Dixon Guard Bar Hinge Set Manuel utilisateur

Taper
Manuel utilisateur
1 090119 REV0
MAINTENANCE & OPERATING
INSTRUCTIONS
090119 REV0
For DIXON BAYCO
LGH5000
Guard Bar Hinge
For Sales & Service Contact
USA:
Dixon Bayco USA
Chestertown, Maryland
Phone: 410-778-2000
Fax: 410-778-4702
Toll Free: 800-355-1991
E-mail: dixonba[email protected]
www.dixonbayco.com
Canada:
Dixon Group Canada Limited
Innisfil (Barrie), Ontario
Phone: 705-436-1125
Fax: 705-436-6251
Toll Free: 877-963-4966
E-mail: isales@dixongroupcanada.com
www.dixongroupcanada.com
Mexico:
Dixva, S. de R.L. de C.V.
Monterrey, N.L
Phone: 01-800-00-DIXON (34966)
Fax: 01-81-8354-8197
E-mail: contactenos@dixonvalve.com.mx
www.dixonvalve.com
Europe:
Dixon Group Europe Ltd
Preston, England
Phone: +44 (0)1772 323529
Fax: +44 (0)1772 314664
E-mail: enquiries@dixoneurope.co.uk
www.dixoneurope.co.uk
Asia Pacific:
Dixon (Asia Pacific) Pty Ltd
Wingfield, South Australia
Phone: +61 8 8202 6000
Fax: +61 8 8202 6099
E-mail: enquiries@dixonvalve.com.au
www.dixonvalve.com.au
2 090119 REV0
LGH5000 Guard Bar Hinge
Item #
Part #
Description
Material
1
341830
left bracket
AL356.1 T6
2
341828
left arm
AL356.1 T6
3
341831
right bracket
AL356.1 T6
4
341829
right arm
AL356.1 T6
5
400694
locking subassembly
5.1
112272
locking rod
stainless steel
5.2
391853
button
stainless steel
6
112273
locking spring
stainless steel
7
112274
washer
stainless steel
8
112275
slotted pin
stainless steel
9
391851
shaft
stainless steel
10
112277
washer
stainless steel
11
112276
tension spring
stainless steel
12
112278
hitch pin clip
stainless steel
13
110717
coil pin
stainless steel
14
391852
roller
stainless steel
15
112279
Nylon locknut
stainless steel/Nylon locknut
16
242047
elbow
AL356.1 T6
17
112250
shoulder bolt
alloy steel
18
112251
wave washer
plated carbon steel
19
112252
washer
stainless steel
20
111557
bearing
Delrin 500
21
111561
grease fitting
plated yellow zinc chromate
22
110697
o-ring
Buna-N
Repair Kits
Part #
Description
Includes item #
LGH5000K1
bearing set
20,21, 22
LGH5000K2
roller set
14, 15, 17,18, 19
LGH5000K3
left arm set
2, 14, 15, 16, 17, 18, 19,
20, 21, 22
LGH5000K4
right arm set
4, 16, 20, 21, 22
3 090119 Rev 0
LGH5000 GUARD BAR HINGE COMPLETE SET
(The 5000AIHD valve and fasteners must be ordered separately.)
LEFT
SUBASSEMBLY
RIGHT
SUBASSEMBLY
4 090119 Rev 0
LEFT SUBASSEMBLY WITH ELBOW (16), GREASE FITTINGS (21) AND COIL PIN (13)
5 090119 Rev 0
RIGHT SUBASSEMBLY WITH ELBOW (16), GREASE FITTINGS (21) AND COIL PIN (13)
6 090119 Rev 0
These instructions and recommendations are provided to ensure proper operation and long service
life of the Dixon “Bayco” guard bar hinge. Parts are identified by the item numbers on the assembly
drawings and parts list.
The Dixon “Bayco guard bar hinge set includes a left subassembly and a right subassembly,
which are pre-assembled in the factory. The guard bar hinge also includes two elbows (16) that
can be welded onto the guard bars or tubes. The guard bars or tubes are supplied and welded on
site by the customer. The guard bar hinge also includes two coil pins (13) and four grease fittings
(21) that will be installed onto the guard bar hinge after the welding work is finished on site.
The Dixon “Bayco” 5000AIHD is a high flow air interlock valve. It is to be used with the Dixon
“Bayco” guard bar hinge to provide a pneumatic control signal when the guard bar is raised. The
5000AIHD valve is to be mounted underneath the left bracket (1). The plunger of the 5000AIHD is
horizontal and slightly downward to prevent the water and debris from getting into the valve. The
5000AIHD and mounting fasteners are sold separately.
