Eaton Ex-Lite NLT Operating Instructions Manual

Catégorie
Batteries rechargeables
Taper
Operating Instructions Manual

Ce manuel convient également à

Explosionsgeschützte LED-Rettungszeichen Notleuchte
Serie: Ex-Lite N; Ex-Lite NLT
Explosion protected LED-Emergency Exit Luminaire
Series: Ex-Lite N; Ex-Lite NLT
Bloc autonome d’éclairage de sécurité (LED) pour
atmospres explosives
Series: Ex-Lite N; Ex-Lite NLT
Betriebsanleitung
Operating instructions
Mode d’emploi
CROUSE-HINDS
SERIES
3 2191 011 061 D/GB/F (G)
2
Inhalt:
Wichtige Hinweise zur Handhabung
der Batterie ....................................................... 3
Maßbilder
......................................................... 6
1 Legende .................................................. 8
1.1 Sicherheitshinweise ................................ 8
2 Technische Angaben ............................... 8
3 Normenkonformität ................................. 9
4 Installation ............................................... 9
4.1 Öffnen und Schließen der Leuchte ......... 9
4.2 Montage der Leuchte ............................. 9
4.3 Netzanschluss ......................................... 9
4.4 Wechsel des Piktogramms ..................... 9
5 Funktion .................................................. 9
5.1 Schaltungsart .......................................... 9
5.2 Anzeigedisplay ........................................ 9
5.3 Ladetechnik ............................................. 9
5.4 Ex-Lite NLT für tiefe Temperaturen .......... 9
5.5 Automatische Testfunktion ...................... 9
5.5.1 Funktionstest (FT) ................................... 9
5.5.2 Teil-Betriebsdauertest (TBT) .................... 9
5.6 Notlichtbetrieb ........................................ 9
6 Inbetriebnahme ...................................... 10
7 Instandhaltung/ Wartung ........................10
7.1 Wechsel des Batteriemoduls .................10
8 Instandsetzung/ Reparaturen .................10
LED-Anzeigezustände ............................17
Konformitätserklärung separat beigelegt.
Contents:
Important notes for battery handling ................ 4
Dimensional drawings
...................................... 6
1 Legende .................................................11
1.1 Safety instructions .................................11
2 Technical data .........................................11
3 Conformity with standards .....................12
4 Installation .............................................12
4.1 Opening and closing the light fitting ......12
4.2 Installation of the fitting .........................12
4.3 Mains connection ...................................12
4.4 Changing of the legend ..........................12
5 Function .................................................12
5.1 System modes .......................................12
5.2 Display ....................................................12
5.3 Charging ................................................12
5.4 Ex-Lite NLT for low temperatures ..........12
5.5 Automatic function test .........................12
5.5.1 Function test (FT) ...................................12
5.5.2 Partial operating time test (TBT) ............12
5.6 Emergency lighting operation ................12
6 Taking into operation ..............................13
7 Maintenance / Servicing .........................13
7.1 Battery module replacement .................13
8 Repair/Overhaul ......................................13
LED-indication status .............................17
Declaration of conformity enclosed separately.
Contenu:
Remarques importantes pour l’utilisation
de la batterie ..................................................... 5
Plans coté
......................................................... 6
1 Légende .................................................14
1.1 Consignes de sécurité ...........................14
2 Caractéristiques techniques ..................14
3 Conformité avec les normes ..................15
4 Installation .............................................15
4.1 Ouverture et fermeture du panneau: .....15
4.2 Montage du panneau .............................15
4.3 Raccordement au secteur: .....................15
4.4 Remplacement du pictogramme ...........15
5 Fonction .................................................15
5.1 Type de circuit ........................................15
5.2 Afficheur ................................................15
5.3 Technique de charge ..............................15
5.4 Ex-Lite NLT pour températures basses ..15
5.5 Essai fonction automatique ....................15
5.5.1 Fonction de test (FT) ..............................15
5.5.2 Test partiel de durée de service (TBT) ...15
5.6 Fonctionnement d’éclairage de secours 15
6 Mise en service ......................................16
7 Entretien / Maintenance.........................16
7.1
Remplacement de la Caisse de batterie 16
8 Réparation/ Remise en état ....................16
LED Affichage de l'état
de charge et de capacité ............................ 17
Déclaration de conformité jointe séparément.
Explosionsgeschützte
LED-Rettungszeichen Notlleuchte
Serie: Ex-Lite N; Ex-Lite NLT
Explosion protected
LED-Emergency Exit Luminaire
Series: Ex-Lite N; Ex-Lite NLT
Bloc autonome d’éclairage de
sécurité (LED) pour atmosphères
explosives Series: Ex-Lite N; Ex-Lite NLT
3
Wichtige Hinweise
zur Handhabung der Batterie
D
B3.2 Laden während des Betriebes
Der Ladestrom ist bei ordnungsgemäßem
Betrieb der Leuchte so bemessen, dass bei
entladener Batterie innerhalb von 14 h ca. 90 %
und innerhalb von 20 h ca. 100% der Nenn-
kapazität erreicht werden.
Der Tiefentladeschutz mit Wiedereinschaltsper-
re überwacht bei Netzausfall die Batteriespan-
nung und verhindert die Tiefentladung der
Zellen.
Die sich durch Selbstentladung im Normalbe-
trieb reduzierende Batteriekapazität wird, durch
den Mikroprozessor kontrolliert und nachgeladen.
Eine ein- bis zweimalige vollständige Entladung
(Notlichtbetrieb bis zum Erlöschen der
Notlichtlampe) pro Jahr, erhöht die nutzbare
Lebens dauer der Batterie und wird dringend
empfohlen!
Sollte dies aus Sicherheitsgründen nicht
möglich sein, empfehlen wir eine Teilentladung
von mindes tens 40 min bzw. 2 h.
B3.3 Laden nach Lagerung
Nach längerer Lagerung empfiehlt sich eine
erste ununterbrochene Ladung für 20 h, danach
eine Entladung bis zum Ansprechen des
Tiefentladeschutzes (Notlichtlampe verlischt),
und anschließend ein erneutes Laden für
mindestens 14 h.
Zeigt die Kapazitätsanzeige keine 5 grüne LEDs
in Dauerlicht an, sollte der Vorgang wiederholt
werden.
Um nach längerer Lagerung die volle Batterie-
kapazität zu erreichen wird empfohlen,
mindestens 3 Lade-/Entladezyklen durchzuführen.
B3. Laden
B3.1 Erstmaliges Laden
Nach Anlegen der Netzspannung gemäß
Schaltplan der Betriebsanleitung der Leuchte
wird die Batterie geladen. Bei Anschluss einer
neuen Batterie kann sich die Ladezustandsan-
zeige (erste blinkende grüne LED) um einige
Minuten verzögern.
Die Batterie hat nach 14 Stunden Ladezeit ca.
90% ihrer Nennkapazität erreicht.
Durch eine Überdimensionierung der Batte-
rie-Kapazität erreicht eine neue Batterie auch
mit diesen 90% Nennkapazität die eingestellte
Notlicht-Nennbetriebsdauervon 90 min bzw.
180 min.
Bei einer Umgebungstemperatur von ca. 0 °C
benötigt die Erstladung der Batterie in etwa
die doppelte Zeit gegenüber einer Ladung bei
über 10 °C.
Bei der Erstinbetriebnahme empfiehlt sich eine
ununterbrochene Ladezeit von 20 h. Hierdurch
wird eine vorzeitige Alterung der Batterie
vermieden.
Der Batteriesatz ist im Auslieferungszustand
nicht vollständig geladen.
Mehrfaches Ein- und Ausschalten der Ver-
sorgungsspannung vor einer ersten
vollständigen Ladung der Batterie (empfoh-
len 20 h, jedoch mindestens 14 h) kann die
Lebens dauer der Batterie erheblich reduzie-
ren.
Empfehlung: Bei neuen Batterien wird die
gesamte nutzbare Batteriekapazität erst nach
ca. 3 Lade-/Entladezyklen erreicht.
B1. Sicherheitshinweise
Zielgruppe:
Elektrofachkräfte und qualifizierte
Personen gemäß den nationalen Rechts-
vorschriften einschließlich der einschlägi-
gen Normen für elektrische Geräte in
explosionsgefährdeten Bereichen (EN/IEC
60079-17).
Die Batterie darf nicht in der Zone 0 oder
Zone 20 verwendet werden!
B2. Informationen zur Ladetechnik
Mit der durch einen Mikrocomputer gesteuer-
ten Ladetechnik wird der Lade- und Entla-
destrom erfasst, aufbereitet und einem
Kapazitätszähler zugeführt. Fünf grüne Leuchtdi-
oden zeigen in 20%-Schritten den jeweiligen
Ladezustand der Batterie an.
