUSTRES DE VERRE PURE VIEW POUR SYSTÈME AL
13
HOME
INSTRUCTIONS D’INSTALLATION
2
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
TABLE OF CONTENTS
English
Introducon.........................................................................3
LevelBracket............................................................4
AngledBracket.......................................................25
StairBracket...........................................................33
Care&Maintenance..............................................48
Warranty.................................................................49
Español
Introducción............................................................................................... 3
Soporte a nivel............................................................................ 4
Soporte en ángulo..................................................................... 25
Soporte de escalera.................................................................. 33
Cuidado y mantenimiento.........................................................48
Garana..................................................................................... 49
Français
Introducon.......................................................................3
Ferrureàniveau.....................................................4
Ferrure à angle......................................................25
Ferrure pour escalier.............................................33
Entreen...............................................................48
Garane................................................................49
3
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits.Thedeckandrailinginstallershoulddetermine
andimplementappropriateinstallaontechniquesfor
eachinstallaonsituaon.FortressRailingProductsandits
distributors shall not be held liable for improper or unsafe
installaons.
FortressPostsmustalwaysbesecuredtothedeck
framingandshouldneverbeaachedtoonlythedeck
boards.
PureViewI-SupportisrequiredforCanadian
CodeCompliance.
Note
WhencungFortressrailing,itisveryimportantto
completethefollowingatcutpoints:
• Removeallmetalshavingsfromthecutarea.
• Fileanysharpedgeslebycung.Thoroughlywipeand
removeanylings,grime,ordirtfromtherailing.
• ApplytwocoatsofFortresszincbasedtouch-uppaintto
thecutarea.Iftouchupisatrailends,allowpainttodry
beforeconnecngbrackettopost.
Be sure to remove any metal shavings from the surface of
deck,pao,orbalconytopreventstainsonthedeck
surface.
Torx Safety Tips
• Alwaysusethelowestspeedsengondrill.
• Toreducechanceofbitbreakage,startghteningwithdrill
onlowtorquesengandworkupunlscrewissecured.
Tip: Pre-drill holes with 3/16” [4.5mm] drill bit.
4
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Required Tools
Goggles
Drill
Tape
Measurer
Level
Tool
Speed
Square
Touch-Up
Paint
MiterSaw
T-25
Driver Bit
#2Phillips
Head Bit
Bit
Extender
5/16”[8mm]
Nut Driver Bit
DrillBits:1/16”,3/16”,
3/8”,5/8”[1.5mm,
4.5mm,9.5mm,16mm]
Pure View: Al
13
HOME Glass Baluster Installaon Opons
Socket
Set
Pencil
Rubber
Mallet
Hex
Wrench
PureView:Al
13
HOMEBalusterRail69”[1753mm]
Crescent
Wrench
Socket
Wrench
Spring
Punch
Safety
Gloves
Support
Blocks
2”[51mm]or3”[76mm]ProudPost
RoundAccentTopRail
FlatAccentTopRail
PostCap
Straight Bracket Cup
Al
13
HOMEPostwithPostBaseCover
Straight Bracket Cap
PureView
Baluster
Al
13
HOMEVercalCable/
PureViewI-Support
File
C-Clamp
5
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
2”[51mm]OverThePost(OTP)
RoundAccentTopRail
FlatAccentTopRail
FlatATR
Line Splice
RoundATR
Line Splice
Straight Bracket Cup
PureView
Baluster
Straight Bracket Cap
PureView:Al
13
HOMEBalusterRail69”[1753mm]
Al
13
HOMEPostwithPostBaseCover
Al
13
HOMEVercalCable/
PureViewI-Support
2”[51mm]or3”[76mm]ProudPostConguraons
*Installedheightsincludea3-1/2”[89mm]forthe32-1/2”[825.5mm]panel&2”[51mm]forthe
40”[1016mm] panel spacebetweendecksurfaceandboomedgeofboomrail.
Al
13
HOME
Panel Height
40”[1016mm]
Rail Panel
42”[1067mm]
InstalledPanelHeight
45-1/2”[1156mm]
RequiredPost
32-1/2”[826mm] 39-1/2”[1003.5mm]36”[914.5mm]
2”[51mm]OverThePost(OTP)Conguraons
Al
13
HOME
Panel Height
40”[1016mm]
Rail Panel
42”[1067mm]
InstalledPanelHeight
42”[1067mm]
RequiredPost
32-1/2”[826mm] 36”[914.5mm]36”[914.5mm]
*Installed heights include a 3-1/2” [89mm] for the 32-1/2” [825.5mm] panel & 2” [51mm] for the 40”
[1016mm] panel space between deck surface and bottom edge of bottom rail.
