Simplicity HGS INSTALLATION MANUAL BRIGGS & STRATTON 10KW STANDBY- MODEL 01679-0 Guide d'installation

Catégorie
Groupes électrogènes
Taper
Guide d'installation

Ce manuel convient également à

Installation and
Start-Up Manual
Manual de Instalación y
Arranque
Manuel d'Installation et
Démarrage
Questions? Help is just a moment away!
Preguntas? La ayuda es justa un momento
lejos!
Vous avez des questions? Vous n'avez pas
besoin d'aller loin pour trouver de l'aide!
Call: Home Standby Helpline
Llamada: Línea Directa de Reserva de Hogar
Appelez: Ligne Directe de Secours À la Maison
- 1-800-743-4115 M-F 8-5 CT
Web: www.briggsandstratton.com
Model 01679-0 Part No. 190838GS
Rev. 3 (01/03/2003)
2
Briggs & Stratton Power Products Home Generator System
Installation Manual
TABLE OF CONTENTS EQUIPMENT
DESCRIPTION
This system consists of an engine driven AC generator
designed to provide backup electrical power for operating
compatible electrical loads through the supplied automatic
power transfer switch.
This manual contains installation, startup and adjustment
instructions for Home Generator Systems that operates
120 and/or 240 Volt, single phase, 60Hz devices.The
generator may be operated on LP or natural gas fuel.A
separate owner’s manual (part number 190839) contains
specifications, operating and maintenance instructions for
these models.
Every effort has been expended to make sure that the
information in this manual is both accurate and current.
However, the manufacturer reserves the right to change,
alter or otherwise improve the system at any time without
prior notice.
CAUTION! DO NOT tamper with engine
governed speed. High operating speeds are
dangerous and increase the risk of personal injury
or damage to equipment.
CUSTOMER
RESPONSIBILITIES
Read and follow the instructions given in the Owner’s
Manual, especially the section regarding selecting essential
circuits.
Follow a regular schedule in maintaining, caring for and
using your Home Generator System, as specified in the
Owner’s Manual.
INSTALLER
RESPONSIBILITIES
Read and observe the safety rules.
Read and follow the instructions given in this Installation
and Start-up Manual.
Employ good workmanship techniques to ensure a long
lasting and trouble-free backup power installation.
TABLE OF CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . 2
EQUIPMENT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . 2
CUSTOMER RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . 2
INSTALLER RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . 2
SAFETY RULES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
INSTALLATION PROCEDURES . . . . . . . . . . . . . . . . . . . 4
Unpacking Precautions . . . . . . . . . . . . . . . . . . . . . . . 4
Delivery Inspection . . . . . . . . . . . . . . . . . . . . . . . . . 4
Shipment Contents . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Required Tools/Equipment . . . . . . . . . . . . . . . . . . . . 4
Home Generator System Location . . . . . . . . . . . . . . 4
Fuel and Electrical Inlet Dimensions . . . . . . . . . . . . . 5
Lifting the Generator . . . . . . . . . . . . . . . . . . . . . . . . 5
Access Doors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Automatic Power Transfer Switch Mounting
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . 7
THE GASEOUS FUEL SYSTEM . . . . . . . . . . . . . . . . . . 7-8
Fuel Consumption . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Fuel Pipe Sizing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
ESSENTIAL CIRCUIT ISOLATION . . . . . . . . . . . . . . . . 10
TRANSFER SWITCH . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Generator AC Connection System . . . . . . . . . . . . . 11
Power Wiring Interconnections . . . . . . . . . . . . . . . 12
Grounding the System . . . . . . . . . . . . . . . . . . . . . . 13
Control Circuit Interconnections . . . . . . . . . . . . . . 13
Fault Detection System . . . . . . . . . . . . . . . . . . . . . . 13
System Control Panel . . . . . . . . . . . . . . . . . . . . . . . 13
BEFORE INITIAL ENGINE START-UP . . . . . . . . . . . . . . 14
Engine Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Battery Connection . . . . . . . . . . . . . . . . . . . . . . . . 14
Fuel Supply System . . . . . . . . . . . . . . . . . . . . . . . . . 14
INITIAL START-UP (NO LOAD) . . . . . . . . . . . . . . . . . 15
Electrical Checks . . . . . . . . . . . . . . . . . . . . . . . . . . 15
AUTOMATIC OPERATION SEQUENCE . . . . . . . . . . . 16
Checking Automatic Operation . . . . . . . . . . . . . . . 17
SETTING EXERCISE TIMER . . . . . . . . . . . . . . . . . . . . . 17
RECONFIGURING THE FUEL SYSTEM . . . . . . . . . . . . 18
Engine Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . 18
POST INSTALLATION INSPECTION . . . . . . . . . . . . . . 19
REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Standards Index . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Fuel Comparison Chart . . . . . . . . . . . . . . . . . . . . . 20
Size of Propane Tank Required at Various Temperatures
When Kept at Least Half Full . . . . . . . . . . 20
INSTALLATION NOTES. . . . . . . . . . . . . . . . . . . . . . . . . 21
3
Briggs & Stratton Power Products Home Generator System
Installation Manual
SAFETY RULES
The safety alert symbol ( ) is used with a signal word
(DANGER, CAUTION,WARNING), a pictorial and/or a
safety message to alert you to hazards. DANGER indicates
a hazard which, if not avoided, will result in death or serious
injury. WARNING indicates a hazard which, if not avoided,
could result in death or serious injury. CAUTION
indicates a hazard which, if not avoided, might result in
minor or moderate injury. CAUTION, when used
without the alert symbol, indicates a situation that could
result in equipment damage. Follow safety messages to
avoid or reduce the risk of injury or death.
Only qualified electricians and gaseous fuel
technicians should attempt installation of this
system, which must strictly comply with applicable
codes, standards and regulations.
WARNING
DO NOT handle generator or electrical cords while standing
in water, while barefoot, or while hands or feet are wet.
