The tank is ready for the installation on the central heating system (CAS, CAS-S, CAS-B and CAS-BS)
and DHW (sanitary water) system (CAS-B and CAS-BS).
The thermal insulation is delivered bended, so it can have some anomaly in looks. These anomalies will
disappear in 48 hours from mounting.
In the case of subsequent installation of the sensor, the thermal insulation jacket should not be moved,
simply open the zipper to the desired position of the sensor and insert it into the holder for the sensors.
By lower room temperature the material of the insulation changes his properties, so jacket
must be mounted on room temperature. It is recommended to mount the jacket on ca. 20°C,
if not, the mounting will be hard.
If the insulation is in cold room, it is necessary to keep the jacket on room temperature for
24 hours to be prepared for mounting.
IMPORTANT!
1.
2.
4.0. IMPORTANT
17
Installation of thermal insulation CAS, CAS-S, CAS-B and CAS-BS
Installation of thermal insulation CAS, CAS-S, CAS-B and CAS-BS
ENG