Eine Überladung wird durch diese kapazitätsab-
hängige Ladesteuerung vermieden. Nur die
entnommene Energie wird nachgeladen. Auch
der sogenannte Memory-Effekt der Batterie
wird hierbei vermieden.
Das Laden und die Kapazität der Batterie
werden aus elektrochemischen Gründen durch
die Umgebungstemperatur beeinflusst.
Bei Temperaturen unter -5 °C und über +35 °C
verzögert sich der Ladevorgang entsprechend
und es wird nicht sichergestellt, dass die
Batterie vollständig aufgeladen wird.
4
Important notes
for battery handling
GB
B3.2 Charging during operation
The charging current is engineered in such a
way that a discharged battery will have within
14 h approx. 90% and within 20 h approx.
100% of its capacity.
In emergency operation the battery voltage is
monitored via a deep discharge protection
which prevents a deep discharge of the cells.
The microprocessor controls and recharges any
reduction of capacity due to self-discharge in
normal operation.
It is recommended to have one or two fully
discharges per year. This increases the usable
life time of the battery.
Should this not be possible due to logistic and
safety reasons at least a partial discharge of a
minimum of 40 minutes or 2 hours depending
on the setting, is recommended.
B3.3 Charging after storage
After a long storage of the batteries a full
uninterrupted charge for 20 h should be applied
followed by a full discharge down to deep
discharge protection (emergency lamp off) and
then reloading for at least 14 h.
If the capacity indication does not show 5 green
LEDs fully lit after 14 h, the above process
should be repeated.
For a storage period > 6 months it is recom-
mended to have 3 charging/discharging cycles.
B3. Charging
B3.1 Initial Charging
Battery charging starts when the power is
switched on. On the connection of a new
battery the indication of the charge state may
be delayed by a few minutes. The first green
LED might take a few minutes to start flashing.
After a charging period of 14 hours the battery
will have reached approx. 90% of its rated
capacity. As the capacity of the battery is over
specified, this 90% will be sufficient to provide
a rated discharge for both a 90 minute and
180 minute setting.
Initial charging at 0 °C ambient temperature
might take double the time than at tempera-
tures of >10 °C.
After first mains connection an uninterrupted
charging time of 20 hours is recommended to
avoid early ageing due to power-on power-off
situations. The battery set is only partially
charged when supplied.
Multiple switching (on - off) of the mains
circuit should be avoided before a first initial
charge (recommended 20h, minimum 14h) is
achieved. Such interruptions can significant-
ly reduce the lifetime of the battery.
Recommendation: New batteries will reach
the full utilisable capacity after approx. 3
charging / discharging cycles.
B1. Safety instructions
Target group:
For skilled electricians and qualified
personnel in accordance with national
legislation, including the relevant stand-
ards and, where applicable, in acc. with
IEC/EN 60079-17 on electrical apparatus
for explosive atmospheres.
The battery must not be operated in zone
0 or zone 20 hazardous areas!
B2. General information about
the charging technology
The microcomputer controlled charging system
measures the charging and discharging current
and transmits it to a capacity meter. Five green
light emitting diodes indicate in 20%-steps the
actual charge state of the battery.
Overcharging is prevented by means of this
charging control dependent on the capacity.
Only the energy drawn is recharged. The
so-called memory effect is thus also prevented.
For electrochemical reasons charging and the
capacity are influenced at the ambient
temperature.
At temperatures below -5 °C and above +35 °C
charging will take a longer time and full
charging is not guaranteed.
5
Remarques importantes
pour l’utilisation de la batterie
B3.2 Chargement pendant l´utilisation
Le courant de chargement est calculé de telle
manière qu´une batterie déchargée mettra
environ 14 h pour atteindre 90% de sa capacité
et 20 h pour atteindre les 100%.
En cas d´urgence la tension de la batterie est
surveillée par une protection décharge profonde
qui empêche les cellules de se décharger
complètement.
Le microprocesseur contrôle et comble les
réductions de capacité de la batterie par
auto-décharge en fonctionnement normal.
Il est recommandé de procéder à un ou deux
déchargements complets par an. La durée de
vie de la batterie s´en trouve agrandie.
Si cela est impossible pour des raisons de
logistique et de sécurité, alors il est recomman-
dé de procéder à un déchargement d´au moins
40 minutes à 2 heures.
B3.3 Chargement après stockage
Suite à une longue période de stockage des
batteries il convient de les charger en continu
pendant 20 heures avant de procéder à un
déchargement complet jusqu´au niveau de
protection décharge profonde (voyant urgence
éteint), puis de les recharger pendant au moins
14 heures.
Si les 5 voyants verts de capacité ne restent
pas allumés en permanence, alors il faut
recommencer le processus depuis le début.
Afin d´obtenir le total de capacité de la batterie
après une longue période de stockage
(> 6 mois), il faut réaliser au moins 3 cycles de
chargement / déchargement.
B3. Chargement
B3.1 Chargement initial
Le chargement de la batterie commence
lorsque le chargeur est mis sous tension. Lors
de la connexion d´une batterie neuve, l´indica-
tion de chargement (première diode verte
clignotante LED) peut ne commencer qu´après
plusieurs minutes.
Après un chargement de 14 heures la batterie
aura atteint environ 90% de sa capacité
nominale. La capacité de la batterie étant sur
dimensionnée, ces 90% suffisent pour produire
un temps de décharge de 90 minutes, voire 180
minutes.
Un chargement initial par une température
ambiante de 0 °C peut prendre le double du
temps d´un chargement par >10 °C.
Lors de la première mise en service un temps
ininterrompu de chargement de 20 heures est
recommandé pour éviter un vieillissement
prématuré de la batterie dû à des mises sous et
hors tension fréquentes.
Les mises sous et hors tension fréquentes
doivent être évitées avant le chargement
initial complet (20h recommandées, 14h
minimum) pour éviter un vieillissement
prématuré de la batterie.
Recommandation : les batteries neuves
atteindront leur capacité maximale utilisable
après environ 3 cycles complets de charge-
ment / déchargement.
B1. Consignes de sécurité
Groupe cible:
Électriciens et personnel qualifiés en
conformité avec la législation et les
standards nationaux et, si applicable, en
conformité avec CEI/EN 60079-17 sur les
installations électriques pour les atmos-
phères explosives.
La batterie ne doit pas être utilisée en zones
0 ou 20!
B2. Information sur la technique
de chargement.
Le système de chargement contrôlé à partir
d´un micro-ordinateur mesure le courant de
charge et de décharge et le transmet à un
compteur. Cinq diodes vertes de 20% chacune
montrent le taux de chargement de la batterie.
Une surcharge est évitée car le contrôle de
charge est dépendant de la capacité. Seule
l´énergie retirée est remplacée. Ainsi, l´effet
mémoire de la batterie est également évitée.
Pour des raisons électrochimiques le charge-
ment et la capacité de la batterie sont
influencés par la température atmosphérique.
À des températures inférieures à -5°C et
supérieures à +35°C le chargement ralentit en
conséquence et un chargement complet ne
peut plus être garanti.
F
6
Maßangaben in mm / Dimensions in mm / Dimensions en mm
Maßbilder / Dimensional drawings / Plans coté
115400
422
380
180
230
Piktogramme / Legends / pictogrammes ISO 7010
L
N
PE
Befestigungs-
schrauben
LED-Leiterkarte /
Fixing screws LED
printed circuit /
vis de fixation LED
carte de circuits
Befestigungsschrauben
LED-Leiterkarte /
Fixing screws
LED printed circuit /
vis de fixation
LED carte de circuits
Ex-Lite NLT Ex-Lite NLT
Isolation herausziehen / pull out
isolation / supprimer isolement
1
1 = Heizung / heating / chauffage
L
N
PE
Ex-Lite NLT
Ex-Lite N Ex-Lite N Ex-Lite N
Bild 1 / fig. 1 / Fig.1
Befestigungsschrauben /
Fixing screws /
vis de fixation
Ø 5 mm
Bild 2 / fig. 2 / Fig.2
Abklappen der Leiterkarte /
Turn printed circuit downwards /
tournez le circuit imprimé vers le bas
Bild 3 / fig. 3 / Fig.3
Netzanschluss/
Mains connection/
schéma des connexions
7
2
3
100 %
80 %
60 %
40 %
20 %
Kapazität/Capacity/Capacité
> 20 % < 40 %
Ladebetrieb / Notlichtbetrieb /
Charging operation / Emergency op. /
Batterie charge Fonctionnement
d’éclairage de secours
m aus/off/hors tension
l an/on/allumée
W blinkend/flashing/clignotant
lösen / remove / défaire
Batterie/
Battery/
Batterie
4
4
5
5 6
3.- 6. grüne /
green /
verte LEDs
2. rote / red /
rouge LED
1. gelbe /
yellow / jaune LED
Bild 4 / fig. 4 / Fig. 4
Befestigungsschrauben /
Fixing screws /
vis de fixation
Bild 5 / fig. 5 / Fig. 5
Wechsel der Piktogramm-Scheibe /
Changing of legend-mask /
Replacement de pictogramme
Modification du calibre de pictogramme
Bild 6 / fig. 6 / Fig. 6.