If you must work around a unit while it is operating, stand on
an insulated dry surface to reduce shock hazard.
DO NOT allow unqualified persons or children to operate or
service generator.
In case of an accident caused by electrical shock, immediately
shut down the source of electrical power. If this is not
possible, attempt to free the victim from the live conductor.
Avoid direct contact with the victim. Use a non-
conducting implement, such as a rope or board, to free the
victim from the live conductor. If the victim is unconscious,
apply first aid and get immediate medical help.
Before performing any maintenance on the generator,
disconnect the battery cable indicated by a NEGATIVE,
NEG or (-) first.When finished, reconnect that cable last.
After your Home Generator System is installed, the generator
may crank and start without warning any time there is a
power failure.To prevent possible injury, always set the
AUTO/OFF/MANUAL switch to OFF AND remove the
15 Amp fuse BEFORE working on the equipment.
Generator produces powerful voltage.
Failure to properly ground generator can result
in electrocution.
Failure to isolate generator from power utility
can result in death or injury to electric utility
workers due to backfeed of electrical energy.
WARNING
Adequate, unobstructed flow of cooling and ventilating air is
critical to correct generator operation.
Keep at least 2 feet of clearance on all sides of generator for
adequate ventilation.
Despite the safe design of the Home Generator System,
operating this equipment imprudently, neglecting its
maintenance or being careless can cause possible injury or
death.
Remain alert at all times while working on this equipment.
Never work on the equipment when you are physically or
mentally fatigued.
DO NOT use the generator or any of its parts as a step.
Stepping on the unit can cause stress and break parts.This
may result in dangerous operating conditions from leaking
exhaust gases, fuel leakage, oil leakage, and so forth.
Improper treatment of generator can damage it and
shorten its life.
CAUTION
Install the fuel supply system according to applicable fuel-gas
codes.
Before placing the Home Generator System into service, the
fuel system lines must be properly purged and leak tested.
After the system is installed, you should inspect the fuel
system periodically.
NO leakage is permitted.
Propane and Natural Gas is extremely
flammable and explosive.
Fire or explosion can cause severe burns or
death.
WARNING
NOT INTENDED FOR USE AS PRIMARY
POWER IN PLACE OF UTILITY OR IN
LIFE-SUPPORT APPLICATIONS
WARNING
4
Briggs & Stratton Power Products Home Generator System
Installation Manual
INSTALLATION
PROCEDURES
Unpacking Precautions
The unit is shipped bolted to its mounting pad, ready for
hookup. Use care to avoid damage from dropping, bumping,
collision, etc. Store and unpack carton with the proper side
up, as noted on the shipping carton.
Delivery Inspection
After removing the carton, carefully inspect the Home
Generator and Automatic Power Transfer Switch
components for any damage that may have occurred during
shipment.
IMPORTANT: If loss or damage is noted at time of
delivery, have the person(s) making delivery note all damage
on the freight bill and affix his signature under the
consignor's memo of loss or damage. If loss or damage is
noted after delivery, separate the damaged materials and
contact the carrier for claim procedures. Missing or
damaged parts are not warranted.
Shipment Contents
The Home Generator System is supplied with:
Backup Power generator
Pre-attached mounting pad
Automatic Power Transfer switch
One 24” flexible hook-up pipe
Installation and start-up manual (P/N 190838)
Owner’s manual(P/N 190839)
Product warranty sheet (P/N 190881)
Installation checklist (P/N 190840)
Three access door keys
Four lifting hole plugs
Oil fill spout
Touch-up paint
One spare 15A fuse
Diagnostic LED kit (diode/plate/decal/pin connectors (2))
Required Tools/Equipment
Two 48” lengths of 1” OD pipe (NOT conduit)
Hole punches for 16ga steel
Torque screwdriver, 5 to 50 inch-pound range
Home Generator System Location
TO THE INSTALLER: Consult with the owners
and convey any technical considerations that might
affect their wishes, before applying these general
guidelines.
Generator Clearances
The generator enclosure must be a minimum of 3 ft.
(92 cm) from combustible material (NFPA 37). Leave at
least 3 ft. (92 cm) all around the enclosure for access to the
inside of the enclosure (NEC Art. 110-26a,Art. 110-26b).
The unit’s exhaust port must be at least 5 ft. (152 cm) from
any building opening (window, door, vent etc.), and the
exhaust must not be able to accumulate in any occupied
area (Figure 1).
General Location Guidelines
Install the unit outdoors ONLY. NO MODIFICATIONS
WILL ALLOW INSIDE INSTALLATION!
Place the unit in a prepared location that is flat and has
provisions for water drainage.
Install the unit where air inlet and outlet openings will
not become obstructed by leaves, grass, snow, etc. If
prevailing winds will cause blowing or drifting, you may
need to construct a windbreak to protect the unit.
In locations where strong winds blow from one
direction, face the generator air inlet openings into the
prevailing winds, if possible.
Figure 1 — Home Generator System Clearances
Exhaust port must be
5 ft (152 cm) minimum
distance from building
openings
Exhaust
Port
5
Briggs & Stratton Power Products Home Generator System
Installation Manual
Install the generator as close as possible to the
Automatic Power Transfer System to reduce the length
of wiring and conduit.
Install the generator as close as possible to the fuel
supply to reduce length of pipes.
CAUTION! Laws or local codes may regulate the
distance to the fuel supply.
The Home Generator System is shipped already attached
to its mounting pad. Unless mandated by local code, no
concrete slab is required.
If mandated by local code, detach the unit from its supplied
base. Construct a concrete slab at least 3 inches thick and
6 inches longer and wider than the unit.Attach unit to slab
with 1/4” diameter (minimum) masonry anchor bolts long
enough to retain the unit. Use the mounting pad holes as
anchor bolt locators.
Fuel and Electrical Inlet Dimensions
Figure 2, below, depicts the physical location of the fuel
piping connector.Also shown is the recommended location
for punching holes for attaching the power and signal
conduits.