Please check all parts before installation. Contact Dixon Sales & Service if there are any missing or
damaged parts.
Installation:
1. Remove the tension springs (11) from the left assembly and right subassembly. Remove the
hitch pin clips (12) from the shafts (9). Remove the shafts (9) with the coil pins (13) from the
left bracket (1) and the right bracket (3). Remove the arms (2 and 4) from the brackets (1
and 3). Push and hold the locking button (5.1) to unlock the left arm (2) when removing the
left arm (2). Remove the O-rings (22) and the bearings (20) from the arms (2 and 4). For the
left arm (2), remove the Nylon locknut (15), the shoulder bolt (17), the roller (14), the wave
washer (18) and the flat washer (19). Collect all loose parts for re-installation.
2. Mount the brackets (1 and 3) onto the tanker structure. Weld the guard bars or tubes onto
the arms (2 and 4). The customer is responsible for selecting and installing the proper guard
bar tube size, and hinge alignment during drilling, welding and installation.
3. For the left arm (2), install the roller (14), the shoulder bolt (17), the wave washer (18), the
flat washer (19) and the Nylon locknut (15). Apply grease to the roller (14) and the shoulder
bolt (17). Tighten the Nylon locknut (15) by wrenches. Install and tighten the grease fittings
(21) onto both arms (2 and 4) by a wrench. Install the bearings (20) and the O-rings (22)
back into the arms (2 and 4). Install the arms (2 and 4) back onto the brackets (1 and 3)
through the shafts (9) with the washers (10) and the hitch clip pins (12). Charge the arms (2
and 4) with bearing grease through the 4 grease fittings (21). A 3/8 OD charging fitting
should be used.
4. Install the tensions springs (11) to link the arms (2 and 4) to the brackets (1 and 3). Check
the swing action to make sure there are no obstructions. Check and operate the locking
subassembly (5) to make sure that it can properly lock and unlock the left arm (2), when the
guard bar is up and down.
5. Install the 5000AIHD (purchased separately) horizontally onto the bottom of the left bracket
(1) through the threaded holes on the left brackets (1). The button of the 5000AIHD should
face the roller (14) on the left arm (1). Lift the guard bar to check the 5000AIHD button
action.
7 090119 Rev 0
6. After testing that all the operations are satisfactory, install the coil pins (13) into the left holes
on the shafts (9) using a hammer.
OPERATION:
To open the guard bar for hose connection, push and hold the button (5.2) to move the locking rod
(5.1) out of the locking hole on the left arm (2) and lift the guard bar. Release the button (5.2). The
locking rod (5.2) will retract into the other hole on the left arm (2). The guard bar will be locked in
place.
After the hoses are disconnected, hold the guard bar, push and hold the button (5.2) to move the
lock rod (5.1) out of the locking hole on the left arm (2). Swing the guard bar back so the arms (2
and 4) rest on the brackets (1 and 3). Release the button (5.2). The locking rod (5.1) will retract into
the other hole on the left arm (2). The guard bar will be locked in place.
Step 6: Install the
coil pins (13)
8 090119 Rev 0
MAINTENANCE:
Examine the threaded connections regularly to make sure all fasteners are tight. Visually check the
parts, for signs of wear and tear. Using a grease gun, apply grease on regular basis to the grease
fittings (21) on both hinges. If the guard bar does not swing smoothly, remove the coil pins (13) and
disassemble the hinges to check the condition of the bearings (20) and o-rings (22). Replace any
worn or damaged parts.
DIXON WARRANTY:
For Warranty Information, please refer to the inside back cover of the latest Dixon
Catalogue.
1 090119 REV0 (FR)
Entretien & mode d’emploi
Pour DIXON BAYCO
090119 REV0 (FR)
LGH5000
Charnière Barre de Garde
Pour vente & service contactez
É-U:
Dixon Bayco USA
Chestertown, Maryland
Téléphone: 410-778-2000
Fax: 410-778-4702
Sans frais: 800-355-1991
E-mail: dixonba[email protected]
www.dixonbayco.com
Canada:
Dixon Group Canada Limited
Innisfil (Barrie), Ontario
Téléphone: 705-436-1125
Fax: 705-436-6251
Sans frais: 877-963-4966
E-mail: isales@dixongroupcanada.com
www.dixongroupcanada.com
Mexique:
Dixva, S. de R.L. de C.V.