6
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 1: Install Wood Blocks
1. InstallWoodBlocklevelwithtopofjoist.AsshowninFig.1(A)
2. SecureWoodBlocktoblockingonallfoursideswith#10X
3-1/2”[89mm]deckscrews.
WoodBlockmustbeconstructedwithtreateddimensional
lumberwithaminimumthicknessof11/2”[38mm].
POST MOUNTING
*IfusingFortressEvoluonFraming,contactFortressforinstrucons.
Note:
It’s recommended to install brackets into post before post
mounng. Reference page 8 for bracket Installaon steps.
Fig. 1
#10x3-1/3”
[84.5mm]
(A)
(A)
Joist
Blocking
Step 2: Posion Base Plate
1. PosiontheedgeofAL
13
HOME base plate a minimum
of½”[12.5mm]fromtheinsideedgeofrimjoist.
AsshowninFig.1.
Fig. 1
1/2”[12.5mm]
1/2”
[12.5mm]
7
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 4: Mount Posts
1. Markmounngholelocaonsandpre-drilla3/8”[9.5mm]
hole.
2. Insert3/8”x3-1/2”[9.5mmx89mm]HexHeadgalvanized
boltsthrough3/8”[9.5mm]galvanizedwasherandpost
baseplate.
Note:
PostBasePlateholesMUSTbeposionedaminimum½”
[12.5mm]fromedgeofdeckboard.
Useonly3/8”[9.5mm]HexHeadGalvanizedBolts.Lag
ScrewsshouldNOTbeused.Secureeachpostwithfourbolts.
Fig. 1
Step 3: Max Post Spacing
6’panelmaximumpostspacingis69-1/4”[1759mm].
Note:
Do not exceed the maximum post spacing.
6’panelmaximumpostspacingis69-1/4”
[1759mm]
Fig. 1 Fig. 2
OTP and Proud Post: Max Post Spacing
• 8’ panel maximum post spacing is 93-7/8”.
• 6’ panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’ Panel max post spacing 93-7/8”
6’ Panel max post spacing 69-7/8”
OTP and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of the bracket on other post.
• Confirm that the measurements for the top brackets are the same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
OTP and Proud Post: Max Post Spacing
• 8’ panel maximum post spacing is 93-7/8”.
• 6’ panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’ Panel max post spacing 93-7/8”
6’ Panel max post spacing 69-7/8”
OTP and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of the bracket on other post.
• Confirm that the measurements for the top brackets are the same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
8
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 5: Check Mounted Posts
1. Shimpostasneededtoensurepostislevel.
Fig. 1
Fig. 2
Shim post as needed to
ensure post is level
Deck Board
RimJoist
Joist/Blocking
Wood Block
1/2”
[12.5
mm]
Step 1: Mark Bracket Hole Locaons
1. Markthecenterlineofeachpostwithapencil.
2. TakemeasurementsusedinFig.1and2tomarkboom
andtopbracketholelocaonsontoposts.
BRACKET INSTALLATION
Fig. 1
Bracket Hole Locaons
Pre-drill Dimensions: Pre-drillingwitha3/16”[4.5mm]drillbitisrequired
3-13/16”[97mm]
A*
3/8”[9.5mm]
B
3/8”[9.5mm]
35-1/16”[890.5mm]
C
41-3/16”[1047mm]
3/4”[19mm]
D
*DimensionAposionsboomedgeofrail(1) 3-1/2”[89mm]and(2) 2”[51mm]
abovedecksurface.
*DimensionAismeasuredfromtheboomsurfaceofpostbase.
2-1/2”[63.5mm]
3/4”[19mm]
32-1/2” [826mm] Panel
40” [1016mm] Panel
(1)
(2)
9
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Fig. 2
B
C
B
A
B A
D
Step 2: Pre-Drill and Install Brackets
Tip:
Its important to double check dimensions to conrm ac-
curacy of bracket hole locaons before drilling.
1. UseSpringPunchtomarktheholes.AsshowninFig.1.
2. Pre-drillbracketholeswitha3/16”[89.5mm]drillbit.As
showninFig.2.
3. AachBrackettothepostswithsuppliedT-25thread-cut-
ngscrews.Usetwoscrewsperbracket.Uselowspeed
sengondrill.AsshowninFig.3.
4. Oncetopandboombracketsareinstalled,remeasure
bracketspacingtoconrmdimensionsusedinFig.2and3
ofstep1.AsshowninFig.4.