Lifting the Generator
The generator weighs more than 375 pounds. Proper tools,
equipment and qualified personnel should be used in all
phases of handling and moving the unit.
CAUTION! DO NOT lift unit by roof as damage to unit
will occur.
Two 4ft. lengths of 1” O.D. pipe (supplied by the installer)
are required to lift the generator manually. Insert pipes
through the lifting holes located near the unit’s base, as
shown in Figure 3 (next page).
CAUTION!The unit may shift on the lifting pipes
during movement, which may cause an injury.
WARNING! If lifting or hoisting equipment is
used, be careful not to touch any overhead power
lines.
Figure 2 — Generator Fuel and Conduit Attachment Locations, Oil Service Side of Unit
3/4” NPT
Fuel Piping
Connector
Recommended
Conduit Attachment
Area
4.5”
13.5”
6
Briggs & Stratton Power Products Home Generator System
Installation Manual
You may also lift the unit using a “hook and hoist” method
attached to the lifting pipes, provided that you use a
spreader bar to ensure that the chains or cables do not
touch the generator’s roof.
Retouch any chipped paint with supplied touch-up paint.
After paint is dry, and the unit is in place,.fill the lifting
holes with the supplied lifting hole plugs.
Access Doors
The Home Generator System is equipped with an
enclosure having four access doors.As shown in Figure 4,
below, the doors are named for a significant component
located behind them.Also shown is the unit’s dimensions.
Starting with the side that has the fuel piping connector
and proceeding clockwise, the doors are named:
Oil Service door
Air Intake door
Control Panel door
Battery door
Each unit is equipped with three identical circular keys.
These keys fit the locks that secure the oil service and
control panel doors.
To remove an access door:
1. Insert a key into the lock of the access door you wish
to remove and turn one quarter turn clockwise.
NOTE: The key is retained in the lock when the locks are
open.
2. Grasp the door’s lift handle and pull the door upwards
until the security pins are free of the engagement holes
in the lower base.
Fuel
Inlet
Exhaust
Port
Door Lock
Screw
Door
Lock
Screw
Battery Door
Control Panel Door
42”
30”
29”
Figure 4 — Enclosure Access Doors
Air Intake Door
Oil Service Door
To lift:
Insert
pipe
here
Installer-supplied pipe
Figure 3 — Location of Lifting Holes
7
Briggs & Stratton Power Products Home Generator System
Installation Manual
3. With the security pins free, pull the lift handle outward
(away) from the unit while pulling the door down and
out of the upper door channel.The door will come
free of the generator enclosure.
The Battery door and the Air Intake door do not have locks
or lift handles.They are opened in the same manner, lifting on
the louvers instead of a lift handle. However, you must
remove the door lock screw, found directly above the center
of the door. Replace the screw whenever the access door is
installed.
WARNING! Burn Hazard! The exhaust port can
reach a temperature of 600° F during use and
remains hot after shutdown. Carelessness could
cause severe burns.
To install an access door:
1. Support the door by grasping the lift handle or louver.
Guide the top of the door into the upper channel of
the generator enclosure.
2. Lift the door up into its upper mounting channel until
the security pins clear enclosure sill.
3. Push the lower half of the door into the door recess
until it is flush with the sides.
4. Seat the door by pushing it down until the rubber coated
security pins engage and the door rests on the sill.
5. If installing a lockable door, turn the key one quarter
turn counterclockwise. Remove and secure the key.
6. If installing air intake or battery door, replace the door
lock screw.
Check to ensure that all the rubber and foam vibration
dampers remain in place.This will minimize vibration noise.
CAUTION! Observe that the 15 Amp fuse has
been removed from the control panel for shipping.
DO NOT install this fuse until all plumbing and
wiring has been completed and inspected. Failure to
install the fuse as described on page 14 could cause
the engine to start.
Automatic Power Transfer Switch
Mounting Dimensions
Figure 5 depicts the physical size and mounting hole
locations of the NEMA automatic transfer switch
enclosure.This enclosure is suitable for indoor use only.
The transfer switch enclosure is commonly secured
through the predrilled holes, as shown. However, other
mounting holes can be made by removing the switch
component mounting plate and drilling new holes.
THE GASEOUS FUEL
SYSTEM
WARNING! Gaseous fuels, such as LP and
natural gas, are highly volatile and their vapors are
Explosive. LP gas is heavier than air and will settle
in low areas. Natural gas is lighter than air and will
collect in high areas. Even the slightest spark can
ignite these fuels and cause an explosion.
TO THE INSTALLER: Consult with the Home
Generator System owner(s) and convey any
technical considerations that might affect their
installation plans before applying these general
guidelines.
The following general rules apply to gaseous fuel system
piping:
The piping should be of a material that conforms to
NFPA and local codes, rigidly mounted and protected
against vibration.
The information provided below is to assist
gaseous fuel system technicians in planning
installations. In no way should this information
be interpreted to conflict with applicable fuel gas
codes. Consult with your local fuel supplier or
Fire Marshall if questions or problems arise.
Figure 5 — Automatic Power Transfer Switch Dimensions
Mounting Dimensions
Enclosure Dimensions
8
Briggs & Stratton Power Products Home Generator System
Installation Manual
Install flexible gaseous pipe (supplied) between the Home
Generator System Fuel Inlet port and rigid piping.
CAUTION! Connector is not to be installed
underground or in contact with the ground.
CAUTION! Entire flex connector must be visible
for periodic inspection and must not be concealed
within, contact, or run through any wall, floor, or
partition.
Piping must be of the correct size to maintain the
required supply pressures and volume flow under varying
conditions.
Use an approved pipe sealant or joint compound on all
threaded fittings to reduce the possibility of leakage.
Installed piping must be properly purged and leak tested,
in accordance with applicable codes and standards.
Consider the following factors when planning to
install the fuel supply system:
The Home Generator System engine is fitted with a fuel
carburetion system that meets the specifications of the
California Air Resources Board for “tamper-proof” dual fuel
systems.The unit will run on natural gas or liquefied
propane.