Monterrey, N.L
Téléphone: 01-800-00-DIXON (34966)
Fax: 01-81-8354-8197
E-mail: contactenos@dixonvalve.com.mx
www.dixonvalve.com
Europe:
Dixon Group Europe Ltd
Preston, England
Téléphone: +44 (0)1772 323529
Fax: +44 (0)1772 314664
E-mail: enquiries@dixoneurope.co.uk
www.dixoneurope.co.uk
Asie et Pacifique:
Dixon (Asia Pacific) Pty Ltd
Wingfield, South Australia
Téléphone: +61 8 8202 6000
Fax: +61 8 8202 6099
E-mail: enquiries@dixonvalve.com.au
www.dixonvalve.com.au
2 090119 REV0 (FR)
LGH5000 Charnière Barre de Garde
Pièce
Partie
Description
Matériel
1
341830
Support gauche
AL356.1 T6
2
341828
Bras gauche
AL356.1 T6
3
341831
Support droit
AL356.1 T6
4
341829
bras droit
AL356.1 T6
5
400694
Sous-ensemble de
verouillage
5.1
112272
Barre de verouillage
acier inoxidable
5.2
391853
bouton
acier inoxidable
6
112273
Resort de verrouillage
acier inoxidable
7
112274
rondelle
acier inoxidable
8
112275
Goupille fendue
acier inoxidable
9
391851
Arbre
acier inoxidable
10
112277
Rondelle
acier inoxidable
11
112276
Resort de tension
acier inoxidable
12
112278
Goupille de pin d’attelage
acier inoxidable
13
110717
Goupille de bobine
acier inoxidable
14
391852
rouleau
acier inoxidable
15
112279
Écrou de blocage en
Nylon
acier inoxidable/ Écrou de
blocage en Nylon
16
242047
coude
AL356.1 T6
17
112250
boulon à épaulement
Acier allié
18
112251
rondelle ondulée
acier au carbone galvanisé
19
112252
rondelle
acier inoxidable
20
111557
roulement
Delrin 500
21
111561
Graisseur
plaqué chromate de zinc
jaune
22
110697
Joint torique
Buna-N
Trousse de réparation
Partie #
Description
Comprend les pieces #
LGH5000K1
Ensemble de roulement
20,21, 22
LGH5000K2
Ensemble de rouleau
14, 15, 17,18, 19
LGH5000K3
Ensemble du bras gauche
2, 14, 15, 16, 17, 18, 19,
20, 21, 22
LGH5000K4
Ensemble du bras droit
4, 16, 20, 21, 22
3 090119 Rev 0 (FR)
LGH5000 Charnière barre de garde Ensemble complet
(La valve et attaches 5000AIHD doivent être commandés séparément.)
Sous-ensemble
gauche
Sous-ensemble
droit
4 090119 Rev 0 (FR)
Sous-ensemble gauche avec coude (16), Graisseurs (21) et Goupille de bobine (13)
5 090119 Rev 0 (FR)
Sous-ensemble droit avec coude (16), Graisseurs (21) et Goupille de bobine (13)
6 090119 Rev 0 (FR)
Ces instructions et ces recommandations sont fournies pour assurer un bon fonctionnement et
longévité de service Dixon « Bayco » pour charnière barre de garde. Les pièces sont identifiées
par numéro d’article sur le diagramme et la liste des pièces.
La charnière barre de garde Dixon « Bayco » comprend un sous-ensemble à gauche et à droit, qui
sont préassemblés en usine. La charnière barre de garde comprend également deux coudes (16)
qui peuvent être soudés sur les barres de garde ou les tubes. Les barres de garde ou les tubes
sont fournis et soudés sur place par le client. La charnière barre de garde comprends aussi deux
goupilles de bobine (13) et quatre raccords de graissage (21) qui seront installés sur la charnière
barre de garde après les travaux de soudage est terminé sur le site.
Le 5000AIHD de Dixon « Bayco » est une valve de verrouillage à bit élevé. Il doit être utilisé
avec la charnière barre de garde Dixon "Bayco" pour fournir un signal de commande
pneumatique lorsque la barre de garde est soulevé. La valve 5000AIHD doit être montée au-
dessous du support à gauche (1). Le piston du 5000AIHD est horizontale et légèrement vers le bas
pour empêcher l'eau et les débris de pénétrer dans la valve. Les fixations 5000AIHD et montage
sont vendus séparément.
S'il vous plaît vérifier toutes les pièces avant le montage. Contactez le service à la clientèle et
ventes de Dixon s'il y a des pièces manquantes ou endommagées.