Anzeigedisplay /
indicator display /
rangée de LED’s
Bild 7 / fig.7 / Fig.7.
Ladezustandsanzeige /
charging condition disply /
Affichage de l'état de charge et de capacité
Bild 8 / fig.8 / Fig.8
Lösen der Leiterkarte /
remove of the printed board /
défaire de LED carte de circuits
Bild 9 / fig. 9 / Fig. 9 Bild 10a / fig. 10a / Fig. 10aBild 10 / fig.10 / Fig.10
8
D
Explosionsgeschützte LED-Rettungszeichen Notlleuchte
Serie: Ex-Lite N; Ex-Lite NLT
2 Technische Angaben
EG-Baumusterprüfbescheinigung: BVS 09 ATEX E 048
Konformität gemäß Richtlinie 2014/34/EU und der Normenreihe
EN 60079
N ta
max
+ 40 °C:
II 2 G Ex e ib mb IIC T5 Gb
ta
max
+ 50 °C:
II 2 G Ex e ib mb IIC T4 Gb
NLT ta
max
+ 40 °C:
II 2 G Ex d e ib mb IIC T4 Gb
N/NLT
II 2 D Ex tb IIIC T80°C Db
IECEx Konformitätsbescheinigung: IECEx BVS 13.0016
Gerätekennzeichnung nachder Normenreihe
IEC 60079
N ta
max
+ 40 °C: Ex e ib mb IIC T5 Gb
ta
max
+ 50 °C: Ex e ib mb IIC T4 Gb
N Ex tb IIIC T80°C Db
Bemessungsspannung
N AC: 110 V - 277 V *
DC: 110 V - 250 V *
NLT AC: 110 V - 240 V *
* zulässige Toleranzen gemäß EN/IEC 60079-0
Bemessungsfrequenz: 50 - 60 Hz
Bemessungsstrom
N 110 V AC/DC: ca. 0,06 A
220 V AC/DC: ca. 0,035 A
NLT Heizung: ca. 0,5 A / 50 W
Batteriemodul: Akku 2 x 6 V / 0,8 Ah
Ladezeit (Kap. > 90 %) 24 h
Nennbetriebsdauer Notlichtbetrieb: 3 h
(**)
(**)
Hinweis: Bei neuen Batterien wird die gesamte nutzbare Batteriekapazität erst nach ca. 3 Lade/Entladezyclen
erreicht.
Schutzklasse nach EN/IEC 61140: I
Schutzart nach EN/IEC 60529: IP 66
Zulässige Umgebungstemperatur:
N -20 °C ... +40 °C/+50 °C
NLT -40 °C ... +40 °C
datenhaltig N: +5 °C ... +35 °C
datenhaltig NLT: -40 °C ... +35 °C
Lagertemperatur in Originalverpackung: -20 °C ... +50 °C
Gewicht mit Batterie ca. 6,7 kg
Klemmvermögen Anschlussklemme: 2 x je Klemme: 2,5 mm²
Ex e-Kabel- und Leitungseinführung 1x M25 x 1,5 Gewindeverschluss
Standardausführung M25 x 1,5
geeignete Leitungen und Prüfdrehmomente
der Druckschraube
Ø Leitung (mm) Nm
Dichtung 1+2+3
1 2
3
min. 8,0 1,5
max.
(1)
10,0 2,0
Dichtung 1+2
1 2
3
min. 10,0 2,3
max.
(1)
13,0 2,6
Dichtung 1
1 2
3
min. 13,5 1,3
max.
(1)
1 7, 5 2,3
(1)
Die Prüfungen der Klemmbereiche und Prüfdrehmomente wurden mit Metalldornen durchgeführt.
Bei der Verwendung von Leitungen mit unterschiedlichen Fertigungstoleranzen und Materialeigenschaften kann
der Klemmbereich variieren. Bitte verwenden Sie im Zwischenbereich eine geeignete Kombination aus
Dichtungen, so dass bei zukünftigen Wartungsarbeiten an der KLE die Hutmutter nachgezogen werden kann.
Metallausführung: 2 x M20 x 1,5 Gewinde
Prüfdrehmomente
Einschraubgewinde: 3,0 Nm
Haube: 2,4 Nm
Scheibenbefestigung: 1,4 Nm
1 Legende
Warnung
Dieses Symbol warnt von einer ernsten
Gefahr. Diese Warnung nicht zu beobach-
ten kann Tod oder die Zerstörung von
Einrichtungen zur Folge haben.
Achtung
Dieses Symbol warnt von einem mögli-
chen Ausfall. Wird diese Warnung nicht
beobachtet kann den Gesamtausfall der
Vorrichtung oder des Systems oder des
Betriebes erfolgen, an die es angeschlos-
sen wird.
1.1 Sicherheitshinweise
Zielgruppe:
Elektrofachkräfte und qualifizierte
Personen gemäß den nationalen
Rechtsvorschriften, einschließlich der
einschlägigen Normen für elektrische
Geräte in explosionsgefährdeten Berei-
chen (EN/IEC 60079-14).
Die Leuchte darf nicht in der Zone 0
oder 20 eingesetzt werden!
Die auf der Leuchte angegebenen
technischen Daten sind zu beachten!
Die Anforderungen der EN/IEC 60079-31
u.a. in Bezug auf übermäßige Staub-
ablagerungen und Temperatur, sind vom
Anwender zu beachten
Umbauten oder Veränderungen an der
Leuchte sind nicht zulässig!
Die Leuchte ist bestimmungsgemäß in
unbe schädigtem und einwandfreiem
Zustand zu betreiben!
Diese Betriebsanleitung während des
Betriebes nicht in der Leuchte lassen!
Die nationalen Unfallverhütungs- und
Sicherheitsvorschriften und die nachfol-
genden Sicherheitshinweise, die in dieser
Betriebsanleitung mit einem ( )
gekennzeichnet sind, beachten!
9
Achtung!
Nur festverlegte Leitungen zulässig! Bei
Verwendung anderer Leitungseinführungen
sind die Angaben des Herstellers hinsichtlich
Klemmvermögen und Zugentlastung zu
beachten!
Klemmen Sie die Leitungen L, N und PE am
Klemmstein sicher an (Bild 3).
Montieren Sie die LED-Leiterkarte. Achten Sie
auf sichere Lage der Leitungen.
Quetschen Sie keine Leitungen!
Montieren Sie die Haube mit den vier Schrau-
ben (Prüfdrehmoment 2,4 Nm).
4.4 Wechsel des Piktogramms
Zum Wechsel des Piktogramms sind nur die
4 Schrauben (Bild 4) mit Halteklammern am
Scheibenrahmen zu lösen. Die Piktogamm-
scheibe entnehmen. Die neue Scheibe
einlegen, mit den Halteklammern fixieren und
den Rahmen wieder auf der Leuchte befestigen
(Bild 5).
5 Funktion
5.1 Schaltungsart
Bedingt durch die Lichtleistung der LED-Licht-
quellen werden damit ausgerüstete Leuchten
fast ausschließlich als Rettungszeichenleuchten
eingesetzt. Deshalb sind diese Leuchten nur in
Dauerschaltung zu betreiben.
5.2 Anzeigedisplay
Die in der Leuchte eingebaute Notlichtversor-
gungseinheit ist mit einem Mikrocomputer zur
Ladung und Überwachung sowie mit einer aus
7Leuchtdioden bestehenden Anzeige
ausgestattet. Die fünf grünen LEDs zeigen den
Lade- und Kapazitätszustand der Batterie an.
Die rote LED signalisiert mögliche Störquellen,
die gelbe LED signalisiert den Notlichtbetrieb
(Bild 6).
Siehe hierzu auch Tabelle Seite 10:
LED-Anzeigezustände
5.3 Ladetechnik
Mit der durch einen Mikrocomputer gesteuer-
ten Ladetechnik wird der Lade- und Entla-
destrom erfasst, auf bereitet und einem
Kapazitätszähler zugeführt. Fünf grüne Leuchtdi-
oden zeigen in 20%-Schritten den jeweiligen
Ladezustand der Batterie an, siehe Bild 7.
Die sich durch Selbstentladung im Normalbe-
trieb reduzierende Batteriekapazität wird, durch
den Mikroprozessor gesteuert, nachgeladen.
Beim Ladevorgang zeigt die führende,
blinkende LED die bis zu diesem Zeitpunkt
eingeladene Kapazität an. Die LEDs der bereits
eingeladenen Kapazität zeigen Dauer licht an
(Bild 7). Der Ladevorgang ist beendet, wenn alle
5 grünen LEDs leuchten und keine mehr blinkt.