A minimum of one manual shutoff valve should be placed
in-line and located outside the building to facilitate
servicing the generator.
Natural gas fuel supply pressure at the generator's fuel
inlet port should be between 5 to 7 inches of water (in.
W.C.) at full load. LP fuel supply pressure should be 11 to
14 inches of water (in.W.C.) at full load.
The Home Generator System unit has been factory
set to run on natural gas. If you need to change from
natural gas to LP gas, the unit will need to be reconfigured,
as described on page 18.
It is recommended that the fuel connection incorporate
the following components:
A manual fuel shut-off valve located in the interior of the
building.
A manual fuel shut-off valve located outside the building,
just before the generator unit.
The termination of hard piping should include a sediment
trap.
A manometer port should be provided.
The manometer port permits temporary installation of a
manometer (Figure 6), to ensure that the engine receives
the correct fuel pressure to operate efficiently throughout
its operating range.
When the initial test runs are completed, the manometer is
removed and the port is plugged.A typical final fuel
connection assembly is shown in Figure 7.
Figure 7 — Completed Fuel Connections
Figure 6 — Temporary Manometer Installed
From Fuel
Supply Line
To Home
Generator System
9
Briggs & Stratton Power Products Home Generator System
Installation Manual
Fuel Consumption
See Figure 8 for fuel supply requirements at half and full
load for both natural gas and LP vapor.
Fuel Pipe Sizing
Figures 9 and 10 provide the maximum capacity of pipe in
cubic feet of gas per hour for gas pressures of 0.5 psi or
less and a pressure drop of 0.3 in. water column. Specific
gravity of gas is shown.This information is based on data
found in Chapter 9 of NFPA Publication 54.
Listed values compensate for a nominal amount of
restriction from bends, fittings, etc. If an unusual number of
fittings, bends, or other restrictions are used, please refer
to NFPA Publication 54.
NPT
10ft
15ft
20ft
30ft
40ft
50ft
60ft
70ft
80ft
90ft
100ft
½”
110
96
76
61
52
46
42
38
36
33
32
¾”
277
192
158
126
107
95
87
79
74
69
65
1”
428
360
293
236
202
180
164
151
139
129
123
NPT
10ft
15ft
20ft
30ft
40ft
50ft
60ft
70ft
80ft
90ft
100ft
½”
168
146
115
93
79
70
63
59
55
51
48
¾”
346
293
240
192
163
145
132
120
113
106
99
1”
653
549
446
360
307
274
250
230
211
197
187
Natural Gas (sg=0.65)
Model 1679-0 requires 177.9 CFH at “Full Load”
Liquefied Petroleum (LP) (sg=1.50)
Model 1679-0 requires 78.24 CFH at “Full Load”
Figure 10 — LIQUEFIED PETROLEUM (LP) GAS Pipe Size - Gas Flow Chart, in cubic feet per hour
Model
Natural
Gas*
Vapor **
1/2
Load
Full
Load
1/2 Load
Full Load
1679-0
100.8
177.9
1.16/42.21
2.15/78.24
Figure 8 — Fuel Supply Requirements
* = Natural Gas is in cubic feet per hour
** = LP Vapor is in gallons per hour/cubic feet per hour
Figure 9 — NATURAL GAS (NG) Pipe Size - Gas Flow Chart, in cubic feet per hour
10
Briggs & Stratton Power Products Home Generator System
Installation Manual
ESSENTIAL CIRCUIT
ISOLATION
Essential electrical loads are loads that will be powered by
the Home Generator System. Essential loads are grouped
together and wired into the transfer switch.
CAUTION!This Home Generator System MUST
be installed as described herein.
TO THE INSTALLER: Consult with Home
Generator System owner(s) to discuss their
“Selection of Essential Circuits”, described in the
owner’s manual.
Ensure that the total of the selected load circuits fed by this
transfer switch are within the generator's rated capacity.
The following requirements apply to this type of isolation
system:
The Automatic Transfer Switch is installed after the main
distribution panel.
The Automatic Transfer Switch has a load rating of
50 Amps.This is the maximum load rating of the essential
loads.
All wiring must conform to the National Electrical Code,
and all state and local codes.
The illustration in Figure 11 depicts the Home Generator
System and assumes the utility is supplying 120/240 Volt,
single-phase electrical service.
Figure 11 — Typical System Diagram with Essential Circuits
To Utility Power
Watt Meter
Main Distrubution Panel
To Air Conditioner (240V)
To Other Circuits (120V)
To Range
To Water Heater
240V
To Briggs & Stratton
Home Generator Unit
120V To Microwave
120 V To Bathroom
240V To Well Pump
120V To Sump Pump
Neutral
120V
To Furnace Blower
To Lights
To Refrigerator
120V To Freezer
Automatic Transfer Switch
(in normal position)
11
Briggs & Stratton Power Products Home Generator System
Installation Manual
TRANSFER SWITCH
The Automatic Transfer Switch supplied with the Home
Generator System is enclosed in a NEMA Type 1 enclosure
suitable for indoor use only. Guidelines for mounting the
Automatic Transfer Switch include:
Install the switch on a firm, sturdy supporting structure.
To prevent switch contact distortion, level the switch if
necessary.This can be done by placing washers between
the switch enclosure and the mounting surface.
NEVER install the switch where water or any corrosive
substance might drip onto the enclosure.
Protect the switch at all times against excessive moisture,
dust, dirt, lint, construction grit and corrosive vapors.
The typical Automatic Power Transfer Switch is depicted in
Figure 12. It is best if it is mounted inside near the main
distribution panel, as shown. Discuss layout
suggestions/changes with the owner before beginning the
system installation process.
Generator AC Connection System
A single-phase, three-wire AC connection system is used in
the Home Generator System.The stator assembly consists
of a pair of stationary windings with two leads brought out
of each winding.The two windings are connected together
in series, resulting in a fixed 240 Volt AC, 60Hz output.