Installation:
1. Retirer le ressort de tension (11) de l'ensemble gauche et sous-ensemble à droite. Retirer
les clips de goupilles fendues (12) de l'arbre (9). Enlever les arbres (9) avec les goupilles de
bobines (13) du support gauche (1) et le support droit (3). Retirer les bras (2 et 4) des
supports (1 et 3). Appuyez et maintenez enfoncé le bouton de verrouillage (5,1) pour
gager le bras gauche (2) en retirant le bras gauche (2). Retirer le joint torique (22) et les
roulements (20) des bras (2 et 4). Pour le bras gauche (2), enlever l'écrou de blocage en
nylon (15), le boulon à épaulement (17), le rouleau (14), la rondelle ondulée (18) et la
rondelle plate (19). Collecter toutes les pièces détachées pour réinstallation.
2. Monter les supports (1 et 3) sur la structure de citerne du pétrolier. Souder les barres de
garde ou des tubes sur les bras (2 et 4). Le client est responsable du choix et de
l'installation de la bonne taille de barre garde tube, et l'alignement de charnière au cours du
forage, de soudage et d'installation.
3. Pour le bras gauche (2), installer le rouleau (14), le boulon à épaulement (17), la rondelle
ondulée (18), la rondelle plate (19) et l’écrou de blocage en nylon (15). Appliquer de la
graisse sur le rouleau (14) et le boulon à épaulement (17). Serrer l’écrou de blocage en
nylon (15) par une clé. Installer et serrer les raccords de graissage (21) sur les deux bras (2
et 4) par une clé. Poser les roulements (20) et les joints toriques (22) de retour dans les
bras (2 et 4). Installer les bras (2 et 4) sur les supports (1 et 3) à travers les arbres (9) avec
les rondelles (10) et les clips pour goupilles fendues (12). Chargez les bras (2 et 4) avec de
la graisse à roulement à travers les 4 graisseurs (21). Un raccord de charge 3/8 "OD doit
être utilisé.
4. Installer des ressorts tensions (11) pour relier les bras (2 et 4) sur les supports (1 et 3).
Vérifiez l'action de balancement pour s'assurer qu'il n'y aucune obstruction. Vérifier et
fonctionner le sous-ensemble de verrouillage (5) pour s'assurer qu'il peut correctement
verrouiller et déverrouiller le bras gauche (2), lorsque la barre de garde est haute et basse.
7 090119 Rev 0 (FR)
Étape 6: Installez les
goupilles de bobine (13)
5. Installez le 5000AIHD (vendu séparément) horizontalement sur le bas du support gauche
(1) à travers les trous filetés sur les supports gauche (1). Le bouton du 5000AIHD doit faire
face au rouleau (14) sur le bras gauche (1). Soulevez la barre de garde pour vérifier l'action
du bouton 5000AIHD.
6. Après avoir testé que toutes les opérations sont satisfaisantes, installer les goupilles de
bobine (13) dans les trous à gauche sur les arbres (9) à l'aide d'un marteau.
OPÉRATION:
Pour ouvrir la barre de garde pour raccord de tuyau, appuyez et tenir le bouton (5,2) pour déplacer
la tige de verrouillage (5,1) hors du trou de verrouillage sur le bras gauche (2) et soulevez la barre
de garde. Relâchez le bouton (5,2). La tige de verrouillage (5,2) se rétractera dans l'autre trou du
bras gauche (2). La barre de garde se verrouillera en place.
Après que les tuyaux sont débranchés, tenez la barre de garde, appuyez et maintenez le bouton
(5,2) pour déplacer la tige de verrouillage (5,1) hors du trou de verrouillage sur le bras gauche (2).
Pivoter la barre de garde en arrière de sorte que les bras (2 et 4) se reposent sur les supports (1 et
3). Relâchez le bouton (5,2). La tige de verrouillage (5,1) se rétractera dans l'autre trou du bras
gauche (2). La barre de garde se verrouillera en place.
8 090119 Rev 0 (FR)
ENTRETIEN:
Examinez les raccords filetés régulièrement pour s'assurer que toutes les attaches sont bien
serrées. Vérifier visuellement les pièces, pour des signes d'usure. En utilisant un pistolet à graisse,
appliquez de la graisse régulièrement aux graisseurs (21) sur les deux charnières. Si la barre de
garde se balance pas doucement, retirer les goupilles de bobines (13) et désassembler les
charnières pour vérifier l'état des roulements (20) et les joints toriques (22). Remplacer les pièces
usées ou endommagées.
GARANTIE DIXON:
Pour plus d’informations complètes sur la garantie, s’il vous plait se référer à la couverture
intérieure de la dernière page du dernier catalogue Dixon.
ANGLE DOPÉRATION
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

Dixon Guard Bar Hinge Set Manuel utilisateur

Taper
Manuel utilisateur

dans d''autres langues