3 Normenkonformität
Diese Leuchte ist zum Einsatz in explosions-
gefährdeten Be rei chen der Zone 1,2, 21 und 22
gemäß EN/IEC 60079-10-1 und
EN/IEC 60079-10-2 geeignet.
Die Leuchte entspricht den aufgeführten Normen,
in der separat beigelegten Konformitätserklärung.
Verweise auf Normen und Richtlinien in dieser
Betriebsanleitung beziehen sich immer auf die
aktuelle Version. Zusätzliche Ergänzungen
(z.B. Jahreszahlangaben) sind zu beachten.
4 Installation
Die für das Errichten und Betreiben von
explosionsgeschützten elektrischen
Betriebs mitteln geltenden Sicherheitsvor-
schriften sowie die allgemein anerkannten
Regeln der Technik sind einzuhalten
(EN/IEC 60079-14)!
Transport und Lagerung der Leuchte ist nur
in Original verpackung gestattet!
4.1 Öffnen und Schließen der Leuchte
Lösen sie die vier Deckelschrauben
(Kreuzschlitz)
Entfernen Sie die Haube
4.2 Montage der Leuchte
Die Leuchte ist an den vier Befestigungsla-
schen mit geeigneten Befestigungsschrauben
(Schraube Ø max. 5 mm, Bild 1) sicher auf
tragfähigem Untergrund anzuschrauben.
Warnung :
Gefahr durch elektrostatische Entladung!
Die Leuchte darf nicht in der Nähe von ladungs-
erzeugenden Prozessen installiert werden.
4.3 Netzanschluss
Der elektrische Anschluss des Betriebsmit-
tels darf nur durch eine Elektrofachkraft
gem. EN/IEC 60079-14 erfolgen.
Nach Öffnen der Haube sind die zwei
Befes tigungsschrauben der LED-Leiterkarte zu
lösen (Bild 1).
Bei der Version Ex-Lite NLT sind vier Schrauben
zu lösen (Bild 1).
Die Leiterkarte herunter klappen (Bild 2).
Führen Sie die Netzzuleitung durch die
bescheinigte Leitungseinführung M25x1,5 ein.
Für Leitungen von
Ø 8 bis 10 mm Dichtungsein sätze 1,2 und 3,
von Ø 10 bis 13 mm Dichtungsein sätze 1 und 2 und
von Ø 13,5 bis 17,5 mm Dichtungsein satz 1
verwenden.
Achten Sie auf korrekten Sitz des verbleibenden
Dichtungseinsatzes in der Verschraubung.
Bei nicht benutzten Kabel-und Leitungseinfüh-
rungen ist die Schutzscheibe zu entfernen und
durch einen bescheinigten Verschlussstopfen
(Drehmoment 3,0 Nm) zu verschließen.
Beim Verschließen mit einem Verschlussstopfen
die Dichtungseinsätze 1 und 2 verwenden!
Bei Metall-Kabeleinführungen sind die
Schutzkappen der nicht benutzten Einführun-
gen zu entfernen und durch bescheinigte Ex-Ver-
schlussstopfen (min. IP66) zu verschließen!
Die LED-Anzeige berücksichtigt den Kapazi-
täts-Rückgang der Batterie: d.h., geht z.B. die
Anzeige über die 3. grüne LED auch nach
längerer Ladezeit nicht hinaus, so liegt die
verfügbare Kapazität zwischen 40 und 60%.
Diese Anzeige wird bei jedem Notlichtbetrieb
bis zur Abschaltung durch den Tiefentladeschutz
der Batterie wieder aktualisiert.
Bei Temperaturen unter -5 °C und über +35 °C
ist aus elektrochemischen Gründen nicht
sicher gestellt, dass die Batterie voll aufgeladen
wird.
5.4 Ex-Lite NLT für tiefe Temperaturen
Die Version Ex-Lite NLT ist mit einer zusätzli-
chen Heizung und Isolation ausgestattet. Die
Heizung ist bei anliegender Versorgungsspan-
nung immer in Betrieb.
Das Batteriemodul der Ex-Lite NLT kann
dadurch, auch bei tiefen Temperaturen (siehe
techn. Daten), ausreichend geladen werden.
5.5 Automatische Testfunktion
5.5.1 Funktionstest (FT)
Wöchentlich wird automatisch ein Funktions-
test (FT) durchgeführt. Dabei wird nur die
Notlichtlampe für ca. 5 min. auf Batterieversor-
gung umgeschaltet und getestet.
5.5.2 Teil-Betriebsdauertest (TBT)
Alle 3 Monate wird automatisch ein Teilbetriebs-
dauertest durchgeführt.
Falls innerhalb der letzten 3 Monate kein
Notlichtbetrieb >30 min. stattgefunden hat.
Hierbei erfolgt für ca 35 min. Notlichtbetrieb.
5.6 Notlichtbetrieb
Notlichtbetrieb wird automatisch durch den
FT+TBT, durch Netzausfall oder manuell durch
Abschalten der Netzspannung eingeleitet.
Hierbei wird die gelbe LED im Anzeigedisplay
aktiviert.
Die zur Verfügung stehende Restkapazität wird
durch die 5 grünen Leuchtdioden angezeigt,
siehe Bild 7.
D
Explosionsgeschützte LED-Rettungszeichen Notlleuchte
Serie: Ex-Lite N; Ex-Lite NLT
10
7 Instandhaltung/ Wartung
Die für die Instandhaltung, Wartung und
Prüfung von explosionsgeschützten
Betriebs mitteln geltenden Bestimmungen
(z.B. EN/IEC 60079-17) sind einzuhalten!
7.1 Wechsel des Batteriemoduls
Sollte die Batteriekapazität durch Alterung der
Batterie nicht mehr ausreichend sein, muss das
Batteriemodul ersetzt werden.
Schalten Sie die Leuchte spannungsfrei!
Anschließend ist die Leiterkarte sowie die drei
Leitungen von der Leiterkarte L, N und PE zu
lösen (siehe Netzanschluss).
Seite 4:
Ziehen sie die zwei Kurzschlussbrücken
(2) und
(3) aus den Ex d-Steckkontakten und nehmen
sie die ganze Leiterkarte aus der Leuchte (Bild 8).
Die Leiterkarte ist nun spannungsfrei und
darf nur so durch den Ex-Raum transportiert
werden.
Wechseln Sie das Batteriemodul außerhalb des
Ex-Raumes durch Lösen der beiden Schrauben
M 4 (4) sowie der vier Leitungen an den
Klemmensteinen (5) (Bild 9). Drücken sie die
vier Schnapphaken (6) auf der Leiterkartenrück-
seite zusammen und entnehmen sie das
Batterie modul aus der Leiterkarte (Bild 10 und
10a).
Montieren sie das neue Batteriemodul in
umgekehrter Reihenfolge.
Im Rahmen der Wartung sind vor allem die Teile,
von denen die Zündschutzart abhängt, zu
prüfen z. B.:
Gehäuse und Scheibe auf Risse und
Beschädigungen.
Dichtungen auf Beschädigungen.
Klemmen und Verschluss-Stopfen auf festen
Sitz.
8 Instandsetzung/ Reparaturen
Reparaturen, die den Explosionsschutz
betreffen, dürfen nur von CEAG/CCH oder
einer qualifizierten Elektrofachkraft in
Übereinstimmung mit national geltenden
Regeln durchgeführt werden
(EN/IEC 60079-19).
Vor dem Austausch oder der Demontage
von Einzelteilen ist folgendes zu beachten:
Das Betriebsmittel vor dem Öffnen oder vor
Instandhaltungsarbeiten erst spannungsfrei
schalten!
Nur zugelassene CEAG/CCH Originalersatz-
teile verwenden (siehe CEAG/CCH Ersatz-
teilliste).
9 Entsorgung / Wiederverwer-
tung
Bei der Entsorgung des Betriebsmittels sind die
jeweils geltenden nationalen Abfallbeseitigungs-
vorschriften zu beachten.
Zusätzliche Informationen zur Entsorgung des
Produktes können Sie bei Ihrer zuständigen
Cooper Crouse-Hinds / EATON Niederlassung
erfragen.
Programmänderungen und -ergänzungen sind
vorbehalten.
D
Explosionsgeschützte LED-Rettungszeichen Notlleuchte
Serie: Ex-Lite N; Ex-Lite NLT
6 Inbetriebnahme
Vor der Inbetriebnahme die korrekte
Funktion und Installation der Leuchte in
Übereinstimmung mit dieser Betriebs anlei-
tung und anderen zutreffenden Bestimmun-
gen überprüfen!
Isolationsmessungen nur zwischen PE und
Außenleiter L sowie zwischen PE und N
durchführen!
– Messspannung: max. 1 kV AC/DC
– Messstrom: max. 10 mA
Achtung:
Eine Isolationsmessung zwischen L und N
darf nicht durchgeführt werden, da sonst die
Elektronik oder die Netzein gangs sicherung
im Gerät) zerstört wird.