5. R e m o v e a l l m e t a l s h a v i n g s f r o m d e c k , p o s t b a s e c o v e r, 
post,andpanelbeforebracketisscrewedtopostto
preventcorrosion.
Fig. 1 Fig. 2
10
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Fig. 3
Fig. 4
Fig. 1
Fig. 2
Measure the panel opening
Checkmeasurementwithtop
Do not
measure from
post
Measure
from back
of bracket
Step 3: Measure The Panel Opening Length
1. Measurethedistanceofthepanelopening.
AsshowninFig.1.
2. Conrmthatthemeasurementsforthetopbracketsarethe
sameastheboombrackets.
Note:
Measure from the back wall of the bracket to the back wall
of the bracket on other post. As shown in Fig. 2.
11
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
CUTTING DOWN BOTTOM AND TOP RAILS
Step 1: Measure & Mark Rails Where Cuts Will Be Made
1. Toensurerailsaresymmetrical,takethemeasurement
foundonpage10,step3ofBracketInstallaon,anddivide
itinhalf.Thencutequallengthsfrombothends.
2. Find the center of the rails and measure out half of the
lengtheachdirecon.AsshowninFig.1.
3. Marktheselocaonswithapencilonthetopandboom
rail.
Fig. 1
Mark HereMark Here
Mark Here Mark Here
HalfofPanelLength
CenterofRails
Step 2: Cut & Clean Rails
1. Cutrailsusingasawwithanetoothcarbidecungblade.
2. Useletosmoothcutedges.
3. Removeanymetalshavingsanddustwithabrushorrag.
4. Makesuresurfacestobepaintedareclean.
Note:
DO NOTcutGrommetsinrails.
Fig. 1
Fig. 2
Fig. 3
12
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 3: Apply Spray Paint To Cut Areas
1. Usingapieceofcardboardasamask,applythe1
st
coat of
Fortresszincbasedtouch-uppaint.
2. Allowtodrybeforeapplyingsecondcoat.
3. Applythe2
nd
coatofFortresszincbasedtouch-uppaint.
4. Allowtodryandinstall.
Fig. 1
2X
Fig. 1
3/16”
[4.5mm]
Hole
Fig. 2
Phillips
Head
Thread
Cung
Screws
1. Measureandlocatethecenteroftheboomrail.Usingthe
I-Supportasaguide,markthecenterofthe2screwholes.
AsshowninFig.1.
2. Usinga3/16”[4.5mm]drillbit,drillthoughtheoutsidewall.
3. InstalltheI-SupportwiththeprovidedPhillipsHeadthread
cungscrews.AsshowninFig.2.
Note:
BesuretoinstallI-Supportonsideofrailfacingdeck.
BALUSTER INSTALLATION
Step 1: Install I-Support On Boom Rail
13
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 2: Install Boom Rail
1. Install cut boomrailintothelowerinstalledbrackets.
2. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
3. SecurerailtoBracketCupswithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
Fig. 1
Straight
Bracket
Cup
Straight
Bracket
Cup
Fig. 2
Step 3: Install Balusters Into Boom Rail
1. CarefullyslipBalustersvercallyintoeachslotofthe
boomrail.Holesinbalustersshouldnotbevisibleaer
inseronofbalusterintorail.AsshowninFig.1.
Tip:
Besuretowearsafetyglovesandgoggleswhenhandling
Glass.
Set
Screw
Al
13
HOMEVercalCable/
PureViewI-Support
14
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Fig. 1
Baluster
Pre-Installed
Grommet*
Step 4: Install Top Rail
1. CarefullyslipTopRailoverthetopoftheBalustersintothe
slots&topBracketCups.
2. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
3. SecurerailtoBracketCupsatthismewithprovidedT-25
DriveThread-CungScrews.Uselowspeedsengondrill.
Pre-sloedBoomRail
*PureViewStandardGrommetscomeinstalledinpre-sloedrails.
Step 5: Aach I-Support To Deck
1. FastenI-SupporttodecksurfacewiththesuppliedPhillips
HeadWoodScrew.
Tip:
Pre-drillwitha1/16”[1.5mm]drillbit.
Fig. 1
TopRail
15
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Fig. 1
PROUD POST: ROUND ACCENT TOP RAIL (ATR)
Step 1: Round ATR Spacers
1. AachSpacersusingprovidedself-drillingscrewswitha
5/16”[8mm]nutdriver,twoscrewsperspacer.Asshownin
Fig.2.
