3
31-1000190 Rev. 2
Contents
Safety 2
Design Guide
Dimensions and Clearances 4
Accessories/Kits 5
Reversing the Door Swing 6
Step 1. Remove Upper Enclosure 7
Step 2. Remove Door 7
Step 3. Move Control Assembly 8
Step 4. Move Light Switch Housing 8
Step 5. Reinstall Hinge Brackets 9
Step 6. Reinstall the Enclosure 9
Step 7. Reinstall the Front Access Cover 10
Step 8. Remove Hinges from Door 10
Step 9. Panel Brackets and Hinges 11
Step 10. Reinstall the Door 11
Instructions for Dual Integrated Installation 12
The Installation Space 13
Tools, Hardware, Materials 14
Grounding the Unit 15
Flooring 15
Step 1. Remove Packaging 15
Step 2. Install Water Line 16
Step 3. Preparing Unit for Installation 16
Step 4. Install Anti-tip Bracket 17
Step 5. Joining Dual Installed Units 18
Step 6. Connecting Water Supply 19
Step 7. Inserting/Securing into Cabinet Surround 19
Step 8. Level Unit 20
Step 9. Final External Unit Preparation 21
Step 10. Toe Kick Installation 22
Step 11. Internal Unit Preparation 22
Step 12. Start Icemaker 22
Step 13. Install AutoFill Pitcher Assembly 23
Instructions for Dual Retro-Fit Installation 24
The Installation Space 25
Tools, Hardware, Materials 26
Grounding the Unit 26
Flooring 26
Step 1. Remove Packaging 27
Step 2. Install Water Line 27
Step 3. Preparing Unit for Installation 28
Step 4. Install Anti-tip Bracket 29
Step 5. Joining Dual Installed Units 30
Step 6. Connecting Water Supply 32
Step 7. Inserting/Securing into Cabinet Surround 33
Step 8. Level Unit 34
Step 9. Final External Unit Preparation 34
Step 10. Toe Kick Installation 36
Step 11. Internal Unit Preparation 36
Step 12. Start Icemaker 36
Step 13. Install AutoFill Pitcher Assembly 37
Instructions for Single Integrated Installation 38
The Installation Space 39
Tools, Hardware, Materials 40
Grounding the Unit 40
Flooring 40
Step 1. Remove Packaging 41
Step 2. Install Water Line 41
Step 3. Preparing Unit for Installation 42
Step 4. Install Anti-tip Bracket 42
Step 5. Connecting Water Supply 42
Step 6. Inserting/Securing into Cabinet Surround 43
Step 7. Level Unit 44
Step 8. Final External Unit Preparation 44
Step 9. Toe Kick Installation 45
Step 10. Internal Unit Preparation 45
Step 11. Start Icemaker 45
Step 12. Install AutoFill Pitcher Assembly 46
Stainless Steel Door Panel Installation 47
Step 1. Install Stainless Panel 48
Step 2. Adjust Stainless Panel 49
Step 3. Install Hinge Covers 49
Step 4. Install Door Trims 50
Custom Overlay Door Panel Installation 51
Custom Handle Design Guide 52
3/4” Custom Decorative Panel Dimensions 52
Step 1. Overlay Panel Prep 53
Step 2. Install Overlay Panel 54
Step 3. Adjust Overlay Panel 54
Step 4. Install Hinge Covers 55
Step 5. Install Door Trims 55