11
GB
Explosion protected LED-Emergency Exit Luminaire
Series: Ex-Lite N; Ex-Lite NLT
2 Technical data
EC-Type Examination Certificate: BVS 09 ATEX E 048
Marking acc. to 2014/34/EU and standard of series
EN 60079
N ta
max
+ 40 °C:
II 2 G Ex e ib mb IIC T5 Gb
ta
max
+ 50 °C:
II 2 G Ex e ib mb IIC T4 Gb
NLT ta
max
+ 40 °C:
II 2 G Ex d e ib mb IIC T4 Gb
N/NLT
II 2 D Ex tb IIIC T80°C Db
IECEx Certificate of Conformity: IECEx BVS 13.0016
Category of application standard of series IEC 60079
IEC 60079
N ta
max
+ 40 °C: Ex e ib mb IIC T5 Gb
ta
max
+ 50 °C: Ex e ib mb IIC T4 Gb
N Ex tb IIIC T80°C Db
Rated voltage
N AC: 110 V - 277 V *
DC: 110 V - 250 V *
NLT AC: 110 V - 240 V *
* max. permissable tolerances accd. IEC/EN 60079-0
Frequency: 50 - 60 Hz
Rated current
N 110 V AC/DC: approx. 0.06 A
220 V AC/DC: approx. 0.035 A
NLT heating: approx. 0.5 A / 50 W
Battery module: Accu 2 x 6 V / 0,8 Ah
Charging time (cap. > 90 %): 24 h
Duration of emergency lighting: 3 h
(**)
(**)
Note: New batteries will reach their total useful capacity only after 3 charging/discharging cycles.
Insulation class to IEC/EN 61140: I
Degree of protection accd. IEC/EN 60529: IP 66
Operation temperature
N -20 °C ... +40 °C/+50 °C
NLT -40 °C ... +40 °C
Specified data N +5 °C ... +35 °C
Specified data NLT -40 °C ... +35 °C
Storage temperature in original packing: -20 °C ... +50 °C
Weight: approx. 6.7 kg
Supply terminal clamping capacity: 2 x per terminal: 2.5 mm²
Ex-e cable entry standard version: 1x M25x1.5 blanking plug
Standard version M25 x 1.5
suitable cables and test torques of the
pressure screw
Ø cable (mm) Nm
Seal 1+2+3
1 2
3
min. 8.0 1. 5
max.
(1)
10.0 2.0
Seal 1+2
1 2
3
min. 10.0 2.3
max.
(1)
13.0 2.6
Seal 1
1 2
3
min. 13.5 1. 3
max.
(1)
1 7. 5 2.3
(1)
The tests of clamping ranges and torque values were performed with metal mandrel. The clamping range can
vary by using cables with different manufacturing tolerances and material properties. Please use a suitable
combination of seals in the intermediate area, so that the cap nut can be tightened in future maintenance
work on the cable entry.
Metall version 2x M20x1.5 thread
Test torque for screw in thread cable entry:
for screw in thread cable entry: 3.0 Nm
for cover screw 2.4 Nm
for screw fixing: 1.4 Nm
1 Legende
Warning
This symbol warns of a serious hazard.
Failure to observe this warning may result
in death or the destruction of property.
Caution
This symbol warns of a possible failure.
Failure to observe this caution may result
in the total failure of the device or the
system or plant to which it is connected.
1.1 Safety instructions
For skilled electricians and
qualified personnel in accordance
with national legislation, including
the relevant standards and, where applica-
ble, in acc. with IEC/EN 60079-14 on
electrical apparatus for explosive
atmospheres.
The light fitting must not be operated in
zone 0 or 20 hazardous areas!
The technical data indicated on the light
fitting are to be observed!
The requirements of the
IEC/EN 60079-31 regarding excessive
dust deposits and temperature to be
considered from the user.
Changes of the design and modificati-
ons to the light fitting are not permit-
ted!
The light fitting shall be operated as
intended and only in undamaged and
perfect condition!
Do not keep these operating instruc-
tions inside the light fitting during
operation!
The national safety rules and regulations
for pre vention of accidents and the
following safety in structions which are
marked with an ( ) in these operating
instruction, will have to be observed!
12
Attention!
Only fix laid cable may be used for connec-
tion! If cable glands from other manufactur-
er are used the instructions regarding strain
relief and clamping capacity must be
observed!
Connect the conductors to the terminals L, N
and PE in accordance with the terminal marking
(see fig. 3).
Remount the LED-printed board into the
housing.
Take care not to pinch any conductors.
Take care not to pinch any conductors. Install
the protective cover with the four screws
(Test torque 2.4 Nm).
4.4 Changing of the legend
To install the correct legend open the 4 screws
(fig. 4) together with the 2 brackets at the cover
frame. Remove the old legend. Put the selected
new legend (fig. 5) onto the protective glas
panel. Fix the legend with the two brackets and
screws on the frame. Close the frame onto the
enclosure.
5 Function
5.1 System modes
Luminaires equipped with LED-lightsources are
used normally as exit-luminaires due to the light
output of the LEDs. Therefore these light
fittings have to be operated continuously
(Independent system mode).
5.2 Display
The luminaire is fitted with a microcomputer for
charging and monitoring and with a display
composed of 7 light emitting diodes. The five
green LED’s indicate the battery’s charge state
and available capacity. The red LED signals
possible failures, the yellow LED signals the
emergency operation (fig. 6).
See also page 10: table of LED indication
status.
5.3 Charging
The microcomputer controlled charging system
measures the charging and discharging current
and transmits it to a capacity meter. Five green
light emitting diodes indicate in 20%-steps the
actual charge state of the battery, see fig. 7.
The reduction in the battery capacity due to
self-discharge in normal operation is auto-
matically recharged controlled by the micro-
processor.
During the charging process the leading
flashing LED indicates the amount of capacity
charged so far. The LED’s for the capacity
already charged indicate continuously (fig. 7).
The charging process is complete when all five
green LED’s are illuminated and none is
flashing.
3 Conformity with standards
The luminaire is suitable for use in zone 1, 2, 21
and 22 hazardous areas acc. to
EN/IEC 60079-10-1 and EN/IEC 60079-10-2.
The luminaire is conform to the standards
specified in the EC-Declaration of conformity,
enclosed separately.
References to standards and directives in these
operating instructions always relate to the latest
version. Other additions (e.g. details relating to
the year) shall be observed.
4 Installation
The respective national regulations as
well as the general rules of engineering
which apply to the installation and opera-
tion of explosion protected apparatus will
have to be observed (IEC/EN 60079-14)!
Transport and storage of the luminaire is
permitted in original packing and specified
position only!
4.1 Opening and closing the
light fitting
Unscrew the four recessed head screws of
the cover
Remove the protective cover
4.2 Installation of the fitting
The luminaire shall be fitted by using the four
mounting clips with suitable fixing screws
(Ø: 5 mm, fig. 1) onto a suitable surface.
Warning:
Hazard due to electrostatic charges!
Luminaire must not be installed in the
vicinity of charge-generating processes.
4.3 Mains connection
The electrical connection of the device may
only be carried out by skilled staff
(IEC/EN 60079-14).
After opening the cover unscrew the two
screws of the LED-printed board (fig.1).
In the version Ex-Lite NLT four screws are
unscrewed (fig. 1).
Turn the printed board downwards using the
two guided springs (fig. 2).
Pass the cable through the certified Ex cable
entry M 25 x 1,5. Use sealing inserts
1,2 and 3 for cables from 8 to 10 mm Ø,
sealing inserts 1 and 2 for cables from 10 to 13 mm Ø and
sealing insert 1 for cables from 13.5 to 17.5 mm Ø.
When closing the gland with a blanking plug,
always use sealing inserts 1+2!
In case of unused cable entries, remove their
protective cover and close the entries with a
blanking plug (torque of 3.0 Nm).
When closing the gland with a blanking plug,
always use both sealing inserts!
When metal cable entries are used, the
protective caps of the unused entries are to be
removed and the entries to be closed with
certified Ex blanking plugs IP 66!
GB
Explosion protected LED-Emergency Exit Luminaire
Series: Ex-Lite N; Ex-Lite NLT
The LED display takes into account the decline
in the capacity of the battery: i.e., if the
indication does not go beyond the 3rd green
LED even after an extended charging period,
the available capacity is between 40 and 60%.
This indication is updated again on each
emergency lighting operation until the battery is
shut down by the deep discharge protection for
the battery.
At temperatures below -5 °C and above +35 °C
the battery will not be fully charged for
electrochemical reasons.
5.4 Ex-Lite NLT for low temperatures
The Ex-Lite NLT version is equipped with extra
heating and insulation. The heating always
functions if the supply voltage is applied.
This way the ExLiteNLT battery module stays
sufficiently loaded even in low temperatures
(see technical data).
5.5 Automatic function test
5.5.1 Function test (FT)
A function test (FT) is performed automatically.
