HUSSONG MANUFACTURING CO., INC.
READ ALL THESE STEPS
BEFORE STARTING INSTALLATION.
LEAVE THESE INSTRUCTIONS WITH THE
APPLIANCE.
This kit must be installed by a qualied installer,
service agency, or gas supplier at the time of
the heater installation. These instructions must
be used in conjunction with the installation and
operation manual provided with the appliance.
Please read the appliance owner’s manual
completely before performing any procedures in
these instructions.
INSTALLER: Leave this manual with the appliance.
CONSUMER: Retain this manual for future reference.
KOMFORT ZONE KIT
#KZK-1510A
For use with the #BHM-44, #CLW-ST, and #CLW-
50 (Starting Serial Number: 19 501780 50)
This optional convection duct kit redistributes the
warm air ow away from the replace opening to
a more desirable location using natural convection
without the use of a fan. The warm air ow may be
relocated to a position higher up the wall, out the
sidewalls, or even to an adjacent room. The result
is much cooler wall temperatures above the re-
place opening for locating televisions, artwork, etc.
English and French installation manuals are available through your
local dealer. Visit our website www.kozyheat.com.
Les manuels d’installation en français et en anglais sont disponibles
chez votre détaillant local. Visitez
www.kozyheat.com
.
Hussong Manufacturing Co., Inc.
P.O. Box 577, 204 Industrial Park Drive
Lakeeld, MN 56150-0577, USA Rev. 6, 4/21
1.0 INTRODUCTION .......................................................................3
1.1 Kit Contents..........................................................................................3
1.2 Fireplace Preparation ........................................................................3
1.3 Suggested Congurations .............................................................. 4
1.4 Dimensions and Overview .............................................................7
1.5 Air Duct Pipe Run ...............................................................................8
2.0 FRAMING AND CLEARANCES ................................................9
2.1 Clearance to Sprinkler ...................................................................... 9
2.2 Framing................................................................................................10
2.3 Shelf Requirements .........................................................................14
2.4 CLW-ST Front Facing Clearances ................................................16
3.0 FACING AND FINISHING .......................................................17
3.1 Non-combustible Requirements ................................................ 17
3.2 Combustible Finish .......................................................................... 20
3.3 Hearth and Mantel Clearances ....................................................24
4.0 INSTALLATION .......................................................................27