Stator output leads 11 and 44 are the two “hot” leads; the
junction of leads 22 and 33 forms the neutral lead, as
shown schematically and as wiring diagram in Figure 13.A
complete schematic and wiring diagram can be found in the
owner’s manual.
Figure 13 — System AC Connections
Automatic
Transfer Switch
Main
Distribution
Panel
Figure 12 — Typical Switch Mounting
12
Briggs & Stratton Power Products Home Generator System
Installation Manual
Power Wiring Interconnections
All wiring must be the proper size, properly supported, of
approved insulative qualities, and protected by NEC
approved conduit. Use flexible conduit between the
enclosure and any rigid conduit.
CAUTION! Per NEC code, power voltage leads
must be run in separate conduit from low voltage
transfer switch "signal" leads.
Complete the following connections between the
generator, transfer switch and main distribution panel
(Figure 14).
1. Connect utility power supply leads from a two pole
breaker installed in the main distribution panel to
transfer switch terminals marked “UTILITY
CONNECTION”. Use a 50 Amp circuit breaker.
Ensure breaker is turned OFF.
2. Connect utility neutral to the transfer switch
“NEUTRAL” bus.
3. Connect utility ground to the transfer switch “GND”
bus.
4. Connect generator power supply leads from the
generator’s control panel to transfer switch terminals
marked “GENERATOR CONNECTION”.
5. Connect generator Neutral from the control panel to
the transfer switch NEUTRAL bus.
6. Connect generator GND from the control panel to
the transfer switch GND bus.
7. Torque all wire connections/fasteners to values
recommended in Figure 15.
Generator
Neutral is
White wire
Control Signal
Connections
GND lug
Wire
Nut
Dual Pole
Breaker
Utility
Connection
Generator
Connection
Rear of
Control
Panel
Neutral
Bus
Neutral
Bus
Ground
Bus
Main
Distribution
Panel
Automatic Power Transfer Switch
Home Generator
System
Generator
Figure 14 — Typical Installation Diagram for Home Generator System
Diagnostic LED
13
Grounding the System
Installer-supplied minimum 10 AWG stranded copper wire
is connected to the generator housing GND lug and routed
through conduit to the Automatic Transfer Switch’s GND
bus. Continue the 10AWG wire through conduit to the
main distribution panel ground bus.Torque all wire
connections/fasteners to values recommended in Figure 15.
Generator grounding rod is used ONLY if required
by local code.
Control Circuit Interconnections
Control circuit interconnections consist of "Utility" and
"Load" leads, plus leads “15”,“205”, and “206”.These seven
signal leads must be routed in conduit that is separate from
the AC power leads. Control lead functions are briefly
described as follows:
"Utility 1" and "Utility 2" deliver utility power to the
generator’s circuit board.
"Load 1" and "Load 2" are used to operate the exercise
timer on the generator's circuit board.
Leads “15”,“205”, and “206” supply control signals to the
Automatic Transfer Switch.
Using installer-supplied minimum 14 AWG stranded copper
wire, connect each control circuit terminal in the generator
to its corresponding terminal in the Automatic Transfer
Switch.Torque all wire connections/fasteners to values
recommended in Figure 15.
Fault Detection System
The light on the control panel is referred to as the
Diagnostic LED. It will turn on and off in a series of blinks if
certain problems are detected in the HGS.An extra LED
and mounting plate is supplied so that it can be installed at a
convenient inside location.The owner will use it to observe
the status of the HGS.
To install the remote LED panel:
Apply the supplied decal.
Pull the LED through the mounting plate from the back
until it snaps in place.
Using minimum 18AWG wire, connect the remote LED
to the generator control panel using supplied pin
connectors. Use wire nuts to attach wire to LED leads.
Attach mounting plate to installer-supplied low voltage
electrical box.
Refer to the section “Fault Detection System” in the
Owner’s Manual for operation.
System Control Panel
Figure 16 depicts the Home Generator System control
panel, located inside the generator housing. Brief
descriptions of the controls used during installation follow.
More information may be found in the Owner’s Manual.
AUTO/OFF/MANUAL Switch
The most important control on the generator is the
AUTO/OFF/MANUAL” switch.This three-position
switch will be referred to herein as
“AUTO/OFF/MANUAL”, and is used as follows:
•“AUTO” position is the normal operating position. If a
utility power outage is sensed, the system will start the
generator, let it reach operating temperature, then
connect generator power to the transfer switch.When
Briggs & Stratton Power Products Home Generator System
Installation Manual
Hour Meter
Circuit
Breaker
Set Exercise
Switch
AUTO/OFF/
MANUAL
Switch
Diagnostic
LED
15 Amp
Fuse
Figure 16 — Home Generator System Control Panel
CONNECTIONS:
Torque
Value
In Main Distribution Panel:
Minimum
Maximum
Refer to panel manufacturer specs
In Transfer Switch:
UTILITY CONNECTION lugs
35 in-lb
45 in-lb
GENERATOR CONNECTION lugs
35 in-lb
45 in-lb
GND Bar and NEUTRAL Bar:
14-10 AWG
20 in-lb
8 AWG
25 in-lb
6-4 AWG
35 in-lb
Circuit Breakers:
Refer to circuit breaker
manufacturer specs
Figure 15 — Recommended Torque Values
14
Briggs & Stratton Power Products Home Generator System
Installation Manual
utility power is restored, the system reconnects utility
power to the transfer switch, lets the engine ‘cool down’,
shuts off the generator, and waits for the next utility
power outage.
•“OFF” position turns off a running generator and takes
the system out of the Automatic operation mode.
•“MANUAL” position starts the engine but does not
disconnect utility power from the transfer switch. It is
used for maintenance or diagnostic functions.
15 Amp Fuse
The Home Generator System DC control circuit is
protected from overload by a 15 Amp fuse mounted on the
generator’s control panel (see Figure 16).The fuse is wired
in series with the battery output lead to the control panel.