During this process the emergency luminaire is
switched to battery supply for approx. 5 min.
and tested.
5.5.2 Partial operating time test (TBT)
Every 3 months a partial operating time test is
performed.
If no emergency lighting operation
> 30 min. has occurred during the last
3 months. During this test emergency lighting
operation is performed for approx. 35 min.
5.6 Emergency lighting operation
Emergency lighting operation is automatically
initiated by the FT+TBT, by mains failure, or
manually by shutting down the mains supply.
During this process the emergency luminaire
marked in yellow is switched to battery
operation.
The residual capacity available is indicated by
the 5 green light emitting diodes, see figure 7.
13
7 Maintenance / Servicing
Observe the national regulations
applicable to the maintenance, servicing and
test of apparatus for explosive atmospheres
e.g IEC/EN 60079-17 as well as the general
rules of engineering!
7.1 Battery module replacement
When the battery shows low capacity because
of ageing the battery module has to be
changed.
Cut the apparatus off the voltage before
opening it!
Remove the printed board and disconnect the
3 wires L, N and PE from the terminal
(see mains connection).
Page 4:
Remove the two jumpers
(2) and (3) from the
Ex d contacts and demount the complete board
from the enclosure (fig. 8)
Now the printed board is voltage-free
and may be carried in hazardous area
without additional protection.
Outside of the hazardous area the battery
module can be changed. Open the two screws
M4 (4) and disconnect the 4 wires at the
terminals (5) (fig. 9). Compress the snap-on
fasteners (6) at the back side of the printed
board and remove the battery module (fig. 10
and 10a).
Assemble the new battery module in reverse
order.
When servicing, in particular those components
that affect the explosion protection, will have to
be checked, e. g.:
Housing and protective glass for any cracks
or damages.
Gaskets for their perfect condition.
Terminals and blanking plugs for their firm fit.
8 Repair/Overhaul
Repairs that affect the explosion
protection, may only be carried out by
CEAG/CCH or a qualified electrician in
compliance with the applicable national
rules (IEC/EN 60079-19).
Prior to replacing or removing any
components, observe the following:
Cut the apparatus off the voltage before
opening it or carrying out repairs!
Only use certified genuine CEAG/CCH spare
parts
(see CEAG/CCH spare parts list).
9 Disposal/Recycling
When the apparatus is disposed of, the
respective national regulations on waste
disposal will have to be observed.
In case of disposal you can obtain additional
information from your Cooper Crouse-Hinds /
EATON branch.
Subject to modifications or supplement of the
product range.
GB
Explosion protected LED-Emergency Exit Luminaire
Series: Ex-Lite N; Ex-Lite NLT
6 Taking into operation
Prior to operation, check the light fitting
for its proper functioning and installation in
compliance with these operating instruc-
tions and other applicable regulations!
Only carry out insulation measurements
between PE and the external conductor L as
well as between PE and N.
– measuring voltage: max. 1 kV AC/DC
– measuring current: max. 10 mA
Mind:
There must no insulation measurement be
carried out between L and N, since that
would destroy the electronics (mains input
fuse in the unit).
14
F
Bloc autonome d’éclairage de sécurité (LED) pour atmosphères
explosives Series: Ex-Lite N; Ex-Lite NLT
2 Caractéristiques techniques
Attestation d’examen CE de type: BVS 09 ATEX E 048
Marquage selon 2014/34/UE et normes de la série
EN 60079
N ta
max
+ 40 °C:
II 2 G Ex e ib mb IIC T5 Gb
ta
max
+ 50 °C:
II 2 G Ex e ib mb IIC T4 Gb
NLT ta
max
+ 40 °C:
II 2 G Ex d e ib mb IIC T4 Gb
N/NLT
II 2 D Ex tb IIIC T80°C Db
IECEx Certificat de Conformité: IECEx BVS 13.0016
Marquage selon normes de la série
IEC 60079-0
N ta
max
+ 40 °C: Ex e ib mb IIC T5 Gb
ta
max
+ 50 °C: Ex e ib mb IIC T4 Gb
N Ex tb IIIC T80°C Db
Gamme des tensions
N CA: 110 V - 277 V *
CC: 110 V - 250 V *
NLT CA: 110 V - 240 V *
* Tolerances admissible selon CEI/EN 60079-0
Gamme des fréquences 50 - 60 Hz
Courant nom.
N 110 V CA/CC: env. 0,06 A
220 V CA/CC: env. 0,035 A
NLT Chauffage: env. 0,5 A / 50 W
Caisse de batterie: Cellules 2 x 6 V / 0,8 Ah
Durée de charge heures (> 90%): env. 24 h
Durée de service d’éclairage de secours 3 heures
(**)
(**)
Note: Une batterie neuve n’atteint sa capacité utile totale qu’après 3 cycles de charge et de décharge.
Classe d’isolation selon CEI/EN 61140: I
Indice de protection selon CEI/EN 60529: IP 66
Température ambiante
N -20 °C ... +40 °C / +50 °C
NLT -40 °C ... +40 °C
Conseillée N: +5 °C ... +35 °C
Conseillée NLT: -40 °C ... +35 °C
Température de stockage dans l’emballage original: -20 °C ... +50 °C
Poids: env. 6,7 kg
Capacité de serrage des bornes: 2 x par borne: 2,5 mm²
Entrée de câble Ex-e: M25x1,5 pour câbles d’un modèle standard
modèle standard M25x1,5
câbles appropriés et couples d’essai de la vis
de pression
Ø câble (mm) Nm
Garniture 1+2+3
1 2
3
min. 8,0 1,5
max.
(1)
10,0 2,0
Garniture 1+2
1 2
3
min. 10,0 2,3
max.
(1)
13,0 2,6
Garniture 1
1 2
3
min. 13,5 1,3
max.
(1)
1 7, 5 2,3
(1)
Les tests des plages de serrage et les valeurs de couple de serrage ont été réalisés avec un mandrin
métallique. La plage de serrage peut varier légèrement selon le type de câble et les propriétés des matériaux
utilisés. Pour les plages de serrage intermédiaires, veuillez utiliser des garnitures d’étanchéité qui laisseront la
possibilité de resserrer le chapeau du presse étoupe lors de futures opérations de maintenance.
Fils de métal: 2xM20x1,5 fil
Couple d' essai pour
l’entrée de câble: 3,0 Nm
montage capot: 2,4 Nm
la carreau de pictogramme: 1,4 Nm
1 Légende
Avertissement
Ce symbole avertit d’un danger grave. Le
non-respect de cet avertissement peut
entrainer la mort ou la destruction de biens.
Attention
Ce symbole met en garde contre un
éventuel défaut. Le non-respect de cette
consigne peut entrainer une panne totale
de l’appareil ou du système ou de
l’installation à laquelle il est connecté.
1.1 Consignes de sécurité
Pour le personnel électricien
qualifié et le personnel instruit
suivant la règlementation légale,
y compris les normes respectives
ainsi que, le cas échéant, CEI/EN 60079-14
pour appareils électriques utilisables en
atmosphère explosive.
Il n’est pas permis d’utiliser le luminaire
dans la zone 0 et 20.
Les caractéristiques techniques
indiquées sur le luminaire doivent être
respectées!
Les exigences des CEI/EN 60079-31 en
ce qui concerne des dépôts de pous-
sière démesurés et une température
doivent être considérées par
I’utilisateur.
Il n’est pas permis de transformer ou de
modifier le luminaire!
Le luminaire ne doit être exploité que
pour la fonction qui lui est dévolue et
qu’en état intact et parfait!
Ce mode d’emploi ne doit pas être
laissé dans le luminaire pendant son
exploitation!
Veuillez respecter les prescriptions
nationales de sécurité et de prévoyance
contre les accidents ainsi que les
consignes de sécurité qui sont marquées
d’un ( ) dans ce mode d’emploi!
15
Utilisez toujours les deux inserts d’étanchéité lors
de la fermeture avec le bouchon homologué !
En cas de passe-câble en métal, les capuchons
de protection des passe-câbles non utilisés
doivent être enlevés et remplacés par des
bouchons de fermeture antidéflagrants
homologués (minimum IP66) !
Attention !
Seul un câblage fixe est autorisé ! Dans le cas
d’utilisation d’autres passe-câbles, respectez
les instructions du fabricant en ce qui concerne
le serrage des câbles et l’absence de tension
mécanique sur ceux-ci!
Raccordez sûrement les câbles L, N et PE au
bornier (fig. 3).
Montez la carte à LED. Veillez à une pose
correcte et sûre des câbles.
Evitez tout pincement des câbles !
Monter le couvercle avec les quatre vis. Les vis
ne doivent être serrées qu’à la main.
