Kong ZAZA2 PBJ2 Manuel utilisateur

Taper
Manuel utilisateur
zaza2 pbj 2
x1
ZAZA2 PBJ
x1
Brevet deposé/Patent deposit
NO !
OK
CT/WLL 20kN
EN 15567-1
EN13411-3
STANDARDS
ACCT
MAX 50M
FOR GAME / POUR JEUX
MAX : 100M
ZIPLINE / TYROLIENNE
= 1 x
GO 14 - LO 9/16"
2000 Kg
+ 1 x
GO 10 - LO 7/16"
OU
FOR ZIPLINE /POUR TYROLIENNE
TECHNICAL SHEET 2023-09
NOTICE TECHNIQUE 2023-09
Facile et simple à installer
Easy to install
Sans SERRE-CÂBLE!
No CLAMP
Sans maintenance
No maintenance
11xx
GAME / JEUX
= 1 x
GO 12 - LO 1/2"
1250 Kg
+ 1 x
GO 10 - LO 7/16"
CT/WLL:1000 Kg
ACIER INOXYDABLE
STAINLESS STEEL
INOX 316 L
Ø10 Ø10
Ø12/14 =
zaza2 pbj 2
ADVANTAGES / AVANTAGES
CT/WLL:1000 Kg
MANILLE LYRE
BOW SCHACKLE
HR 2T - HS 1/2"
EXEMPLES DE FIXATIONS (liste non-exhaustive) / FIXATION EXAMPLE (non-exhaustive list)
NORMES : EN 13411-1/7
STANDARDS:
CÂBLES ø12 or 1/2"
ÂME METALLIQUE
OK ! METALLIC CORE
ELINGUE DE LEVAGE RONDE TEXTILE TYPE "E" CMU mini 3 tonnes
ROUND TEXTILE SLING FOR LIFTING TYPE "E" WLL mini 3 tons
COSSE-COEUR / THIMBLE
Chain HR/HS Ø 8/10 Grade 80 mini
La CMU des fixations doit être correctement dimensionnée / WLL of the fixing element must be correctly sized
ø 12 mm or 1/2 "
Safety Line /Ligne de vie :
Galvanized steel wire rope with metal core /
Câble acier galvanisé avec âme métalique :-
-7x19
-Non rotating wire rope / Anti-giratoire
-6x26 Swaged/ Compacté
For any other type: do tests
Pour tout autre type : faire des tests
Une platine de tyrolienne doit impérativement être montée avec une platine backup
A zipline plate must be fitted with a backup plate.
Operation 1 x1
Operation 2
x1 = GO 10 - LO 7/16"
FOR GAMES /POUR JEUX
x1 = GO 12 - LO 1/2"
Operation 3
a1 =
a2 =
a3 =
4x 130KN
EN 15567-1
EN 13411-3
STANDARDS - ACCT
FOR ZIPLINE / POUR TYROLIENNE
INSTALLATION of STARTING PLATE
INSTALLATION DE LA PLATINE DE DEPART
= HR 2T - HS 1/2"
x1 = GO 14 - LO 9/16"
OK
OK !
NORMES DE MONTAGE
STANDARDS OF ASSEMBLY
GUIDING PLATE
PLAQUE DE GUIDAGE
NO !
COSSE-COEUR / THIMBLE
MANILLE LYRE / BOW SCHACKLE
Operation 5
Operation 4
INSTALLATION of ARRIVALL PLATE
INSTALLATION DE LA PLATINE D'ARRIVEE
CABLE TENSION
TENSION DU CÂBLE
Operation 6
TO CRIMP / POUR SERTIR
TENSION MAX
MAX TENSION
OUTIL DE
TRACTION
TENSION
= 12 mm
1
23
= 1 x 130kN
4 x 130kN
OK !
TOOL TRACTION
COSSE-COEUR / THIMBLE
Operation 8
RECOMMANDATION ASSEMBLY /RECOMMANDATION DE MONTAGE
Operation 9
CHARGE MAXI = 1500 daN
MAX LOAD
=TENSION SOUPLE
FLEXIBLE TENSION
NOT contractual Examples
system for fixation
Exemples (non contractuel)
de systèmes de fixations
JUNCTION / JONCTION
Operation 7TENSION SYSTEM FOR ZIPLINE / SYSTEME DE TENSION POUR TYROLIENNE
12
FIRST POSITION
PREMIERE POSITION
SECOND POSITION
DEUXIEME POSITION
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Kong ZAZA2 PBJ2 Manuel utilisateur

Taper
Manuel utilisateur