TheAccentTopRailKitcomeswith6spacersinthe69.89”
[1775mm]kit.
Thespacersshouldbeequallyspacedalongthelengthof
therail,withnomorethen14”[279.5mm]spacing be-
tweenthem.AsshowninFig.1.
Theendspacersshouldbeplacedasclosetotheendbrack-
etsaspossible.
Note:
DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
Fig. 1
14”[355.5mm]
Max
SpacerAached
NextToBracket
16
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Double Sided
Tape
Fig. 2
Step 2: Round ATR Line & End
1. Measurethedistancefromtheinsideedgeofthe2posts.
2. CuttheATRtomeasuredlength.
3. WhentestngtheATR,placeitontopofthespacers.
DonotpresstheATRdownoverthespacers.Removingthe
ATRfromthespacerscandamagetheATRandspacers.As
showninFig.2.
4. Removethebackingofallofthedouble-sidedtapeonthe
ATRspacers.
5. ARubberMalletmightneedtobeusedtoinstall.Ifusinga
RubberMallet,useaclothtoprotecttheATRfromdamage.
Fig. 1
17
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
PROUD POST: FLAT ACCENT TOP RAIL (ATR)
Step 1: Flat ATR Spacers
1. MeasuredistancebetweenbracketsandcutATRSpacerto
length.TheSpacercanbe1/4”[6.5mm]shorterthanthe
distancebetweenbrackets.
2. Ifoneofthescrewholeswascutoduringthesizingofthe
ATRSpacer,usea5/8”[16mm]drillbittoaddanotherhole
1”fromtheendoftheATRSpacer.
3. AachtheATRSpacerusingtheprovidedself-drilling
screwswitha5/16”[8mm]nutdriver.
4. Allscrewholesmusthaveascrewinstalled.
Note:
Flat ATR uses a full length ATR spacer.
DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
Fig. 1
Fig. 2
ATRShouldNotGoPastThis
PointWhenTestFing
18
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 2: Flat ATR Line And End
ReferenceProudPostRoundATRLine&Endinstruconson
page16.
Double Sided
Tape
Fig. 2
OVER THE POST: ROUND ACCENT TOP RAIL (ATR)
Step 1: Round ATR Spacers
1. Aachspacersusingprovidedself-drillingscrewswitha
5/16”[8mm]nutdriver,twoscrewsperspacer.Asshownin
Fig.2.
TheAccentTopRailKitcomeswith6spacersinthe69.89”
[1775mm]kit.
Thespacersshouldbeequallyspacedalongthelengthof
therail,withnomorethen14”[279.5mm]spacingbe-
tweenthem.AsshowninFig.1.
Theendspacersshouldbeplacedasclosetotheendbrack-
etsaspossible.
Note:
DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
19
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Double Sided
Tape
Fig. 2
Fig. 1 SpacerAached
NextToBracket
14”[279.5mm]
Max
Step 2. Round ATR Line & End
1. Measurethedistancefromtheinsideedgeofthe2posts.
2. CuttheATRtomeasuredlength.
3. TheATRcannotblocktheinsideedgeofthepost.Asshown
inFig.3.
4. WhentestngtheATR,placeontopofthespacers.Do
notpresstheATRdownoverthespacers.Removingthe
ATRfromthespacerscandamagetheATRandspacers.As
showninFig.2.
5. Removethebackingofallofthedouble-sidedtapeonthe
ATRspacers.
6. ARubberMalletmightneedtobeusedtoinstall.Ifusinga
rubbermallet,useaclothtoprotecttheATRfromdamage.
20
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 3: Round ATR Corner
1. WheninstallingATRoncornerswitha2”[51mm]post,
theATRmustbe5/16”[8mm]awayfromthepost.
AsshowninFig.1.
2. Ifinstallingacornerwitha3”[76mm]proudpost,install
theATRatfulllengthfromtheinsideedgeofthepostto
theinsideedgeofthepost.
Fig. 1
Fig. 2
ATRCannotGo
PastThisLine
Fig. 1 Fig. 2
ATRWith3”[76mm]ProudPost/
OverThePost
3”Post
[76mm]
ATR
ATR
ATRWith2”[51mm]ProudPost/
OverThePost
2”Post
[51mm]
5/16”
[8mm]
Minimum
5/16’[8mm]
Minimum
Fig. 3
ATRShouldNotGoPastThis
PointWhenTestFing
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152

Fortress Technologies PURE VIEW GLASS BALUSTER AL13 HOME Installation Instructions Manual

Taper
Installation Instructions Manual