TO THE INSTALLER: This system is designed so
that when Utility power is present and the 15 Amp
fuse is blown or missing, the transfer switch
UTILITY relay remains closed, thus providing utility
power to the customer.The generator will not start
if utility power drops out or the 15 Amp fuse is
blown or missing.
These functions are controlled by the CMA board. It
provides the power needed to hold the transfer switch
UTILITY relay closed for as long as there is a charge in the
starting battery AND utility power is present
REGARDLESS of the absence or presence of the 15 Amp
fuse.
Replace the fuse using ONLY an identical BUS AGC
15A fuse. One spare fuse is supplied with the unit.
BEFORE INITIAL ENGINE
START-UP
Engine Oil
The generator’s engine is shipped from the factory full of
oil and should be ready to run. However, check oil level and
ensure that engine is serviced as described in the Engine
Owner’s Manual.
CAUTION! Any attempt to crank or start the engine
before it has been properly serviced with the
recommended oil will result in an engine failure that is not
covered under warranty.
Oil Considerations
Your Home Generator System is equipped with an engine
that has completed the traditional “break-in” process.The
engine should only be filled with synthetic oil (SAE 5W-30,
API SJ or later).This permits ‘standby’ operation in the
widest range of temperature and climate variations.
NOTE: The use of synthetic oil does not alter the
required oil change intervals recommended in the Engine
Owner’s Manual.
Battery Connection
The Home Generator System is supplied with a 12 Volt DC
18 Amp-Hour battery. It is a sealed, lead-acid rechargeable
battery. It is installed in the unit and the battery cables are
connected at the factory.The unit’s 15 Amp fuse, which
isolates the battery and prevents the unit from starting, has
been removed for shipping.
If it is necessary to connect the battery, proceed as follows:
1. Set the generator's “AUTO/OFF/MANUAL” switch to
OFF.
2. Turn OFF the main distribution panel circuit breaker
supplying utility power to the Automatic Power
Transfer System.
CAUTION!The generator can crank and start
when the battery cable contacts the battery
terminal if the “AUTO/OFF/MANUAL” switch is not
set to its OFF position.
3. Using supplied hardware, connect the red battery lead
to the battery positive terminal (indicated by
POSITIVE, POS, or (+).
4. Repeat step 3 (above) to connect the negative battery
cable.You may need to clip a cable tie to place the
negative wire. Ensure hardware on both positive and
negative battery terminals is secure.
NOTE: With the battery installed and utility power available
to the Automatic Transfer Switch, the battery receives a
trickle charge whenever the engine is not running.The trickle
charge only prevents self-discharge and cannot be used to
recharge a battery that is completely discharged.
Fuel Supply System
Ensure that all fuel pipe connections are tight, secure and
without leaks.
NOTE: In the absence of local purging and leak test
standards, NFPA No. 54 may be used as a guide. (See
“Standards Index” on page 19).
15
Briggs & Stratton Power Products Home Generator System
Installation Manual
Ensure that all gas line shutoff valves are OPEN and that
adequate fuel pressure is available whenever automatic
operation is desired.
INITIAL START-UP (NO LOAD)
Begin testing the system without any electrical loads
connected, as follows:
1. Set the AUTO/OFF/MANUAL switch to OFF.
2. Set the generator’s main circuit breaker to its OFF
(open) position.
3. Install the 15 Amp fuse in the control panel.
4. Set the AUTO/OFF/MANUAL switch to MANUAL.
NOTE: When the Home Generator System is started for
the very first time, it will require that air in the gaseous fuel
lines be purged.This may take a few minutes.
5. Use short starting cycles (15 sec. per min.) to reduce
heat in the starter.
6. Repeat process until lines are purged of air and engine
starts.
7. Listen for unusual noises, vibration or other indications
of abnormal operation. Check for oil leaks, evidence of
overheating etc. while the unit runs.
Electrical Checks
With the AUTO/OFF/MANUAL switch set to OFF:
1. Turn ON the main distribution panel circuit breaker
that supplies utility power to the Automatic Transfer
Switch.
WARNING! The Automatic Transfer Switch is
now electrically "HOT." Contact with "HOT" parts
will result in extremely hazardous and possibly fatal
electrical shock. Proceed with caution.
2. Use an accurate AC voltmeter to check utility power
voltage across “UTILITY CONNECTION” lugs in the
Automatic Transfer Switch (see Interconnection
Diagram on page 12). Nominal line-to-line voltage
should be 240 Volts.
3. Check utility power between one of the UTILITY
CONNECTION lugs and the neutral lug, then between
the other UTILITY CONNECTION lugs and the
neutral lug. Nominal line-to-neutral voltage should be
120 Volts.
4. When certain that utility voltage is as specified above,
turn OFF the main distribution panel circuit breaker
that supplies utility power to the Automatic Transfer
Switch.
5. Set the generator's main circuit breaker to the OFF
position. Initial tests will be conducted at “no-load”
condition.
6. Set the AUTO/OFF/MANUAL switch to MANUAL.
The engine should crank and start.
7. Let the engine warm up for about five minutes to allow
internal temperatures to stabilize.Then, set the
generator’s main circuit breaker to its ON (or closed)
position.
WARNING! Proceed with caution. Generator
output voltage is now supplied to the Automatic
Transfer Switch. Contact with “HOT” Automatic
Transfer Switch parts will result in dangerous and
possibly fatal electrical shock.
8. Connect an accurate AC voltmeter and a frequency
meter to check generator output across
“GENERATOR CONNECTION” lugs in the Automatic
Transfer Switch (see Interconnection Diagram on
page 12).Voltage should be 239-250 Volts, frequency
should be 62.0 - 62.5 Hz.
NOTE: If either parameter is outside these ranges,
perform the Engine Adjustments described on page 18.
9. Check generator output between one of the
GENERATOR CONNECTION lugs and the neutral
lug, then between the other GENERATOR
CONNECTION lug and the neutral lug. In both cases,
voltage reading should be between 121-126Volts.