4.4 Remplacement du pictogramme
Pour remplacer le pictogramme, il suffit de
desserrer les 4 vis (figure 4) avec les agrafes de
retenue sur le cadre de disque. Soulevez
doucement le disque de couverture rouge et
enlevez les patrons de pictogramme superpo-
sés. Introduisez le patron souhaité, fixez le
disque de couverture rouge et puis fixez de
nouveau le cadre sur la lampe (figure 5).
5 Fonction
5.1 Type de circuit
Du fait de la puissance lumineuse des sources
lumineuses à DEL, les lampes qui en sont
équipées sont utilisées quasi exclusivement en
tant que lampes de signalisation de secours.
Pour cette raison, ces lampes doivent
uniquement être en circuit en permanence.
5.2 Afficheur
Le bloc d’alimentation en lumière de secours
intégré dans la lampe est équipé d’un
microcalculateur destiné au chargement et à la
surveillance ainsi que d’un afficheur composé
de 7 diodes lumineuses.
Les 5 DEL vertes indiquent l’état de charge et
de capacité de la pile. La DEL rouge signale
d’éventuelles sources de perturbation, la DEL jaune
signale le mode éclairage de secours (figure 6).
Voir à ce sujet également page 10 :
Etats d’affichage par DEL.
5.3 Technique de charge
La technique de charge pilotée par micro-
ordinateur détecte le courant de charge et de
décharge, le conditionne et le transmet à un
capacimètre. Cinq diodes luminescentes vertes
indiquent par pas de 20% l’état de charge
respectif de la batterie, voir fig. 7.
La réduction de la capacité de la batterie due à
l’auto-décharge en fonctionnement normal est
automatiquement contrôlée et rechargée par le
microprocesseur.
Pendant le processus de charge, la LED
clignotant en tête indique la quantité de
3 Conformité avec les normes
Ce luminaire convient à l’utilisation dans les
zones 1, 2, 21 et 22 d’une atmosphère
explosive
selon CEI/EN 60079-10-1 et
CEI/EN 60079-10-2.
Ce luminaire sont conformes aux normes
reprises dans la déclaration de conformité,
jointe séparément.
Les références aux normes et directives dans
cette notice se réfèrent toujours à la dernière
version. Les suppléments éventuels doivent
également être respectés.
4 Installation
Lors de l’installation et de l’exploitation
des appareils électriques pour atmosphère
explosive, les règlements nationaux ainsi
que les règles de la technique généralement
reconnues doivent être respectés
(CEI/EN 60079-14)!
Le transport et le stockage ne sont permis
que dans l’emballage original et dans la
position spécifiée!
4.1 Ouverture et fermeture du panneau:
Desserrez les quatre vis du couvercle
(empreinte cruciforme)
Enlevez le couvercle
4.2 Montage du panneau
Le panneau doit être correctement fixé à l’aide
des quatre pattes de fixation avec des vis
appropriées (vis Ø maximum 5 mm, fig.1) sur
un support solide.
Avertissement - Risque de décharge
électrostatique!
La lumière ne doit pas être installé à proximité
des processus de production de charge.
4.3 Raccordement au secteur:
Le raccordement électrique du dispositif ne
doit se faire que par du personnel qualifié
(CEI/EN 60079-14).
Après ouverture du couvercle, desserrez les
deux vis de fixation de la carte à LED (fig.1).
Dans la version Ex-Lite NLT quatre vis desserrées (Fig. 1).
Tournez la carte à LED vers le bas (fig. 2).
Faites passer le câble d’alimentation secteur
dans le passe-câble marqué M 25x1,5. Utiliser
des inserts d'étanchéité 1,2 et 3
pour les câbles de 8 à 10 mm Ø,
inserts 1 et 2 d'étanchéité
pour les câbles 10-13 mm Ø et
étanchéité insert 1 pour
câbles de 13,5 à 17,5 mm Ø.
En fermant par un bouchon de fermeture,
toujours utiliser les 1+2 joints d’étanchéité !
En cas de non utilisation de câbles ou de
passe-câbles, la rondelle de protection doit être
retirée et remplacée par un bouchon de
fermeture homologué (couple de serrage 3,0 Nm).
capacité absorbée jusqu’à ce moment. Les
diodes luminescentes se rapportant à la
capacité déjà absorbée sont allumées en
continu. Les diodes luminescentes se
rapportant à la capacité encore manquante ne
s’allument pas (fig. 7). Le processus de charge
est terminé lorsque toutes les 5 diodes vertes
s’allument et qu’aucune diode ne clignote plus.
L’affichage des diodes luminescentes tient
compte de la diminution de capacité de la
batterie: à savoir, si l’affichage ne dépasse pas
la 3e LED verte même après une période de
charge prolongée, la capacité disponible se
situe entre 40 et 60%.
Cette indication est réactualisée lors de chaque
fonctionnement d’éclairage de secours jusqu’à
la mise hors service par la protection contre la
décharge profonde de la batterie.
En cas de températures au-dessous de -5 °C et
au-dessus de +35 °C, une pleine charge des
batteries n’est pas assurée pour des raisons
électrochimiques.
5.4 Ex-Lite NLT pour températures basses
La version Ex-Lite NLT est équipée d´un
chauffage et d´une isolation supplémentaires.
Le chauffage fonctionne toujours lorsque la
tension d´alimentation est appliquée.
Ainsi le module de batterie de ExLite NLT reste
suffisamment chargé même par des tempéra-
tures basses (voir caractéristiques techniques).
5.5 Essai fonction automatique
5.5.1 Fonction de test (FT)
Une fonction de test (FT) est exécutée
automatiquement chaque semaine. Ce faisant,
seul le luminaire de secours est commuté
pendant env. 5 min sur alimentation par batterie
et testé.
5.5.2 Test partiel de durée de service (TBT)
Tous les 3 mois, un test partiel de durée de
service est automatiquement effectué.
Si aucun fonctionnement de secours > 30 min
n’a eu lieu au cours des 3 derniers mois. Le
fonctionnement d’éclairage de secours est alors
activé pendant env. 35 min.
5.6 Fonctionnement d’éclairage de secours
Le fonctionnement d’éclairage de secours est
automatiquement enclenché par FT+TBT, en
cas de panne de secteur ou manuellement par
coupure de la tension du secteur.
Ce faisant, la lampe d’éclairage de secours
marquée en jaune est commutée sur le
fonctionnement sur batterie.
La capacité résiduelle disponible est indiquée
par les 5 diodes lumineuses vertes, voir figure
5, la DEL jaune signale le mode éclairage de
secours (figure 7), défectueuse sont reconnus.
F
Bloc autonome d’éclairage de sécurité (LED) pour atmosphères
explosives Series: Ex-Lite N; Ex-Lite NLT
16
6 Mise en service
Vérifiez que l’installation et le fonction-
nement corrects de l’afficheur soient
conformes aux instructions de cette notice
d’utilisation et à toutes les autres prescrip-
tions en vigueur !
Les mesures d’isolation ne doivent être
effectuées qu’exclusivement entre PE et les
câbles extérieurs L ainsi qu’entre PE et N !
Tension de mesure : maximum 1kV AC/DC
– Courant de mesure : maximum 10 mA
Attention:
Ne pas effectuer de mesure d’isolation entre
L et N, sinon il y a destruction de l’électro-
nique ou du fusible de protection d’alimen-
tation secteur de l’appareil.
7 Entretien / Maintenance
Respectez la réglementation en vigueur
en ce qui concerne l’entretien, la mainte-
nance
et le contrôle des moyens d’exploitation
antidéflagrants (par ex. CEI/EN 60079-17) !
7.1
Remplacement de la Caisse de batterie
Si un vieillissement affecte la capacité de la
pile, il faut remplacer cette dernière.
Mettez la lampe hors tension!
Desserrez ensuite la carte de circuits imprimés
ainsi que les trois conducteurs de la carte L, N et
PR (voir Alimentation).
Page 4:
Enlevez les deux shunts de court-circuit
(2)
et
(3)
des contacts Ex d et extrayez la totalité de la
carte de la lampe (figure 8).
La carte de circuits imprimés est
désormais hors tension et peut donc être
transportée à tavers le local Ex.
A l’extérieur de la zone Ex, détachez caisse de
la batterie pile en desserrant les deux vis M4
(4) ainsi que les quatre conducteurs sur les
bornes (5) (figure 9). Pressez les quatre
crochets à déclic (6) sur le côté arrière de la
carte et enlevez la pile de la carte
(figure 10 et 10a).
Montez la nouvelle caisse de batterie en suivant
l’ordre inverse.
Il faut avant tout vérifier les pièces desquelles dé-
pend le type de protection antidéflagrante, par
ex. :
Fissures et dommages au boîtier et au carter
de protection.
Dommages aux joints.
Positionnement correct des borniers et des
bouchons de fermeture.
