IS-4_N Installation for rough-in section
for non-IC new construction
Instructions for wood frame ceiling applications
Step 1
Preparation: Remove wing nuts on T-bar clips
and remove clips from frame. Discard both
the clips and wing nuts (Fig.D). Loosen wing
nuts on frame clamps enough to allow free
movement of mounting bars (Fig.B).
Step 2
Position and install frame: Position frame
between joists with the end bracket at one
end placed against, and ush to, the bottom of
the joist. When positioned, fasten end bracket
with nail or screw through any of the provided
holes in the bracket (Fig.E). Extend the end
bracket at the opposite end of the frame until
it contact the opposite joist. Align and attach.
Slide the frame along the mounting bars until
the aperture is in the desired position and
lock the frame in place by tightening the wing
nuts on the mounting bar clamps.
Instructions for metal furring / hat channel applications (1/2, 7/8, & 1-1/2)
Step 1
Preparation: Loosen wing nuts on mounting
bar clamps enough to allow free movement
of mounting bars (Fig.B).
Step 2
Position and install frame: Each of the
three size channels utilize one of the three
positioning slots located on each end of
the mounting bar system (Fig.F) and on the
T-bar clips (Fig.G). Bend the slotted tabs
on end of one of the mounting bar system
to approximately 45°from original position.
Place this prepared bar end onto one of the
channels, then extend the other bar end to the
opposite channel, ensuring the slot chosen
positions the frame ush with the bottom of
the channel. Bend the remaining two slotted
tabs into position it to align with the other
channel. Drop both T-bar clips over the edge
of channel and tighten wing nut to secure.
Slide the frame along the mounting bars until
the aperture is in the desired position and lock
the frame in place by tightening the wing nuts
on the mounting bar clamps.
For luminaires with 0-10V dimming, or digital
dimming: wire purple & gray leads to
appropriate control wires. Additional orange
wire is for future expansion and should remain
capped off when not in use.
For
square
f
rames: adjustment of the position
can be accomplished by loosening the wing
nut clamp and rotating the inner square of the
frame. Re-tighten the wing nut clamps when
appropriately positioned
Instructions for all applications
Wire in: Wire to supply leads. Wire neu
tral lead
supply lead to white wire, hot supply lead to
black wire, and bare copper and/or green wire
must be connected to supply ground. Use wire
nuts (local hardware item). Place all electrical
connections in the j-box and close j-box door.
Fig.D
Fig.F Fig.G
Three slots
for positioning
1-1/2"
7/8"
1/2"
Discard T-bar clips
and wing nuts
Fig.E
Holes to secure
by nail or by screw
Mounting system is designed to
install into channel with a height
dimension of 1/2", 7/8" or 1-1/2".
Note: The mounting bars may be readily adjusted to t openings between 13" (330mm) minimum and 24" (610mm) maximum.
Signify North America Corporation
200 Franklin Square Drive.
Somerset. NJ 08873
Telephone 855-486-2216
Signify Canada Ltd.
281 Hillmount Road.
Markham, ON. Canada L6C 2S3
Telephone 800-668-9008
©
2019 Signify Holding. All rights re
se
rve
d. This
docume
nt may be
subject to change
. N
o representation or warranty as to the accuracy or
completeness of the information included herein is given and any
liability for any action in reliance thereon is disclaimed. All trademarks
are owned by Signify Holding or their respective owners.
12/3/2018 page 2 www.lightolier.com
For Color Kinetics iHue driver applications:
wire the data conductor from the Color Kinetics
Data Enabler to the purple conductor.
The data conductor from the Color Kinetics
Data Enabler provides a proprietary control signal,
that is required to operate the luminaire.
CAUTION - The data conductor is NOT isolated.
Refer to the installation instructions provided
with the Color Kinetics Data Enabler for conductor
identification and system operation.