10. Set the generator’s main circuit breaker to OFF. Let
the engine run at “no-load” for a few minutes to
stabilize internal engine/generator temperatures.
11. Set the AUTO/OFF/MANUAL switch to OFF. Engine
should stop.
IMPORTANT: DO NOT proceed until you are certain
that generator AC voltage and frequency are correct and
within the stated limits.To obtain the proper generator
frequency, see Engine Adjustments on page 18.
16
Briggs & Stratton Power Products Home Generator System
Installation Manual
AUTOMATIC OPERATION
SEQUENCE
The generator’s control panel houses a logic control circuit
board.This control board constantly monitors utility power
source voltage. Should that voltage drop below a preset
level, control board action will signal the engine to crank
and start.After the engine starts, the control board signals
the transfer switch to activate and to connect load circuits
to the backup power supply.
When utility source voltage is restored above a preset
voltage level, the control board signals the transfer switch
to transfer loads back to the power supply.After retransfer,
the engine is signaled to shut down.
The actual system operation is not adjustable and is
sequenced by sensors and timers on the control board, as
follows:
Utility Voltage Dropout Sensor
This sensor monitors utility source voltage.
If utility source voltage drops below about 60 percent of
the nominal supply voltage, the sensor energizes a
6-second timer.The timer is used to ‘sense’ brown-outs.
Once the timer has expired, the engine will crank and
start.
Engine Warm-up Time Delay
This mechanism lets the engine warm up for about
15 seconds before the load is transferred to the Home
Generator System.
Backup Voltage Sensor
This sensor monitors generator AC output voltage.When
the voltage has reached 50 percent of the nominal rated
voltage, transfer to the backup generator can occur.
Utility Voltage Pickup Sensor
This sensor monitors utility power supply voltage.When
that voltage is restored above 70 percent of the nominal
source voltage, a retransfer time delay starts timing.
Retransfer Time Delay
This timer runs for about 6 seconds.
At the end of a 6-second delay, circuit board action de-
energizes the generator relay in the transfer switch.
Retransfer to utility power source then occurs.
Engine Cool-down Timer
When the load is transferred back to the utility power
source, the engine cool-down timer starts timing.
The timer will run for about one minute, then the
generator will stop.
17
Briggs & Stratton Power Products Home Generator System
Installation Manual
Checking Automatic Operation
To check the system for proper automatic operation,
proceed as follows:
1. Check that AUTO/OFF/MANUAL is set to OFF.
2. Apply utility power to the Automatic Transfer Switch
by turning ON the main distribution panel circuit
breaker.
3. Set the AUTO/OFF/MANUAL switch to AUTO.The
Automatic Power System is now ready for automatic
operation.
4. Turn OFF the main distribution panel circuit breaker
sending power to the automatic transfer switch.
The engine will crank and start after sensors have timed
out.After starting, the Automatic Power Transfer System
will transfer essential circuit loads to the generator. Let the
system go through its entire automatic operation sequence.
5. With the generator output supplying its loads, turn
ON the main distribution panel circuit breaker that
supplies utility power to the Automatic Power Transfer
Switch.
6. After about 6 seconds, the automatic transfer switch
will transfer loads back to the utility power.
7. About one minute after re-transfer, the generator will
stop.
This completes the test procedures for the automatic
operation of the Home Generator System.
SETTING EXERCISE TIMER
The Home Generator System is equipped with an exercise
timer that will start and exercise the system once every
seven days. During this exercise period, the unit runs for
approximately 12 minutes and then shuts down. Electrical
load transfer DOES NOT occur during the exercise cycle
(unless an utility power outage occurs).
A switch on the control panel is labeled “Set Exercise” (see
Figure 16).The specific day and the specific time of day this
switch is pressed is programmed into the control board
memory.This date and time is then used to automatically
initiate the system exercise cycle.
To perform the Set Exercise procedure:
1. Choose the day and time you want your Home
Generator System to exercise.
2. On that da
y and time, set the AUTO/OFF/MANUAL
switch to OFF.
3. Press and hold down the “Set Exercise” switch until
the Diagnostic LED turns on (about five seconds).
4. Hold the switch down until the Diagnostic LED turns
off. Release the Set Exercise switch.
5. Set the AUTO/OFF/MANUAL switch to AUTO.“Set
Exercise” is complete.
For example, if you press the “Set Exercise” switch on
Sunday morning at 10:00 AM, the unit will run an exercise
cycle the following Sunday at 10:00 AM.
NOTE: “Set Exercise” will only work if the unit is in the
Automatic mode and this exact procedure is followed.The
exerciser does not need to be re-set if the 15 Amp fuse is
removed or changed.The exerciser will need to be re-set if
the 12 Volt DC battery is disconnected.
If you want to change the day and time the unit exercises,
simply perform the “Set Exercise” procedure at the exact
weekday and time you want it to take place.
18
Briggs & Stratton Power Products Home Generator System
Installation Manual
RECONFIGURING THE
FUEL SYSTEM
The engine of your Home Generator System is factory
calibrated to run on natural gas (NG). It may also be
operated on liquefied petroleum (LP).There is no additional
hardware/equipment required to switch between either
fuel. However, LP fuel inlet pressure must be between
11 and 14 inches water column.
To reconfigure the fuel system for LP use:
Set the AUTO/OFF/MANUAL switch to OFF.
Set the generator’s main circuit breaker OFF.
Remove the 15 Amp fuse.
Activate the fuel transfer solenoid as follows:
1. Remove the “Oil Service” access panel.
2. Join the two-pin electrical connector shown in
Figure 17.
3. Reinstall the “Oil Service” access panel.
Reinstall the 15 Amp fuse.
Set the generator’s main circuit breaker ON.
Set the AUTO/OFF/MANUAL switch to AUTO.
The system is now ready to operate automatically using LP
fuel.With a fixed main jet for LP gas, there is no need to
perform any engine adjustments for LP operation.