F
Bloc autonome d’éclairage de sécurité (LED) pour atmosphères
explosives Series: Ex-Lite N; Ex-Lite NLT
8 Réparation/ Remise en état
Des réparations qui portent sur la
protection contre l’explosion, ne devront
être exécutées que par CEAG/CCH ou par
un électricien qualifié en conformité avec la
règlementation nationale en vigueur
(CEI/EN 60079-19).
Respectez les instructions suivantes
avant le remplacement ou le démontage de
pièces détachées:
Mettre d’abord le panneau hors tension
avant toute ouverture ou travaux de
répara tion.
N’utilisez que des pièces détachées agréées
d’origine CEAG/CCH
(voir liste des pièces détachées CEAG/CCH).
9 Évacuation des déchets /
Recyclage
Lors de l’évacuation de ce matériel électrique,
la règlementation nationale respective en
vigueur devra être respectée.
En cas d'élimination, vous pouvez obtenir des
informations supplémentaires auprès de votre
branche Cooper Crouse-Hinds / EATON.
Sous réserve de modification ou de supplément
de cette série de produits.
17
LED
rot/
red/
rouge
LED
grün/
green/
vert
1)
LED
gelb/
yellow/
jaune
Batterie Kapazität/
battery-/capacity/
Capacité de la batterie
Funktion/
Function/
Fonction
Maßnahmen/
Action/
Mesures
-
< 20 %
}
Batterie wird geladen/
battery on charge/
Batterie en charge
Batterie o.k.
Keine/
None/
Aucune
-
l
< 40 %
-
l l
< 60 %
-
l l l
< 80 %
-
l l l l
< 100 %
-
l l l l l
- 100 %
Batterie ist geladen
battery charge completed
Batterie charge
i. O./ok
Keine/
None/
Aucune
-
l l l l l l
80 - 100 %
}
Notlichtbetrieb
emergency operation
Fonctionnementd’éclairage
de secours
Batterie wird entladen
Battery is being discharged
Batterie en cours de décharge
Funktion i. O.
Keine/
None/
Aucune
-
l l l l l
60 - 80 %
-
l l l l
40 - 60 %
-
l l l
20 - 40 %
-
l l
0 - 20 %
- - - 0 %
Batterie entladen/
battery discharged
Batterie déchargée
Netzspannung einschalten/
Switch on mains supply/
Vérifier l’appareil d’éclairage de
secours
(
l l l
l
²)
l
0 - 100 %
Störung im Notlichtstrom-
kreis/
Emergency circuit defective/
Appareil d’éclairage de
secours défectueux
Notlichtgerät prüfen/
Check emergencylighting device/
Vérifier l’appareil d’éclairage de
secours
oder/or/
ou
Notlichtdauer < 30 min
Batterielade-/Entladezyklus
durchführen
Duration of emergency lighting
< 30 min
Perform battery charging/
discharging cycle
(see chap. 6. Fault indicator)
Durée d’éclairage de secours
< 30 min
charge/décharge de la batterie
(voir chap. 6 Indication de
défaut)
LED blinkt
LED flashing
LED clignotant
LED leuchtet
LED illuminated
LED illuminé
l
1) Siehe auch 5. Funktion:
Bei reduzierter Batterie-Kapazität wird auch
nur die verfügbare Kapazität angezeigt.
Beispiel:
Wurde beim letzten Kapazitätstest
nur 65% Restkapazität ermittelt, so bleibt
die Anzeige bei 4 grünen LEDs in Dauerlicht
bestehen (verfügbare Kapazität 60-80%).
2) beliebige Kombinationen der Anzeige
möglich gemäß Lade- / Entladezustand.
1) See also chapter 5. Function:
In case of reduced battery capacity only the
available capacity is indicated.
Example:
If during the last capacity test only 65%
remaining capacity was found, then the
indication stops at 4 green LEDs continuous-
ly illuminated (available capacity 60-80%).
2) Any combination of indications possible
depending on charge / discharge state.
1) Voir également 5. Fonctionnement:
Si la capacité de la batterie est réduite,
seule la capacité disponible est indiquée.
Exemple:
Si une capacité résiduelle de seulement
65% a été déterminée lors du dernier test
de capacité, l’indication reste fixée à 4 LED
vertes allumées en permanence (capacité
disponible 60-80%).
2) combinaisons quelconques de l’indication
possible suivant l’état de charge ou
décharge.
LED-Anzeigezustände / LED-indication status / LED Affichage de l'état de charge et de capacité
18
Notizen / Notes / Remarques
19
Notizen / Notes / Remarques
Eaton is a registered trademark.
All trademarks are property
of their respective owners.
Eaton is dedicated to ensuring that reliable, efficient
and safe power is available when it’s needed most. With
unparalleled knowledge of electrical power management
across industries, experts at Eaton deliver customized,
integrated solutions to solve our customers’ most critical
challenges.
Our focus is on delivering the right solution for the appli-
cation. But, decision makers demand more than just
innovative products. They turn to Eaton for an unwavering
commitment to personal support that makes customer
success a top priority. For more information, visit
www.eaton.com/electrical.
Changes to the products, to the information contained in this
document, and to prices are reserved; so are errors and omissions.
Only order confirmations and technical documentation by Eaton is
binding. Photos and pictures also do not warrant a specific layout or
functionality. Their use in whatever form is subject to prior approval
by Eaton. The same applies to Trademarks (especially Eaton, Moeller,
and Cutler-Hammer). The Terms and Conditions of Eaton apply, as
referenced on Eaton Internet pages and Eaton order confirmations.
Publication No.
32191011061 D/GB/F (G) /
Auflage / 27.2016 / MS
CZ: "Tento návod k použití si m žete vyžádat
ve
svém mate ském jazyce u p íslušného
zastoupení spole nosti Cooper Crouse-
Hinds/CEAG ve vaší zemi."
DK: "Montagevejledningen kan oversættes til
andre EU-sprog og rekvireres hos Deres
Cooper Crouse-Hinds/CEAG leverandør"
E: "En caso necesario podrá solicitar de su
representante Cooper Crouse-Hinds/CEAG
estas instrucciones de servicio en otro idioma
de la Union Europea"
EST: "Seda kasutusjuhendit oma riigikeeles
võite küsida oma riigis asuvast asjaomasest
Cooper Crouse-Hindsi/CEAG esindusest."
FIN: "Tarvittaessa tämän käyttöohjeen käännös
on saatavissa toisella EU:n kielellä Teidän
Cooper
Crouse-Hinds/CEAG - edustajaltanne"
GR:
Cooper Crouse-
Hinds/CEAG"
H: "A kezelési útmutatót az adott ország
nyelvén a Cooper Crouse-Hinds/CEAG cég
helyi képviseletén igényelheti meg."
I: "Se desiderate la traduzione del manuale
operativo in un´altra lingua della Comunit à
Europea potete richiederla al vostro
rappresentante Cooper Crouse-Hinds/CEAG"
LT: Šios naudojimo instrukcijos, išverstos
J su
gimt
j kalb , galite pareikalauti atsakingoje
"Cooper Crouse-Hinds/CEAG" atstovyb
je savo
šalyje.
LV: "Šo ekspluat
cijas instrukciju valsts valod
varat piepras t j su valsts atbild gaj Cooper
Crouse-Hinds/CEAG p
rst vniec b ."
M: Jistg
u jitolbu dan il-manwal fil-lingwa
nazzjonali tag
hom ming and ir-rappre entant
ta' Cooper Crouse Hinds/CEAG f'pajji
hom.
NL: "Indien noodzakelijk kan de vertaling van
deze gebruiksinstructie in een andere EU-taal
worden opgevraagd bij Uw Cooper Crouse-
Hinds/CEAG - vertegenwoordiging"
P: "Se for necessária a tradução destas
instruções de operação para outro idioma da
União Europeia, pode solicita-la junto do seu
representante Cooper Crouse-Hinds/CEAG"
PL: Niniejsz
instrukcj obs ugi w odpowiedniej
wersji j
zykowej mo na zamówi
w
przedstawicielstwie firmy Cooper-Crouse-
Hinds/CEAG na dany kraj.
S: "En översättning av denna montage- och
skötselinstruktion till annat EU - språk kan vid
behov beställas från Er Cooper Crouse-
Hinds/CEAG- representant"
SK: "Tento návod na obsluhu Vám vo Vašom
rodnom jazyku poskytne zastúpenie spolo
nosti
Cooper Crouse-Hinds/CEAG vo Vašej krajine."
SLO: "Navodila za uporabo v Vašem jeziku
lahko zahtevate pri pristojnem zastopništvu
podjetja Cooper Crouse-Hinds/CEAG v Vaši
državi."
RUS:
"
При необходимости, вы можете запрашивать
перевод данного руководства на другом языке
ЕС или на русском от вашего
Cooper Crouse-Хиндс / CEAG - представителей."
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20

Eaton Ex-Lite NLT Operating Instructions Manual

Catégorie
Batteries rechargeables
Taper
Operating Instructions Manual
Ce manuel convient également à

dans d''autres langues