Engine Adjustment
It is commonly known that there are regional variances in
the combustibility of natural gas. Each HGS unit is adjusted
at the factory for correct NG operation. If the generator
output voltage or frequency measured during initial
Electrical Check (paragraph #8 on page 15) is outside the
listed ranges, the combustibility of the gas supplied at the
installation site may be substantially different.
To adjust the engine for this different fuel, proceed as
follows.
1. Remove the Air Intake access door.
2. Remove the three M5 sheet metal screws that hold
the control panel wiring cover to the air intake guard
(Figure 18).
3. Remove the six (M5) sheet metal screws that hold the
air intake guard to the engine impeller panel.
4. An access hole is visible above the engine impeller
panel (see Figure 18). It will be covered with a plug.
Remove the plug to gain access to the adjustment
screw.
NOTE: The mixture adjustment screw is the brass slotted
screw in the center of the aluminum boss directly visible in
the access hole.
Figure 17 — Fuel Transfer Solenoid Connection
Push two
connectors
together
Figure 18 — Accessing Engine Mixture Control
Remove
Access
Hole Plug
19
Briggs & Stratton Power Products Home Generator System
Installation Manual
5. Connect an accurate frequency meter to the load side
of the main circuit breaker (on the back of the control
panel).
6. Ensure that the 15 Amp fuse is installed.
7. Set the generator’s main circuit breaker ON.
8. Set the AUTO/OFF/MANUAL switch to MANUAL.
When the engine starts, allow it to warm up for two
minutes.
9. When the engine speed has stabilized, slowly rotate
the adjustment screw clockwise and/or
counterclockwise until the maximum (peak) frequency
is reached. Normal operating frequency is 62.0 to
62.5 Hz. Reinstall the access hole plug.
10. Set the AUTO/OFF/MANUAL switch to OFF.
11. After the engine has halted, reinstall the air intake
guard.
12. Reinstall the control panel wiring cover to the air
intake guard.
13. Reinstall the battery/air intake access panel.
14. Set the AUTO/OFF/MANUAL switch to AUTO.
POST INSTALLATION
INSPECTION
Before placing the Home Generator System into service,
inspect the entire installation carefully. Ensure that any
scratches or broken paint on the inside or outside of the
enclosure are touched up with the supplied paint.
Complete the ”Installation Checklist” as you make the
inspection. Ensure all items have been filled-in and all
signatures have been obtained. Instruct the owner to mail
the white copy to:
Briggs & Stratton Power Products
Warranty Registration
P. O. Box 1144
Milwaukee,WI 53201-1144
REFERENCES
Standards Index
In the absence of pertinent standards, codes, regulations, or
laws, the published information listed below may prove
useful when installing this equipment.
NFPA No. 54, National Fuel Gas Code, available from
the National Fire Protection Association, 1 Batterymarch
Park, Quincy, MA 02269-9101; (617) 770-3000; Fax
(617) 770-0700; online at www.nfpa.org..
NFPA No. 30, Flammable and Combustible Liquids
Code, obtainable from NFPA, above.
NFPA No. 37, Stationary Combustion Engines and Gas
Turbines, obtainable from NFPA, above.
NFPA No. 58,American National Standard for Storage
and Handling of Liquefied Petroleum Gas, obtainable from
NFPA, above.
NFPA No. 70, NFPA Handbook of National Electric
Code, obtainable from NFPA, above.
NFPA No. 76A, Essential Electrical Systems for Health
Care Facilities, obtainable from NFPA, above.
Article X, National Building Code, available from the
American Insurance Association, 1130 Connecticut Ave,
NW, Suite 1000,Washington, DC 20036; (202) 828-7100;
Fax (202) 293-1219; online at www.aiadc.org.
Agricultural Wiring Handbook, obtainable from the
Food and Energy Council , 909 University Avenue,
Columbia, MO 65201; (573) 875-7155; online at
www.nfec.org/electricalwiring.htm.
ASAE EP-3634, Installation and Maintenance of Farm
Backup Electrical Systems, available from the American
Society of Agricultural Engineers, 2950 Niles Road,
St. Joseph, MI, 49085-9659; (616) 429-0300; Fax
(616) 429-0385; online at www.asae.org.
20
Briggs & Stratton Power Products Home Generator System
Installation Manual
Fuel Comparison Chart
* LHV (Low Heat Value) is the more realistic rating.
** Gross Heat Value does not consider heat lost in the form of water during combustion.
*** Density is given in "Cubic Feet of Gas per Gallon of Liquid".
Weight is given in "Pounds per Gallon of Liquid".
Size of Propane Tank Required at Various Temperatures When Kept at Least
Half Full
Given the gas withdrawal rate and the lowest average winter temperature, an installer can specify the required LP storage
tank size:
Physical Properties
Butane
Propane
Natural Gas
Normal Atmospheric State
Gas
Gas
Gas
Boiling Point (in °F):
Initial
32
-44
-259
End
32
-44
-259
Heating Value:
BTU per gallon (Net LHV*)
94,670
83,340
63,310
BTU per Gallon (Gross**)
102,032
91,547
Cubic Feet (Gas)
3,264
2,516
1,000
Density***
31.26
36.39
57.75
Weight†
4.81
4.24
2.65
Octane Number:
Research
94
110+
110+
Motor
90
97
Fuel Comparison Chart
Withdrawal Rate
32°F
20°F
10°F
0°F
-10°F
-30°F
-40°F
50 CFH
115
115
115
250
250
400
600
100 CFH
250
250
250
400
500
1000
1500
150 CFH
300
400
500
500
1000
1500
2500
200 CFH
400
500
750
1000
1200
2000
2500
300 CFH
750
1000
1500
2000
2500
4000
5000
Required Propane Tank Size (Lowest Average Winter Temperature), in Gallons
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60

Simplicity HGS INSTALLATION MANUAL BRIGGS & STRATTON 10KW STANDBY- MODEL 01679-0 Guide d'installation

Catégorie
Groupes électrogènes
Taper
Guide d'installation
Ce manuel convient également à